tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GARGA VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 12543857.68 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883360 | 94288 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 562.4 | False | None | None | False | None | False | 232074.36 | 0 | 2883361 | 94288 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 8556.0 | False | None | None | False | None | False | 853461.0 | 0 | 2883362 | 94288 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1389.75 | False | None | None | False | None | False | 148842.225 | 0 | 2883363 | 94288 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Common SR Vol-I, 2023-24, P- 9, I- 1.15.2) In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 718.59 | False | None | None | False | None | False | 320670.7875 | 0 | 2883364 | 94288 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 93.67 | False | None | None | False | None | False | 596710.6845 | 0 | 2883365 | 94288 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 656.8 | False | None | None | False | None | False | 4465839.352 | 0 | 2883366 | 94288 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 517.96 | False | None | None | False | None | False | 3782532.39 | 0 | 2883367 | 94288 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.8237 | False | None | None | False | None | False | 1102963.21317 | 0 | 2883368 | 94288 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1820.0 | False | None | None | False | None | False | 741468.0 | 0 | 2883369 | 94288 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 211.25 | False | None | None | False | None | False | 283476.375 | 0 | 2883370 | 94288 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883371 | 94288 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR THIMLAPURA-1 IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 15471676.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883372 | 94289 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using DozerIn area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 713.25 | False | None | None | False | None | False | 294322.6125 | 0 | 2883373 | 94289 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 9900.0 | False | None | None | False | None | False | 987525.0 | 0 | 2883374 | 94289 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work . In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1652.89 | False | None | None | False | None | False | 177024.519 | 0 | 2883375 | 94289 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 994.06 | False | None | None | False | None | False | 443599.275 | 0 | 2883376 | 94289 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 117.44 | False | None | None | False | None | False | 748133.904 | 0 | 2883377 | 94289 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 814.01 | False | None | None | False | None | False | 5534771.4539 | 0 | 2883378 | 94289 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 648.53 | False | None | None | False | None | False | 4736052.4575 | 0 | 2883379 | 94289 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 14.3895 | False | None | None | False | None | False | 1342311.55695 | 0 | 2883380 | 94289 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1960.0 | False | None | None | False | None | False | 798504.0 | 0 | 2883381 | 94289 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 293.325 | False | None | None | False | None | False | 393612.8175 | 0 | 2883382 | 94289 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883383 | 94289 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR G.NAGALAPURA VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 15581690.37 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883384 | 94290 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 774.0 | False | None | None | False | None | False | 319391.1 | 0 | 2883385 | 94290 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 9990.0 | False | None | None | False | None | False | 996502.5 | 0 | 2883386 | 94290 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 2085.18 | False | None | None | False | None | False | 223322.778 | 0 | 2883387 | 94290 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 538.87 | False | None | None | False | None | False | 240470.7375 | 0 | 2883388 | 94290 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 117.44 | False | None | None | False | None | False | 748133.904 | 0 | 2883389 | 94290 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 814.01 | False | None | None | False | None | False | 5534771.4539 | 0 | 2883390 | 94290 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 663.03 | False | None | None | False | None | False | 4841942.3325 | 0 | 2883391 | 94290 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 14.5271 | False | None | None | False | None | False | 1355147.44911 | 0 | 2883392 | 94290 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2240.0 | False | None | None | False | None | False | 912576.0 | 0 | 2883393 | 94290 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 293.325 | False | None | None | False | None | False | 393612.8175 | 0 | 2883394 | 94290 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883395 | 94290 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR BAILAVADIGERE VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 15593476.28 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883396 | 94291 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 821.1 | False | None | None | False | None | False | 338826.915 | 0 | 2883397 | 94291 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 7560.0 | False | None | None | False | None | False | 754110.0 | 0 | 2883398 | 94291 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work .In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1764.5 | False | None | None | False | None | False | 188977.95 | 0 | 2883399 | 94291 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 752.18 | False | None | None | False | None | False | 335660.325 | 0 | 2883400 | 94291 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 123.06 | False | None | None | False | None | False | 783935.271 | 0 | 2883401 | 94291 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 875.41 | False | None | None | False | None | False | 5952253.9999 | 0 | 2883402 | 94291 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 605.38 | False | None | None | False | None | False | 4420938.795 | 0 | 2883403 | 94291 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 14.9767 | False | None | None | False | None | False | 1397087.98047 | 0 | 2883404 | 94291 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2520.0 | False | None | None | False | None | False | 1026648.0 | 0 | 2883405 | 94291 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 283.125 | False | None | None | False | None | False | 379925.4375 | 0 | 2883406 | 94291 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883407 | 94291 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR DHASHAMAPURA VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 19671545.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883408 | 94292 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 872.3 | False | None | None | False | None | False | 359954.595 | 0 | 2883409 | 94292 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 9798.0 | False | None | None | False | None | False | 977350.5 | 0 | 2883410 | 94292 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work .In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 2791.09 | False | None | None | False | None | False | 298925.739 | 0 | 2883411 | 94292 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 940.4 | False | None | None | False | None | False | 419653.5 | 0 | 2883412 | 94292 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 165.5 | False | None | None | False | None | False | 1054292.925 | 0 | 2883413 | 94292 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 1030.25 | False | None | None | False | None | False | 7005071.5475 | 0 | 2883414 | 94292 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 836.99 | False | None | None | False | None | False | 6112328.7225 | 0 | 2883415 | 94292 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 18.1238 | False | None | None | False | None | False | 1690662.37158 | 0 | 2883416 | 94292 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.300mm thick. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2520.0 | False | None | None | False | None | False | 1026648.0 | 0 | 2883417 | 94292 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 529.725 | False | None | None | False | None | False | 710837.9775 | 0 | 2883418 | 94292 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883419 | 94292 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR INGALAGI VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT | 11546099.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883420 | 94293 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 334.8 | False | None | None | False | None | False | 138155.22 | 0 | 2883421 | 94293 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 6192.0 | False | None | None | False | None | False | 617652.0 | 0 | 2883422 | 94293 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1166.29 | False | None | None | False | None | False | 124909.659 | 0 | 2883423 | 94293 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 594.78 | False | None | None | False | None | False | 265420.575 | 0 | 2883424 | 94293 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 78.84 | False | None | None | False | None | False | 502238.394 | 0 | 2883425 | 94293 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 604.7 | False | None | None | False | None | False | 4111591.133 | 0 | 2883426 | 94293 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 524.92 | False | None | None | False | None | False | 3833359.53 | 0 | 2883427 | 94293 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.2354 | False | None | None | False | None | False | 1048084.17714 | 0 | 2883428 | 94293 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1750.0 | False | None | None | False | None | False | 712950.0 | 0 | 2883429 | 94293 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 131.625 | False | None | None | False | None | False | 176627.5875 | 0 | 2883430 | 94293 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883431 | 94293 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR PAPINAYAKANAHALLI VILLAGE IN HOSPETE TALUK,VIJAYANAGARA DISTRICT | 19182877.45 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883432 | 94294 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 853.9377 | False | None | None | False | None | False | 352377.391905 | 0 | 2883433 | 94294 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 8184.0 | False | None | None | False | None | False | 816354.0 | 0 | 2883434 | 94294 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 2984.27 | False | None | None | False | None | False | 319615.317 | 0 | 2883435 | 94294 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 1146.7 | False | None | None | False | None | False | 511714.875 | 0 | 2883436 | 94294 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 170.33 | False | None | None | False | None | False | 1085061.7155 | 0 | 2883437 | 94294 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 1134.75 | False | None | None | False | None | False | 7715607.8025 | 0 | 2883438 | 94294 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 715.1 | False | None | None | False | None | False | 5222196.525 | 0 | 2883439 | 94294 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 18.503 | False | None | None | False | None | False | 1726035.7023 | 0 | 2883440 | 94294 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2100.0 | False | None | None | False | None | False | 855540.0 | 0 | 2883441 | 94294 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 419.75 | False | None | None | False | None | False | 563262.525 | 0 | 2883442 | 94294 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883443 | 94294 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification .etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR LOKAPPANAHALLI VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT | 14123912.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883444 | 94295 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 565.5 | False | None | None | False | None | False | 233353.575 | 0 | 2883445 | 94295 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 6840.0 | False | None | None | False | None | False | 682290.0 | 0 | 2883446 | 94295 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1607.15 | False | None | None | False | None | False | 172125.765 | 0 | 2883447 | 94295 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 778.91 | False | None | None | False | None | False | 347588.5875 | 0 | 2883448 | 94295 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 100.69 | False | None | None | False | None | False | 641430.5415 | 0 | 2883449 | 94295 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 756.92 | False | None | None | False | None | False | 5146594.2788 | 0 | 2883450 | 94295 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 613.28 | False | None | None | False | None | False | 4478630.52 | 0 | 2883451 | 94295 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 13.1984 | False | None | None | False | None | False | 1231200.86544 | 0 | 2883452 | 94295 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2100.0 | False | None | None | False | None | False | 855540.0 | 0 | 2883453 | 94295 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 237.975 | False | None | None | False | None | False | 319338.6525 | 0 | 2883454 | 94295 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883455 | 94295 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification .etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR MARIYAMMANAHALLI VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT | 13257280.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883456 | 94296 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 532.8 | False | None | None | False | None | False | 219859.92 | 0 | 2883457 | 94296 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 8262.0 | False | None | None | False | None | False | 824134.5 | 0 | 2883458 | 94296 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1208.08 | False | None | None | False | None | False | 129385.368 | 0 | 2883459 | 94296 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 800.17 | False | None | None | False | None | False | 357075.8625 | 0 | 2883460 | 94296 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 86.34 | False | None | None | False | None | False | 550016.019 | 0 | 2883461 | 94296 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 674.26 | False | None | None | False | None | False | 4584556.7014 | 0 | 2883462 | 94296 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 588.22 | False | None | None | False | None | False | 4295623.605 | 0 | 2883463 | 94296 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 12.173 | False | None | None | False | None | False | 1135547.3493 | 0 | 2883464 | 94296 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2240.0 | False | None | None | False | None | False | 912576.0 | 0 | 2883465 | 94296 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 173.4 | False | None | None | False | None | False | 232685.46 | 0 | 2883466 | 94296 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883467 | 94296 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification .etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR NANDIBANDA VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 13001603.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883468 | 94297 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 446.4 | False | None | None | False | None | False | 184206.96 | 0 | 2883469 | 94297 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 7896.0 | False | None | None | False | None | False | 787626.0 | 0 | 2883470 | 94297 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1341.42 | False | None | None | False | None | False | 143666.082 | 0 | 2883471 | 94297 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 612.15 | False | None | None | False | None | False | 273171.9375 | 0 | 2883472 | 94297 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 83.95 | False | None | None | False | None | False | 534790.8825 | 0 | 2883473 | 94297 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 663.51 | False | None | None | False | None | False | 4511463.2589 | 0 | 2883474 | 94297 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 587.78 | False | None | None | False | None | False | 4292410.395 | 0 | 2883475 | 94297 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 12.066 | False | None | None | False | None | False | 1125565.9506 | 0 | 2883476 | 94297 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2240.0 | False | None | None | False | None | False | 912576.0 | 0 | 2883477 | 94297 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 164.175 | False | None | None | False | None | False | 220306.4325 | 0 | 2883478 | 94297 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883479 | 94297 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR VADRAHALLI VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT | 14002824.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883480 | 94298 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 600.25 | False | None | None | False | None | False | 247693.1625 | 0 | 2883481 | 94298 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 9930.0 | False | None | None | False | None | False | 990517.5 | 0 | 2883482 | 94298 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1466.4 | False | None | None | False | None | False | 157051.44 | 0 | 2883483 | 94298 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 557.95 | False | None | None | False | None | False | 248985.1875 | 0 | 2883484 | 94298 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 96.15 | False | None | None | False | None | False | 612509.1525 | 0 | 2883485 | 94298 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 735.35 | False | None | None | False | None | False | 4999931.4365 | 0 | 2883486 | 94298 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 617.01 | False | None | None | False | None | False | 4505869.7775 | 0 | 2883487 | 94298 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 13.2265 | False | None | None | False | None | False | 1233822.14865 | 0 | 2883488 | 94298 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1820.0 | False | None | None | False | None | False | 741468.0 | 0 | 2883489 | 94298 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 185.675 | False | None | None | False | None | False | 249157.2825 | 0 | 2883490 | 94298 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883491 | 94298 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR THIMMALAPURA-2 VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 11399258.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883492 | 94299 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 187.43 | False | None | None | False | None | False | 77342.9895 | 0 | 2883493 | 94299 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 5265.0 | False | None | None | False | None | False | 525183.75 | 0 | 2883494 | 94299 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1044.91 | False | None | None | False | None | False | 111909.861 | 0 | 2883495 | 94299 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5 m, but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 586.76 | False | None | None | False | None | False | 261841.65 | 0 | 2883496 | 94299 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 74.34 | False | None | None | False | None | False | 473571.819 | 0 | 2883497 | 94299 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 584.1 | False | None | None | False | None | False | 3971523.699 | 0 | 2883498 | 94299 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 543.84 | False | None | None | False | None | False | 3971527.56 | 0 | 2883499 | 94299 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 10.5884 | False | None | None | False | None | False | 987729.36444 | 0 | 2883500 | 94299 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1960.0 | False | None | None | False | None | False | 798504.0 | 0 | 2883501 | 94299 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 152.25 | False | None | None | False | None | False | 204304.275 | 0 | 2883502 | 94299 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883503 | 94299 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR BYALAKUNDI VILLAGE IN HOSPETE TALUK, VIJAYANAGARA DISTRICT | 12981653.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883504 | 94300 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 558.25 | False | None | None | False | None | False | 230361.8625 | 0 | 2883505 | 94300 | None | MI002 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 9990.0 | False | None | None | False | None | False | 996502.5 | 0 | 2883506 | 94300 | None | MI003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1387.42 | False | None | None | False | None | False | 148592.682 | 0 | 2883507 | 94300 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 371.22 | False | None | None | False | None | False | 165656.925 | 0 | 2883508 | 94300 | None | MI005 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 87.93 | False | None | None | False | None | False | 560144.8755 | 0 | 2883509 | 94300 | None | MI006 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 678.55 | False | None | None | False | None | False | 4613726.0845 | 0 | 2883510 | 94300 | None | MI007 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 546.92 | False | None | None | False | None | False | 3994020.03 | 0 | 2883511 | 94300 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 12.0886 | False | None | None | False | None | False | 1127674.17126 | 0 | 2883512 | 94300 | None | MI009 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2240.0 | False | None | None | False | None | False | 912576.0 | 0 | 2883513 | 94300 | None | MI010 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 161.925 | False | None | None | False | None | False | 217287.1575 | 0 | 2883514 | 94300 | None | MI011 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 2883515 | 94300 | None | MI012 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1709367302000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF BYALAKUNDI VILLAGE TANK IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 31692530.82 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883516 | 94301 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 630.0 | False | None | None | False | None | False | 259969.5 | 0 | 2883517 | 94301 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 25677.0 | False | None | None | False | None | False | 687373.29 | 0 | 2883518 | 94301 | None | MI003 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 33612.5 | False | None | None | False | None | False | 3317553.75 | 0 | 2883519 | 94301 | None | MI004 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 14253.02 | False | None | None | False | None | False | 6794414.634 | 0 | 2883520 | 94301 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 3703.63 | False | None | None | False | None | False | 1446637.878 | 0 | 2883521 | 94301 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 8641.81 | False | None | None | False | None | False | 6669316.8675 | 0 | 2883522 | 94301 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 491.18 | False | None | None | False | None | False | 52605.378 | 0 | 2883523 | 94301 | None | MI008 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 163.75 | False | None | None | False | None | False | 1043144.8125 | 0 | 2883524 | 94301 | None | MI009 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 120.0 | False | None | None | False | None | False | 764316.0 | 0 | 2883525 | 94301 | None | MI010 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 306.06 | False | None | None | False | None | False | 2081021.3034 | 0 | 2883526 | 94301 | None | MI011 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 171.29 | False | None | None | False | None | False | 1250888.0475 | 0 | 2883527 | 94301 | None | MI012 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 5.7108 | False | None | None | False | None | False | 532726.83828 | 0 | 2883528 | 94301 | None | MI013 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 44.73 | False | None | None | False | None | False | 60023.187 | 0 | 2883529 | 94301 | None | MI014 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 51.38 | False | None | None | False | None | False | 38789.331 | 0 | 2883530 | 94301 | None | MI015 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 240.0 | False | None | None | False | None | False | 2085300.0 | 0 | 2883531 | 94301 | None | MI016 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 8000.0 | False | None | None | False | None | False | 3259200.0 | 0 | 2883532 | 94301 | None | MI017 | Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 1139.25 | 1139.25 | 800.0 | False | None | None | False | None | False | 911400.0 | 0 | 2883533 | 94301 | None | MI018 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 18.9 | 18.9 | 8000.0 | False | None | None | False | None | False | 151200.0 | 0 | 2883534 | 94301 | None | MI019 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 1092.0 | False | None | None | False | None | False | 286650.0 | 0 |
| 1709367303000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF D.N.KERE TANK IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 33613449.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883535 | 94302 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 478.5 | False | None | None | False | None | False | 197453.025 | 0 | 2883536 | 94302 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 1860.5 | False | None | None | False | None | False | 49805.585 | 0 | 2883537 | 94302 | None | MI003 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 29586.2 | False | None | None | False | None | False | 14103741.54 | 0 | 2883538 | 94302 | None | MI004 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 6633.42 | False | None | None | False | None | False | 2591013.852 | 0 | 2883539 | 94302 | None | MI005 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 9950.14 | False | None | None | False | None | False | 7679020.545 | 0 | 2883540 | 94302 | None | MI006 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work . In all kinds of soils Depth upto 3 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 709.28 | False | None | None | False | None | False | 75963.888 | 0 | 2883541 | 94302 | None | MI007 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 276.45 | False | None | None | False | None | False | 1761083.2575 | 0 | 2883542 | 94302 | None | MI008 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 28.8 | False | None | None | False | None | False | 183435.84 | 0 | 2883543 | 94302 | None | MI009 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 538.06 | False | None | None | False | None | False | 3658479.7834 | 0 | 2883544 | 94302 | None | MI010 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 171.29 | False | None | None | False | None | False | 1250888.0475 | 0 | 2883545 | 94302 | None | MI011 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 9.4745 | False | None | None | False | None | False | 883820.20545 | 0 | 2883546 | 94302 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 191.73 | False | None | None | False | None | False | 257282.487 | 0 | 2883547 | 94302 | None | MI013 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 51.38 | False | None | None | False | None | False | 38789.331 | 0 | 2883548 | 94302 | None | MI014 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 57.6 | False | None | None | False | None | False | 500472.0 | 0 | 2883549 | 94302 | None | MI015 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 1456.0 | False | None | None | False | None | False | 382200.0 | 0 |
| 1709367303000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF G.NAGALAPURA TANK IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 26410568.01 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883550 | 94303 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 737.0 | False | None | None | False | None | False | 304123.05 | 0 | 2883551 | 94303 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 20149.0 | False | None | None | False | None | False | 539388.73 | 0 | 2883552 | 94303 | None | MI003 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 14230.8 | False | None | None | False | None | False | 1404579.96 | 0 | 2883553 | 94303 | None | MI004 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 11743.0 | False | None | None | False | None | False | 5597888.1 | 0 | 2883554 | 94303 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 1781.71 | False | None | None | False | None | False | 695935.926 | 0 | 2883555 | 94303 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 4157.32 | False | None | None | False | None | False | 3208411.71 | 0 | 2883556 | 94303 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 511.97 | False | None | None | False | None | False | 54831.987 | 0 | 2883557 | 94303 | None | MI008 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 146.74 | False | None | None | False | None | False | 934785.159 | 0 | 2883558 | 94303 | None | MI009 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 144.0 | False | None | None | False | None | False | 917179.2 | 0 | 2883559 | 94303 | None | MI010 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 442.06 | False | None | None | False | None | False | 3005738.3434 | 0 | 2883560 | 94303 | None | MI011 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 152.29 | False | None | None | False | None | False | 1112135.7975 | 0 | 2883561 | 94303 | None | MI012 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 7.8389 | False | None | None | False | None | False | 731244.73149 | 0 | 2883562 | 94303 | None | MI013 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 149.73 | False | None | None | False | None | False | 200922.687 | 0 | 2883563 | 94303 | None | MI014 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 45.68 | False | None | None | False | None | False | 34486.116 | 0 | 2883564 | 94303 | None | MI015 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 288.0 | False | None | None | False | None | False | 2502360.0 | 0 | 2883565 | 94303 | None | MI016 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 9720.0 | False | None | None | False | None | False | 3959928.0 | 0 | 2883566 | 94303 | None | MI017 | Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 1139.25 | 1139.25 | 808.0 | False | None | None | False | None | False | 920514.0 | 0 | 2883567 | 94303 | None | MI018 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 18.9 | 18.9 | 8080.0 | False | None | None | False | None | False | 152712.0 | 0 | 2883568 | 94303 | None | MI019 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 508.2 | False | None | None | False | None | False | 133402.5 | 0 |
| 1709367303000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF HOSACHANNAPURA VILLAGE TANK IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 22088840.01 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883569 | 94304 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 564.5 | False | None | None | False | None | False | 232940.925 | 0 | 2883570 | 94304 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 5130.0 | False | None | None | False | None | False | 137330.1 | 0 | 2883571 | 94304 | None | MI003 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 8996.55 | False | None | None | False | None | False | 887959.485 | 0 | 2883572 | 94304 | None | MI004 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 654.0 | False | None | None | False | None | False | 4165522.2 | 0 | 2883573 | 94304 | None | MI005 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 8.4467 | False | None | None | False | None | False | 787942.80747 | 0 | 2883574 | 94304 | None | MI006 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 1254.0 | False | None | None | False | None | False | 10895692.5 | 0 | 2883575 | 94304 | None | MI007 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 9880.0 | False | None | None | False | None | False | 4025112.0 | 0 | 2883576 | 94304 | None | MI008 | Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 1139.25 | 1139.25 | 720.0 | False | None | None | False | None | False | 820260.0 | 0 | 2883577 | 94304 | None | MI009 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 18.9 | 18.9 | 7200.0 | False | None | None | False | None | False | 136080.0 | 0 |
| 1709367303000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF JOGAYANAKERE TANK IN HOSPETE TALUK, VIJAYANAGARA DISTRICT. | 17686988.73 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2883578 | 94305 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 681.0 | False | None | None | False | None | False | 281014.65 | 0 | 2883579 | 94305 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 7351.0 | False | None | None | False | None | False | 196786.27 | 0 | 2883580 | 94305 | None | MI003 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 3625.6 | False | None | None | False | None | False | 357846.72 | 0 | 2883581 | 94305 | None | MI004 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 567.6 | False | None | None | False | None | False | 3615214.68 | 0 | 2883582 | 94305 | None | MI005 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 3.0046 | False | None | None | False | None | False | 280281.40686 | 0 | 2883583 | 94305 | None | MI006 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 1116.0 | False | None | None | False | None | False | 9696645.0 | 0 | 2883584 | 94305 | None | MI007 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 8000.0 | False | None | None | False | None | False | 3259200.0 | 0 |
|
|
---|