| 1708894090000 | 0 | None | None | Roads | Development of UGD and Road from Pillappa house to Venkatesh house, Devamma house to Pillappa house , Annayyappa house to Yashodamma house and Harish house to Annayappa house, Manju house to Prabhu house and Shekar house to Babu and Vinod house and Construction of UGD from Rajappa house to Park in W.No.15 Hebbagodi CMC Limits | 3383127.66 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2807028 | 90392 | None | code01 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge..(PWD SR 2023-24, VOL-2, P-187,I.No-19.2.1 ) | Cum | 1712.89 | 1712.89 | 33.6 | False | None | None | False | None | False | 57553.104 | 0 | | 2807029 | 90392 | None | code02 | Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (as per specification. PWD SR 2023-224 Vol:1 P.NO.8 I.No:1.14.1) | Cum | 105.06 | 105.06 | 309.84 | False | None | None | False | None | False | 32551.7904 | 0 | | 2807030 | 90392 | None | code03 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24 Vol:1 P.NO. 7 I.No:1.10A) | Cum | 164.8 | 164.8 | 309.84 | False | None | None | False | None | False | 51061.632 | 0 | | 2807031 | 90392 | None | code04 | Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing 230 mm dia. pipes.BWSSB SR 2023-24 Vol:5 P.NO.187 I.No:16.1.4) | Mtr | 908.46 | 908.46 | 224.0 | False | None | None | False | None | False | 203495.04 | 0 | | 2807032 | 90392 | None | code05 | Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Providing and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Providing and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, de-watering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm dia Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.2 M depth & SFRC cover and frame BWSSB SR 2023-24 Vol:3 P.NO.192 I.No: 16.15.4 ) | Nos | 32311.1 | 32311.1 | 19.0 | False | None | None | False | None | False | 613910.9 | 0 | | 2807033 | 90392 | None | code06 | Earth Work Excavtion Earth work in surface excavation by mechanical means for lowering & levelling the ground for all works other than foundation in all kinds of soils & up to depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated urfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.( PWD SR 2023-24, Vol:1 P.NO.8 I.No:1.12 ) | Cum | 97.85 | 97.85 | 222.0 | False | None | None | False | None | False | 21722.7 | 0 | | 2807034 | 90392 | None | code07 | Removal of Unserviceable Soil with Disposal up to a suitable distance as directed by the Engineer in charge of work (PWD SR 2023-24, Vol:3, P.NO.15 I.No:3.1) | Cum | 87.55 | 87.55 | 531.84 | False | None | None | False | None | False | 46562.592 | 0 | | 2807035 | 90392 | None | code08 | Compacting original ground supporting embankment Loosening, levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (PWD SR 2023-24, Vol:3 P.NO.17, I.No:3.7) | Cum | 108.15 | 108.15 | 222.0 | False | None | None | False | None | False | 24009.3 | 0 | | 2807036 | 90392 | None | code09 | Wet Mix Macadam (Plant mix method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (PWD SR 2023-24, VOL:3, P.NO.26, I.NO:4.17) | Cum | 2635.77 | 2635.77 | 111.0 | False | None | None | False | None | False | 292570.47 | 0 | | 2807037 | 90392 | None | code10 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs or 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.(PWD SR 2023-24 VOL:3 P.NO.149 I.NO:16.28) | Cum | 6956.62 | 6956.62 | 111.0 | False | None | None | False | None | False | 772184.82 | 0 | | 2807038 | 90392 | None | code11 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge..(PWD SR 2023-24, VOL-2, P-187,I.No-19.2.1 ) | Cum | 1712.89 | 1712.89 | 15.9 | False | None | None | False | None | False | 27234.951 | 0 | | 2807039 | 90392 | None | code12 | Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (as per specification. PWD SR 2023-224 Vol:1 P.NO.8 I.No:1.14.1) | Cum | 105.06 | 105.06 | 200.13 | False | None | None | False | None | False | 21025.6578 | 0 | | 2807040 | 90392 | None | code13 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24 Vol:1 P.NO. 7 I.No:1.10A) | Cum | 164.8 | 164.8 | 200.13 | False | None | None | False | None | False | 32981.424 | 0 | | 2807041 | 90392 | None | code14 | Supplying, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of 300 mm dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing..(BWSSB SR 2023-24 VOL-5, P-187/I-16.1.6) | Mtr | 1125.79 | 1125.79 | 159.0 | False | None | None | False | None | False | 179000.61 | 0 | | 2807042 | 90392 | None | code15 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Table Moulded Bricks & Medium Duty SFRC Cover & Frame: For Constructing Table Moulded Bricks Machinehole 1.2 m internal dia., 2.0 m depth & Medium duty SFRC cover & frame. (BWSSB SR 2023-24, VOL-5 , P-201/I-16.40.2 | Nos | 47848.65 | 47848.65 | 8.0 | False | None | None | False | None | False | 382789.2 | 0 | | 2807043 | 90392 | None | code16 | Earth Work Excavtion Earth work in surface excavation by mechanical means for lowering & levelling the ground for all works other than foundation in all kinds of soils & up to depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated urfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.( PWD SR 2023-24, Vol:1 P.NO.8 I.No:1.12 ) | Cum | 97.85 | 97.85 | 119.25 | False | None | None | False | None | False | 11668.6125 | 0 | | 2807044 | 90392 | None | code17 | Removal of Unserviceable Soil with Disposal up to a suitable distance as directed by the Engineer in charge of work (PWD SR 2023-24, Vol:3, P.NO.15 I.No:3.1) | Cum | 87.55 | 87.55 | 319.38 | False | None | None | False | None | False | 27961.719 | 0 | | 2807045 | 90392 | None | code18 | Compacting original ground supporting embankment Loosening, levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (PWD SR 2023-24, Vol:3 P.NO.17, I.No:3.7) | Cum | 108.15 | 108.15 | 119.25 | False | None | None | False | None | False | 12896.8875 | 0 | | 2807046 | 90392 | None | code19 | Wet Mix Macadam (Plant mix method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (PWD SR 2023-24, VOL:3, P.NO.26, I.NO:4.17) | Cum | 2635.77 | 2635.77 | 59.625 | False | None | None | False | None | False | 157157.78625 | 0 | | 2807047 | 90392 | None | code20 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs or 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.(PWD SR 2023-24 VOL:3 P.NO.149 I.NO:16.28) | Cum | 6956.62 | 6956.62 | 59.625 | False | None | None | False | None | False | 414788.4675 | 0 |
|