| 1708851238000 | 0 | None | None | Other Works | Construction of drain and slab from Thirupalya road behind Babureddy house to Thoppamma Temple in W.No.13 & Construction of drain and culvert from Govind Reddy house to Gopal Reddy house in W.No.16 Hebbagodi CMC Limits(Reserved for SC) | 2537641.57 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2805018 | 90255 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the w( PWD SR 2023-24, Vol:1 P.NO.8 I.No:1.14 ) | Cum | 105.06 | 105.06 | 433.0 | False | None | None | False | None | False | 45490.98 | 0 | | 2805019 | 90255 | None | code02 | Providing rubble and murum filling in layers of 250 to 300 mm including cost of all materials, machinery, labour, watering, ramming etc., complete with all lead and all lifts. WRD Vol:4 P.NO.39 I.No:3.11) | Cum | 1439.94 | 1439.94 | 26.64 | False | None | None | False | None | False | 38360.0016 | 0 | | 2805020 | 90255 | None | code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm and down size graded crushed coarse aggregates (PWD SR 2023-24, Vol:1, P.NO.15, I.No:2.1.3) | Cum | 6168.67 | 6168.67 | 44.97 | False | None | None | False | None | False | 277405.0899 | 0 | | 2805021 | 90255 | None | code04 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately )M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates (PWD SR 2021-22, Vol:1, P.NO.16, I.No:2.4.2) and Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 5% PWD SR 2023-24, Vol:2 P.NO.16 I.No: 22-2) | Cum | 6512.69 | 6512.69 | 152.34 | False | None | None | False | None | False | 992143.1946 | 0 | | 2805022 | 90255 | None | code05 | As per recommendation of technical working group, rates fro formwork (centering, shutering and scaffholding) shall be added on percentage basis to the finished concrete item rate. For drain form works consider 35% (as per specification PWD SR 2023-24, VOL-1, Page no-111, I.NO.4) | Sqm | 2279.44 | 2279.44 | 152.34 | False | None | None | False | None | False | 347249.8896 | 0 | | 2805023 | 90255 | None | code06 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (All other type of structures) (PWD SR 2023-24 , Vol:1, P.NO.18, I.No:2.11 h) | Tonne | 81381.33 | 81381.33 | 7.8 | False | None | None | False | None | False | 634774.374 | 0 | | 2805024 | 90255 | None | code07 | Providing and laying 100mm thick pre-cast cover slabs over Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 500 @ 6kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. (PWD SR 2023-24, Vol:2, P.NO.176, I.No:17.14) | Sqm | 955.84 | 955.84 | 171.9 | False | None | None | False | None | False | 164308.896 | 0 | | 2805025 | 90255 | None | code08 | Removal of Unserviceable Soil with Disposal up to a suitable distance as directed by the Engineer in charge of work (PWD SR 2023-24, Vol:3 P.NO.17, I.No:3.1) | Cum | 87.55 | 87.55 | 433.0 | False | None | None | False | None | False | 37909.15 | 0 |
|