noticeInvitingTenderDTO
createdTs1708520915222
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd620000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-03-2024 16:00:00
tenderQueryClose27-02-2024 15:00:00
technicalBidOpen07-03-2024 16:30:00
publishedDate23-02-2024 16:11:04
publishedByPostBBMP_EE_TEC_MR
publishedByUserKPE14958 - BALAJI M T
bidValidityPeriod180
noOfCalls1
preBidMeetingDate27-02-2024 16:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonBalaji M T
splitEmdRequiredYnTrue
emdBankGuarantee520000.00
emdCash100000.00
bgValidityPeriod180
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8892124229
tenderSupplierListNone
tenderSchedule
createdTs1708520915251
version4
createdDateNone
modifiedDateNone
tenderNumberBBMP/2023-24/RD/WORK_INDENT2669
titleConstruction of New Shoulder Drain with Fiber Reinforced Polymer (FRP) Silt Trap Chamber in selected Arterial & Sub-Arterial Roads in the jurisdiction of East, West South, Dasarahalli, R R Nagar Zone & Mahadevapura Division in BBMP Limits
descriptionConstruction of New Shoulder Drain with Fiber Reinforced Polymer (FRP) Silt Trap Chamber in selected Arterial & Sub-Arterial Roads in the jurisdiction of East, West South, Dasarahalli, R R Nagar Zone & Mahadevapura Division in BBMP Limits
categoryWORKS
categoryTextWorks
ecv41097890.92
deptNameBruhat Bengaluru Mahanagara Palike
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location937
locationNameBBMP TEC Major Roads
provisionalAmount41500000.0
groupOverheadTotal6269169.8
fileNumberEE/RI-TEC/TEND/17/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17085209150000NoneNoneRoadsConstruction of New Shoulder Drain with Fiber Reinforced Polymer (FRP) Silt Trap Chamber in selected Arterial & Sub-Arterial Roads in the jurisdiction of East, West South, Dasarahalli, R R Nagar Zone & Mahadevapura Division in BBMP Limits34828721.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
274570887210Nonecode01Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately II By Mechanical Means A Bituminous course including all lead & lift etc complete and as per the directions of the engineer in chargeCum354.2354.241.63FalseNoneNoneFalseNoneFalse14745.3460
274570987210Nonecode02Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such similar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface levelled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenances required to complete the work. In all kinds of soils Depth upto 1.5 m. including all lead & lift etc complete and as per the directions of the engineer in chargeCum266.2266.2712.25FalseNoneNoneFalseNoneFalse189600.950
274571087210Nonecode03CARRIAGE OF MATERIALS: Loading and Unloading of Stone Boulder/Stone aggregates /Sand /Kankar/Moorum. (Tipper 10 m3) including all lead & lift etc complete and as per the directions of the engineer in chargeCum130.9130.9753.875FalseNoneNoneFalseNoneFalse98682.23750
274571187210Nonecode04Cost of Haulage Excluding Loading and Unloading :Case-1 : Surfaced Road: Taking output 10 t load and lead 10 km = 100 t.km including all lead & lift etc complete and as per the directions of the engineer in chargeT.Km13.213.2904.65FalseNoneNoneFalseNoneFalse11941.380
274571287210Nonecode05Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates including all lead & lift etc complete and as per the directions of the engineer in chargeCum6867.36867.3140.785FalseNoneNoneFalseNoneFalse966812.83050
274571387210Nonecode06Supplying and installation of COMPOSITE FIBER REINFORCED POLYMER Water Gully Grating with bottom chamber of appropriate size of 450 x 450 mm and a load bearing capacity of 40MT (D400 Load capacity) of approved bond confirming to BSEN-124:1994/IS 1726. Gully grating should have minimum 30% of water entrance area that of clear opening of chamber. It shall give top abrasion resistant layer of decorative dark grey finish. The cover should have a beam design at the bottom with thickness in the center of a minimum of 125MM to 150MM at the center and should be without any reinforcement of steel or any other metal not be used in the construction of product. The chamber should have no filler or reinforcement of any kind of metal and a 150mm dia cutout. The chamber as one circular cut of 200mm dia. It shall also confirm “Permanent set” criterion as per BSEN-124/IS 1726. Product should be tested in test lab for load capacity and permanent set with cost of all materials, transportation, loading & unloading charges etc., complete and as per the directions of the engineer in chargeNos38005.038005.0740.0FalseNoneNoneFalseNoneFalse28123700.00
274571487210Nonecode07Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification including all lead & lift etc complete and as per the directions of the engineer in charget86912.186912.13.7FalseNoneNoneFalseNoneFalse321574.770
274571587210Nonecode08Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6969.66969.6166.5FalseNoneNoneFalseNoneFalse1160438.40
274571687210Nonecode09Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. HDPE Grade PE80-PN 6.0,200mm dia including all lead & lift etc complete and as per the directions of the engineer in chargem1582.91582.91850.0FalseNoneNoneFalseNoneFalse2928365.00
274571787210Nonecode10Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including all lead & lift etc complete and as per the directions of the engineer in chargeCum2814.92814.974.0FalseNoneNoneFalseNoneFalse208302.60
274571887210Nonecode11Removing & Resetting existing Heavy Duty Cobble/Interlocking stones/Pavers of thickness 60/75/80/100mm using Cement and 40mm thick sand bed (average thickness) and compacting with plate vibrator to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (The cost of new paver/stones required shall be added separately) including all lead & lift etc complete and as per the directions of the engineer in chargeSqm532.4532.4647.5FalseNoneNoneFalseNoneFalse344729.00
274571987210Nonecode12Removing and resetting of precast kerb stones fixed with CM 1:3 fixed and finished in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)m38.538.5296.0FalseNoneNoneFalseNoneFalse11396.00
274572087210Nonecode13Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in charge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specificationSqm1174.81174.8277.5FalseNoneNoneFalseNoneFalse326007.00
274572187210Nonecode14Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)m413.6413.6296.0FalseNoneNoneFalseNoneFalse122425.60
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17085209160000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17085209160000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17085209160001NoneNoneELIGIBILITYAs per tender documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneachieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 822.00 lakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNonesatisfactorily completed (at least 90% of the contract value) as prime contractor, at least one similar nature of work not less than 205.50 LakhsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year, the following minimum quantities of work As mentioned in clause 3.2 .c TableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAvailability by owning at least 50% of the required / specified key and critical equipment for this work and the remaining 50% can be deployed on lease / hire basis for all works provided the relevant documents (commitment agreements etc.) for availability for this work are furnished. As mentioned in the clause 3.3 a table.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- All The Relevant Documents
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs. 137.00 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAssessed available tender capacity AxNx1.5-BFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tender Capacity
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
all other relevant documents mentioned in bid documentTrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
Pan CardTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1708523856000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Engineer in Chief Annex 2 First Floor BBMP Head office
streetNone
cityBengaluru
stateKarnataka
pin560002