| tenderSubEstimateList | | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
|---|
| 1708840340000 | 1 | None | None | Buildings | Providing basic facilities to Karnataka public schools of Kogali village of Hagaribommanahalli taluk. (Govt Primary School, Govt Higher Primary School and Govt High School) (Construction of New Class Rooms For Pre-Primary ) | 2256885.23 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2803747 | 90175 | None | PRE01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth. (PWD SR 2023-24, V-1, I No: 1.15.1, P-8) | Cum | 381.15 | 381.15 | 103.0171 | False | None | None | False | None | False | 39264.967665 | 0 | | 2803748 | 90175 | None | PRE02 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (PWD SR 2023-24, V-2, I No: 4.1, P-5) | Sqm | 123.9 | 123.9 | 57.924 | False | None | None | False | None | False | 7176.7836 | 0 | | 2803749 | 90175 | None | PRE03 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-1, Item No.2.1.2, Page No.15) | Cum | 5947.2 | 5947.2 | 25.412 | False | None | None | False | None | False | 151130.2464 | 0 | | 2803750 | 90175 | None | PRE04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) .(PWD SR 2023-24, V-2, Item No.5.1.1, Page No.9) | Cum | 5891.55 | 5891.55 | 29.1818 | False | None | None | False | None | False | 171926.03379 | 0 | | 2803751 | 90175 | None | PRE05 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) .(PWD SR 2023-24, V-2, Item No.5.4, Page No.9) | Cum | 6708.45 | 6708.45 | 13.1522 | False | None | None | False | None | False | 88230.87609 | 0 | | 2803752 | 90175 | None | PRE06 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, Item No.2.3.1, Page No.16) | Cum | 6639.15 | 6639.15 | 2.3809 | False | None | None | False | None | False | 15807.152235 | 0 | | 2803753 | 90175 | None | PRE07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m..(PWD SR 2023-24, V-1, Item No.1.9, Page No.7) | Cum | 279.3 | 279.3 | 128.3855 | False | None | None | False | None | False | 35858.07015 | 0 | | 2803754 | 90175 | None | PRE08 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD SR 2023-24, V-2, I No.6.8, P-14) | Cum | 8367.45 | 8367.45 | 21.3103 | False | None | None | False | None | False | 178312.869735 | 0 | | 2803755 | 90175 | None | PRE09 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, I No.2.4.2, P-16) | Cum | 6639.15 | 6639.15 | 10.2888 | False | None | None | False | None | False | 68308.88652 | 0 | | 2803756 | 90175 | None | PRE10 | Form work, centering and scaffolding for Foundation upto Plinth b) All other types, 3% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:1 (b), P-111) | Cum | 199.17 | 199.17 | 10.2888 | False | None | None | False | None | False | 2049.220296 | 0 | | 2803757 | 90175 | None | PRE11 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, I No.2.5.1, P-16) | Cum | 6961.5 | 6961.5 | 43.5622 | False | None | None | False | None | False | 303258.2553 | 0 | | 2803758 | 90175 | None | PRE12 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings. (PWD SR 2023-24, V-1, I No.2.11 (a), P-18) | Tonne | 93929.85 | 93929.85 | 4.4509 | False | None | None | False | None | False | 418072.369365 | 0 | | 2803759 | 90175 | None | PRE13 | Form work, centering and scaffolding for RCC Columns / Shaft (Slip Centering), 70% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:9, P-111) | Cum | 4873.05 | 4873.05 | 5.5189 | False | None | None | False | None | False | 26893.875645 | 0 | | 2803760 | 90175 | None | PRE14 | Form work, centering and scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections, 45% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:19, P-112) | Cum | 3132.67 | 3132.67 | 0.135 | False | None | None | False | None | False | 422.91045 | 0 | | 2803761 | 90175 | None | PRE15 | Form work, centering and scaffolding for RCC Beams, Lintels & Troughs of Aqueducts, 60% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:14, P-112) | Cum | 4176.9 | 4176.9 | 19.5291 | False | None | None | False | None | False | 81571.09779 | 0 | | 2803762 | 90175 | None | PRE16 | Form work, centering and scaffolding for RCC Roof Slabs, 50% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:15, P-112) | Cum | 3480.75 | 3480.75 | 18.3792 | False | None | None | False | None | False | 63973.4004 | 0 | | 2803763 | 90175 | None | PRE17 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.2.2, P-41) | Sqm | 292.95 | 292.95 | 158.76 | False | None | None | False | None | False | 46508.742 | 0 | | 2803764 | 90175 | None | PRE18 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.8, P-42) | Sqm | 389.55 | 389.55 | 157.4683 | False | None | None | False | None | False | 61341.776265 | 0 | | 2803765 | 90175 | None | PRE19 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (PWD SR 2023-24, V-2, I No.8.51, P-50) | Sqm | 105.0 | 105.0 | 101.696 | False | None | None | False | None | False | 10678.08 | 0 | | 2803766 | 90175 | None | PRE20 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24, V-2, I No.11.5.2, P-77) | Sqm | 4454.1 | 4454.1 | 20.16 | False | None | None | False | None | False | 89794.656 | 0 | | 2803767 | 90175 | None | PRE21 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. (PWD SR 2023-24, V-2, I No.11.34A, P-86) | Kg | 176.4 | 176.4 | 204.12 | False | None | None | False | None | False | 36006.768 | 0 | | 2803768 | 90175 | None | PRE22 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (PWD SR 2023-24, V-2, I No.9.34, P-64) | Sqm | 1622.25 | 1622.25 | 106.8 | False | None | None | False | None | False | 173256.3 | 0 | | 2803769 | 90175 | None | PRE23 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. (PWD SR 2023-24, V-2, I No.9.36, P-64) | Sqm | 1732.5 | 1732.5 | 6.48 | False | None | None | False | None | False | 11226.6 | 0 | | 2803770 | 90175 | None | PRE24 | Providing and laying Cement concrete flooring 40 mm thick with 20 mm nominal size stone aggregate using 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry complete. (PWD SR 2023-24, V-2, I No.9.1, P-59) | Sqm | 473.55 | 473.55 | 33.885 | False | None | None | False | None | False | 16046.24175 | 0 | | 2803771 | 90175 | None | PRE25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.25, P-45) | Sqm | 143.85 | 143.85 | 158.76 | False | None | None | False | None | False | 22837.626 | 0 | | 2803772 | 90175 | None | PRE26 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.28, P-45) | Sqm | 93.45 | 93.45 | 157.4683 | False | None | None | False | None | False | 14715.412635 | 0 | | 2803773 | 90175 | None | PRE27 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.40, P-48) | Sqm | 120.75 | 120.75 | 46.728 | False | None | None | False | None | False | 5642.406 | 0 | | 2803774 | 90175 | None | PRE28 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. (PWD SR 2023-24, V-2, I No.11.25.2, P-84) | Kg | 142.8 | 142.8 | 28.35 | False | None | None | False | None | False | 4048.38 | 0 | | 2803775 | 90175 | None | PRE29 | Cement Board. (PWD SR 2023-24, V-2, I No.185, P-A-17) | Sqm | 308.7 | 308.7 | 11.52 | False | None | None | False | None | False | 3556.224 | 0 | | 2803776 | 90175 | None | PRE30 | Student Desk : Of Size 4feet length x 2.5feet Height Bench top 12", Desk top 15" using 1"x2" Sq.Pipe and 20G book shelf, 18mm Brown/Teak colour Novapan top for Bench and Desk. (KSFIC SR 2022-23, SI.No..132 P.No.12 ) | Each | 9320.0 | 9320.0 | 7.0 | False | None | None | False | None | False | 65240.0 | 0 | | 2803777 | 90175 | None | PRE31 | Concealed Conduit System Supplying heavygauge PVC conduit pipe..... mm dia....... mm thick confirming toIS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc.,and running before concreting thes lab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures ,run with 18 SWGGI fish wire wherever necessary-25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.2.2, P No-2) | Rmtr | 78.0 | 78.0 | 100.0 | False | None | None | False | None | False | 7800.0 | 0 | | 2803778 | 90175 | None | PRE32 | Supplying heavy gauge PVC Conduit Pipe....dia.......mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall andf ixing by bracing UorJ hooks and cement plastering upto the wall surface and run with18SWGGI fishwire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.3.2, P No-2) | Rmtr | 79.0 | 79.0 | 100.0 | False | None | None | False | None | False | 7900.0 | 0 | | 2803779 | 90175 | None | PRE33 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick / Stone/C.C wall. 1-2 Way.(PWD EL SR. 2023-24, Vol-6, I No-3.4.1, P No-8) | Each | 103.0 | 103.0 | 6.0 | False | None | None | False | None | False | 618.0 | 0 | | 2803780 | 90175 | None | PRE34 | Supplying of..... feet PVC Batten with integrated LED tube....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI Greater Than 80.Power Input : 220-240V@50/60Hz & Power factor Greater Than 0.9 along with CE approved.2yearsWarranty against any manufacturing defect working unde rstandard electrical condition. LED light fitting 1 x 2feet - 9/10 W. (PWD EL SR. 2023-24, Vol-6, I No-11.3.1, P No-43) | Each | 551.0 | 551.0 | 8.0 | False | None | None | False | None | False | 4408.0 | 0 | | 2803781 | 90175 | None | PRE35 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230V, 50cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system.48" Sweep (1200 mm) Regular model. (PWD EL SR. 2023-24, Vol-6, I No-6.3.1, P No-30) | Each | 2984.0 | 2984.0 | 4.0 | False | None | None | False | None | False | 11936.0 | 0 | | 2803782 | 90175 | None | PRE36 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.1, P No-5) | Point | 269.0 | 269.0 | 4.0 | False | None | None | False | None | False | 1076.0 | 0 | | 2803783 | 90175 | None | PRE37 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to outlet vias witch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.2, P No-5) | Point | 379.0 | 379.0 | 6.0 | False | None | None | False | None | False | 2274.0 | 0 | | 2803784 | 90175 | None | PRE38 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto10Mtr from tapping point to outlet via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.3, P No-5) | Point | 555.0 | 555.0 | 4.0 | False | None | None | False | None | False | 2220.0 | 0 | | 2803785 | 90175 | None | PRE39 | Supplying 6A flush type socket and 6A flush type SP switch either surface / flush mounting in existing gang box or in 4mm thick plastic sheet and fixing overa flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3854. 6A 2 Way. (PWD EL SR. 2023-24, Vol-6, I No-3.1.1, P No-8) | Each | 128.0 | 128.0 | 14.0 | False | None | None | False | None | False | 1792.0 | 0 | | 2803786 | 90175 | None | PRE40 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. (PWD EL SR. 2023-24, Vol-6, I No-3.8, P No-9) | Sq CM | 0.41 | 0.41 | 300.0 | False | None | None | False | None | False | 123.0 | 0 | | 2803787 | 90175 | None | PRE41 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBfeets single phase / 3phase/ single door with powder coated painting Made out of 14SWG MS enclosure. II - Double Door-6 Way SP & N (PWD EL SR. 2023-24, Vol-6, I No-5.19.7, P No-18) | Each | 1791.0 | 1791.0 | 2.0 | False | None | None | False | None | False | 3582.0 | 0 |
| | 1708840340000 | 1 | None | None | Buildings | Providing basic facilities to Karnataka public schools of Kogali village of Hagaribommanahalli taluk. (Govt Primary School, Govt Higher Primary School and Govt High School) (Construction of (CMPTR-SCIENCE-ART Room) | 4182426.33 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2803788 | 90176 | None | PRE01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth. (PWD SR 2023-24, V-1, I No: 1.15.1, P-8) | Cum | 381.15 | 381.15 | 231.592 | False | None | None | False | None | False | 88271.2908 | 0 | | 2803789 | 90176 | None | PRE02 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (PWD SR 2023-24, V-2, I No: 4.1, P-5) | Sqm | 123.9 | 123.9 | 139.716 | False | None | None | False | None | False | 17310.8124 | 0 | | 2803790 | 90176 | None | PRE03 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-1, Item No.2.1.2, Page No.15) | Cum | 5947.2 | 5947.2 | 52.8625 | False | None | None | False | None | False | 314383.86 | 0 | | 2803791 | 90176 | None | PRE04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) .(PWD SR 2023-24, V-2, Item No.5.1.1, Page No.9) | Cum | 5891.55 | 5891.55 | 59.098 | False | None | None | False | None | False | 348178.8219 | 0 | | 2803792 | 90176 | None | PRE05 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) .(PWD SR 2023-24, V-2, Item No.5.4, Page No.9) | Cum | 6708.45 | 6708.45 | 23.1968 | False | None | None | False | None | False | 155614.57296 | 0 | | 2803793 | 90176 | None | PRE06 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, Item No.2.3.1, Page No.16) | Cum | 6639.15 | 6639.15 | 5.6521 | False | None | None | False | None | False | 37525.139715 | 0 | | 2803794 | 90176 | None | PRE07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m..(PWD SR 2023-24, V-1, Item No.1.9, Page No.7) | Cum | 279.3 | 279.3 | 281.069 | False | None | None | False | None | False | 78502.5717 | 0 | | 2803795 | 90176 | None | PRE08 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD SR 2023-24, V-2, I No.6.8, P-14) | Cum | 8367.45 | 8367.45 | 39.0051 | False | None | None | False | None | False | 326373.223995 | 0 | | 2803796 | 90176 | None | PRE09 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, I No.2.4.2, P-16) | Cum | 6639.15 | 6639.15 | 24.336 | False | None | None | False | None | False | 161570.3544 | 0 | | 2803797 | 90176 | None | PRE10 | Form work, centering and scaffolding for Foundation upto Plinth b) All other types, 3% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:1 (b), P-111) | Cum | 199.17 | 199.17 | 24.336 | False | None | None | False | None | False | 4847.00112 | 0 | | 2803798 | 90176 | None | PRE11 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, I No.2.5.1, P-16) | Cum | 6961.5 | 6961.5 | 69.3405 | False | None | None | False | None | False | 482713.89075 | 0 | | 2803799 | 90176 | None | PRE12 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings. (PWD SR 2023-24, V-1, I No.2.11 (a), P-18) | Tonne | 93929.85 | 93929.85 | 7.2359 | False | None | None | False | None | False | 679667.001615 | 0 | | 2803800 | 90176 | None | PRE13 | Form work, centering and scaffolding for RCC Columns / Shaft (Slip Centering), 70% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:9, P-111) | Cum | 4873.05 | 4873.05 | 9.07 | False | None | None | False | None | False | 44198.5635 | 0 | | 2803801 | 90176 | None | PRE14 | Form work, centering and scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections, 45% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:19, P-112) | Cum | 3132.67 | 3132.67 | 0.54 | False | None | None | False | None | False | 1691.6418 | 0 | | 2803802 | 90176 | None | PRE15 | Form work, centering and scaffolding for RCC Beams, Lintels & Troughs of Aqueducts, 60% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:14, P-112) | Cum | 4176.9 | 4176.9 | 23.172 | False | None | None | False | None | False | 96787.1268 | 0 | | 2803803 | 90176 | None | PRE16 | Form work, centering and scaffolding for RCC Roof Slabs, 50% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:15, P-112) | Cum | 3480.75 | 3480.75 | 36.5583 | False | None | None | False | None | False | 127250.302725 | 0 | | 2803804 | 90176 | None | PRE17 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.2.2, P-41) | Sqm | 292.95 | 292.95 | 301.05 | False | None | None | False | None | False | 88192.5975 | 0 | | 2803805 | 90176 | None | PRE18 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.8, P-42) | Sqm | 389.55 | 389.55 | 261.3883 | False | None | None | False | None | False | 101823.812265 | 0 | | 2803806 | 90176 | None | PRE19 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (PWD SR 2023-24, V-2, I No.8.51, P-50) | Sqm | 105.0 | 105.0 | 189.136 | False | None | None | False | None | False | 19859.28 | 0 | | 2803807 | 90176 | None | PRE20 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24, V-2, I No.11.5.2, P-77) | Sqm | 4454.1 | 4454.1 | 28.08 | False | None | None | False | None | False | 125071.128 | 0 | | 2803808 | 90176 | None | PRE21 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. (PWD SR 2023-24, V-2, I No.11.34A, P-86) | Kg | 176.4 | 176.4 | 453.6 | False | None | None | False | None | False | 80015.04 | 0 | | 2803809 | 90176 | None | PRE22 | Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : ** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent. (PWD SR 2023-24, V-2, I No.9.23, P-63) | Sqm | 2589.3 | 2589.3 | 202.104 | False | None | None | False | None | False | 523307.8872 | 0 | | 2803810 | 90176 | None | PRE23 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. (PWD SR 2023-24, V-2, I No.9.36, P-64) | Sqm | 1732.5 | 1732.5 | 20.79 | False | None | None | False | None | False | 36018.675 | 0 | | 2803811 | 90176 | None | PRE24 | Providing and laying Cement concrete flooring 40 mm thick with 20 mm nominal size stone aggregate using 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry complete. (PWD SR 2023-24, V-2, I No.9.1, P-59) | Sqm | 473.55 | 473.55 | 68.211 | False | None | None | False | None | False | 32301.31905 | 0 | | 2803812 | 90176 | None | PRE25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.25, P-45) | Sqm | 143.85 | 143.85 | 301.05 | False | None | None | False | None | False | 43306.0425 | 0 | | 2803813 | 90176 | None | PRE26 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.28, P-45) | Sqm | 93.45 | 93.45 | 261.3883 | False | None | None | False | None | False | 24426.736635 | 0 | | 2803814 | 90176 | None | PRE27 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.40, P-48) | Sqm | 120.75 | 120.75 | 66.528 | False | None | None | False | None | False | 8033.256 | 0 | | 2803815 | 90176 | None | PRE28 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. (PWD SR 2023-24, V-2, I No.11.25.2, P-84) | Kg | 142.8 | 142.8 | 296.73 | False | None | None | False | None | False | 42373.044 | 0 | | 2803816 | 90176 | None | PRE29 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(PWD SR 2023-24, V-2, I No.8.49, P-49) | cm | 4.2 | 4.2 | 2000.0 | False | None | None | False | None | False | 8400.0 | 0 | | 2803817 | 90176 | None | PRE30 | Cement Board. (PWD SR 2023-24, V-2, I No.185, P-A-17) | Sqm | 308.7 | 308.7 | 17.28 | False | None | None | False | None | False | 5334.336 | 0 | | 2803818 | 90176 | None | PRE31 | Concealed Conduit System Supplying heavygauge PVC conduit pipe..... mm dia....... mm thick confirming toIS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc.,and running before concreting thes lab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures ,run with 18 SWGGI fish wire wherever necessary-25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.2.2, P No-2) | Rmtr | 78.0 | 78.0 | 225.0 | False | None | None | False | None | False | 17550.0 | 0 | | 2803819 | 90176 | None | PRE32 | Supplying heavy gauge PVC Conduit Pipe....dia.......mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall andf ixing by bracing UorJ hooks and cement plastering upto the wall surface and run with18SWGGI fishwire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.3.2, P No-2) | Rmtr | 79.0 | 79.0 | 225.0 | False | None | None | False | None | False | 17775.0 | 0 | | 2803820 | 90176 | None | PRE33 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick / Stone/C.C wall. 1-2 Way.(PWD EL SR. 2023-24, Vol-6, I No-3.4.1, P No-8) | Each | 103.0 | 103.0 | 15.0 | False | None | None | False | None | False | 1545.0 | 0 | | 2803821 | 90176 | None | PRE34 | Supplying of..... feet PVC Batten with integrated LED tube....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI Greater than80.Power Input : 220-240V@50/60Hz & Power factor Greater than0.9 along with CE approved.2yearsWarranty against any manufacturing defect working unde rstandard electrical condition. LED light fitting 1 x 2feet - 9/10 W. (PWD EL SR. 2023-24, Vol-6, I No-11.3.1, P No-43) | Each | 551.0 | 551.0 | 12.0 | False | None | None | False | None | False | 6612.0 | 0 | | 2803822 | 90176 | None | PRE35 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230V, 50cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system.48" Sweep (1200 mm) Regular model. (PWD EL SR. 2023-24, Vol-6, I No-6.3.1, P No-30) | Each | 2984.0 | 2984.0 | 6.0 | False | None | None | False | None | False | 17904.0 | 0 | | 2803823 | 90176 | None | PRE36 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.1, P No-5) | Point | 269.0 | 269.0 | 6.0 | False | None | None | False | None | False | 1614.0 | 0 | | 2803824 | 90176 | None | PRE37 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to outlet vias witch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.2, P No-5) | Point | 379.0 | 379.0 | 9.0 | False | None | None | False | None | False | 3411.0 | 0 | | 2803825 | 90176 | None | PRE38 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto10Mtr from tapping point to outlet via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.3, P No-5) | Point | 555.0 | 555.0 | 6.0 | False | None | None | False | None | False | 3330.0 | 0 | | 2803826 | 90176 | None | PRE39 | Supplying 6A flush type socket and 6A flush type SP switch either surface / flush mounting in existing gang box or in 4mm thick plastic sheet and fixing overa flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3854. 6A 2 Way. (PWD EL SR. 2023-24, Vol-6, I No-3.1.1, P No-8) | Each | 128.0 | 128.0 | 30.0 | False | None | None | False | None | False | 3840.0 | 0 | | 2803827 | 90176 | None | PRE40 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. (PWD EL SR. 2023-24, Vol-6, I No-3.8, P No-9) | Sq CM | 0.41 | 0.41 | 300.0 | False | None | None | False | None | False | 123.0 | 0 | | 2803828 | 90176 | None | PRE41 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBfeets single phase / 3phase/ single door with powder coated painting Made out of 14SWG MS enclosure. II - Double Door-6 Way SP & N (PWD EL SR. 2023-24, Vol-6, I No-5.19.7, P No-18) | Each | 1791.0 | 1791.0 | 3.0 | False | None | None | False | None | False | 5373.0 | 0 |
| | 1708840340000 | 1 | None | None | Buildings | Providing basic facilities to Karnataka public schools of Kogali village of Hagaribommanahalli taluk. (Govt Primary School, Govt Higher Primary School and Govt High School) (Construction of Library at First Floor) | 1367162.33 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2803829 | 90177 | None | PRE01 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, I No.2.5.1, P-16) | Cum | 7027.8 | 7027.8 | 28.7614 | False | None | None | False | None | False | 202129.36692 | 0 | | 2803830 | 90177 | None | PRE02 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings. (PWD SR 2023-24, V-1, I No.2.11 (a), P-18) | Tonne | 94824.42 | 94824.42 | 3.052 | False | None | None | False | None | False | 289404.12984 | 0 | | 2803831 | 90177 | None | PRE03 | Form work, centering and scaffolding for RCC Columns / Shaft (Slip Centering), 70% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:9, P-111) | Cum | 4919.46 | 4919.46 | 3.5548 | False | None | None | False | None | False | 17487.696408 | 0 | | 2803832 | 90177 | None | PRE04 | Form work, centering and scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections, 45% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:19, P-112) | Cum | 3162.51 | 3162.51 | 0.27 | False | None | None | False | None | False | 853.8777 | 0 | | 2803833 | 90177 | None | PRE05 | Form work, centering and scaffolding for RCC Beams, Lintels & Troughs of Aqueducts, 60% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:14, P-112) | Cum | 4216.68 | 4216.68 | 8.405 | False | None | None | False | None | False | 35441.1954 | 0 | | 2803834 | 90177 | None | PRE06 | Form work, centering and scaffolding for RCC Roof Slabs, 50% of Basic rate of concrete. (PWD SR 2023-24, V-1, I No:15, P-112) | Cum | 3513.9 | 3513.9 | 16.5315 | False | None | None | False | None | False | 58090.03785 | 0 | | 2803835 | 90177 | None | PRE07 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD SR 2023-24, V-2, I No.6.8, P-14) | Sqm | 8447.14 | 8447.14 | 23.5917 | False | None | None | False | None | False | 199282.392738 | 0 | | 2803836 | 90177 | None | PRE08 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24, V-2, Item No.2.3.1, Page No.16) | Cum | 6702.38 | 6702.38 | 0.5683 | False | None | None | False | None | False | 3808.962554 | 0 | | 2803837 | 90177 | None | PRE09 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.2.2, P-41) | Sqm | 295.74 | 295.74 | 118.908 | False | None | None | False | None | False | 35165.85192 | 0 | | 2803838 | 90177 | None | PRE10 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.8, P-42) | Sqm | 393.26 | 393.26 | 211.1772 | False | None | None | False | None | False | 83047.545672 | 0 | | 2803839 | 90177 | None | PRE11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (PWD SR 2023-24, V-2, I No.8.51, P-50) | Sqm | 106.0 | 106.0 | 93.7125 | False | None | None | False | None | False | 9933.525 | 0 | | 2803840 | 90177 | None | PRE12 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24, V-2, I No.11.5.2, P-77) | Sqm | 4496.52 | 4496.52 | 12.6 | False | None | None | False | None | False | 56656.152 | 0 | | 2803841 | 90177 | None | PRE13 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. (PWD SR 2023-24, V-2, I No.11.34A, P-86) | Kg | 178.08 | 178.08 | 226.8 | False | None | None | False | None | False | 40388.544 | 0 | | 2803842 | 90177 | None | PRE14 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. (PWD SR 2023-24, V-2, I No.9.34, P-64) | Sqm | 1637.7 | 1637.7 | 101.08 | False | None | None | False | None | False | 165538.716 | 0 | | 2803843 | 90177 | None | PRE15 | Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 g/m2 (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes , finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturerFeets specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with : 12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095- (Part I) : 2011 (Board with BIS Certification marks only). (PWD SR 2023-24, V-2, I No.7.32.1, P-25) | Sqm | 1041.98 | 1041.98 | 74.4 | False | None | None | False | None | False | 77523.312 | 0 | | 2803844 | 90177 | None | PRE16 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.25, P-45) | Sqm | 145.22 | 145.22 | 118.908 | False | None | None | False | None | False | 17267.81976 | 0 | | 2803845 | 90177 | None | PRE17 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.28, P-45) | Sqm | 94.34 | 94.34 | 211.1772 | False | None | None | False | None | False | 19922.457048 | 0 | | 2803846 | 90177 | None | PRE18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, V-2, I No.8.40, P-48) | Sqm | 121.9 | 121.9 | 30.096 | False | None | None | False | None | False | 3668.7024 | 0 | | 2803847 | 90177 | None | PRE19 | Cement Board. (PWD SR 2023-24, V-2, I No.185, P-A-17) | Sqm | 311.64 | 311.64 | 5.76 | False | None | None | False | None | False | 1795.0464 | 0 | | 2803848 | 90177 | None | PRE20 | Concealed Conduit System Supplying heavygauge PVC conduit pipe..... mm dia....... mm thick confirming toIS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc.,and running before concreting thes lab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures ,run with 18 SWGGI fish wire wherever necessary-25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.2.2, P No-2) | Rmtr | 78.0 | 78.0 | 70.0 | False | None | None | False | None | False | 5460.0 | 0 | | 2803849 | 90177 | None | PRE21 | Supplying heavy gauge PVC Conduit Pipe....dia.......mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall andf ixing by bracing UorJ hooks and cement plastering upto the wall surface and run with18SWGGI fishwire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick. (PWD EL SR. 2023-24, Vol-6, I No-1.3.2, P No-2) | Rmtr | 79.0 | 79.0 | 70.0 | False | None | None | False | None | False | 5530.0 | 0 | | 2803850 | 90177 | None | PRE22 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick / Stone/C.C wall. 1-2 Way.(PWD EL SR. 2023-24, Vol-6, I No-3.4.1, P No-8) | Each | 103.0 | 103.0 | 4.0 | False | None | None | False | None | False | 412.0 | 0 | | 2803851 | 90177 | None | PRE23 | Supplying of..... feet PVC Batten with integrated LED tube....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI Greater than80.Power Input : 220-240V@50/60Hz & Power factor Greater than0.9 along with CE approved.2yearsWarranty against any manufacturing defect working unde rstandard electrical condition. LED light fitting 1 x 2Feet - 9/10 W. (PWD EL SR. 2023-24, Vol-6, I No-11.3.1, P No-43) | Each | 551.0 | 551.0 | 8.0 | False | None | None | False | None | False | 4408.0 | 0 | | 2803852 | 90177 | None | PRE24 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230V, 50cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system.48" Sweep (1200 mm) Regular model. (PWD EL SR. 2023-24, Vol-6, I No-6.3.1, P No-30) | Each | 2984.0 | 2984.0 | 4.0 | False | None | None | False | None | False | 11936.0 | 0 | | 2803853 | 90177 | None | PRE25 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.1, P No-5) | Point | 269.0 | 269.0 | 8.0 | False | None | None | False | None | False | 2152.0 | 0 | | 2803854 | 90177 | None | PRE26 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to outlet vias witch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.2, P No-5) | Point | 379.0 | 379.0 | 12.0 | False | None | None | False | None | False | 4548.0 | 0 | | 2803855 | 90177 | None | PRE27 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) &1x1.0sqmm (Earthwire) FRLS multi strand PVC insulated copper wire (confirmingtoIS-694:and latest amendments) without control switch shallbe fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto10Mtr from tapping point to outlet via switch box. (PWD EL SR. 2023-24, Vol-6, I No-2.2.3, P No-5) | Point | 555.0 | 555.0 | 8.0 | False | None | None | False | None | False | 4440.0 | 0 | | 2803856 | 90177 | None | PRE28 | Supplying 6A flush type socket and 6A flush type SP switch either surface / flush mounting in existing gang box or in 4mm thick plastic sheet and fixing overa flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3854. 6A 2 Way. (PWD EL SR. 2023-24, Vol-6, I No-3.1.1, P No-8) | Each | 128.0 | 128.0 | 28.0 | False | None | None | False | None | False | 3584.0 | 0 | | 2803857 | 90177 | None | PRE29 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. (PWD EL SR. 2023-24, Vol-6, I No-3.8, P No-9) | Sq CM | 0.41 | 0.41 | 300.0 | False | None | None | False | None | False | 123.0 | 0 | | 2803858 | 90177 | None | PRE30 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBFeets single phase / 3phase/ single door with powder coated painting Made out of 14SWG MS enclosure. II - Double Door-6 Way SP & N (PWD EL SR. 2023-24, Vol-6, I No-5.19.7, P No-18) | Each | 1791.0 | 1791.0 | 4.0 | False | None | None | False | None | False | 7164.0 | 0 |
|
|
|---|