createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1708595856886
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd10600.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose01-03-2024 17:00:00
tenderQueryClose27-02-2024 11:00:00
technicalBidOpenNone
publishedDate23-02-2024 12:31:14
publishedByPostPWD_EE_DIV_KOD
publishedByUserKPE16346 - Y S SIDDEGOWDA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber080225645
mobileNumber9449627780
tenderSupplierListNone
tenderSchedule
createdTs1708595856917
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BR/WORK_INDENT9103
titleConstruction of foot bridge at makki Devasthana road in Ayyappanda honi at Napoklu Grama Panchayth Madikeri Taluk
descriptionConstruction of foot bridge at makki Devasthana road in Ayyappanda honi at Napoklu Grama Panchayth Madikeri Taluk
categoryWORKS
categoryTextWorks
ecv846843.04
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1679
locationNamePWD Division Office Kodagu
provisionalAmount1000000.0
groupOverheadTotal0.0
fileNumberkpwd/mdk/kodagu/5054Bridge/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17085958570000NoneNoneBridges/CulvertsConstruction of foot bridge at makki Devasthana road in Ayyappanda honi at Napoklu Grama Panchayth Madikeri Taluk846843.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
276053887874NoneP No 8 V-1 Item No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum114.24114.2495.2FalseNoneNoneFalseNoneFalse10875.6480
276053987874NoneP No 129 V-3 Item No 14.1Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2141.442141.4421.42FalseNoneNoneFalseNoneFalse45869.64480
276054087874NoneP No 59 V-1 Item No 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6707.686707.687.68FalseNoneNoneFalseNoneFalse51514.98240
276054187874NoneP No 75 V-1 Item No 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8515.588515.5837.65FalseNoneNoneFalseNoneFalse320611.5870
276054287874NoneP No 18 V-1 Item No 2.11CSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.t96804.9696804.963.2FalseNoneNoneFalseNoneFalse309775.8720
276054387874NoneP No 117 V-3 Item No 12.1Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m154.56154.566.3FalseNoneNoneFalseNoneFalse973.7280
276054487874NoneP No 117 V-3 Item No 12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification granular material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum1308.161308.167.5FalseNoneNoneFalseNoneFalse9811.20
276054587874NoneP No 117 Item No 12.4 V-3Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2998.242998.246.75FalseNoneNoneFalseNoneFalse20238.120
276054687874NoneP No 7 Iem no 1.8 V-1Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum530.88530.8891.2FalseNoneNoneFalseNoneFalse48416.2560
276054787874NoneP No 68 Item No 8.21 V-3Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawing ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m2212.02212.013.0FalseNoneNoneFalseNoneFalse28756.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17085958620001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptableNone
17085958620001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17085958620001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionNone
17085974090000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17085974190000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17085974280000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value Min Rs.500/- & Max Rs.7500/-soon after contract has been issued to bidder.None
17085974380000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17085974470000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender and the employer will in no case be responsible and liable for these costsNone
17085974620000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all Tender without assigning any reasonsNone
17085974750000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E-Procurement PortalNone
17085974840000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17085974950000NoneNoneELIGIBILITYAs per Government order LD/300/LET/2006 Bangalore dated 1.01.2007 nad Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17085975100000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17085975230000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approvalNone
17085975370000NoneNoneELIGIBILITYMaterials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work.None
17085975490000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17085975610000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17085975740000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties. If any damage is caused, it has to be rectified at his own risk and cost.None
17085975850000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17085975950000NoneNoneELIGIBILITYAt the time of agreement, the successfull bidder/contractor should submit proposed methodology and programme of construction backed with equipment and material planning, & deployment duly supported with broad calculation and quality management , plan, proposed to be adopted justifying their capability of execution , completion of the work and cast flow forecasts as per technical specifications and within the stipulated period of completion.None
17085976080000NoneNoneELIGIBILITYThe contractor s assessed available tender capacity will be calculated as prescribed in tender document Attached.None
17085976210000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents attached.None
17085976360000NoneNoneELIGIBILITYSecurity deposit for an amount equivalent to 5% of the contract price shall be deducted in every running bill. However, in case of first and final bill the entire security deposit will be deducted from the final bill. and Within 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer, a additional security deposit for unbalanced tenders for an amount equal to the amount put to tender as per CSR minus quoted amount.None
17085976510000NoneNoneELIGIBILITYIf the Contractors is a firm, then all the partners or members of the firm shall belong to the same Caste as the case may be.None
17085976640000NoneNoneELIGIBILITYContractors should be registered with KPWD Class IV and above RegistrationNone
17085976770000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should give all details and documents as per K.W-1None
17085976940000NoneNoneELIGIBILITYWork should be carried out as per K/W-1 STD attached with tenderNone
17086018440000NoneNoneELIGIBILITYThe period of completion of this work is 3 MonthsNone
17086018650000NoneNoneELIGIBILITYThe eligible contractor should maintain the work FOR ONE YEAR AFTER THE SUCCESSFUL COMPLETION OF THE PROJECTNone
17086018910000NoneNoneELIGIBILITYContractor shall bound to comply the prevailing rules and regulations with regard to the EPF Contribution rules and any modifications thereof before and after execution of agreementNone
17086019080000NoneNoneELIGIBILITYThe FSD deducted in RA bills will be refunded only after successful completion of Defect Liability PeriodNone
17086019190000NoneNoneELIGIBILITYContractors has to submit their labour EPF details with every Running BillNone
17086019300000NoneNoneELIGIBILITYThe contractor belonging to Scheduled tribe ST castes should upload Caste Certificate issued by Competent Authority.None
17086019420000NoneNoneELIGIBILITYIf the contractor is a firm, then all the partners or members of the firm shall belong to the Scheduled tribe ST castes as the case may beNone
17086019530000NoneNoneELIGIBILITYThe contractor belonging to Scheduled tribe ST castes shall be domicile of the State of Karnataka for more than 10 years-Should upload Certificate issued by Competent Authority.None
17086019620000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately.None
17086019880000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of contract for which the Contractor alone is responsible for delay as determined by the authority while granting the extension of timeNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate certificate issued by Approved Chartered Accountant with UDIN last five years as per KW-1 i.e. 2018-19, 2019-20,2020-21, 2021-22 & 2022-23 Rs.8.46 lakhs Updated to 2023-24 price levelTrueTechnical Bid
KPWD Class-IV and above Registration CertificateTrueTechnical Bid
The contractor belonging to Scheduled tribe ST castes should upload Caste Certificate issued by Competent Authority.TrueTechnical Bid
The contractor belonging to Scheduled tribe ST castes shall be domicile of the State of Karnataka for more than 10 years,Should upload Certificate issued by Competent Authority.TrueTechnical Bid
Tenderers , will only be qualified, if their available tender capacity is more than the total tender value. i.e.AxNx5.0 - B as per KW-1 Document.TrueTechnical Bid
Work Done CertificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Bridges/CulvertsKodaguMadikeriMysoreVIRAJPET (ST)AyyapandaNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone