createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709097052363
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd5890.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose07-03-2024 16:30:00
tenderQueryClose06-03-2024 16:30:00
technicalBidOpen11-03-2024 16:30:00
publishedDate29-02-2024 14:59:41
publishedByPostPWD_EE_DIV_CKM
publishedByUserKPE11164 - D N SRIDHAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonD N Sridhar
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08262234028
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709097052400
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9402
titleConstruction and development of Painting works to AC Quarters in Tarikere Taluk
descriptionConstruction and development of Painting works to AC Quarters in Tarikere Taluk
categoryWORKS
categoryTextWorks
ecv199539.86
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1699
locationNamePWD Division Office Chikkamagaluru
provisionalAmount250000.0
groupOverheadTotalNone
fileNumberAEE/pwd/trk/acqrts/painting
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17090970520000NoneNoneBuildingsConstruction and development of Painting works to AC Quarters in Tarikere Taluk199539.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
283194291701None1.4 v1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m. (Vol 1/ page 5, sl no-1.4) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum242.0242.011.7FalseNoneNoneFalseNoneFalse2831.40
283194391701None2.1.3 v1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Vol 1/ page 15, sl no-2.1.3) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum5989.05989.02.34FalseNoneNoneFalseNoneFalse14014.260
283194491701None5.5 v2Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Foundation in CM 1:6. (Vol 2/ page 9, sl no-5.5) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum6374.06374.04.55FalseNoneNoneFalseNoneFalse29001.70
283194591701None5.6Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Basement in CM 1:6. (Vol 2/ page 9, sl no-5.6) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum6448.06448.03.64FalseNoneNoneFalseNoneFalse23470.720
283194691701None6.3 v2Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (Vol 2/ page 13, sl no-6.3) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Cum8874.08874.08.97FalseNoneNoneFalseNoneFalse79599.780
283194791701None8.7 v2Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol 2/ page 42, sl no-8.7) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm366.0366.078.0FalseNoneNoneFalseNoneFalse28548.00
283194891701None8.29 v2Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol 1/ page 45, sl no-8.29) ---- Including cost and conveyance of all materials Labour Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc.. Complete as directed as per specification and direction of Engineer in-charge of the work.Sqm283.0283.078.0FalseNoneNoneFalseNoneFalse22074.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17091878950000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17091878950000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17091878950000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17091879900000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17091879960000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17091880050000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17091880100000NoneNoneELIGIBILITYThe tenderer should be a PWD registered Contractor - Class-4 and above also Contractors should have Registration of GST, Employers Provident Fund and tenderer should submit Registration Certificate along with technical bid.None
17091880180000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund and Contractors should follow strictly prevailing rules of labour act.None
17091880230000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17091880290000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government orders. The item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts labor, hire charges of machinery equipment etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17091880360000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. The tender fee is non-refundable and The employer is not responsible for any delay in accessing KPP Portal.None
17091880430000NoneNoneELIGIBILITYAll Scanned Documents of the Original should be up-loaded, Executive Engineer/ Superintending Engineer/ Chief Engineer reserves the right verify the Original Documents before approval, 0riginal documents / Certificates for qualification shall be produced when called for during evaluation of tender.None
17091880500000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17091880570000NoneNoneELIGIBILITYThe Tenderer should maintain the Work during defective liability period as indicated in The Contract DataNone
17091880640000NoneNoneELIGIBILITYThe materials like bitumen, Steel, Cement etc., required for the work shall be procured by the tenderer themselves and should be got tested by the Quality Control Authority before use on the work.None
17091880710000NoneNoneELIGIBILITYTenderer shall obtain the Work done Certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the tender. The Original Certificate shall be produced at the time of opening of Technical Bids for physical verification.None
17091880780000NoneNoneELIGIBILITYIf the tender of the successful tenderer is seriously unbalanced in relation to the Employers estimate of the cost of the work to be performed under the contract, the Employer may require the Tenderer to produce detailed price analysis for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, the Employer may require that the amount of the performance security set forth in Clause 24 be increased at the expense of the successful Tenderer to a level sufficient to protect the Employer against financial loss in the event of default of the successful under the contract.None
17091880840000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30/07/2022, 18% GST will be added to the Contract amount separately. And Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17091880910000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2021-22 updated to 2023-24 and prevailing GST (18% of Amount Put to tender) amount is kept in form of Lump sum in sanctioned estimate according to guidelines in Common SR (GO:PWD 51 RDF 2019 Bangaluru Dt:18.03.2022). Therefore, amount put to Tender and ECV amount are excluding GST. KPP-PORTAL format has No Options to add GST Separately at stage of Draft Tender Schedule Process for Over All amount put to Tender, tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. Hence, Contractor has to quote the rates excluding GST and the GST will be paid separately for the quoted amount accordingly. Declaration Certificate must be attached mandatorily.None
17091881000000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
17091881060000NoneNoneELIGIBILITYIn case if the death of a contractor, after executing the agreement / commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work.None
17091881120000NoneNoneELIGIBILITYPERFORMANCE SECURITY - The successful tenderer shall furnish Performance Security Deposit (Achievement Guarantee) at 5% of the amount put to tender with in 20 days after approve of tender as per rule 29.5 of the tender and clause 44 of the agreement in the form of cash/Bankers Cheque, D.D, Pay order Bank Guarantee or N.S.Cs, duly pledged in the nature of EXECUTIVE ENGINEER, PWD Chikmagalur Division.None
17091881180000NoneNoneELIGIBILITYAll documents should be uploaded by the contractor is to be attested by the authorized notary or not below the rank of Executive Engineer and should be produced for verification at any stage of process as and when saught for .Failure to produce original documents leads to rejection of Tender.None
17091881240000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17091881300000NoneNoneELIGIBILITYItem for which no rates or price has been entered in will not be paid for by the Employer when executed & shall be deemed covered by the other rates & prices in the bill of quantities.None
17091881360000NoneNoneELIGIBILITYThe tender validity period is 90Days from the date of opening of TenderNone
17091881420000NoneNoneELIGIBILITYContractors has to upload the EPF Registration with JANUARY 2024 Challan Copy Contractors has to submit their labour EPF details with every Running BillNone
17091881490000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document.None
17091882270000NoneNoneELIGIBILITYName, address, and telephone, telex, and fax numbers of the Tenderers may provide references if contacted by the EmployerNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNoneMandating Satisfactory completion as a prime contractor, for at least one Similar nature of work to on Extent Of 50% of the cost of the work for all works costing up to and Rs. 100 Lakhs. i.e Rs.1.18 Lakhs. (similar nature of work: BUILDING work) (2018-2019 to 2022-2023)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneKPWD Class IV and above RegistratioCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneexisting commitments and on-going works to be completed during the next THREE months in the prescribed format from the Competent Authority not below the rank of Executive Engineer District Level OfficerCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- existing commitments
NoneNoneNoneNoneContractors has to upload the EPF Registration with Challan JANUARY 2024Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneachieved in at least ONE financial year a minimum financial contract turnover (2018-2019 to 2022-2023) (in all classes of civil engineering construction works only). Of Rs.2.35 lakhs, Approved by CA with UDIN No.THE CONTRACTOR SHOULD UPLOAD TURNOVER CERTIFICATE WITH BALANCE SHEETSFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTenderers , will only be qualified, if their available tender capacity is more than the total tender value. i.e. AXNX2.5 - B as per KW 1 Document for computing the value of A and B for the last five years i.e. 2018-2019 to 2022-2023Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneName, address, and telephone, telex, and fax numbers of the Tenderers may provide references if contacted by the EmployerOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneContractor has to upload GST Declaration Certificate in the prescribed format.OthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Class IV and above RegistrationTrueTechnical Bid
Mandating Satisfactory completion as a prime contractor, for at least one Similar nature of work to on Extent Of 50 PERCENT of the cost of the work for all works costing up to and Rs. 100 Lakhs. i.e Rs.1.18 Lakhs. similar nature of work BUILDING work 2018-2019 to 2022-2023TrueTechnical Bid
achieved in at least ONE financial year a minimum financial contract turnover 2018-2019 to 2022-2023 in all classes of civil engineering construction works only. Of Rs.2.35 lakhs, Approved by CA with UDIN No.THE CONTRACTOR SHOULD UPLOAD TURNOVER CERTIFICATE WITH BALANCE SHEETSTrueTechnical Bid
existing commitments and on-going works to be completed during the next THREE months in the prescribed format from the Competent Authority not below the rank of Executive Engineer District Level OfficerTrueTechnical Bid
Name, address, and telephone, telex, and fax numbers of the Tenderers may provide references if contacted by the EmployerTrueTechnical Bid
Tenderers , will only be qualified, if their available tender capacity is more than the total tender value. i.e. AXNX2.5 - B as per KW 1 Document for computing the value of A and B for the last five years i.e. 2018-2019 to 2022-2023TrueTechnical Bid
Contractors has to upload the EPF Registration with Challan JANUARY 2024TrueTechnical Bid
Contractor has to upload GST Declaration Certificate in the prescribed format.TrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsChikkmagaluruTarikereChikmagalurTARIKERETarikereNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone