1708942891000 | 0 | None | None | Dam and Allied works | Construction of Check Dam across halla near Kyasapura Anamanahalli village, Shyanuboganahalli Grama panchayath in Ramanagara Taluk Ramanagara District | 4034522.97 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2812781 | 90663 | None | Item No 2.5 (ii) a, Volume-III, PAGE No-9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By mechanical means using Dozer (a) In area of light jungle. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | 100 Sqm | 393.0 | 393.0 | 121.2 | False | None | None | False | None | False | 47631.6 | 0 | 2812782 | 90663 | None | Item No 1.14.1, Volume-I, PAGE No-8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 102.0 | 102.0 | 433.65 | False | None | None | False | None | False | 44232.3 | 0 | 2812783 | 90663 | None | Item No 2.13, Volume-IV, PAGE No-39 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 6067.0 | 6067.0 | 26.69 | False | None | None | False | None | False | 161928.23 | 0 | 2812784 | 90663 | None | Item No 1.12, Volume-IV, PAGE No-130 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 6955.0 | 6955.0 | 417.25 | False | None | None | False | None | False | 2901973.75 | 0 | 2812785 | 90663 | None | Item No 2.11e, Volume-I, PAGE No-18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (e) Dam and allied works Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | t | 88842.0 | 88842.0 | 3.426 | False | None | None | False | None | False | 304372.692 | 0 | 2812786 | 90663 | None | Item No 1.8, Volume-IV, PAGE No-130 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 1278.0 | 1278.0 | 142.8 | False | None | None | False | None | False | 182498.4 | 0 | 2812787 | 90663 | None | Item No 3.41.2, Volume-IV, PAGE No-54 | Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.300mm thick Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Sqm | 455.0 | 455.0 | 470.8 | False | None | None | False | None | False | 214214.0 | 0 | 2812788 | 90663 | None | Item No 3.3, Volume-IV, PAGE No-47 | Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not
less than 95 percent or as stipulated using power roller and all other ancillary operations complete. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 629.0 | 629.0 | 96.0 | False | None | None | False | None | False | 60384.0 | 0 | 2812789 | 90663 | None | Item No 3.13, Volume-IV, PAGE No-140 | De-silting of Tank bed/Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | Cum | 94.0 | 94.0 | 1152.0 | False | None | None | False | None | False | 108288.0 | 0 | 2812790 | 90663 | None | Item No 8.54, Volume-III, PAGE No-78 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild
steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 Complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work | No | 9000.0 | 9000.0 | 1.0 | False | None | None | False | None | False | 9000.0 | 0 |
|