1707915950000 | 0 | None | None | Buildings | Construction of skywalk from New Annex building to Main building of CMM Court | 4716300.45 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2593357 | 80752 | None | 19.7.3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. (Page No.187 Item No 19.7.3 SR Book 2023-24, Volume 2) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 1131.9 | 1131.9 | 6.56 | False | None | None | False | None | False | 7425.264 | 0 | 2593358 | 80752 | None | 19.2.2 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (Page No.187 Item No 19.2.2 SR Book 2023-24, Volume 2) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 1131.9 | 1131.9 | 19.2 | False | None | None | False | None | False | 21732.48 | 0 | 2593359 | 80752 | None | 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (Page No.6 Item No 1.4.1 SR Book 2023-24, Volume 1 ) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 266.2 | 266.2 | 65.25 | False | None | None | False | None | False | 17369.55 | 0 | 2593360 | 80752 | None | 1.4.2 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Depth exceeding 1.5m, but not exceeding 3 m (Page No.5 Item No 1.4.2 SR Book 2023-24, Volume 1 ) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 284.9 | 284.9 | 54.0 | False | None | None | False | None | False | 15384.6 | 0 | 2593361 | 80752 | None | 2.10.a | Ready Mix Concrete (RMC) with Cement & Cementitious Materials. Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M10 Grade (Page No.18 Item No 2.10.a SR Book 2023-24, Volume 1)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 6452.6 | 6452.6 | 12.83 | False | None | None | False | None | False | 82786.858 | 0 | 2593362 | 80752 | None | 2.1.2 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing andtechnical specification. (Page No.15 Item No 2.1.2 SR Book 2023-24, Volume 1)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | t | 94826.6 | 94826.6 | 2.0 | False | None | None | False | None | False | 189653.2 | 0 | 2593363 | 80752 | None | 2.10.c | Ready Mix Concrete (RMC) with Cement & Cementitious Materials. Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M25 Grade (Page No.18 Item No 2.10.c SR Book 2023-24, Volume 1)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 6840.9 | 6840.9 | 35.36 | False | None | None | False | None | False | 241894.224 | 0 | 2593364 | 80752 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (Page No.7 Item No 1.9 SR Book 2023-24, Volume) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 292.6 | 292.6 | 71.07 | False | None | None | False | None | False | 20795.082 | 0 | 2593365 | 80752 | None | 11.2 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (Page No. 26 Item No 11.2 SR Book 2023-24, Volume 2)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 649.79 | 649.79 | 52.8 | False | None | None | False | None | False | 34308.912 | 0 | 2593366 | 80752 | None | 11.26.3s | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. G.I. pipes er specifications and as per directions of the Engineer-in-Charge. (Page No. 84 Item No 11.26.3SR Book 2023-24, Volume 2)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Kg | 201.3 | 201.3 | 600.0 | False | None | None | False | None | False | 120780.0 | 0 | 2593367 | 80752 | None | 11.2 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. (Page No.77 Item No 11.2 SR Book 2023-24, Volume 2) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Kg | 126.79 | 126.79 | 24658.4 | False | None | None | False | None | False | 3126438.536 | 0 | 2593368 | 80752 | None | 13.50.10 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work.150 mm nominal dia Pipes (Page No. 125 Item No 13.50.10 SR Book 2023-24, Volume 5)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | m | 1752.3 | 1752.3 | 20.0 | False | None | None | False | None | False | 35046.0 | 0 | 2593369 | 80752 | None | 13.53 | Constructing brick masonry chamber for underground C.I. inspectionchamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3.5 (Page No. 126 Item No 13.53 SR Book 2023-24, Volume 5)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Unit | 6206.2 | 6206.2 | 1.0 | False | None | None | False | None | False | 6206.2 | 0 | 2593370 | 80752 | None | 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Page No. 48 Item No 8.41SR Book 2023-24, Volume 2)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 187.37 | 187.37 | 514.8 | False | None | None | False | None | False | 96458.076 | 0 | 2593371 | 80752 | None | 11.2 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. (Page No.77 Item No 11.2 SR Book 2023-24, Volume 2) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Kg | 129.27 | 129.27 | 4800.0 | False | None | None | False | None | False | 620496.0 | 0 | 2593372 | 80752 | None | 1.4.3 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Depth exceeding 3m, but not exceeding 4.5 m (Page No.6 Item No 1.4.3 SR Book 2023-24, Volume 1 ) ---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Cum | 413.6 | 413.6 | 27.0 | False | None | None | False | None | False | 11167.2 | 0 | 2593373 | 80752 | None | 19.22.1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material to the appropriate disposal area as per direction of Engineer-in-charge For thickness of tiles 10 mm to 25 mm (Page No189 Item No.19.22.1 Common SR for 2023-24)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 52.8 | 52.8 | 32.0 | False | None | None | False | None | False | 1689.6 | 0 | 2593374 | 80752 | None | 19.55 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground to the appropriate disposal area as per direction of Engineer-in-charge. (Page No.193, SR Vol-2,I No19.55 SR 2023-24)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 40.7 | 40.7 | 28.0 | False | None | None | False | None | False | 1139.6 | 0 | 2593375 | 80752 | None | 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Page No.41 Item No.8.2.1 Common SR for 2023-24 Vol-2)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 330.99 | 330.99 | 126.0 | False | None | None | False | None | False | 41704.74 | 0 | 2593376 | 80752 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page No.48 Item No.8.39 Common SR for 2023-24)
---- the item is inclusive of all materials, lead and lift ,loading and unloading, Transportation charges and other incidental charges and work should be carried out as per the directions of the Engineer-in-charge of the work | Sqm | 142.49 | 142.49 | 167.2 | False | None | None | False | None | False | 23824.328 | 0 |
|