createdTs1708606628953
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee530.00
emd31250.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose01-03-2024 16:30:28
tenderQueryClose26-02-2024 10:30:19
technicalBidOpen02-03-2024 16:30:39
publishedDate22-02-2024 23:02:04
publishedByPostCMC_MCOM_KPL
publishedByUserKPE15848 - GANAPATI J PATIL
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonMadhura AEE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9739167662
tenderSupplierListNone
tenderSchedule
createdTs1708606628981
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT15829
titleP4Construction of Drain, Slab & Wall at W.No. 30,11,20 in Koppal City Limit. (SC Category)
descriptionP4Construction of Drain, Slab & Wall at W.No. 30,11,20 in Koppal City Limit. (SC Category)
categoryWORKS
categoryTextWorks
ecv2114846.04
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2350
locationNameDMA City Municipal Council Koppala
provisionalAmount2500000.0
groupOverheadTotalNone
fileNumber15thF/2020-21/SA/4
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17086066290000NoneNoneOther WorksP4Construction of Drain, Slab & Wall at W.No. 30,11,20 in Koppal City Limit. (SC Category) (W.No. 30)422948.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
276675088177Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.151.75FalseNoneNoneFalseNoneFalse5542.4250
276675188177Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.458.63FalseNoneNoneFalseNoneFalse54269.32350
276675288177Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.217.25FalseNoneNoneFalseNoneFalse152700.450
276675388177Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.851.12FalseNoneNoneFalseNoneFalse105201.4320
276675488177Nonecode05Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. PWD SR 2023-24 , Page No-176, SI. No. 17.12, Volume -2Sqm974.4974.4108.0FalseNoneNoneFalseNoneFalse105235.20
17086066290000NoneNoneOther WorksP4Construction of Drain, Slab & Wall at W.No. 30,11,20 in Koppal City Limit. (SC Category) (W.No. 11)845948.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
276675588178Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.126.19FalseNoneNoneFalseNoneFalse2804.9490
276675688178Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.452.23FalseNoneNoneFalseNoneFalse14023.24350
276675788178Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.258.01FalseNoneNoneFalseNoneFalse513516.1220
276675888178Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.853.36FalseNoneNoneFalseNoneFalse315604.2960
17086066290000NoneNoneOther WorksP4Construction of Drain, Slab & Wall at W.No. 30,11,20 in Koppal City Limit. (SC Category) (W.No. 20)845948.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
276675988179Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.126.19FalseNoneNoneFalseNoneFalse2804.9490
276676088179Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3Cum6288.456288.452.23FalseNoneNoneFalseNoneFalse14023.24350
276676188179Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.2Cum8852.28852.258.01FalseNoneNoneFalseNoneFalse513516.1220
276676288179Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - For Buildings PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11at93929.8593929.853.36FalseNoneNoneFalseNoneFalse315604.2960
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17086066300000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17086066300000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17086066300000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17086066520000NoneNoneELIGIBILITYAll terms and Conditions as per bid documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneSatisfactorily completed as prime contractor, at least one similar nature of works to an extent 25% cost of the Drain and Slab work value not less than Rs 6.25 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneContractor Registration CertificatePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneEPF registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneESI registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid ESI certificate
NoneNoneNoneNoneUnbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentageFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Unbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentage
NoneNoneNoneNoneAnnual Turnover CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneGST registration certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Other WorksKoppalaKoppalaNoneNoneW.No. 30NoneNoneNoneNoneNoneNone
Other WorksKoppalaKoppalaNoneNoneW.No. 11NoneNoneNoneNoneNoneNone
Other WorksKoppalaKoppalaNoneNoneW.No. 30NoneNoneNoneNoneNoneNone