tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1708671983000 | 0 | None | None | Buildings | PART - A - MAIN BUILDING | 2012429.98 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2780015 | 88672 | None | VOL 1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth . (V-1, P.No 8, I.No 1.12) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 95.0 | 95.0 | 60.0 | False | None | None | False | None | False | 5700.0 | 0 | 2780016 | 88672 | None | VOL 1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (V-1, P.No 8, I.No 1.14.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 102.0 | 102.0 | 46.8 | False | None | None | False | None | False | 4773.6 | 0 | 2780017 | 88672 | None | VOL 1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m. (V-1, P.No 9, I.No 1.15.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 425.0 | 425.0 | 11.7 | False | None | None | False | None | False | 4972.5 | 0 | 2780018 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. (V-1, P.No 15, I.No 2.1.3) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 5989.0 | 5989.0 | 22.96 | False | None | None | False | None | False | 137507.44 | 0 | 2780019 | 88672 | None | VOL 2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (V-2, P.No 9, I.No 5.4) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6389.0 | 6389.0 | 23.53 | False | None | None | False | None | False | 150333.17 | 0 | 2780020 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Footings (V-1, P.No 16, I.No 2.4.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6323.0 | 6323.0 | 11.2 | False | None | None | False | None | False | 70817.6 | 0 | 2780021 | 88672 | None | Vol 1 | All other types Formwork, Centring & Scaffolding For Footings at 3Percent (V-1, P.No 111, I.No 1b) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 189.69 | 189.69 | 11.2 | False | None | None | False | None | False | 2124.528 | 0 | 2780022 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Columns (V-1, P.No 16, I.No 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6843.0 | 6843.0 | 6.39 | False | None | None | False | None | False | 43726.77 | 0 | 2780023 | 88672 | None | Vol 1 | Formwork, Centring & Scaffolding For Columns at 70Percent (V-1, P.No 111, I.No 9) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 4790.1 | 4790.1 | 6.39 | False | None | None | False | None | False | 30608.739 | 0 | 2780024 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Plinth Beams (V-1, P.No 16, I.No 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6843.0 | 6843.0 | 4.02 | False | None | None | False | None | False | 27508.86 | 0 | 2780025 | 88672 | None | Vol 1 | Formwork, Centring & Scaffolding For Plinth Beams at 50Percent (V-1, P.No 111, I.No 2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 3421.5 | 3421.5 | 4.02 | False | None | None | False | None | False | 13754.43 | 0 | 2780026 | 88672 | None | Vol 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceed ing 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m (V-1, P.No 7, I.No 1.9) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 266.0 | 266.0 | 35.98 | False | None | None | False | None | False | 9570.68 | 0 | 2780027 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For RCC Beams & Lintel (V-1, P.No 16, I.No 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6843.0 | 6843.0 | 5.62 | False | None | None | False | None | False | 38457.66 | 0 | 2780028 | 88672 | None | Vol 1 | Formwork, Centring & Scaffolding For RCC Beams & Lintel at 60Percent (V-1, P.No 112, I.No 14) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 4105.8 | 4105.8 | 5.62 | False | None | None | False | None | False | 23074.596 | 0 | 2780029 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Roof Slab (V-1, P.No 16, I.No 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6843.0 | 6843.0 | 15.56 | False | None | None | False | None | False | 106477.08 | 0 | 2780030 | 88672 | None | Vol 1 | Formwork, Centring & Scaffolding For Plinth Beams at 50Percent (V-1, P.No 112, I.No 14) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 3421.5 | 3421.5 | 15.56 | False | None | None | False | None | False | 53238.54 | 0 | 2780031 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . For Cill (V-1, P.No 16, I.No 2.5.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6630.0 | 6630.0 | 0.54 | False | None | None | False | None | False | 3580.2 | 0 | 2780032 | 88672 | None | Vol 1 | All other types Formwork, Centring & Scaffolding For Cill at 3Percent (V-1, P.No 111, I.No 1b) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 198.9 | 198.9 | 0.54 | False | None | None | False | None | False | 107.406 | 0 | 2780033 | 88672 | None | Vol 1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Chejja (V-1, P.No 16, I.No 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6843.0 | 6843.0 | 0.75 | False | None | None | False | None | False | 5132.25 | 0 | 2780034 | 88672 | None | Vol 1 | Formwork, Centring & Scaffolding For Chejja at 45Percent (V-1, P.No 112, I.No 19) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 3079.35 | 3079.35 | 0.75 | False | None | None | False | None | False | 2309.5125 | 0 | 2780035 | 88672 | None | Vol 1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straighening, cutting, bending, lapping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (V-1, P.No 18, I.No 2.11a) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | t | 89457.0 | 89457.0 | 4.59 | False | None | None | False | None | False | 410607.63 | 0 | 2780036 | 88672 | None | Vol 2 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge. (V-2, P.No 59, I.No 9.4) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6666.0 | 6666.0 | 5.67 | False | None | None | False | None | False | 37796.22 | 0 | 2780037 | 88672 | None | Vol 2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (V-2, P.No 14, I.No 6.8) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 7969.0 | 7969.0 | 26.45 | False | None | None | False | None | False | 210780.05 | 0 | 2780038 | 88672 | None | VOL 2 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. (V-2, P.No 100, I.No 12.13.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 98815.0 | 98815.0 | 0.68 | False | None | None | False | None | False | 67194.2 | 0 | 2780039 | 88672 | None | VOL 2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (V-2, P.No 104, I.No 12.51) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 1016.0 | 1016.0 | 2.0 | False | None | None | False | None | False | 2032.0 | 0 | 2780040 | 88672 | None | VOL 2 | Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (V-2, P.No 104, I.No 12.52) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 773.0 | 773.0 | 6.0 | False | None | None | False | None | False | 4638.0 | 0 | 2780041 | 88672 | None | VOL 2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. (V-2, P.No 86, I.No 11.34A) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Kg | 168.0 | 168.0 | 283.5 | False | None | None | False | None | False | 47628.0 | 0 | 2780042 | 88672 | None | VOL 2 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. Fastener with threaded dia 12 mm (V-2, P.No 69, I.No 10.6.3) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 60.0 | 60.0 | 2.0 | False | None | None | False | None | False | 120.0 | 0 | 2780043 | 88672 | None | VOL 2 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) (V-2, P.No 100, I.No 12.15) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 7444.0 | 7444.0 | 18.54 | False | None | None | False | None | False | 138011.76 | 0 | 2780044 | 88672 | None | Vol 2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (V-2, P.No 41, I.No 8.1.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 241.0 | 241.0 | 147.81 | False | None | None | False | None | False | 35622.21 | 0 | 2780045 | 88672 | None | VOL 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (V-2, P.No 50, I.No 8.51) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 100.0 | 100.0 | 218.21 | False | None | None | False | None | False | 21821.0 | 0 | 2780046 | 88672 | None | VOL 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Out side) (V-2, P.No 41, I.No 8.2.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 279.0 | 279.0 | 196.65 | False | None | None | False | None | False | 54865.35 | 0 | 2780047 | 88672 | None | VOL 2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 Percent and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry at 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. (V-2, P.No 61, I.No 9.17.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1175.0 | 1175.0 | 75.16 | False | None | None | False | None | False | 88313.0 | 0 | 2780048 | 88672 | None | VOL 2 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (V-2, P.No 64, I.No 9.34) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1545.0 | 1545.0 | 19.54 | False | None | None | False | None | False | 30189.3 | 0 | 2780049 | 88672 | None | VOL 2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessoris such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (V-2, P.No 85, I.No 11.28) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Kg | 565.0 | 565.0 | 56.25 | False | None | None | False | None | False | 31781.25 | 0 | 2780050 | 88672 | None | VOL 2 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m2 over and including one coat of Special primer applied @ 0.75 ltr /10 m2 with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(V-2, P.No 46, I.No 8.33.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 158.0 | 158.0 | 218.21 | False | None | None | False | None | False | 34477.18 | 0 | 2780051 | 88672 | None | VOL 2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m2 over and including priming coat of exterior primer applied at 2.20 kg/10 m2) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (V-2, P.No 46, I.No 8.30) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 174.0 | 174.0 | 238.97 | False | None | None | False | None | False | 41580.78 | 0 | 2780052 | 88672 | None | VOL 2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m2 over an under coat of primer applied @0.75 L/10 m2 of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (V-2, P.No 46, I.No 8.33.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 138.0 | 138.0 | 41.72 | False | None | None | False | None | False | 5757.36 | 0 | 2780053 | 88672 | None | VOL 2 | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (V-2, P.No 44, I.No 8.16a) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1238.0 | 1238.0 | 8.24 | False | None | None | False | None | False | 10201.12 | 0 | 2780054 | 88672 | None | VOL 2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes confirming to IS 13592 Type A, including jointing with seal ring confirming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter. (V-2, P.No 125, I.No 13.48) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | MT | 291.0 | 291.0 | 18.0 | False | None | None | False | None | False | 5238.0 | 0 |
| 1708671983000 | 0 | None | None | Buildings | PART - B - ELECTRIFICATION WORK | 101071.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2780055 | 88673 | None | VOL 6 | Concealed PVC Conduit System : Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18 SWG GI fish wire wherever necessary. 19/20 mm dia 2mm thick (V-6, P.No 2, I.No 1.2.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | MT | 66.0 | 66.0 | 70.0 | False | None | None | False | None | False | 4620.0 | 0 | 2780056 | 88673 | None | VOL 6 | Concealed PVC Conduit System : Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18 SWG GI fish wire wherever necessary. 25mm dia 2mm thick (V-6, P.No 2, I.No 1.2.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | MT | 78.0 | 78.0 | 70.0 | False | None | None | False | None | False | 5460.0 | 0 | 2780057 | 88673 | None | VOL 6 | PVC/metal conduit Deep Junction Box : Supplying and fixing PVC/metal conduit Deep junction box. 19/20 mm Deep Junction Box (V-6, P.No 2, I.No 1.5.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 49.0 | 49.0 | 10.0 | False | None | None | False | None | False | 490.0 | 0 | 2780058 | 88673 | None | VOL 6 | PVC/metal conduit Deep Junction Box : Supplying and fixing PVC/metal conduit Deep junction box. 25 mm Deep Junction Box (V-6, P.No 3, I.No 1.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 56.0 | 56.0 | 10.0 | False | None | None | False | None | False | 560.0 | 0 | 2780059 | 88673 | None | VOL 6 | Flush Mounting Wooden Box : Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 8x6x3 (203x152x76mm) (V-6, P.No 3, I.No 1.6.4) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 86.0 | 86.0 | 12.0 | False | None | None | False | None | False | 1032.0 | 0 | 2780060 | 88673 | None | VOL 6 | Flush Mounting Wooden Box : Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 4x4x3 ( 101x101x76mm) (V-6, P.No 3, I.No 1.6.6) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 74.0 | 74.0 | 12.0 | False | None | None | False | None | False | 888.0 | 0 | 2780061 | 88673 | None | VOL 6 | Metal Fan Box : Supplying And Fixing Metal Fan Box with Round Hook. (V-6, P.No 4, I.No 1.13) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 117.0 | 117.0 | 6.0 | False | None | None | False | None | False | 702.0 | 0 | 2780062 | 88673 | None | VOL 6 | Point wiring using Copper wire with switch : Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch (V-6, P.No 5, I.No 2.2.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 269.0 | 269.0 | 16.0 | False | None | None | False | None | False | 4304.0 | 0 | 2780063 | 88673 | None | VOL 6 | Point wiring using Copper wire with switch : Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch (V-6, P.No 5, I.No 2.2.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 379.0 | 379.0 | 12.0 | False | None | None | False | None | False | 4548.0 | 0 | 2780064 | 88673 | None | VOL 6 | Wiring for Lightings/Power Circuit : Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 Sqmm (V-6, P.No 5, I.No 2.3.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | MT | 26.0 | 26.0 | 60.0 | False | None | None | False | None | False | 1560.0 | 0 | 2780065 | 88673 | None | VOL 6 | Wiring for Lightings/Power Circuit : Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 Sqmm (V-6, P.No 5, I.No 2.3.3) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | MT | 42.0 | 42.0 | 40.0 | False | None | None | False | None | False | 1680.0 | 0 | 2780066 | 88673 | None | VOL 6 | Modular Switches/Sockets/Regulators etc : Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way (V-6, P.No 9, I.No 3.6.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 102.0 | 102.0 | 2.0 | False | None | None | False | None | False | 204.0 | 0 | 2780067 | 88673 | None | VOL 6 | Modular Switches/Sockets/Regulators etc : Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps two way (V-6, P.No 9, I.No 3.6.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 166.0 | 166.0 | 2.0 | False | None | None | False | None | False | 332.0 | 0 | 2780068 | 88673 | None | VOL 6 | Modular Switches/Sockets/Regulators etc : Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped fan regulator (V-6, P.No 9, I.No 3.6.4) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 357.0 | 357.0 | 3.0 | False | None | None | False | None | False | 1071.0 | 0 | 2780069 | 88673 | None | VOL 6 | Modular Switches/Sockets/Regulators etc : Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps universal socket (V-6, P.No 9, I.No 3.6.10) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 236.0 | 236.0 | 2.0 | False | None | None | False | None | False | 472.0 | 0 | 2780070 | 88673 | None | VOL 6 | Modular Switches/Sockets/Regulators etc : Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone socket (V-6, P.No 9, I.No 3.6.11) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 156.0 | 156.0 | 2.0 | False | None | None | False | None | False | 312.0 | 0 | 2780071 | 88673 | None | VOL 6 | 4mm Thick Plastic Sheets : Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. 80 / 90 mm (V-6, P.No 9, I.No 3.10.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 15.0 | 15.0 | 4.0 | False | None | None | False | None | False | 60.0 | 0 | 2780072 | 88673 | None | VOL 6 | 4mm Thick Plastic Sheets : Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. 110 mm (V-6, P.No 9, I.No 3.10.3) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 21.0 | 21.0 | 4.0 | False | None | None | False | None | False | 84.0 | 0 | 2780073 | 88673 | None | VOL 6 | Miniature Circuit Breakers : Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps SP (V-6, P.No 17, I.No 5.18.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 415.0 | 415.0 | 2.0 | False | None | None | False | None | False | 830.0 | 0 | 2780074 | 88673 | None | VOL 6 | Miniature Circuit Breakers : Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP (V-6, P.No 17, I.No 5.18.4) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 739.0 | 739.0 | 2.0 | False | None | None | False | None | False | 1478.0 | 0 | 2780075 | 88673 | None | VOL 6 | MCB Distribution Boards : Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. II - Double Door 8 Way SP & N (V-6, P.No 8, I.No 5.19.13) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 6091.0 | 6091.0 | 2.0 | False | None | None | False | None | False | 12182.0 | 0 | 2780076 | 88673 | None | VOL 6 | GI Grounding : GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolts nuts, GI Strips and washers complete Minimum Weight of GI Pipe: 7.3 Kgs. (V-6, P.No 22, I.No 51.01) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 743.0 | 743.0 | 1.0 | False | None | None | False | None | False | 743.0 | 0 | 2780077 | 88673 | None | VOL 6 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each (V-6, P.No 22, I.No 51.02) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 676.0 | 676.0 | 1.0 | False | None | None | False | None | False | 676.0 | 0 | 2780078 | 88673 | None | VOL 6 | Good Quality Salt for grounding purposes packed in 50Kg gunny bag (V-6, P.No 22, I.No 51.03) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 310.0 | 310.0 | 1.0 | False | None | None | False | None | False | 310.0 | 0 | 2780079 | 88673 | None | VOL 6 | 1.1 KV LT UG Cable : 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975. 3.5 core 25 sqmm (V-6, P.No 13, I.No 32.07) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Km | 179844.0 | 179844.0 | 0.01 | False | None | None | False | None | False | 1798.44 | 0 | 2780080 | 88673 | None | VOL 6 | EWE for cable Trench : Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. In Ordinary Soil. (V-6, P.No 63, I.No 29.02) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 260.0 | 260.0 | 75.0 | False | None | None | False | None | False | 19500.0 | 0 | 2780081 | 88673 | None | VOL 6 | Laying of cable : Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. LT Cable: 2.5 to 25 Sqmm (V-6, P.No 52, I.No 21.05) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Km | 20886.0 | 20886.0 | 0.01 | False | None | None | False | None | False | 208.86 | 0 | 2780082 | 88673 | None | VOL 6 | Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr. (V-6, P.No 63, I.No 29.07) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 58.0 | 58.0 | 75.0 | False | None | None | False | None | False | 4350.0 | 0 | 2780083 | 88673 | None | VOL 6 | Ceiling Fans : Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 56 Sweep (1400mm) Regular model (V-6, P.No 30, I.No 6.3.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 3031.0 | 3031.0 | 6.0 | False | None | None | False | None | False | 18186.0 | 0 | 2780084 | 88673 | None | VOL 6 | PVC Batten with LED Tubes : Supplying of ......feet - PVC Batten with integrated LED tube .....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V at 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1x4- 20/22 w (V-6, P.No 43, I.No 11.3.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 690.0 | 690.0 | 8.0 | False | None | None | False | None | False | 5520.0 | 0 | 2780085 | 88673 | None | VOL 6 | LED Down Lights :Supply of round/square recess/surface mounted rolling type LED Down light with .......W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70Percent lumen maintenance with CRI 80. Power Input: 220-240V at 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED square or round down light 10-12W (V-6, P.No 44, I.No 11.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 885.0 | 885.0 | 4.0 | False | None | None | False | None | False | 3540.0 | 0 | 2780086 | 88673 | None | VOL 6 | Lamp Holder : Supplying & Fixing of 70-150 Watts lamp holder 2 Pin. (V-6, P.No 52, I.No 12.46) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 63.0 | 63.0 | 8.0 | False | None | None | False | None | False | 504.0 | 0 | 2780087 | 88673 | None | VOL 6 | Fixing of Fan : Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing S hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. (V-6, P.No 57, I.No 13.11) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 315.0 | 315.0 | 6.0 | False | None | None | False | None | False | 1890.0 | 0 | 2780088 | 88673 | None | VOL 6 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076 twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall/ ceiling / Rafter / Girders (V-6, P.No 56, I.No 13.7.1) ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 122.0 | 122.0 | 8.0 | False | None | None | False | None | False | 976.0 | 0 |
|
|
---|