noticeInvitingTenderDTO
createdTs1708598649050
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee840.00
emd67200.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose05-03-2024 17:30:00
tenderQueryClose04-03-2024 17:30:00
technicalBidOpen07-03-2024 11:30:00
publishedDate23-02-2024 16:39:02
publishedByPostTP_CO_GTL
publishedByUserKPE11829 - D T DODDAMANI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSuresh B Chalavadi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9845728012
tenderSupplierListNone
tenderSchedule
createdTs1708598649135
version5
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT15610
titleCONSTRUCTION OF COMPOUND WALL AT SWM SITE CONTINUED WORK
descriptionCONSTRUCTION OF COMPOUND WALL AT SWM SITE CONTINUED WORK
categoryWORKS
categoryTextWorks
ecv3360000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2337
locationNameDMA Town Panchayat Guttal
provisionalAmount3360000.0
groupOverheadTotal530279.53
fileNumber15FTG/2023-24/GTL/118
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17085986490000NoneNoneOther WorksCONSTRUCTION OF COMPOUND WALL AT SWM SITE CONTINUED WORK2829720.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
276192887953None101Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/ Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work PWD Common DSR 2023-24 Volume 1 I No 1.13 P.No 8Cum372.86372.86174.94FalseNoneNoneFalseNoneFalse65228.12840
276192987953None102Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed raded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 I No 2.1.2 P.No 15Cum5833.925833.9222.17FalseNoneNoneFalseNoneFalse129338.00640
276193087953None103Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 I No 2.5.1 P.No 16Cum6828.96828.948.45FalseNoneNoneFalseNoneFalse330860.2050
276193187953None104Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) PWD Common DSR 2023-24 Volume 1 I No 5.1.1 P.No 9Cum5779.335779.33120.9FalseNoneNoneFalseNoneFalse698720.9970
276193287953None105Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Foundation upto Plinth. All other types 3% PWD Common DSR 2021-22 Volume 1 P No: 111 I.No 1.bCum204.87204.8721.3FalseNoneNoneFalseNoneFalse4363.7310
276193387953None106Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Plinth beams of Buildings 50% PWD S.R. 2023-24 Volume 1 (P No: 111 SL.No 3Cum3414.453414.4513.93FalseNoneNoneFalseNoneFalse47563.28850
276193487953None107Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Columns / Shaft (Slip Centering) 70% PWD Common PWD S.R. 2023-24 Volume 1 (P No: 111 SL.No 9Cum4780.234780.2314.12FalseNoneNoneFalseNoneFalse67496.84760
276193587953None108Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.PWD Common DSR 2023-24 Volume 2 I No 6.8 P.No 14Cum8208.078208.071.66FalseNoneNoneFalseNoneFalse13625.39620
276193687953None109Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. PWD Common DSR 2023-24 Volume 2 I No 6.32. P.No 17Cum1349.31349.3517.99FalseNoneNoneFalseNoneFalse698923.9070
276193787953None110Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed raded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 I No 2.1.4 P.No 15Cum6403.516403.514.71FalseNoneNoneFalseNoneFalse30160.53210
276193887953None111Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (Vol:2 P.NO.86 I.No: 11.34A PWD S.R. 2023-24 21KG/SQMKg173.04173.04441.0FalseNoneNoneFalseNoneFalse76310.640
276193987953None112Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol:2 P.NO.41 I.No: 8.1.2 PWD S.R. 2023-24)Sqm248.23248.23239.4FalseNoneNoneFalseNoneFalse59426.2620
276194087953None113Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Percentage on finished rate of concrete per m3 Plastering & Painting of New walls & Ceiling 25% (Vol:2 P.NO.46 I.No: 8.33.1 PWD S.R. 2023-24Sqm162.74162.74232.2FalseNoneNoneFalseNoneFalse37788.2280
276194187953None114Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.PWD Common DSR 2023-24 Volume 2 I No 8.33.3 P.No 47Sqm143.17143.1742.0FalseNoneNoneFalseNoneFalse6013.140
276194287953None115Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. PWD SR 2023-24 Vol: 1 P.NO.18 I.No:2.11.aTonne92140.7192140.716.12FalseNoneNoneFalseNoneFalse563901.14520
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17085986520000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17085986520000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17085986520002NoneNoneELIGIBILITYTenderer shall obtain the work done certificate 80% of the amount/Quantity put to tender in nature of work from the competent authority not below the rank of Executive Engineer (District Level Officer) and scan the original certificated and attach the scanned file to the tender. The original certificate shall be produced at the time of opening of Tenders.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs.26.88 Lakhs)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSatisfactoriy completed (atleast 50%) as prime contractor at-least one such similar work of value not less than Rs. 16.80 (50% of estimated cost of tender)OthersWork Done
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneRegistration Certificates of KPWDOthersRegistration Certificates of KPWD
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Registration Certificates of KPWD
NoneNoneNoneNonesatisfactory completed as a prime contractor at Nature of work to an extent of 50% of the cost of the work, such Construction of Construction of Compound Wall10 of value not less than Rs 16.80OthersWork Done
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- ongoing works
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of not less than Rs 10.08 lakhs (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc.) (usually 30% of the amount of contract) (30% of tender amount)OthersLiquid assets
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Liquid assets
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Line of Credit 30 percent of Estimated costTrueTechnical Bid
PAN Card, Vat & Income Tax Registration and Return CertificateTrueTechnical Bid
List of Ongoing worksFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone