tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1709020986000 | 0 | None | None | Buildings | Ground Floor | 7431062.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2821553 | 91150 | None | Vol 1 8 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 105.06 | 105.06 | 225.31 | False | None | None | False | None | False | 23671.0686 | 0 | 2821554 | 91150 | None | Vol 1 9 1.15.2 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 437.75 | 437.75 | 25.03 | False | None | None | False | None | False | 10956.8825 | 0 | 2821555 | 91150 | None | Vol 2 5 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 ltr/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 121.54 | 121.54 | 411.97 | False | None | None | False | None | False | 50070.8338 | 0 | 2821556 | 91150 | None | Vol 1 7 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 273.98 | 273.98 | 225.31 | False | None | None | False | None | False | 61730.4338 | 0 | 2821557 | 91150 | None | Vol 1 7 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials usage all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 488.22 | 488.22 | 188.41 | False | None | None | False | None | False | 91985.5302 | 0 | 2821558 | 91150 | None | Vol 1 15 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 6168.67 | 6168.67 | 57.67 | False | None | None | False | None | False | 355747.1989 | 0 | 2821559 | 91150 | None | Vol 1 15 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Isolated Footing ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 6526.08 | 6526.08 | 51.77 | False | None | None | False | None | False | 337855.1616 | 0 | 2821560 | 91150 | None | Vol 1 111 1a | Formwork, Centering & Scaffloding 8% For Isolated Footing ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 522.08 | 522.08 | 51.77 | False | None | None | False | None | False | 27028.0816 | 0 | 2821561 | 91150 | None | Vol 1 17 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns up to plinth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 6526.08 | 6526.08 | 4.7 | False | None | None | False | None | False | 30672.576 | 0 | 2821562 | 91150 | None | Vol 1 111 9 | Formwork, Centering & Scaffloding 70% For Columns up to plinth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 4568.25 | 4568.25 | 4.7 | False | None | None | False | None | False | 21470.775 | 0 | 2821563 | 91150 | None | Vol 1 17 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 7048.29 | 7048.29 | 12.73 | False | None | None | False | None | False | 89724.7317 | 0 | 2821564 | 91150 | None | Vol 1 111 9 | Formwork, Centering & Scaffloding 70% For Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 4933.8 | 4933.8 | 12.73 | False | None | None | False | None | False | 62807.274 | 0 | 2821565 | 91150 | None | Vol 1 17 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Plinth beams & Curtain wall ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 6526.08 | 6526.08 | 27.9 | False | None | None | False | None | False | 182077.632 | 0 | 2821566 | 91150 | None | Vol 1 111 2 | Formwork, Centering & Scaffloding 50% For Plinth Beams & Curtain wall ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 3263.04 | 3263.04 | 27.9 | False | None | None | False | None | False | 91038.816 | 0 | 2821567 | 91150 | None | Vol 1 17 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 7048.29 | 7048.29 | 25.7 | False | None | None | False | None | False | 181141.053 | 0 | 2821568 | 91150 | None | Vol 1 112 14 | Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 4228.97 | 4228.97 | 25.7 | False | None | None | False | None | False | 108684.529 | 0 | 2821569 | 91150 | None | Vol 1 17 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 7048.29 | 7048.29 | 55.55 | False | None | None | False | None | False | 391532.5095 | 0 | 2821570 | 91150 | None | Vol 1 112 15 | Formwork, Centering & Scaffloding 50% For Roof Slab ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 3524.14 | 3524.14 | 55.55 | False | None | None | False | None | False | 195765.977 | 0 | 2821571 | 91150 | None | Vol 1 17 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 7048.29 | 7048.29 | 2.2 | False | None | None | False | None | False | 15506.238 | 0 | 2821572 | 91150 | None | Vol 1 112 14 | Formwork, Centering & Scaffloding 3% For Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 211.44 | 211.44 | 2.2 | False | None | None | False | None | False | 465.168 | 0 | 2821573 | 91150 | None | Vol 1 17 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 7048.29 | 7048.29 | 0.82 | False | None | None | False | None | False | 5779.5978 | 0 | 2821574 | 91150 | None | Vol 1 112 119 | Formwork, Centering & Scaffloding 3% For Sill
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 3171.73 | 3171.73 | 0.82 | False | None | None | False | None | False | 2600.8186 | 0 | 2821575 | 91150 | None | Vol 1 18 2.11(a) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | t | 92140.71 | 92140.71 | 18.76 | False | None | None | False | None | False | 1728559.7196 | 0 | 2821576 | 91150 | None | Vol 2 9 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 6580.67 | 6580.67 | 6.16 | False | None | None | False | None | False | 40536.9272 | 0 | 2821577 | 91150 | None | Vol 2 17 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 1349.3 | 1349.3 | 324.71 | False | None | None | False | None | False | 438131.203 | 0 | 2821578 | 91150 | None | Vol 2 17 6.34 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 1137.12 | 1137.12 | 152.07 | False | None | None | False | None | False | 172921.8384 | 0 | 2821579 | 91150 | None | Vol 2 100 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 101779.45 | 101779.45 | 1.4 | False | None | None | False | None | False | 142491.23 | 0 | 2821580 | 91150 | None | Vol 2 105 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Nos | 1046.48 | 1046.48 | 8.0 | False | None | None | False | None | False | 8371.84 | 0 | 2821581 | 91150 | None | Vol 2 69 10.6.3 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 61.8 | 61.8 | 48.0 | False | None | None | False | None | False | 2966.4 | 0 | 2821582 | 91150 | None | Vol 2 105 12.57.2 | Providing and fixing 35 mm thick one side teak and one side commercial flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 ( part-I) 1991. from manufacturer complete as per spcification ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 4013.91 | 4013.91 | 23.04 | False | None | None | False | None | False | 92480.4864 | 0 | 2821583 | 91150 | None | Vol 2 110 12.9 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor TPs shall not be made) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 6936.02 | 6936.02 | 32.4 | False | None | None | False | None | False | 224727.048 | 0 | 2821584 | 91150 | None | Vol 2 86 11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Kg | 188.49 | 188.49 | 680.4 | False | None | None | False | None | False | 128248.596 | 0 | 2821585 | 91150 | None | Vol 2 41 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 248.23 | 248.23 | 452.86 | False | None | None | False | None | False | 112413.4378 | 0 | 2821586 | 91150 | None | Vol 2 50 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 103.0 | 103.0 | 988.72 | False | None | None | False | None | False | 101838.16 | 0 | 2821587 | 91150 | None | Vol 2 42 8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 382.13 | 382.13 | 708.21 | False | None | None | False | None | False | 270628.2873 | 0 | 2821588 | 91150 | None | Vol 2 59 9.2 | Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 824.0 | 824.0 | 102.5 | False | None | None | False | None | False | 84460.0 | 0 | 2821589 | 91150 | None | VOL 2 61 9.17.2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 1210.25 | 1210.25 | 307.49 | False | None | None | False | None | False | 372139.7725 | 0 | 2821590 | 91150 | None | Vol 2 63 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with whitecement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.
** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, Lakared, River Pink, Orissa Blue or equivalent. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 2937.56 | 2937.56 | 119.07 | False | None | None | False | None | False | 349775.2692 | 0 | 2821591 | 91150 | None | Vol 2 63 9.25 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 824.0 | 824.0 | 103.2 | False | None | None | False | None | False | 85036.8 | 0 | 2821592 | 91150 | None | Vol 2 85 11.28 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessoris such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Kg | 581.95 | 581.95 | 136.17 | False | None | None | False | None | False | 79244.1315 | 0 | 2821593 | 91150 | None | Vol 2 46 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 162.74 | 162.74 | 988.72 | False | None | None | False | None | False | 160904.2928 | 0 | 2821594 | 91150 | None | Vol 2 46 8.3 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two coat applied at 1.67 ltr/10 sqm over and including priming coat of exterior primer applied at 2.20 kg 10 sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 179.22 | 179.22 | 708.21 | False | None | None | False | None | False | 126925.3962 | 0 | 2821595 | 91150 | None | Vol 2 47 8.33.2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 143.17 | 143.17 | 32.4 | False | None | None | False | None | False | 4638.708 | 0 | 2821596 | 91150 | None | Vol 2 149 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. Thewaterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Sqm | 841.51 | 841.51 | 411.97 | False | None | None | False | None | False | 346676.8747 | 0 | 2821597 | 91150 | None | Vol 5 45 686 | PVC pipes of10 Kg/cm2 for 110mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | m | 345.05 | 345.05 | 54.0 | False | None | None | False | None | False | 18632.7 | 0 |
| 1709020986000 | 0 | None | None | Buildings | Electrical Estimation | 411321.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2821598 | 91151 | None | 1.2.1 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. Theconduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 66.0 | 66.0 | 360.0 | False | None | None | False | None | False | 23760.0 | 0 | 2821599 | 91151 | None | 1.2.2 | 25 mm dia 2 mm thick
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 78.0 | 78.0 | 148.0 | False | None | None | False | None | False | 11544.0 | 0 | 2821600 | 91151 | None | 1.3.1 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fishwire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 68.0 | 68.0 | 210.0 | False | None | None | False | None | False | 14280.0 | 0 | 2821601 | 91151 | None | 1.3.2 | 25 mm dia 2 mm thick
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 79.0 | 79.0 | 75.0 | False | None | None | False | None | False | 5925.0 | 0 | 2821602 | 91151 | None | 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 49.0 | 49.0 | 89.0 | False | None | None | False | None | False | 4361.0 | 0 | 2821603 | 91151 | None | 1.5.2 | 25 mm deep Junction box
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 56.0 | 56.0 | 45.0 | False | None | None | False | None | False | 2520.0 | 0 | 2821604 | 91151 | None | 1.13 | Supplying And Fixing Metal Fan Box with Round Hook.
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 117.0 | 117.0 | 24.0 | False | None | None | False | None | False | 2808.0 | 0 | 2821605 | 91151 | None | 2.2.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box Short point upto 3m from tapping point to out let via switch box
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Point | 269.0 | 269.0 | 20.0 | False | None | None | False | None | False | 5380.0 | 0 | 2821606 | 91151 | None | 2.2.2 | Medium point above 3m upto 6m from tapping point to out let via switch box
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Point | 379.0 | 379.0 | 30.0 | False | None | None | False | None | False | 11370.0 | 0 | 2821607 | 91151 | None | 2.2.3 | Long point above 6m upto 10m from tapping point to out let viawitch box
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Point | 555.0 | 555.0 | 38.0 | False | None | None | False | None | False | 21090.0 | 0 | 2821608 | 91151 | None | 2.2.4 | Two outlet in a row, above 3m upto 6m from tapping point toout let via switches
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Point | 677.0 | 677.0 | 2.0 | False | None | None | False | None | False | 1354.0 | 0 | 2821609 | 91151 | None | 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 26.0 | 26.0 | 430.0 | False | None | None | False | None | False | 11180.0 | 0 | 2821610 | 91151 | None | 2.3.3 | 2.5 mm2
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 42.0 | 42.0 | 520.0 | False | None | None | False | None | False | 21840.0 | 0 | 2821611 | 91151 | None | 2.3.4 | 4 mm2
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 63.0 | 63.0 | 210.0 | False | None | None | False | None | False | 13230.0 | 0 | 2821612 | 91151 | None | 3.4.1 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-2 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 138.0 | 138.0 | 6.0 | False | None | None | False | None | False | 828.0 | 0 | 2821613 | 91151 | None | 3.4.4 | 6 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 220.0 | 220.0 | 6.0 | False | None | None | False | None | False | 1320.0 | 0 | 2821614 | 91151 | None | 3.4.5 | 8 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 261.0 | 261.0 | 10.0 | False | None | None | False | None | False | 2610.0 | 0 | 2821615 | 91151 | None | 3.4.6 | 10-12 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 319.0 | 319.0 | 14.0 | False | None | None | False | None | False | 4466.0 | 0 | 2821616 | 91151 | None | 3.4.8 | 18 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 405.0 | 405.0 | 4.0 | False | None | None | False | None | False | 1620.0 | 0 | 2821617 | 91151 | None | 3.5.1 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with requirednos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.1 to 2 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 137.0 | 137.0 | 6.0 | False | None | None | False | None | False | 822.0 | 0 | 2821618 | 91151 | None | 3.5.3 | 4 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 175.0 | 175.0 | 6.0 | False | None | None | False | None | False | 1050.0 | 0 | 2821619 | 91151 | None | 3.5.4 | 6 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 234.0 | 234.0 | 6.0 | False | None | None | False | None | False | 1404.0 | 0 | 2821620 | 91151 | None | 3.5.5 | 8 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 284.0 | 284.0 | 10.0 | False | None | None | False | None | False | 2840.0 | 0 | 2821621 | 91151 | None | 3.5.6 | 10-12 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 344.0 | 344.0 | 14.0 | False | None | None | False | None | False | 4816.0 | 0 | 2821622 | 91151 | None | 3.5.7 | 18 Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 457.0 | 457.0 | 4.0 | False | None | None | False | None | False | 1828.0 | 0 | 2821623 | 91151 | None | 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch
6A Two Way Switch
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 166.0 | 166.0 | 4.0 | False | None | None | False | None | False | 664.0 | 0 | 2821624 | 91151 | None | 3.6.3 | 6A Three Way socket
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 171.0 | 171.0 | 18.0 | False | None | None | False | None | False | 3078.0 | 0 | 2821625 | 91151 | None | 3.6.4 | Stepped Fan Regulator Two Module
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 357.0 | 357.0 | 24.0 | False | None | None | False | None | False | 8568.0 | 0 | 2821626 | 91151 | None | 3.6.7 | 16A One Way Switch
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 180.0 | 180.0 | 6.0 | False | None | None | False | None | False | 1080.0 | 0 | 2821627 | 91151 | None | 3.6.10 | 6/16A Universal Socket
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 236.0 | 236.0 | 6.0 | False | None | None | False | None | False | 1416.0 | 0 | 2821628 | 91151 | None | 3.6.8 | 6A Bell Push
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 177.0 | 177.0 | 4.0 | False | None | None | False | None | False | 708.0 | 0 | 2821629 | 91151 | None | 3.6.9 | 32A DP Switch
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 326.0 | 326.0 | 4.0 | False | None | None | False | None | False | 1304.0 | 0 | 2821630 | 91151 | None | 3.10.2 | Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit usingnecessary machine screws. 80/90 mm
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 15.0 | 15.0 | 20.0 | False | None | None | False | None | False | 300.0 | 0 | 2821631 | 91151 | None | 3.10.3 | 110 mm
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 21.0 | 21.0 | 25.0 | False | None | None | False | None | False | 525.0 | 0 | 2821632 | 91151 | None | 5.7.2 | Supplying & fixing of Porcelain fuse channel with cut out onexisting wooden/panel using necessary nuts, bolts and washers. 32 A
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 241.0 | 241.0 | 3.0 | False | None | None | False | None | False | 723.0 | 0 | 2821633 | 91151 | None | 5.19.10 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., withprovision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. II - Double Door 16 Way SP & N
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 2908.0 | 2908.0 | 1.0 | False | None | None | False | None | False | 2908.0 | 0 | 2821634 | 91151 | None | 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 6-32 A DP
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 739.0 | 739.0 | 8.0 | False | None | None | False | None | False | 5912.0 | 0 | 2821635 | 91151 | None | 5.18.9 | 50 to 63 A TPN
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 3088.0 | 3088.0 | 4.0 | False | None | None | False | None | False | 12352.0 | 0 | 2821636 | 91151 | None | 5.35 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 AccuracyEnergy Meter.
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 5705.0 | 5705.0 | 1.0 | False | None | None | False | None | False | 5705.0 | 0 | 2821637 | 91151 | None | 6.4.1 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 4.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturerWarranty. 48" Sweep 5 Star (1200 mm)
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 2677.0 | 2677.0 | 24.0 | False | None | None | False | None | False | 64248.0 | 0 | 2821638 | 91151 | None | 11.3.2 | Supplying of .feet PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70 lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 690.0 | 690.0 | 42.0 | False | None | None | False | None | False | 28980.0 | 0 | 2821639 | 91151 | None | 11.4. 2 | Supplying of recess mounting non integrated type LED down light. W luminaire comprising of pressure decast/ extruded aluminium housing, with spring loaded false ceiling clA, LED of Power/COB with CCT 6500 degree K, CRI 70%. efficacy 100 lumen per W, 120degree beam spread, life 25000 burning hours and Compliance to IS10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level. LED's are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5% of lamp Wage, short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standardelectrical condition. 10-12W
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 1269.0 | 1269.0 | 10.0 | False | None | None | False | None | False | 12690.0 | 0 | 2821640 | 91151 | None | 11.8.4 | Supply of LED Streetlight luminaire with pressure die castluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complet luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001 2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect LED Streetlight 90 W
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 8860.0 | 8860.0 | 2.0 | False | None | None | False | None | False | 17720.0 | 0 | 2821641 | 91151 | None | 13.2.2 | Supplying and Fixing.mm dia class A GI pipe bracket upto.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clA, bolts, nuts and wiring using suitable capacity wires. Using 32mm dia G.I.Pipe
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 1295.0 | 1295.0 | 2.0 | False | None | None | False | None | False | 2590.0 | 0 | 2821642 | 91151 | None | 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA.On wall/ ceiling / Rafter / Girders
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 122.0 | 122.0 | 52.0 | False | None | None | False | None | False | 6344.0 | 0 | 2821643 | 91151 | None | 13.11 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 315.0 | 315.0 | 24.0 | False | None | None | False | None | False | 7560.0 | 0 | 2821644 | 91151 | None | 32.05 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring stripthickness and resistivity as per IS-3975 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm)
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Km | 141842.0 | 141842.0 | 0.12 | False | None | None | False | None | False | 17021.04 | 0 | 2821645 | 91151 | None | 1.17.1 Vol 1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (30 x 0.5 x 1 m) All kinds of soils. Depth upto 1.50 m
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Cum | 262.0 | 262.0 | 45.0 | False | None | None | False | None | False | 11790.0 | 0 | 2821646 | 91151 | None | 51.04 | Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 2172.0 | 2172.0 | 2.0 | False | None | None | False | None | False | 4344.0 | 0 | 2821647 | 91151 | None | 51.05 | Bentonite clay slurry for earthing in 50 Kg Bag
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Bag | 368.0 | 368.0 | 1.0 | False | None | None | False | None | False | 368.0 | 0 | 2821648 | 91151 | None | 51.01 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long,3.2 mm thick with bolt, nut, GI Strips and washercomplete Minimum Weight of GI Pipe: 7.3 Kg
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 743.0 | 743.0 | 1.0 | False | None | None | False | None | False | 743.0 | 0 | 2821649 | 91151 | None | 51.02 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | No | 676.0 | 676.0 | 1.0 | False | None | None | False | None | False | 676.0 | 0 | 2821650 | 91151 | None | 51.03 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Bag | 310.0 | 310.0 | 1.0 | False | None | None | False | None | False | 310.0 | 0 | 2821651 | 91151 | None | 1.9.3 | Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely 32 mm
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Mtr | 29.0 | 29.0 | 10.0 | False | None | None | False | None | False | 290.0 | 0 | 2821652 | 91151 | None | 3.4.3 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly
flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 177.0 | 177.0 | 6.0 | False | None | None | False | None | False | 1062.0 | 0 | 2821653 | 91151 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.
6A One Way Switch
---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work. | Each | 102.0 | 102.0 | 148.0 | False | None | None | False | None | False | 15096.0 | 0 |
|
|
---|