tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1708764376000 | 1 | None | None | Bridges | Diversion Road | 991752.93 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2796057 | 89657 | None | volume-3,pageno-9,chapter-2,itemno-2.4.ii | Clearing and Grubbing Road Land : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | 100 Sqm | 412.65 | 412.65 | 6.3 | False | None | None | False | None | False | 2599.695 | 0 | 2796058 | 89657 | None | volume-1,pageno-7,chapter-1,itemno-1.8 | Construction of Embankment by excavating the available approved Gravel Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 percent cum for every 1.50 m height or part there off. Deduct 5percent per cum if rollers are not used and tamping is done manually. Add 8percent per cum for works under foul & sullage situation ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 497.7 | 497.7 | 1389.3 | False | None | None | False | None | False | 691454.61 | 0 | 2796059 | 89657 | None | volume-3,pageno-17,chapter-3,itemno-3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 MORTH Specification No. 305 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 517.65 | 517.65 | 247.5 | False | None | None | False | None | False | 128118.375 | 0 | 2796060 | 89657 | None | volume-3,pageno-87,chapter-9,itemno-9.1 | Laying Reinforced Cement Concrete Pipe NP4 /Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.-(ii) 1200 mm dia MORTH Specification No.2900 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Rmtr | 11305.35 | 11305.35 | 15.0 | False | None | None | False | None | False | 169580.25 | 0 |
| 1708764376000 | 1 | None | None | Bridges | Construction of bridge in Bhadravathi to Sasivehalli(Honnali Taluk Border)Via Holehonnur,Sidlipura,Sanyasikodamaggi,Nagasa m udra,Mangote,Anaveri,Nimbegondi,Syderkallahalli in Ch 7.95 km in Bhadravathi Tq | 11290115.64 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2796061 | 89658 | None | volume-3,pageno-10,chapter-2,itemno-2.7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead MORTH Specification 202.(I) Lime /Cement Concrete (ii). By Mechanical means A. Cement Concrete Grade M-15 & M-20 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 754.95 | 754.95 | 33.3 | False | None | None | False | None | False | 25139.835 | 0 | 2796062 | 89658 | None | volume-2,pageno-10,chapter-2,itemno-2.11.A | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead MORTH Specification 202.(IV) Dismantling Stone Masonry (ii). By Mechanical means A. Cement Concrete Grade M-15 & M-20 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 189.0 | 189.0 | 124.29 | False | None | None | False | None | False | 23490.81 | 0 | 2796063 | 89658 | None | volume-1,pageno-8,chapter-1,itemno-1.14.1 | Mechanical Means: -In all kinds of soils Depth upto 3m Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (i) Depth upto 3 m. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 116.84 | 116.84 | 1428.42 | False | None | None | False | None | False | 166896.5928 | 0 | 2796064 | 89658 | None | volume-1,pageno-8,chapter-1,itemno-1.14.2 | Mechanical Means: -In all kinds of soils Depth 3m to 6m Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m to, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (ii) Depth from 3 m to 6 m depth ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 134.02 | 134.02 | 723.21 | False | None | None | False | None | False | 96924.6042 | 0 | 2796065 | 89658 | None | volume-1,pageno-8,chapter-1,itemno-1.15.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 415.8 | 415.8 | 161.83 | False | None | None | False | None | False | 67288.914 | 0 | 2796066 | 89658 | None | volume-1,pageno-15,chapter-2,itemno-2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 6860.07 | 6860.07 | 37.67 | False | None | None | False | None | False | 258418.8369 | 0 | 2796067 | 89658 | None | volume-1,pageno-15,chapter-2,itemno-2.2.3 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of formwork and steel reinforcement to be paid seperately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 7257.54 | 7257.54 | 200.86 | False | None | None | False | None | False | 1457749.4844 | 0 | 2796068 | 89658 | None | volume-1,pageno-111,itemno-1.a | Formwork, Centering & Scaffloding 3% For Foundation (b) All other types ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Per Cmtr | 217.73 | 217.73 | 200.86 | False | None | None | False | None | False | 43733.2478 | 0 | 2796069 | 89658 | None | volume-1,pageno-16,chapter-2,itemno-2.4.3 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of formwork and steel reinforcement to be paid seperately) M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 7257.54 | 7257.54 | 254.01 | False | None | None | False | None | False | 1843487.7354 | 0 | 2796070 | 89658 | None | volume-1,pageno-111,itemno-10 | Formwork, Centering & Scaffloding 10% For abutments and piers ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Per Cmtr | 725.75 | 725.75 | 254.01 | False | None | None | False | None | False | 184347.7575 | 0 | 2796071 | 89658 | None | volume-1,pageno-16,chapter-2,itemno-2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of formwork and steel reinforcement to be paid seperately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.
---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 7185.15 | 7185.15 | 86.59 | False | None | None | False | None | False | 622162.1385 | 0 | 2796072 | 89658 | None | volume-1,pageno-112,itemno-1 | Formwork, Centering & Scaffloding 20% For abutments and piers ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Per Cmtr | 1437.03 | 1437.03 | 86.59 | False | None | None | False | None | False | 124432.4277 | 0 | 2796073 | 89658 | None | volume-3,pageno-121,chapter-13,itemno-13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification MORTH Specification No. 2700 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 7151.55 | 7151.55 | 12.06 | False | None | None | False | None | False | 86247.693 | 0 | 2796074 | 89658 | None | volume-3,pageno-122,chapter-13,itemno-13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). MORTH Specification No. 1500,1600 1700 & 2704. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 12426.75 | 12426.75 | 25.2 | False | None | None | False | None | False | 313154.1 | 0 | 2796075 | 89658 | None | volume-3,pageno-121,chapter-13,itemno-13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) MORTH Specification No. 2702 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 14669.55 | 14669.55 | 14.22 | False | None | None | False | None | False | 208601.001 | 0 | 2796076 | 89658 | None | volume-3,pageno-117,chapter-12,itemno-12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Reference to MORTH Specification 710.1.4 of IRC:78 and 2200 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 2810.85 | 2810.85 | 224.25 | False | None | None | False | None | False | 630333.1125 | 0 | 2796077 | 89658 | None | volume-3,pageno-117,chapter-12,itemno-12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular materialc Reference to MORTH Specification No. 710.1.4 of IRC:78 & 2200 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 1226.4 | 1226.4 | 988.33 | False | None | None | False | None | False | 1212087.912 | 0 | 2796078 | 89658 | None | volume3,pageno-121,chapter-13,pageno-13.7 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification MORTH Specification No. 2705 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | No | 3434.55 | 3434.55 | 2.0 | False | None | None | False | None | False | 6869.1 | 0 | 2796079 | 89658 | None | volume-1,pageno-18,chapter-2,itemno-2.11.b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. b.Foundations of bridges ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Tonne | 90516.3 | 90516.3 | 13.0 | False | None | None | False | None | False | 1176711.9 | 0 | 2796080 | 89658 | None | volume-1,pageno-18,chapter-2,itemno-2.11.c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. c.Sub structure of bridges ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Tonne | 90754.65 | 90754.65 | 22.5 | False | None | None | False | None | False | 2041979.625 | 0 | 2796081 | 89658 | None | volume-1,pageno-18,chapter-2,itemno-2.11.d | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. d.Super structure of bridges ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Tonne | 90990.9 | 90990.9 | 5.5 | False | None | None | False | None | False | 500449.95 | 0 | 2796082 | 89658 | None | volume-3,pageno-121,chapter-13,itemno-13.5 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. MORTH Specification No.2703,1500,1600and 1700. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Mtr | 2377.2 | 2377.2 | 31.6 | False | None | None | False | None | False | 75119.52 | 0 | 2796083 | 89658 | None | volume-3,pageno-123,chapter-13,itemno-13.15.ii | Filler joint Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Mtr | 143.85 | 143.85 | 78.08 | False | None | None | False | None | False | 11231.808 | 0 | 2796084 | 89658 | None | volume-3,pageno-123,chapter-13,itemno-13.15.iii | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Mtr | 242.55 | 242.55 | 78.08 | False | None | None | False | None | False | 18938.304 | 0 | 2796085 | 89658 | None | volume-3,pageno-124,chapter-13,itemno-13.15.iv | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 percent bitumen by weight ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Mtr | 50.4 | 50.4 | 78.08 | False | None | None | False | None | False | 3935.232 | 0 | 2796086 | 89658 | None | volume-4,pageno-38,chapter-2,itemno-2.8 | Providing and fixing 25 mm dia 3 m long cold twisted defomed steel dowel bars with one end driven into 38 mm dia 1.50 m deep hole drilled in bed rock and other end provided with L - bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appurtenant works including cost of all materials, machinery, labour, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Each | 1412.25 | 1412.25 | 64.0 | False | None | None | False | None | False | 90384.0 | 0 |
| 1708764376000 | 0 | None | None | Bridges | Approach road | 5410207.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2796087 | 89659 | None | volume-3,pageno-17,chapter-3,itemno-3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead MORTH Specification No. 305.4.3 (i) By Mechanical Means Using Hydraulic excavator ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Sqm | 6.3 | 6.3 | 1210.0 | False | None | None | False | None | False | 7623.0 | 0 | 2796088 | 89659 | None | volume-1,pageno-7,chapter-1,itemno1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5percent per cum for every 1.50 m height or part there off. Deduct per cum if rollers are not used and tamping is done manually. Add 8percent per cum for works under foul & sullage situation ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 497.7 | 497.7 | 2461.64 | False | None | None | False | None | False | 1225158.228 | 0 | 2796089 | 89659 | None | volume-3,pageno-17,chapter-3,itemno-3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 MORTH Specification No. 305 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 517.65 | 517.65 | 1026.99 | False | None | None | False | None | False | 531621.3735 | 0 | 2796090 | 89659 | None | volume-3,pageno-23,chapter-4,itemno-4.2.V | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per
design spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with front end
loader at OMC and compacting with vibratory roller to achieve
the desired density, complete as per clause 401 (v) For Grading -V Material ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 2476.95 | 2476.95 | 416.9 | False | None | None | False | None | False | 1032640.455 | 0 | 2796091 | 89659 | None | volume-3,pageno-26,chapter-4,itemno-4.17 | 406-A Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORTH Specification No. 406 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 2686.95 | 2686.95 | 412.5 | False | None | None | False | None | False | 1108366.875 | 0 | 2796092 | 89659 | None | volume-3,pageno-31,chapter-5,itemno-5.1 | 502-A (i) Prime Coat Over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. MORTH Specification No. 502 ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Sqm | 43.05 | 43.05 | 1650.0 | False | None | None | False | None | False | 71032.5 | 0 | 2796093 | 89659 | None | volume-3,pageno-35,chapter-5,itemno-5.12.c | Dense Graded Bituminous macadam Grading -II for traffic less than
20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 9921.45 | 9921.45 | 82.5 | False | None | None | False | None | False | 818519.625 | 0 | 2796094 | 89659 | None | volume-3,pageno-38,chapter-5,itemno-5.16.c | Bituminous Concrete Grading -II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH
capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Cum | 11501.7 | 11501.7 | 49.5 | False | None | None | False | None | False | 569334.15 | 0 | 2796095 | 89659 | None | volume-3,pageno-67,chapter-8,itemno8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. MORTH Specification No. 803. ---- including cost and conveyance of all materials with hire charges of machinery and equipments, with all lead | Sqm | 556.5 | 556.5 | 82.5 | False | None | None | False | None | False | 45911.25 | 0 |
|
|
---|