createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1708662989729
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee510.00
emd28750.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose01-03-2024 16:30:51
tenderQueryClose26-02-2024 10:30:39
technicalBidOpen02-03-2024 17:29:03
publishedDate23-02-2024 10:25:01
publishedByPostCMC_MCOM_KPL
publishedByUserKPE15848 - GANAPATI J PATIL
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSomalingappa JE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8892898228
tenderSupplierListNone
tenderSchedule
createdTs1708662989757
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT15837
titleP10Construction of Drain, CD & Slab at W.No. 25,18&10 in Koppal City Limit. (ST Category)
descriptionP10Construction of Drain, CD & Slab at W.No. 25,18&10 in Koppal City Limit. (ST Category)
categoryWORKS
categoryTextWorks
ecv2012281.65
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2350
locationNameDMA City Municipal Council Koppala
provisionalAmount2380000.0
groupOverheadTotalNone
fileNumber15thF/2022-23/SA/3
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17086629900000NoneNoneOther WorksP10Construction of Drain, CD & Slab at W.No. 25,18&10 in Koppal City Limit. (ST Category) (W.No. 25)422200.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
277264288409Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.157.82FalseNoneNoneFalseNoneFalse6192.5220
277264388409Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.458.26FalseNoneNoneFalseNoneFalse51942.5970
277264488409Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.218.88FalseNoneNoneFalseNoneFalse167129.5360
277264588409Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.851.08FalseNoneNoneFalseNoneFalse101444.2380
277264688409Nonecode05Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. PWD SR 2023-24 , Page No-176, SI. No. 17.12, Volume -2Sqm974.4974.498.0FalseNoneNoneFalseNoneFalse95491.20
17086629900000NoneNoneOther WorksP10Construction of Drain, CD & Slab at W.No. 25,18&10 in Koppal City Limit. (ST Category) (W.No. 18)659937.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
277264788410Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.157.6FalseNoneNoneFalseNoneFalse6168.960
277264888410Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.4512.8FalseNoneNoneFalseNoneFalse80492.160
277264988410Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.240.48FalseNoneNoneFalseNoneFalse358337.0560
277265088410Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.852.2883FalseNoneNoneFalseNoneFalse214939.6757550
17086629900000NoneNoneOther WorksP10Construction of Drain, CD & Slab at W.No. 25,18&10 in Koppal City Limit. (ST Category) (W.No. 10)930143.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
277265188411Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.1122.5FalseNoneNoneFalseNoneFalse13119.750
277265288411Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.4517.5FalseNoneNoneFalseNoneFalse110047.8750
277265388411Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.240.0FalseNoneNoneFalseNoneFalse354088.00
277265488411Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.852.28FalseNoneNoneFalseNoneFalse214160.0580
277265588411Nonecode05Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. PWD SR 2023-24 , Page No-176, SI. No. 17.12, Volume -2Sqm974.4974.4245.0FalseNoneNoneFalseNoneFalse238728.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17086629910000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17086629910000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17086629910000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17086629980000NoneNoneELIGIBILITYAll Terms and conditions as per bid documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneSatisfactorily completed as prime contractor, at least one similar nature of work to an extent 50% cost of the Drain and Slab Road Work value not less than Rs 5.95 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneContractor Registration CertificatePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneEPF registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneESI registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid ESI certificate
NoneNoneNoneNoneGST registration certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneUnbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentageOthersUnbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentage
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Unbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentage
NoneNoneNoneNonePayment more towards workers ESI &EPF challan up to till month compulsoryOthersPayment more towards workers ESI &EPF challan up to till month compulsory
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Payment more towards workers ESI &EPF challan up to till month compulsory
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Similar work done CertificateTrueTechnical Bid
Unbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentageTrueTechnical Bid
ESI &EPF registration certificateTrueTechnical Bid
GST registration certificateTrueTechnical Bid
Payment more towards workers ESI &EPF challan up to till month compulsoryTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Other WorksKoppalaKoppalaNoneNoneW.No. 25NoneNoneNoneNoneNoneNone
Other WorksKoppalaKoppalaNoneNoneW.No. 18NoneNoneNoneNoneNoneNone
Other WorksKoppalaKoppalaNoneNoneW.No. 10NoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone