2833372 | 91780 | None | I.No.-1.14.1, P-8, SR 2023-24, Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 102.0 | 102.0 | 530.95 | False | None | None | False | None | False | 54156.9 | 0 |
2833374 | 91780 | None | P.No- 17, I.No-3.7 PWD SR VOL-3 2023-24 | Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 105.0 | 105.0 | 1447.0 | False | None | None | False | None | False | 151935.0 | 0 |
2833376 | 91780 | None | I.No.- 2.1.3, P-15, SR 2023-24, Vol-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5989.0 | 5989.0 | 28.26 | False | None | None | False | None | False | 169249.14 | 0 |
2833378 | 91780 | None | P.No- 9, I.No-5.4 PWD SR VOL-2 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6389.0 | 6389.0 | 133.88 | False | None | None | False | None | False | 855359.32 | 0 |
2833380 | 91780 | None | P.No- 16, I.No-2.4.2 PWD SR VOL-1 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8536.05 | 8536.05 | 30.8 | False | None | None | False | None | False | 262910.34 | 0 |
2833382 | 91780 | None | Vol-I, Page No.15, Item No.2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix sing 20 mm nominal size graded crushed coarse aggregates with 20% partial replacement with Recycled concrete aggregate (RCA) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6287.0 | 6287.0 | 11.99 | False | None | None | False | None | False | 75381.13 | 0 |
2833384 | 91780 | None | P.No- 18, I.No-2.11 PWD SR VOL-1 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 89457.0 | 89457.0 | 2.23 | False | None | None | False | None | False | 199489.11 | 0 |
2833386 | 91780 | None | P.No- 17, I.No-6.32 PWD SR VOL-2 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1310.0 | 1310.0 | 354.3 | False | None | None | False | None | False | 464133.0 | 0 |
2833389 | 91780 | None | P.No- 42, I.No-8.5.2 PWD SR VOL-2023-24 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 349.0 | 349.0 | 928.14 | False | None | None | False | None | False | 323920.86 | 0 |
2833391 | 91780 | None | Vol-II, Page No.44, Item No.8.19.1 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 255.0 | 255.0 | 157.5 | False | None | None | False | None | False | 40162.5 | 0 |
2833393 | 91780 | None | P.No- 46, I.No-8.30 PWD SR VOL- 2023-24 | Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 174.0 | 174.0 | 1276.34 | False | None | None | False | None | False | 222083.16 | 0 |
2833395 | 91780 | None | P.No- 34, I.No-1.9 PWD SR VOL-1 2023-24 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 266.0 | 266.0 | 404.25 | False | None | None | False | None | False | 107530.5 | 0 |
2833397 | 91780 | None | Volume - II, Page No.86, Item No.11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 183.0 | 183.0 | 1008.0 | False | None | None | False | None | False | 184464.0 | 0 |
2833399 | 91780 | None | P.No- 26, I.No- 4.17, PWD SR VOL-3 2023-24 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 2559.0 | 2559.0 | 217.05 | False | None | None | False | None | False | 555430.95 | 0 |
2833401 | 91780 | None | P.No- 149, I.No-16.28 PWD SR VOL-3 2023-24 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6754.0 | 6754.0 | 112.5 | False | None | None | False | None | False | 759825.0 | 0 |
2833403 | 91780 | None | P.No- 51, I.No- 6.8.2, PWD SR VOL-3 2023-24 | Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) . ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1161.0 | 1161.0 | 772.0 | False | None | None | False | None | False | 896292.0 | 0 |
2833405 | 91780 | None | Volume-1, P.No.15 Item No.2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6789.96 | 6789.96 | 1.3 | False | None | None | False | None | False | 8826.948 | 0 |
2833407 | 91780 | None | Volume-1, P.No.16 Item No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11271.0 | 11271.0 | 5.26 | False | None | None | False | None | False | 59285.46 | 0 |
2833409 | 91780 | None | Volume-2, P.No.84 Item No.11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 136.0 | 136.0 | 1470.0 | False | None | None | False | None | False | 199920.0 | 0 |
2833412 | 91780 | None | P.No- 66, I.No- 8.9, PWD SR VOL-3 2023-24 | Overhead Signs : Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting as per IRC:67:2022 with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design requirements and approved plans. Aluminium Alloy Plate for Over Head Sign ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 5818.0 | 5818.0 | 8.1 | False | None | None | False | None | False | 47125.8 | 0 |
2833414 | 91780 | None | Volume V, SOR Code: M020A, Page No.134, Item 10.2 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: 2.1 M020A Pipes of SN 4, 75mm dia. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 217.0 | 217.0 | 40.0 | False | None | None | False | None | False | 8680.0 | 0 |
2833416 | 91780 | None | Volume -V, SOR Coad :T130A, Page No.191, Item 16.8 | Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 4791.0 | 4791.0 | 6.0 | False | None | None | False | None | False | 28746.0 | 0 |
2833418 | 91780 | None | Volume -V, SOR Coad : P070B, page No.158, Item 7.2 | Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments 10 STG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 28113.0 | 28113.0 | 1.0 | False | None | None | False | None | False | 28113.0 | 0 |
2833420 | 91780 | None | Volume -II , page No.132, Item No.14.5.1 | Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls and floors wherever required : 14.5.1 Single half stall urinal with 5 litre P.V.C. automatic flushing cister ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 8642.0 | 8642.0 | 2.0 | False | None | None | False | None | False | 17284.0 | 0 |
2833422 | 91780 | None | Volume -II , page No.125, Item No.14.7.3 | White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar tap ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2866.0 | 2866.0 | 5.0 | False | None | None | False | None | False | 14330.0 | 0 |
2833424 | 91780 | None | Volume -II , page No.136, Item No.14.32.4 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing Rectangular shape 1500x450 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1726.0 | 1726.0 | 2.0 | False | None | None | False | None | False | 3452.0 | 0 |
2833426 | 91780 | None | Volume -II , page No.131, Item No.14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : 14.3.1 W.C. pan with ISI marked white solid plastic seat and lid ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5977.0 | 5977.0 | 2.0 | False | None | None | False | None | False | 11954.0 | 0 |
2833428 | 91780 | None | Vol-II, Page No.133, Item No.14.7.9 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Surgeon type wash basin of size 660x460 mm with single 15 mm C.P. brass pillar taps with elbow operated levers ISI Marked ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3444.0 | 3444.0 | 2.0 | False | None | None | False | None | False | 6888.0 | 0 |
2833430 | 91780 | None | Volume - II, 1st corrigendam SlNo.123 I.No.13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank IS : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Ltr | 9.0 | 9.0 | 2000.0 | False | None | None | False | None | False | 18000.0 | 0 |
2833432 | 91780 | None | Vol-II, Page No.137, Item No.14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 496.0 | 496.0 | 2.0 | False | None | None | False | None | False | 992.0 | 0 |
2833435 | 91780 | None | Vol-II, Page No.117, Item No.13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 549.0 | 549.0 | 8.0 | False | None | None | False | None | False | 4392.0 | 0 |
2833437 | 91780 | None | Vol-II, Page No.115, Item No.13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 305.0 | 305.0 | 10.0 | False | None | None | False | None | False | 3050.0 | 0 |
2833439 | 91780 | None | Vol-II, Page No.A-32, SL No.473 | PTMT pillar cock (fancy) 15 mm foam flow. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 210.0 | 210.0 | 10.0 | False | None | None | False | None | False | 2100.0 | 0 |
2833441 | 91780 | None | Vol-II, Page No.A-32, SL No.468 | PTMT Bottle Trap 31/32MM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 250.0 | 250.0 | 4.0 | False | None | None | False | None | False | 1000.0 | 0 |
2833442 | 91780 | None | Vol-V, Page No.113, SL No.10.1 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 25mm dia, 10 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 48.0 | 48.0 | 1000.0 | False | None | None | False | None | False | 48000.0 | 0 |
2833445 | 91780 | None | Vol-V, Page No.113, SL No.10.2 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 32mm dia., 10 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 67.0 | 67.0 | 35.0 | False | None | None | False | None | False | 2345.0 | 0 |
2833447 | 91780 | None | Vol-V, Page No.113, SL No.10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 411.0 | 411.0 | 95.0 | False | None | None | False | None | False | 39045.0 | 0 |
2833449 | 91780 | None | Vol-II, Page No.117, Item No.13.5.2 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 314.0 | 314.0 | 95.0 | False | None | None | False | None | False | 29830.0 | 0 |
2833451 | 91780 | None | Vol-II, Page No 99, Item No.12.12 | Providing salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 98815.0 | 98815.0 | 0.22 | False | None | None | False | None | False | 21739.3 | 0 |
2833454 | 91780 | None | Vol-II, Page No100, Item No.12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7444.0 | 7444.0 | 5.76 | False | None | None | False | None | False | 42877.44 | 0 |
2833456 | 91780 | None | Vol-VI Page No 31,Item No.6.9.3 PWD Ele SR 2-22-24 | Supply erection, testing, commission ingof Cassette type split Air conditioner ssuitable for operation on single/three phase AC supply,hermetically sealed compressor with air cooled condenser motor capacitor start,capacitors run relay and overload protection, one ceiling mounted in door unit and one outdoor condenser unit including standard accessories covered with insulation tube including battery operated cordless unit 4 TR Cassette 3 Ph ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 120221.0 | 120221.0 | 4.0 | False | None | None | False | None | False | 480884.0 | 0 |
2833458 | 91780 | None | Vol-VI,Page No 30, Item No.6.5.2PWD Ele SR 2-23-24 | Supplying wall mounting fan suitable to operate at single-phase230v AC. supply ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 3212.0 | 3212.0 | 4.0 | False | None | None | False | None | False | 12848.0 | 0 |
2833460 | 91780 | None | 001 | PSCC Pole 9intr long. 300 Kg WL ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 5052.0 | 5052.0 | 2.0 | False | None | None | False | None | False | 10104.0 | 0 |
2833462 | 91780 | None | 002 | Double Pole Transformer Structure set Using PSCC Pole 9 mtr long.
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 17564.0 | 17564.0 | 1.0 | False | None | None | False | None | False | 17564.0 | 0 |
2833463 | 91780 | None | 00012 | PSCC Pole 9intr long. 300 Kg W ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5725.0 | 5725.0 | 1.0 | False | None | None | False | None | False | 5725.0 | 0 |
2833465 | 91780 | None | 003 | 45 kN Disc insulator ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 186.0 | 186.0 | 3.0 | False | None | None | False | None | False | 558.0 | 0 |
2833468 | 91780 | None | 004 | Guy Rod (Anchor Rod) using 12 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 256.0 | 256.0 | 2.0 | False | None | None | False | None | False | 512.0 | 0 |
2833469 | 91780 | None | 004a | Guy Rod (Anchor Rod) using 12 mm labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 593.0 | 593.0 | 2.0 | False | None | None | False | None | False | 1186.0 | 0 |
2833470 | 91780 | None | 005 | Guy Wire 7/10 SWG for Guy ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 77.0 | 77.0 | 10.0 | False | None | None | False | None | False | 770.0 | 0 |
2833471 | 91780 | None | 006 | No. 15 Strain insulator ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 59.0 | 59.0 | 2.0 | False | None | None | False | None | False | 118.0 | 0 |
2833472 | 91780 | None | 007 | Guy Concreting With Boulders, Mud & Sand labour charges
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 200.0 | 200.0 | 2.0 | False | None | None | False | None | False | 400.0 | 0 |
2833473 | 91780 | None | 008 | 63KVA BEE 5 Star rated (Aluminiumound), 11kV/433 Volts 3 phase 50 cycles Dist. Tr. with Oil ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 182545.0 | 182545.0 | 1.0 | False | None | None | False | None | False | 182545.0 | 0 |
2833474 | 91780 | None | 008a | 63KVA BEE 5 Star rated (Aluminiumound), 11kV/433 Volts 3 phase 50 cycles Dist. Tr. with Oil labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1193.0 | 1193.0 | 1.0 | False | None | None | False | None | False | 1193.0 | 0 |
2833475 | 91780 | None | 009 | GI Grounding pipe, B-Class, 42x2.5x3.2 9 mm with bolt, nut, Gl Strips and washer completeMinimum Weight of Gl Pipe
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 743.0 | 743.0 | 3.0 | False | None | None | False | None | False | 2229.0 | 0 |
2833476 | 91780 | None | 010 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Bag | 676.0 | 676.0 | 3.0 | False | None | None | False | None | False | 2028.0 | 0 |
2833477 | 91780 | None | 011 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Bag | 310.0 | 310.0 | 3.0 | False | None | None | False | None | False | 930.0 | 0 |
2833478 | 91780 | None | 011a | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag LABOUR CHARGES ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Bag | 949.0 | 949.0 | 3.0 | False | None | None | False | None | False | 2847.0 | 0 |
2833479 | 91780 | None | 012 | G.I wire 8 Swg for Earthing ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 75.0 | 75.0 | 5.0 | False | None | None | False | None | False | 375.0 | 0 |
2833480 | 91780 | None | 013 | Guy Wire 7/10 SWG for neutral earthing ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 77.0 | 77.0 | 10.0 | False | None | None | False | None | False | 770.0 | 0 |
2833481 | 91780 | None | 014 | 11 kV lightning Arrester, Metal oxide, 9 kV, 5 Ka Poly meric type with ground ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 2760.0 | 2760.0 | 1.0 | False | None | None | False | None | False | 2760.0 | 0 |
2833482 | 91780 | None | 014a | 11 kV lightning Arrester, Metal oxide, 9 kV, 5 Ka Poly meric type with ground labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 119.0 | 119.0 | 1.0 | False | None | None | False | None | False | 119.0 | 0 |
2833483 | 91780 | None | 015 | 11 kV, 200 Amps Single Break GOS ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 |
2833484 | 91780 | None | 015a | 11 kV, 200 Amps Single Break GOS labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 1104.0 | 1104.0 | 1.0 | False | None | None | False | None | False | 1104.0 | 0 |
2833485 | 91780 | None | 016 | H-Frame Set for fixing 11 kV, 200 Amps Single Break GOS For Distribution Transformer Centre (DTC) MS Box for housing the ETV Meter 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 4332.0 | 4332.0 | 1.0 | False | None | None | False | None | False | 4332.0 | 0 |
2833486 | 91780 | None | 016a | H-Frame Set for fixing 11 kV, 200 Amps Single Break GOS For Distribution Transformer Centre (DTC) MS Box for housing the ETV Meter 3 labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 323.0 | 323.0 | 1.0 | False | None | None | False | None | False | 323.0 | 0 |
2833487 | 91780 | None | 017 | Phase 4 Wire 5 Amps, with associated LT CT 0.5 Accuracy Class, ring type, with wiring Clamps, B&N and all other accessories required.
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 6836.0 | 6836.0 | 1.0 | False | None | None | False | None | False | 6836.0 | 0 |
2833488 | 91780 | None | 017a | Phase 4 Wire 5 Amps, with associated LT CT 0.5 Accuracy Class, ring type, with wiring Clamps, B&N and all other accessories required. labour charge
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 1946.0 | 1946.0 | 1.0 | False | None | None | False | None | False | 1946.0 | 0 |
2833489 | 91780 | None | 018 | LT 3 Phase, 4 Wire, CT Operated DLMS Complaint ETV Meter-5A, class 0.5s Accuracy ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 3396.0 | 3396.0 | 1.0 | False | None | None | False | None | False | 3396.0 | 0 |
2833490 | 91780 | None | 018a | LT 3 Phase, 4 Wire, CT Operated DLMS Complaint ETV Meter-5A, class 0.5s Accuracy labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 152.0 | 152.0 | 1.0 | False | None | None | False | None | False | 152.0 | 0 |
2833491 | 91780 | None | 0015 | LT Protection Kit for 63 kVA ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2023.0 | 2023.0 | 1.0 | False | None | None | False | None | False | 2023.0 | 0 |
2833492 | 91780 | None | 0015a | LT Protection Kit for 63 kVA labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 356.0 | 356.0 | 1.0 | False | None | None | False | None | False | 356.0 | 0 |
2833493 | 91780 | None | 0016 | LT Wiring kit
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5272.0 | 5272.0 | 1.0 | False | None | None | False | None | False | 5272.0 | 0 |
2833494 | 91780 | None | 0016a | LT Protection Kit for 63 kVA labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 949.0 | 949.0 | 1.0 | False | None | None | False | None | False | 949.0 | 0 |
2833495 | 91780 | None | 0017 | HG Fuse 11KV SOLID CORE TYPE ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 1069.0 | 1069.0 | 1.0 | False | None | None | False | None | False | 1069.0 | 0 |
2833496 | 91780 | None | 0017a | HG Fuse 11KV SOLID CORE TYPE labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 237.0 | 237.0 | 1.0 | False | None | None | False | None | False | 237.0 | 0 |
2833497 | 91780 | None | 0018 | Alkathine tube
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Coil | 517.0 | 517.0 | 1.0 | False | None | None | False | None | False | 517.0 | 0 |
2833498 | 91780 | None | 0019 | 1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 180.0 | 180.0 | 40.0 | False | None | None | False | None | False | 7200.0 | 0 |
2833499 | 91780 | None | 0019a | insulated, PVC exutruted Inner Seath Armoured LTUG Cable labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Coil | 31.0 | 31.0 | 40.0 | False | None | None | False | None | False | 1240.0 | 0 |
2833500 | 91780 | None | 012 | PSCC Pole 9mtr long, 200 Kg WL ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 4199.0 | 4199.0 | 1.0 | False | None | None | False | None | False | 4199.0 | 0 |
2833501 | 91780 | None | 012a | PSCC Pole 9mtr long, 200 Kg WL LABOUR CHARGES ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1742.0 | 1742.0 | 1.0 | False | None | None | False | None | False | 1742.0 | 0 |
2833502 | 91780 | None | 014 | 11KV Horizantal cross arm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 372.0 | 372.0 | 2.0 | False | None | None | False | None | False | 744.0 | 0 |
2833503 | 91780 | None | 014a | 11KV Horizantal cross arm labour chargeds ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 160.0 | 160.0 | 2.0 | False | None | None | False | None | False | 320.0 | 0 |
2833504 | 91780 | None | 015 | HT Single Top Supports, ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 91.0 | 91.0 | 1.0 | False | None | None | False | None | False | 91.0 | 0 |
2833505 | 91780 | None | 015a | HT Single Top Supports, labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 112.0 | 112.0 | 1.0 | False | None | None | False | None | False | 112.0 | 0 |
2833506 | 91780 | None | 016 | Pole Clamps ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 85.0 | 85.0 | 2.0 | False | None | None | False | None | False | 170.0 | 0 |
2833507 | 91780 | None | 017 | Bolt & Nuts ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 98.0 | 98.0 | 2.0 | False | None | None | False | None | False | 196.0 | 0 |
2833508 | 91780 | None | 018 | 11kV, 5KN Composite/Polymeric Pin Insulator (24mm dia FRP Rod)
Set ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 205.0 | 205.0 | 1.0 | False | None | None | False | None | False | 205.0 | 0 |
2833509 | 91780 | None | 019 | 45KN Disc Inslator for Rabbit Conductor ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 186.0 | 186.0 | 3.0 | False | None | None | False | None | False | 558.0 | 0 |
2833510 | 91780 | None | 0110 | spiral earth electrode
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 239.0 | 239.0 | 1.0 | False | None | None | False | None | False | 239.0 | 0 |
2833511 | 91780 | None | 0111 | Guy Rod (Anchor Rod) using 12 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 256.0 | 256.0 | 1.0 | False | None | None | False | None | False | 256.0 | 0 |
2833512 | 91780 | None | 0111a | Guy Rod (Anchor Rod) using 12 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 593.0 | 593.0 | 1.0 | False | None | None | False | None | False | 593.0 | 0 |
2833513 | 91780 | None | 0110a | spiral earth electrode labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 93.0 | 93.0 | 1.0 | False | None | None | False | None | False | 93.0 | 0 |
2833514 | 91780 | None | 0112 | Guy Wire 7/10 SWG for Guy ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 77.0 | 77.0 | 5.0 | False | None | None | False | None | False | 385.0 | 0 |
2833515 | 91780 | None | 0113 | No. 15 Strain insulator
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 59.0 | 59.0 | 1.0 | False | None | None | False | None | False | 59.0 | 0 |
2833516 | 91780 | None | 0114 | Guy Concreting With Boulders, Mud & Sand labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 200.0 | 200.0 | 1.0 | False | None | None | False | None | False | 200.0 | 0 |
2833517 | 91780 | None | 0115 | Rabbit conductor with 1.5% sag ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 46234.0 | 46234.0 | 0.3 | False | None | None | False | None | False | 13870.2 | 0 |
2833518 | 91780 | None | 0115a | Rabbit conductor with 1.5% sag labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 4361.0 | 4361.0 | 0.3 | False | None | None | False | None | False | 1308.3 | 0 |
2833519 | 91780 | None | 0116 | P.G Clamps (Rabbit to Rabbit) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | LS | 102.0 | 102.0 | 6.0 | False | None | None | False | None | False | 612.0 | 0 |
2833520 | 91780 | None | 0117 | Anti climbing Device (12 Mtr Gl Bared ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 89.0 | 89.0 | 1.0 | False | None | None | False | None | False | 89.0 | 0 |
2833521 | 91780 | None | 0117a | Anti climbing Device (12 Mtr Gl Bared labour charges ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 42.0 | 42.0 | 1.0 | False | None | None | False | None | False | 42.0 | 0 |
2833522 | 91780 | None | 0118 | Caution/Danger Board
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 150.0 | 150.0 | 1.0 | False | None | None | False | None | False | 150.0 | 0 |
2833523 | 91780 | None | 0118a | Caution/Danger Board
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 80.0 | 80.0 | 1.0 | False | None | None | False | None | False | 80.0 | 0 |
2833524 | 91780 | None | Page No 42, Item No.52.2,PWD Electrical SR 2023-24 | DG Set : 50 kW/62.5 kVA Diesel Generator set rated at 50 kW/62.5 kVA, 415 V, 0.8 pf mounted on a base frame, complete with inbuilt fuel tank and battery 1 no. 12 V & inbuilt standard manual Control Panel with acoustic enclosure : NAL Approved D.G. Set 62.5 kVA capacity with AMF panel as per technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 1090595.0 | 1090595.0 | 1.0 | False | None | None | False | None | False | 1090595.0 | 0 |
2833525 | 91780 | None | Page No 42 Item No10.2.3,PWD Electrical SR-2023-24 | Supply, Erection, testing and commission in go fAMF panel suitablefor.kVADG set. The panel isof cubicalty pebase/ floor mounting control panel with in geddoors,undr illed bottom gland plate, aluminium Bus Bar with the accommodationfor. A4 pole contactor for alternator with thermal O/L relay, .A4 pole contactor formains, HRC fuse for short circuit protection, Micro processor based AMF module with supply failure timer, Restoration timer, 3 impulse automatic enginestart/stoplogic, Mains/generator voltage, .capacity by passs witch and frequency sensing, PCC 1301 controller with water temperature / Lube oil pressure / enginespeed, Voltage/ampere/ Frequency/ kVA, Running- hour count, Noof starts, Fault indication, over/ under speed, Failstostart, Low oil pleasure, High engine temperature, Under / over voltage, over current, Earth faultrelay, with in dications for Mainson, Loadon Mains, Battery charger on Push buttons AMF module by pass Mode, Battery charger unit with in built Auto/ Manual and Flat/ Boost facility. The complete set shall have sufficient safety and adhere to NEC, NBC2016, IEC, CPWD specifications, PCB norms and KSGEI Acts and Rules. 62.5 KVA ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 77768.0 | 77768.0 | 1.0 | False | None | None | False | None | False | 77768.0 | 0 |