1708861066000 | 0 | None | None | Buildings | REPAIRS OF RAIN DAMAGE WORKS OF QUARTERS NO 126 AND (ROOF REPAIR, WATER TANK, SHEET ROOFING AND OTHER WORKS)AND CONSTRUCTION OF COMPOUND WALL FOR NO 10 AND 11 AND UGD WORKS OF NO 46,47,103,136 127 AT DEREBAIL IN MANGALORE TALUK D.K DISTRICT UNDER THE HEAD OF ACCOUNT 221 6-07-053-0-01-200 QUARTERS REPAIRS AND MAINTAINANCE | 1525404.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2805688 | 90313 | None | I.No.7.37.2, page No.26, Vol-2 | Providing and fixing Mangalore tile roofing using first class tiles with necessary special tiles for ridges and hips, wood reepers and pointed with cement mortar 1:4 over the existing rafters including cost of materials, labour, curing complete as per specifications.-Nandi wood reepers of size 50x25mm.( I.No.7.37.2, page No.26, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 902.72 | 902.72 | 28.22 | False | None | None | False | None | False | 25474.7584 | 0 | 2805689 | 90313 | None | I.No.20.101, page No.207, Vol-2 | Removing and fixing old Mangalore ridge tiles including pointing with C.M. 1:3.( I.No.20.101, page No.207, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Mtr | 163.52 | 163.52 | 40.0 | False | None | None | False | None | False | 6540.8 | 0 | 2805690 | 90313 | None | I.No.12.3, page No.99, Vol-2 | Providing Mathi / Nandi wood wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete as per specifications. ( I.No.12.3, page No.99, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 137086.88 | 137086.88 | 2.06 | False | None | None | False | None | False | 282398.9728 | 0 | 2805691 | 90313 | None | I.No.12.12, page No.99, Vol-2 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications.( I.No.12.12, page No.99, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 139106.24 | 139106.24 | 0.3 | False | None | None | False | None | False | 41731.872 | 0 | 2805692 | 90313 | None | I.No.12.15, page No.100, Vol-2 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures )( I.No.12.15, page No.100, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 8337.28 | 8337.28 | 15.74 | False | None | None | False | None | False | 131228.7872 | 0 | 2805693 | 90313 | None | Page No.123 , Sl No 13.34A vol-2 | Providing and fixing rectangular high density polyethylene water storage loft tank with cover, confirming to ISI:12701, colour of opaque white or as approved by Engineer-in-charge. The rate includes making necessary holes for inlet, outlet and over flow pipes., The base support i/c fitting and fixtures for tank shall be paid separately.(Page No.123 , Sl No 13.34A vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Ltr | 10.08 | 10.08 | 2000.0 | False | None | None | False | None | False | 20160.0 | 0 | 2805694 | 90313 | None | Vol-2, I.No. 20.90, Page No. 206 | Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:6 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification.(Vol-2, I.No. 20.90, Page No. 206)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 403.2 | 403.2 | 45.91 | False | None | None | False | None | False | 18510.912 | 0 | 2805695 | 90313 | None | Vol-2, I.No. 20.104, Page No. 207 | Repairing and fixing shutters (panelled or glazed) to doors, windows, ventilators and cupboards.(Vol-2, I.No. 20.104, Page No. 207)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 1092.0 | 1092.0 | 4.32 | False | None | None | False | None | False | 4717.44 | 0 | 2805696 | 90313 | None | I.No.14.3.1 P.No.131 Vol-2 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid(I.No.14.3.1P.No.131 Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 6694.24 | 6694.24 | 2.0 | False | None | None | False | None | False | 13388.48 | 0 | 2805697 | 90313 | None | I.No 13.2.1 , P No 117 Vol-2 | Providing and fixing brass bib cock of approved quality 15 mm nominal bore (I.No 13.2.1 , P No 117 Vol-2 of ).
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 320.32 | 320.32 | 4.0 | False | None | None | False | None | False | 1281.28 | 0 | 2805698 | 90313 | None | P.No.120 I.No.13.23.1 vol-2 | Providing and fixing PTMT Ball cock of approved quality, colour and make
complete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball.15 mm nominal bore, 105 mm long, weighing not less than 138 g (P.No.120 I.No.13.23.1 vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 229.6 | 229.6 | 4.0 | False | None | None | False | None | False | 918.4 | 0 | 2805699 | 90313 | None | P.No.132 I.No.14.7.3 Vol-2 | White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps (P.No.132 I.No.14.7.3 Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Each | 3209.92 | 3209.92 | 4.0 | False | None | None | False | None | False | 12839.68 | 0 | 2805700 | 90313 | None | P.No.117 I.No.13.5.3 Vol-2 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :25 mm nominal bore (P.No.117 I.No.13.5.3 Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 371.84 | 371.84 | 3.0 | False | None | None | False | None | False | 1115.52 | 0 | 2805701 | 90313 | None | P.No.117 I.No.13.4.1 Vol-2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :25 mm nominal bore (P.No.117 I.No.13.4.1 Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 614.88 | 614.88 | 4.0 | False | None | None | False | None | False | 2459.52 | 0 | 2805702 | 90313 | None | P.No.134 I.No.14.10.2.1 vol-2 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required :Kitchen sink without drain board 610x510 mm bowl depth 200 mm. (P.No.134 I.No.14.10.2.1 vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Mtr | 4060.0 | 4060.0 | 1.0 | False | None | None | False | None | False | 4060.0 | 0 | 2805703 | 90313 | None | Vol-2, P.No. 125, I.No.13.50.3 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work- 25 mm nominal dia Pipes (Vol-2, P.No. 125, I.No.13.50.3 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Mtr | 250.88 | 250.88 | 61.0 | False | None | None | False | None | False | 15303.68 | 0 | 2805704 | 90313 | None | Vol-2, P.No. 125, I.No.13.50.4 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work- 32 mm nominal dia Pipes (Vol-2, P.No. 125, I.No.13.50.4 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Mtr | 304.64 | 304.64 | 54.0 | False | None | None | False | None | False | 16450.56 | 0 | 2805705 | 90313 | None | P.No.113 I.No.10.1.1 vol-5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latestamendments and conveying to worksite, rolling and lowering intotrenches, laying true to line and level and perfect linking at joints, testingand commissioning, including loading unloading at both destinations andcuts of pipes wherever necessary including jointing of PVC pipes andspecials (excluding cost of specials) with jointing of approved type, withall labour with all lead & lift including encasing the pipe alround to a depthof not less than 15 cms. with soft gravel or selected earth available fromthe excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 25mm dia, 10 kg/sqcm & class 5 (P.No.113 I.No.10.1.1 vol-5)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Rmtr | 53.76 | 53.76 | 72.0 | False | None | None | False | None | False | 3870.72 | 0 | 2805706 | 90313 | None | P.No.113 I.No.10.1.7 Vol-5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latestamendments and conveying to worksite, rolling and lowering intotrenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the cavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. forPVC pipes 110mm dia., 6 kg/sqcm & class 3(P.No.113 I.No.10.1.7 Vol-5)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Rmtr | 460.32 | 460.32 | 102.0 | False | None | None | False | None | False | 46952.64 | 0 | 2805707 | 90313 | None | Vol-5, P.No. 191, I.No.16.10 | Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. (Vol-5, P.No. 191, I.No.16.10 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Nos | 4744.32 | 4744.32 | 2.0 | False | None | None | False | None | False | 9488.64 | 0 | 2805708 | 90313 | None | Item No. 7.1.1 Page 21 Vol. 2 | Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge.0.63 mm thick with zinc coating not less than 275 g/ m²( Item No. 7.1.1 Page 21 Vol. 2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 984.48 | 984.48 | 42.0 | False | None | None | False | None | False | 41348.16 | 0 | 2805709 | 90313 | None | No.11.16.2. Page 82 (Vol-2) | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Item No.11.16.2. Page 82 (Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Kgs | 164.64 | 164.64 | 183.04 | False | None | None | False | None | False | 30135.7056 | 0 | 2805710 | 90313 | None | item no 1.4.1,vol 1,page 5 | Earth work excavation by manual means for drains, canals, waste weir, draft,
approach channels, key trenches, foundation of Buildings & bridges and such
simillar works in all kinds of soils, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, removal
of stumps and other deleterious matter, excavated surface leveled and sides
neatly dressed disposing off the excavated stuff or sorting & stacking the
selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of
labour, tools & other appurtenaces required to complete the work.
1.4.1 In all kinds of soils Depth upto 1.5 m
item no 1.4.1,vol 1,page 5 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 271.04 | 271.04 | 23.64 | False | None | None | False | None | False | 6407.3856 | 0 | 2805711 | 90313 | None | Page no 5, item no 1.4.1, Vol-1 | Earth work excavation by manual means for drains, canals, waste weir, draft,
approach channels, key trenches, foundation of Buildings & bridges and such
simillar works in all kinds of soils, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, removal
of stumps and other deleterious matter, excavated surface leveled and sides
neatly dressed disposing off the excavated stuff or sorting & stacking the
selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of
labour, tools & other appurtenaces required to complete the work.
1.4.1 In all kinds of soils Depth upto 1.5 m
(Page no 5, item no 1.4.1, Vol-1) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 271.04 | 271.04 | 48.02 | False | None | None | False | None | False | 13015.3408 | 0 | 2805712 | 90313 | None | Page no 5, item no 1.4.2, Vol-1 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. b).Depth exceeding 1.50 M, but not exceeding 3.00 M(Page no 5, item no 1.4.2, Vol-1)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 290.08 | 290.08 | 28.58 | False | None | None | False | None | False | 8290.4864 | 0 | 2805713 | 90313 | None | Page no 15, item no 2.1.3, Vol-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical spcifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates.(Page no 15, item no 2.1.3, Vol-1)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6707.68 | 6707.68 | 4.87 | False | None | None | False | None | False | 32666.4016 | 0 | 2805714 | 90313 | None | Page no 15, item no 2.1.6, Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.(Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates). (Page no 15, item no 2.1.6, Vol-1)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6992.16 | 6992.16 | 4.76 | False | None | None | False | None | False | 33282.6816 | 0 | 2805715 | 90313 | None | Page no 9, item no 5.2, Vol-2 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(Page no 9, item no 5.2, Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7412.16 | 7412.16 | 6.48 | False | None | None | False | None | False | 48030.7968 | 0 | 2805716 | 90313 | None | Page no 9, item no 5.3, Vol-2 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Page no 9, item no 5.3, Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 6949.6 | 6949.6 | 4.86 | False | None | None | False | None | False | 33775.056 | 0 | 2805717 | 90313 | None | Page no 9, item no 5.6, Vol-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification. I.S. 3620/1979 having compressive strength not less then 3.5 N/mm2 for saturated dry samples -For Basement in CM 1:6 S.R. (Page no 9, item no 5.6, Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7221.76 | 7221.76 | 29.21 | False | None | None | False | None | False | 210947.6096 | 0 | 2805718 | 90313 | None | Page no 9, item no 5.7, Vol-2 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification. I.S. 3620/1979 having compressive strength not less then 3.5 N/mm2 for saturated dry samples -For Super structure in CM 1:6 (Page no 9, item no 5.7, Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 7565.6 | 7565.6 | 15.07 | False | None | None | False | None | False | 114013.592 | 0 | 2805719 | 90313 | None | Page no 9, item no 16.3.18, Vol-5 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required
pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.(RCC NP3 Class pipe of 2200 mm dia.)(Page no 9, item no 16.3.18, Vol-5)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Rmtr | 33694.08 | 33694.08 | 3.0 | False | None | None | False | None | False | 101082.24 | 0 | 2805720 | 90313 | None | Page no 16, item no 2.3.2, Vol-1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(Page no 16, item no 2.3.2, Vol-1)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Cum | 8709.12 | 8709.12 | 2.85 | False | None | None | False | None | False | 24820.992 | 0 | 2805721 | 90313 | None | Page no18, item no 2.11h, Vol-1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(h. All other type of structures)(Page no18, item no 2.11h, Vol-1)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Tonne | 88492.32 | 88492.32 | 0.2 | False | None | None | False | None | False | 17698.464 | 0 | 2805722 | 90313 | None | Page no 41, item no 8.3.2, Vol-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Page no 41, item no 8.3.2, Vol-2)
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 372.96 | 372.96 | 156.81 | False | None | None | False | None | False | 58483.8576 | 0 | 2805723 | 90313 | None | I.No.8.53.1, page No.50, Vol-2 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge.( I.No.8.53.1, page No.50, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 110.88 | 110.88 | 425.34 | False | None | None | False | None | False | 47161.6992 | 0 | 2805724 | 90313 | None | I.No.8.74.1, page No.53, Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two coat applied @ 1.67 l/ 10 m²) on existing cement paint surface including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.( I.No.8.74.1, page No.53, Vol-2 )
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc.. complete as directed as per specification and direction of Engineer in-charge of the work | Sqm | 117.6 | 117.6 | 385.64 | False | None | None | False | None | False | 45351.264 | 0 |
|