1709214356000 | 0 | None | None | Buildings | Providing and fixing Name board infront of quarters and Automatic Boom Barrier Gate, Construction of Security Room and Other repair works to Sharavathi and Krishna Block, National Games Village, Koramangala, Bengaluru. | 1617737.71 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2864634 | 93193 | None | ADR | Fabricating, supplying and fixing Name Board of sie 2.48 x 0.95 mtr made out of M.S sheet of 16 gauge welded to the two vertical poles of 50mm dia of height 4.00 mtr back side of teh sheet is supported with the L angle of size 25 x 25 x 6 mm L angle is welded to the sheet alround and also three vertical 10mm M.S Rods also welded at equal intervals. The cost includes cutting, welding, grinding painted with one cost primier and two coats of metal paint and lettering to the board with required design and specification and fixing the board in position including cost of earth work excavation and cement concrete 1:2:4 including cost of all materials, labour charges with all lead and lift, loading and unloading, transportation and all other incidenta charges etc., complete as per the specifications and direction of the Engineer in charge of the work (ADR No.8446 Dated:16.01.2014 Sl.N.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 38000.0 | 38000.0 | 18.0 | False | None | None | False | None | False | 684000.0 | 0 | 2864635 | 93193 | None | DATARATE | Supply of Boom Barrier indian make Maximum Boom Length up to 6mtr Aluminium Boom in 75/80mm OD Opening Time: 3-6 Second With IP55 protection grade Duty Cycle 60% Operating Temp:-10C to +60C Incl Installation (Data Rate)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 95000.0 | 95000.0 | 4.0 | False | None | None | False | None | False | 380000.0 | 0 | 2864636 | 93193 | None | 1.2 | Earth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.(Page No.5, SR Vol-1,I No.1.2 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 632.5 | 632.5 | 2.93 | False | None | None | False | None | False | 1853.225 | 0 | 2864637 | 93193 | None | 2.1.6 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates(Page No.15, SR Vol-1,I No.2.1.6 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6867.3 | 6867.3 | 0.65 | False | None | None | False | None | False | 4463.745 | 0 | 2864638 | 93193 | None | 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Page No.15, SR Vol-1,I No.2.2.1 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6915.7 | 6915.7 | 3.04 | False | None | None | False | None | False | 21023.728 | 0 | 2864639 | 93193 | None | 2.11 a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings (Page No.18 Item No.2.11 a Common SR for 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | t | 98402.7 | 98402.7 | 0.17 | False | None | None | False | None | False | 16728.459 | 0 | 2864640 | 93193 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Page No.7, SR Vol-1,I No.1.10 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 176.0 | 176.0 | 2.93 | False | None | None | False | None | False | 515.68 | 0 | 2864641 | 93193 | None | 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(Page No.9, SR Vol-2,I No.5.4 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 7027.9 | 7027.9 | 1.19 | False | None | None | False | None | False | 8363.201 | 0 | 2864642 | 93193 | None | 21.9.3 | Providing and constructing burnt brick masonry with approved quality of modular bricks of standard size of class designation 5.00 N/mm2 table moulded) with lime mortar for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specification - Do- in Lime mortar 1:3 Prop(Page No.214, SR Vol-2,I No.21.9.3 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 3678.4 | 3678.4 | 6.82 | False | None | None | False | None | False | 25086.688 | 0 | 2864643 | 93193 | None | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications.(Page No.5, SR Vol-2,I No.4.1 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 129.8 | 129.8 | 42.0 | False | None | None | False | None | False | 5451.6 | 0 | 2864644 | 93193 | None | 8.5.1 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Page No.42, SR Vol-2,I No.8.5.1 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 402.6 | 402.6 | 103.45 | False | None | None | False | None | False | 41648.97 | 0 | 2864645 | 93193 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page No.48, SR Vol-2,I No.8.39 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 139.7 | 139.7 | 283.53 | False | None | None | False | None | False | 39609.141 | 0 | 2864646 | 93193 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(Page No.50, SR Vol-2,I No.8.51 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 110.0 | 110.0 | 49.5 | False | None | None | False | None | False | 5445.0 | 0 | 2864647 | 93193 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page No.45, SR Vol-2,I No.8.29 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 311.3 | 311.3 | 57.55 | False | None | None | False | None | False | 17915.315 | 0 | 2864648 | 93193 | None | 9.12.2 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm (Page No.60 SR Vol-2,I No.9.12.2 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1259.5 | 1259.5 | 10.5 | False | None | None | False | None | False | 13224.75 | 0 | 2864649 | 93193 | None | 15.1 | Polyurethane based Single Component for New Surface - Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification.(Page No.149 SR Vol-2,I No.15.1 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 898.7 | 898.7 | 10.5 | False | None | None | False | None | False | 9436.35 | 0 | 2864650 | 93193 | None | 12.11 | Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (Page No.99 SR Vol-2,I No.12.11 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 151881.4 | 151881.4 | 0.16 | False | None | None | False | None | False | 24301.024 | 0 | 2864651 | 93193 | None | 12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ). (Page No.100 SR Vol-2,I No.12.15 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 8188.4 | 8188.4 | 2.1 | False | None | None | False | None | False | 17195.64 | 0 | 2864652 | 93193 | None | 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame.The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8 0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) (Page No109 SR Vol-2,I No.12.86 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5929.0 | 5929.0 | 2.0 | False | None | None | False | None | False | 11858.0 | 0 | 2864653 | 93193 | None | 11.29.1 | Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete. Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Page No.85 Item No.11.29.1 Common SR 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 755.7 | 755.7 | 39.86 | False | None | None | False | None | False | 30122.202 | 0 | 2864654 | 93193 | None | 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page No 48, Item No. 8.41 of Common SR 2023-24-Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 183.7 | 183.7 | 68.19 | False | None | None | False | None | False | 12526.503 | 0 | 2864655 | 93193 | None | ADR | Providing and fixing Modular executive table of size 1200 x 600 x 735 mm with pedestal unit with draw units and CPU base and key board made out of 18mm PLPB and with necessary locking arrangements. The work includes cost of all materials, labour charges, machinery charges with all lead and lift, loading and unloading, transportation completion of the work as directed by the Engineer-in-charge of the work (ADR No.8210/2013-14 Date:03.04.2014 Sl.No.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 28000.0 | 28000.0 | 4.0 | False | None | None | False | None | False | 112000.0 | 0 | 2864656 | 93193 | None | 7154 | Supplying office chairs with fixed arm Contact Project Visitors of featherlite or equivalent make, including cost of all materials, labour . All lead and lift, loading and unloadingand all other incident charges etc. complete. (ADR: No. 7154 Date: 11.01.2016, Sl. No.13)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 8489.25 | 8489.25 | 10.0 | False | None | None | False | None | False | 84892.5 | 0 | 2864657 | 93193 | None | 558 | Providing and Supplying Medium Back Revolving Chairs with Mesh Back and Soft Cushioning Seat, Fixed lumber Support and Gas Lift, Knee tilt Mechanism of featherlite / Godrej or equivalent make, including the cost of all materials, labour and transportation lead lift etc., as per the direction of the Engineer in charge of the work (Alpha MB) (ADR No.558 Dated:21.06.2021 Sl No.36)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 11400.0 | 11400.0 | 3.0 | False | None | None | False | None | False | 34200.0 | 0 | 2864658 | 93193 | None | 39.25 | Mobile Pedestal Unit- WOODEN: : Providing and fixing 450mm W x 450mm D x 685MM HT, Mobile Pedestal unit-Wooden with 18mm thick PLPB with edge bonded for body. Two equal drawer and filing drawer with centralized locking system, Telescopic channels, castors, handles and lock etc., complete as per specification, drqawing and as directed by the Engineer-in-charge of the work. (Page.336/Item No.39.25 for 2018-19 CSR)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 5292.0 | 5292.0 | 3.0 | False | None | None | False | None | False | 15876.0 | 0 |
|