createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1708677005007
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee2000.00
emd80000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-03-2024 17:00:00
tenderQueryClose26-02-2024 17:00:00
technicalBidOpen06-03-2024 11:00:00
publishedDate23-02-2024 19:24:51
publishedByPostMI_EE_DIV_MYS
publishedByUserKPE16964 - D NAGARAJ
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212443347
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1708677005031
version5
createdDateNone
modifiedDateNone
tenderNumberMI/2023-24/AB/WORK_INDENT1755
titleRe Construction of Sulekatte pickup and improvements to Nala and Service Road at CH 0.00 (Beyond Hergalli) and Ch.17.00 KM in H D Kote Taluk, Mysore District.
descriptionRe Construction of Sulekatte pickup and improvements to Nala and Service Road at CH 0.00 (Beyond Hergalli) and Ch.17.00 KM in H D Kote Taluk, Mysore District.(Reserved for ST Contractors only)
categoryWORKS
categoryTextWorks
ecv7988114.89
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location111
locationNameMinor Irrigation Division Mysore
provisionalAmount8000000.0
groupOverheadTotal1218526.0
fileNumberAEE/MISD/MYS/HDKOTE/SULEKATTE
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17086770050000NoneNoneConstruction of Anicuts - BarragesRe Construction of Sulekatte pickup and improvements to Nala and Service Road at CH 0.00 (Beyond Hergalli) and Ch.17.00 KM in H D Kote Taluk, Mysore District.6769588.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
278270588808Nonecode01Cutting and burning or disposing off Apu / Jondu frommarshy areasasdirected with all other ancillary operations cetc., complete with all lead and lifts and las per the directions of Engineer incharge of the work.Sqm9.49.41500.0FalseNoneNoneFalseNoneFalse14100.00
278270688808Nonecode02Providing and placing sand bags consisting of empty cement bags filled with 35 to 40 kg locally available sand forforming ringbund includingcost ofall materials, labour, plugging joints with selected earth, and allother ancillary operations etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Each68.068.060.0FalseNoneNoneFalseNoneFalse4080.00
278270788808Nonecode03Filling clayey soil between two rows of sand bags placed for forming ring bund including cost of all materials, labour,tamping, plugging leakage points and all other ancillary operations etc., complete with all lead and lifts and as per the directions of Engineer incharge of the workCum482.0482.0120.0FalseNoneNoneFalseNoneFalse57840.00
278270888808Nonecode04Earth work excavation for Foundation by mechanical means for all works & depth upto 3m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radiusof 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depthupto3m etc., complete with all lead and lifts and as per the directions of Engineer incharge of the workCum106.14106.1460.0FalseNoneNoneFalseNoneFalse6368.40
278270988808Nonecode05Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting complete with all lead and lift loading, unloading charges and as per the direction of the Engineer incharge of the workCum377.69377.69251.7FalseNoneNoneFalseNoneFalse95064.5730
278271088808Nonecode06Providing and laying in-situ vibrated M-20 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling,vibrating, finishing, curing with all other ancillary operations etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Cum6254.06254.09.15FalseNoneNoneFalseNoneFalse57224.10
278271188808Nonecode07Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates andfine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevantI Scodes ,labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork tobe paid separately) M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Cum6969.66969.6279.55FalseNoneNoneFalseNoneFalse1948351.680
278271288808Nonecode08ProvidingandlayinginpositionCementConcreteforallSuperstructuresofbuilding, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compactedusingneedlevibrators.Thecostincludesalllead&lifts,costofallmaterials,quality confirming to the requirements of relevant IS codes ,labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowelbars & formwork to be paid separately ) M25Design Mix Using 20 mm nominal size graded crushed coarse aggregates etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Cum7664.167664.1691.18FalseNoneNoneFalseNoneFalse698818.10880
278271388808Nonecode09Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 250 mm long 12mm dia. anchors fixed to both flanges at 150 mm c/ cand 140 x 6 mm plate welded on top ofone ofthe angle including cost of all materials, labour, machinery, providing and fixing 38 mmthick jointfiller boardmatching the thickness of wearing coat, painting and all other ancillary operations etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.m2525.02525.020.0FalseNoneNoneFalseNoneFalse50500.00
278271488808Nonecode10Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.MT79011.079011.016.74FalseNoneNoneFalseNoneFalse1322644.140
278271588808Nonecode11Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not lessthan 40kg each complete as perdrawing and Technical etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Cum1912.01912.050.0FalseNoneNoneFalseNoneFalse95600.00
278271688808Nonecode12Providing impervious embankment adjacent to masonry / concrete structure and fillingtrial pits using impervious approved soil from borrow area in layers of 100 to 150 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, picking previous layer, spreading soil in layer of specified thickness, sorting-out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using pneumatic tampers / vibrating earth rammer sand all other ancillary operations etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Cum623.0623.02203.5FalseNoneNoneFalseNoneFalse1372780.50
278271788808Nonecode13Providing and constructing 450 mm thick hand packed rough stone revetment consistingof 300 mm thick rough stones with 400 to 450 mm long through stonesat 1.5 m c / c overa backing of 150 mm thick 40 mm downgraded coarseaggregate layerincluding costof allmaterials machinery, labour, layingto specified slope, wedging with chips, finishing & all necessary works as directed and complete as perspecification etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Sqm735.0735.042.0FalseNoneNoneFalseNoneFalse30870.00
278271888808Nonecode14RCC NP 3Pipe - 750 mm dia etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Rmtr2627.02627.010.0FalseNoneNoneFalseNoneFalse26270.00
278271988808Nonecode15Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Using Screening Type A (13.2mm agg) etc., complete with all lead and as per the directions of Engineer in charge of the work.Cum2353.02353.0343.87FalseNoneNoneFalseNoneFalse809126.110
278272088808Nonecode16Fabrication, supply , erecition, testing and commissioning of sliing type verticale lift gate consisting of skin plate horizontal and verticale stiffener, seal seating sponge rubeer seals lifting handles etc., with accessories for venteddam / field channel including cost of all materials, labour cutting along welding finishing clearing applying two coats of anti corrosive bituminous black paint over a coat of zinc chromateredosixe primer paint seal fixing etc. complete as per specification etc., complete with all lead and lifts and as per the directions of Engineer incharge of the work.Kg201.0201.0895.28FalseNoneNoneFalseNoneFalse179951.280
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17086770070000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17086770070000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17086770070000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17086771980000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP Portal on or before the last date and time of bid submissionNone
17086772180000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17086772520000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17086772670000NoneNoneELIGIBILITYThe intending Bidder/ firm/ company are advised to visit the work site before submission of the tendersNone
17086772950000NoneNoneELIGIBILITYThe necessary Certificates / documents in support of eligibility criteria fulflled as stipulated shall be scanned and attached to e- tender document. The original certificate / documents shall be produced prior to the opening of bid for verification. Scanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid documentNone
17086773050000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds goodNone
17086773160000NoneNoneELIGIBILITYConditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever.None
17086773470000NoneNoneELIGIBILITYCorrigendum will be published in the website for all modifcations or corrections if anyNone
17086773910000NoneNoneELIGIBILITYThe contractor should mention their recent correct postal address & mail address in declaration formsNone
17086774050000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only. No departmental supply of any materials shall be made by DeptNone
17086774150000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also Land acquisition problems if anyNone
17086774260000NoneNoneELIGIBILITYRoyalty charges will be deducted from contractors running bill as the per prevailing G.O.at the time of payment. Commerce and Industries Secretariat Notifcation No.CI 81 MMN 2014 18th February 2018 see sub rule i of rule 36 Royalty, and Mines and Geology, rules and regulations amendment Act, para 36 &para 92 of 1994 and as per the and Circular issued from Director Mines and Geology Department, Bengaluru letter no abhuedcbdsbtakhte 2019 20 4493 Dtd 03.12.2019 are to be followedNone
17086774360000NoneNoneELIGIBILITYTypographical errors, if any, will not be the ground for any claims by the Contractor.None
17086774470000NoneNoneELIGIBILITYThe necessary Certificates / documents in support of eligibility criteria fulflled as stipulated shall be scanned and attached to e- tender document. The tenderer shall have valid class II and above registration certificate. The original certifcate / documents shall be produced for verification when demanded, otherwise the tender will be treated as non responsive bid and rejected, document to be counter signedNone
17086774590000NoneNoneELIGIBILITYScanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid documentNone
17086774690000NoneNoneELIGIBILITYIncomplete tender documents will be rejectedNone
17086774780000NoneNoneELIGIBILITYAs per the Karnataka Building and other Constructions Workers Welfare Cess Act 1996, 1% of the bill amount will be deducted from the billsNone
17086774910000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.None
17086775030000NoneNoneELIGIBILITYThe contractor should furnish the name of the individual / firm / company with address & telephone No with place of registration, year of incorporation etcNone
17086775120000NoneNoneELIGIBILITYOriginal documents should be produced for verification at any stage of the tender process, as and when sought for. Failure to produce original documents will lead to disqualifcation. work done certifcate should have all the details CR no, work order issuing date, work completion date and year as asked in bid documentNone
17086775210000NoneNoneELIGIBILITYThe Applicant shall be registered in KPWD/CPWD/KNNL /CNNL/ KBJNL/VJNL and Other Public sector Organizations and shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by GOK/GOINone
17086775330000NoneNoneELIGIBILITYRestrictions on Public Procurement from Bidders of certain countries as per Government order No.FD 455 Exp-12 2020 Bengaluru dated:25-08-2020None
17086775500000NoneNoneELIGIBILITYDuring the execution of works, if any minor minerals are required contractors have to abide by the prevailing rules and Acts applicable to Minor Minerals. As per the prevailing rules, for any use of Minor Minerals the contractor has to submit the mineral Dispatch Permit MDP obtained from Mines and Geology Department. If mineral Dispatch permit MDP is not submitted by the contractor along with the bill, the prevailing penalty DMF contribution as per karnantaka Minor Mineral Concession Rules 1994 (as amended from time to time) will be deducted from the contractors billNone
17086775650000NoneNoneELIGIBILITYThe agencies participating in the tender shall be registered in the Construction Labour Board as per the G.O.No.LD 300 LET 2006 Dated:18-1-2007 and Addendum No.LD 95 LET 2013 Bengaluru Dt:1-4-2013. Also the contractors entrusted with the work shall employ the labours only who have registered in the Karnataka Building and Construction Workers Welfare Board failing which the contractor shall be liable for any further action as deem by the authorityNone
17086775740000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms as mentioned in bid document for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract for all worksNone
17086775840000NoneNoneELIGIBILITYThe Bidder shall quote Rates BY adding GST and all other levies for either materials or works Contract (Service).All other duties (Including recovered from the contractor bill), taxes, and other levies payable by the contractor under the contract or for any other cause shall be included in the Total Tender Price submitted by the Tenderer.None
17086775950000NoneNoneELIGIBILITYThe contractor has to make his own arrangements for procurement of all the required materials and the materials so procured shall confirm to the relevant IS Specifications and obtain necessary quality certificate from authorized quality control.None
17086776040000NoneNoneELIGIBILITYThe Contractor is fully responsible for the Equipment / Material until the same is handed over to the EXECUTIVE ENGINEER in an operating condition after commissioning. The Contractor is responsible for the proper maintenance of equipment / material as well as protection of the same against theft, elements of nature, damages etc., while in his custody as well as after erection until the same is taken over by the EXECUTIVE ENGINEER under due acknowledgment in writingNone
17086776140000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17086776240000NoneNoneELIGIBILITYThe Work Done Certificates shall be issued by the Executive Engineer with indent number mentioned (if work done in Karnataka State), otherwise it shall be issued/counter signed by Superintending Engineer (if the work is done in other states)None
17086776380000NoneNoneELIGIBILITYSub-Leasing/G.P.A of Work is Prohibited.None
17086776540000NoneNoneELIGIBILITYEach Item Of BOQ To be read as with all lead and lifts, loading and un loading charges and as per the direction of Engineer in charge.None
17086776730000NoneNoneELIGIBILITYUploaded drawings are for TENDER PURPOSE ONLYNone
17086776820000NoneNoneELIGIBILITYThe tender processing charges paid by the bidder/ firm/ company are not refundable even if the tenders are cancelledNone
17086776910000NoneNoneELIGIBILITYThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalentNone
17086776990000NoneNoneELIGIBILITYIncome Tax : Latest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos. to be uploadedNone
17086777080000NoneNoneELIGIBILITYAll other terms and conditions as per KW tender documents ARE APPLICABLENone
17086777170000NoneNoneELIGIBILITYConcerned caste certificate and domicile certificateNone
17086777450000NoneNoneELIGIBILITYRATES QUOTED BY THE CONTRACTOR SHALL BE DEEMED TO BE INCLUSIVE OF THE SALES AND OTHER TAXES THAT THE CONTRACTOR WILL HAVE TO PAY FOR THE PERFORMANCE OF THE CONTRACT.THE EMPLOYER SHALL PERFORM SUCH DUTIES IN REGARDS TO THE DEDUCTION OF SUCH TAXES AT SOURCE AS PER APPLICABLE LAWNone
17086777550000NoneNoneELIGIBILITYAnnual Turn over certificate with UDIN NumberNone
17086777630000NoneNoneELIGIBILITYTHE BIDDER SHALL QUOTE Rates BY adding GST for either materials or works Contract (Service).All other duties (Including EXCISE DUTYWHERE THERE IS A EXEMPTION FOR GOVERNMENT PROJECTS THE SAME SHALL BE recovered from the contractor bill), taxes, and other levies payable by the contractor under the contract or for any other cause SHALL BE INCLUDED IN THE TOTAL TENDER PRICE SUBMITTED BY THE TENDERERNone
17086777730000NoneNoneELIGIBILITYLABOUR RATES ARE INCLUSIVE EPF PPF ESI ETC.CONTRACTOR SHOULD BARE ALL LABOUR EXPENSES IN HIS QUOTED RATES WRT LABOUR WAGES.None
17086777820000NoneNoneELIGIBILITYAmount put to tender (ECV) is inclusive of 18 % GSTNone
17086777960001NoneNoneELIGIBILITYThis work is reserved for Schedule Tribe contractor in randomizationNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value) as prime contractor, for at least any CONSTRUCTION WORK of value not less than Rs 20.00 Lakhs (To an extent of 25% of the cost of work, for all works costing upto Rs.100.00 lakh) (As per Government order no FD 611 EXP-12/2023, BANGALORE, DATED:03.02.2024)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year (for a continuous period of 12 months)the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs. Earthwork in both excavation and embankment (combined quantities) : 5059.58 Cum Cement concrete (including RCC and PSC) : 729.36 Cum Steel works for RCC : 32.14 TONNEPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs 24.00 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund equirement etc. (usually 30% of the amount of contract) for works costing up to Rs.100.00 lakhs.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2018-19 to 2022-23 (a) Achieved in at least ONE financial year a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 80.00 Lakhs. (Usually not less than the estimated annual payments under this contract for works costing upto Rs.100.00 lakhs) (As per Government order no : FD 611 EXP-12/2023, BANGALORE, DATED:03.02.2024.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor should up load valid License ST CATEGORY CONTRACTORS ONLYTrueTechnical Bid
Contractor should up load valid GST CopyTrueTechnical Bid
Contractor should up load 5 yearsannual Financial Turnover Certificate duly certified by Chartered Accountant along with UDIN NumberTrueTechnical Bid
Liquid assets and or availability of credit facilities of not less than Rs. 24.00 LakhsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone