| 1708080638000 | 0 | None | None | Other Works | Construction of compound wall at SWM site (PHASE-4) in TP Kabbur | 2523321.06 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2648404 | 82583 | None | code01 | Earth work in surface excavation by mechanical means for lowering &leveling the ground for all works other than foundation in all kinds ofsoils & upto depth not exceeding 300mm as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights , removal of stumps and other deleterious matter includingdressing of excavated surfaces, disposing off or levelling the excavatedearth or sorting & stacking the selected earth for reuse in a radiusof 50 m and lift upto 1.5 m including cost of labour, tools, usage ofmachinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthPWD Common DSR 2021-22 Volume 1 (P No: 8 I.No:1.12) | Cum | 68.25 | 68.25 | 1017.9 | False | None | None | False | None | False | 69471.675 | 0 | | 2648405 | 82583 | None | code02 | Manual Means: Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected tuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.PWD Common DSR 2021-22 Volume 1 (P No: 5 I.No:1.4) | Cum | 195.3 | 195.3 | 74.58 | False | None | None | False | None | False | 14565.474 | 0 | | 2648406 | 82583 | None | code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2021-22 Volume 1 (P No: 15 I.No:2.1.3 )( 6th QuarterRevision of Rates W.E.F 20-10-2023 ) | Cum | 5720.4 | 5720.4 | 19.966 | False | None | None | False | None | False | 114213.5064 | 0 | | 2648407 | 82583 | None | code04 | Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2021-22 Volume 1 (P No: 16 I.No:2.3.1) ( 6th QuarterRevision of Rates W.E.F 20-10-2023 ) (Including 8% of formwok for foundation upto plinth) | Cum | 6104.7 | 6104.7 | 49.0758 | False | None | None | False | None | False | 299593.03626 | 0 | | 2648408 | 82583 | None | code05 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. PWD Common DSR 2021-22 Volume 2 (P No: A-7 I.No:22.2) ( Corrigendum-3 Additionalities for formwork ,centering and Scaffolding W.E.F 01-09-2022 For footing ( 8% for Concrete qty) | Cum | 488.37 | 488.37 | 9.395 | False | None | None | False | None | False | 4588.23615 | 0 | | 2648409 | 82583 | None | code06 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. PWD Common DSR 2021-22 Volume 2 (P No: A-7 I.No:22.2) ( Corrigendum-3 Additionalities for formwork ,centering and Scaffolding W.E.F 01-09-2022 For Cloumn ( 70% for Concrete qty) | Cum | 4273.29 | 4273.29 | 9.664 | False | None | None | False | None | False | 41297.07456 | 0 | | 2648410 | 82583 | None | code07 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. PWD Common DSR 2021-22 Volume 2 (P No: A-7 I.No:22.2) ( Corrigendum-3 Additionalities for formwork ,centering and Scaffolding W.E.F 01-09-2022 For Plinth Beam ( 8% for Concrete qty) | Cum | 488.37 | 488.37 | 30.015 | False | None | None | False | None | False | 14658.42555 | 0 | | 2648411 | 82583 | None | code08 | Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. PWD Common DSR 2021-22 Volume 3 (P No.71/I No.9.3 ) ( 6th QuarterRevision of Rates W.E.F 20-10-2023 ) | Tonne | 82052.25 | 82052.25 | 3.926 | False | None | None | False | None | False | 322137.1335 | 0 | | 2648412 | 82583 | None | code09 | Providing Brickwork with common burnt clay NonModular bricks of class designation 3.5 in foundation and plinth in Cement mortar1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer in charge of work.PWD Common DSR 2021-22 Volume II (P No: 13 I.No:6.2) ( 6th QuarterRevision of Rates W.E.F 20-10-2023 ) | Cum | 6998.25 | 6998.25 | 128.404 | False | None | None | False | None | False | 898603.293 | 0 | | 2648413 | 82583 | None | code10 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete PWD Common DSR 2021-22 Volume 2 (P No.95/I No.11.57.2 ) | Kg | 100.8 | 100.8 | 832.589 | False | None | None | False | None | False | 83924.9712 | 0 | | 2648414 | 82583 | None | code11 | Providing 20mm cement plaster of mix:1:6(1cement:6finesand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including costof materials, labour, curing complete as per specifications and as perdirectionsof Engineer-in-charge.. PWD Common DSR 2021-22 Volume 2 (P No:41 I.No:8.3.2) | Sqm | 287.7 | 287.7 | 1260.629 | False | None | None | False | None | False | 362682.9633 | 0 | | 2648415 | 82583 | None | code12 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD Common DSR 2021-22 Volume 2 (P No.46/I No.8.30 ) | Sqm | 142.8 | 142.8 | 1260.629 | False | None | None | False | None | False | 180017.8212 | 0 | | 2648416 | 82583 | None | code13 | Painting with synthetic enamel paint of approved brand and manu-facture of required colour to give an even shade :Two coats on new work over an under coat of suitable shadewith ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. PWD Common DSR 2021-22 Volume II (P No: 48 I.No: 8.41 ) | Sqm | 136.5 | 136.5 | 234.9 | False | None | None | False | None | False | 32063.85 | 0 | | 2648417 | 82583 | None | code14 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.CSR. P No.94 &95 /I No.11.57. Vol-2 | Mtr | 54.6 | 54.6 | 1566.0 | False | None | None | False | None | False | 85503.6 | 0 |
|