| 1512452 | 44749 | None | RDPR01 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer in charge ---- work complete within 11 Months | Cum | 2080.96 | 2080.96 | 2.27 | False | None | None | False | None | False | 4723.7792 | 0 |
| 1512453 | 44749 | None | RDPR02 | Demolishing brick work manually by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer in charge In cement mortar ---- work complete within 11 Months | Cum | 883.68 | 883.68 | 11.22 | False | None | None | False | None | False | 9914.8896 | 0 |
| 1512454 | 44749 | None | RDPR03 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineerin Charge Of area 3 m² and below ---- work complete within 11 Months | Cum | 206.08 | 206.08 | 1.61 | False | None | None | False | None | False | 331.7888 | 0 |
| 1512455 | 44749 | None | RDPR04 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- work complete within 11 Months | Cum | 81.76 | 81.76 | 590.09 | False | None | None | False | None | False | 48245.7584 | 0 |
| 1512456 | 44749 | None | RDPR05 | Filling available excavated earth excluding rock in trenches, plinth, sides of foundations and other similar works etc. In layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m ---- work complete within 11 Months | Cum | 228.48 | 228.48 | 1124.55 | False | None | None | False | None | False | 256937.184 | 0 |
| 1512457 | 44749 | None | RDPR06 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding150mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications The cost of steel reinforcement and formwork shall be paid separately mix 1:3:6 m10 Using 40mm nominal size garded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6220.48 | 6220.48 | 49.23 | False | None | None | False | None | False | 306234.2304 | 0 |
| 1512458 | 44749 | None | RDPR07 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete :6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 1 cement 6 Coarse sand ---- work complete within 11 Months | Cum | 5320.0 | 5320.0 | 98.75 | False | None | None | False | None | False | 525350.0 | 0 |
| 1512459 | 44749 | None | RDPR08 | Providing and laying in position Reinforced cement concrete for all foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizer laid in finished layers, well compacted using needle vibrators, including all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications The cost of steel reinforcement and formwork to be paid separately Sqm0 Design mix using 20mm nominal size graded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6656.16 | 6656.16 | 77.91 | False | None | None | False | None | False | 518581.4256 | 0 |
| 1512460 | 44749 | None | RDPR09 | Formwork for foundation @ 8% cost of concrete ---- work complete within 11 Months | Cum | 532.49 | 532.49 | 77.91 | False | None | None | False | None | False | 41486.2959 | 0 |
| 1512461 | 44749 | None | RDPR10 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid Separately) Sqm0 Design mix Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6684.16 | 6684.16 | 35.74 | False | None | None | False | None | False | 238891.8784 | 0 |
| 1512462 | 44749 | None | RDPR11 | Formwork for columns upto plinth @70% cost of concrete ---- work complete within 11 Months | Cum | 4678.91 | 4678.91 | 17.66 | False | None | None | False | None | False | 82629.5506 | 0 |
| 1512463 | 44749 | None | RDPR12 | Formwork for plinth beam @50% cost of concrete ---- work complete within 11 Months | Cum | 3342.08 | 3342.08 | 15.38 | False | None | None | False | None | False | 51401.1904 | 0 |
| 1512464 | 44749 | None | RDPR13 | Providing and laying in position Reinforced cement concrete for all super structure of building, Road works, water works, irrigation works and super structure works of bridges upto 3.5m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizer laid in layers, well compacted using needle vibrators. The cost includes all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS Codes, labour, usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement and formwork to be paid separately) Sqm0 Design mix using 20mm nominal size graded crushed coarse aggregates. Beam,Retaining wall and Column upto 3.6 m height ---- work complete within 11 Months | Cum | 6923.84 | 6923.84 | 125.48 | False | None | None | False | None | False | 868803.4432 | 0 |
| 1512465 | 44749 | None | RDPR14 | Formwork for Columns @ 70% cost of concrete. ---- work complete within 11 Months | Cum | 4846.69 | 4846.69 | 19.19 | False | None | None | False | None | False | 93007.9811 | 0 |
| 1512466 | 44749 | None | RDPR15 | Formwork for Beams @ 60% cost of concrete. ---- work complete within 11 Months | Cum | 4154.3 | 4154.3 | 40.15 | False | None | None | False | None | False | 166795.145 | 0 |
| 1512467 | 44749 | None | RDPR16 | Formwork for Slab @ 50% cost of concrete. ---- work complete within 11 Months | Cum | 3461.92 | 3461.92 | 64.02 | False | None | None | False | None | False | 221632.1184 | 0 |
| 1512468 | 44749 | None | RDPR17 | Formwork for Chajja @ 45% cost of concrete. ---- work complete within 11 Months | Cum | 3115.73 | 3115.73 | 1.38 | False | None | None | False | None | False | 4299.7074 | 0 |
| 1512469 | 44749 | None | RDPR18 | Providing and laying in position Reinforced cement concrete for all super structure of building, Road works, water works, irrigation works and super structure works of bridges upto 7.2m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizer laid in layers, well compacted using needle vibrators. The cost includes all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS Codes, labour, usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement and formwork to be paid separately) Sqm0 Design mix using 20mm nominal size graded crushed coarse aggregates. Beams , Columns upto 7.2 m height ---- work complete within 11 Months | Cum | 6931.26 | 6931.26 | 121.44 | False | None | None | False | None | False | 841732.2144 | 0 |
| 1512470 | 44749 | None | RDPR19 | Formwork for Column upto 7.2m height @ 70% cost of concrete. ---- work complete within 11 Months | Cum | 4846.69 | 4846.69 | 19.19 | False | None | None | False | None | False | 93007.9811 | 0 |
| 1512471 | 44749 | None | RDPR20 | Formwork for Beams upto 7.2m height @ 60% cost of concrete. ---- work complete within 11 Months | Cum | 4154.3 | 4154.3 | 35.95 | False | None | None | False | None | False | 149347.085 | 0 |
| 1512472 | 44749 | None | RDPR21 | Formwork for Slab upto 7.2m height @ 50% cost of concrete. ---- work complete within 11 Months | Cum | 3461.92 | 3461.92 | 64.09 | False | None | None | False | None | False | 221874.4528 | 0 |
| 1512473 | 44749 | None | RDPR22 | Formwork for Chajja @ 45% cost of concrete. ---- work complete within 11 Months | Cum | 3115.73 | 3115.73 | 1.47 | False | None | None | False | None | False | 4580.1231 | 0 |
| 1512474 | 44749 | None | RDPR23 | Providing and laying in position Reinforced cement concrete for all super structure of building, Road works, water works, irrigation works and super structure works of bridges upto 10.5m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizer laid in layers, well compacted using needle vibrators. The cost includes all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS Codes, labour, usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement and formwork to be paid separately) Sqm0 Design mix using 20mm nominal size graded crushed coarse aggregates. Beams and columns above 7.2 m height ---- work complete within 11 Months | Cum | 6938.68 | 6938.68 | 5.44 | False | None | None | False | None | False | 37746.4192 | 0 |
| 1512475 | 44749 | None | RDPR24 | Formwork for Column above 7.2m height @ 70% cost of concrete. ---- work complete within 11 Months | Cum | 4846.69 | 4846.69 | 1.32 | False | None | None | False | None | False | 6397.6308 | 0 |
| 1512476 | 44749 | None | RDPR25 | Formwork for Beams above 7.2m height @ 60% cost of concrete. ---- work complete within 11 Months | Cum | 4154.3 | 4154.3 | 1.28 | False | None | None | False | None | False | 5317.504 | 0 |
| 1512477 | 44749 | None | RDPR26 | Formwork for Slab upto 7.2m height @ 50% cost of concrete. ---- work complete within 11 Months | Cum | 3461.92 | 3461.92 | 2.84 | False | None | None | False | None | False | 9831.8528 | 0 |
| 1512478 | 44749 | None | RDPR27 | Providing T.m.T bars of grade Fe-550 for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOm of machinery complete as per specifications. ---- work complete within 11 Months | Kg | 103.04 | 103.04 | 30996.0 | False | None | None | False | None | False | 3193827.84 | 0 |
| 1512479 | 44749 | None | RDPR28 | Providing Brick work with common burnt clay Non modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in cement mortar 1:6 (1 cement: 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Upto 3.6 m height ---- work complete within 11 Months | Cum | 7492.8 | 7492.8 | 120.85 | False | None | None | False | None | False | 905504.88 | 0 |
| 1512480 | 44749 | None | RDPR29 | Providing Brick work with common burnt clay Non modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in cement mortar 1:6 (1 cement: 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Upto 7.2 m height ---- work complete within 11 Months | Cum | 7500.83 | 7500.83 | 141.89 | False | None | None | False | None | False | 1064292.7687 | 0 |
| 1512481 | 44749 | None | RDPR30 | Providing Brick work with common burnt clay Non modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in cement mortar 1:6 (1 cement: 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Above 7.2m height ---- work complete within 11 Months | Cum | 7508.86 | 7508.86 | 8.85 | False | None | None | False | None | False | 66453.411 | 0 |
| 1512482 | 44749 | None | RDPR31 | Providing Half brick masonry with common burnt clay Non modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineerincharge of work. Upto 3.6 m height ---- work complete within 11 Months | Sqm | 969.92 | 969.92 | 52.1 | False | None | None | False | None | False | 50532.832 | 0 |
| 1512483 | 44749 | None | RDPR32 | Providing Half brick masonry with common burnt clay Non modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineerincharge of work. Upto 7.2 m height ---- work complete within 11 Months | Sqm | 970.96 | 970.96 | 101.24 | False | None | None | False | None | False | 98299.9904 | 0 |
| 1512484 | 44749 | None | RDPR33 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Upto 3.6m Height ---- work complete within 11 Months | Sqm | 238.56 | 238.56 | 727.34 | False | None | None | False | None | False | 173514.2304 | 0 |
| 1512485 | 44749 | None | RDPR34 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Upto 7.2m Height ---- work complete within 11 Months | Sqm | 238.82 | 238.82 | 853.27 | False | None | None | False | None | False | 203777.9414 | 0 |
| 1512486 | 44749 | None | RDPR35 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Above 7.2m Height ---- work complete within 11 Months | Sqm | 239.07 | 239.07 | 39.42 | False | None | None | False | None | False | 9424.1394 | 0 |
| 1512487 | 44749 | None | RDPR36 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Upto 3.6m Height ---- work complete within 11 Months | Sqm | 343.84 | 343.84 | 595.66 | False | None | None | False | None | False | 204811.7344 | 0 |
| 1512488 | 44749 | None | RDPR37 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Upto 7.2m Height ---- work complete within 11 Months | Sqm | 344.21 | 344.21 | 666.35 | False | None | None | False | None | False | 229364.3335 | 0 |
| 1512489 | 44749 | None | RDPR38 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.above 7.2m Height ---- work complete within 11 Months | Sqm | 344.58 | 344.58 | 47.39 | False | None | None | False | None | False | 16329.6462 | 0 |
| 1512490 | 44749 | None | RDPR39 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in Charge. Upto 3.6m height ---- work complete within 11 Months | Sqm | 92.96 | 92.96 | 892.5 | False | None | None | False | None | False | 82966.8 | 0 |
| 1512491 | 44749 | None | RDPR40 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in Charge. Upto 7.2m height ---- work complete within 11 Months | Sqm | 93.06 | 93.06 | 1015.73 | False | None | None | False | None | False | 94523.8338 | 0 |
| 1512492 | 44749 | None | RDPR41 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in Charge. Above 7.2m height ---- work complete within 11 Months | Sqm | 93.16 | 93.16 | 39.42 | False | None | None | False | None | False | 3672.3672 | 0 |
| 1512493 | 44749 | None | RDPR42 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. Upto 3.6m Height ---- work complete within 11 Months | Sqm | 117.6 | 117.6 | 892.5 | False | None | None | False | None | False | 104958.0 | 0 |
| 1512494 | 44749 | None | RDPR43 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. Upto 7.2m Height ---- work complete within 11 Months | Sqm | 117.73 | 117.73 | 1015.73 | False | None | None | False | None | False | 119581.8929 | 0 |
| 1512495 | 44749 | None | RDPR44 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. Above 7.2m Height ---- work complete within 11 Months | Sqm | 117.85 | 117.85 | 58.32 | False | None | None | False | None | False | 6873.012 | 0 |
| 1512496 | 44749 | None | RDPR45 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 Kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Upto 3.6m Height ---- work complete within 11 Months | Sqm | 73.92 | 73.92 | 813.24 | False | None | None | False | None | False | 60114.7008 | 0 |
| 1512497 | 44749 | None | RDPR46 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 Kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Upto 7.2m Height ---- work complete within 11 Months | Sqm | 74.0 | 74.0 | 861.09 | False | None | None | False | None | False | 63720.66 | 0 |
| 1512498 | 44749 | None | RDPR47 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 Kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Above 7.2m Height ---- work complete within 11 Months | Sqm | 74.08 | 74.08 | 47.39 | False | None | None | False | None | False | 3510.6512 | 0 |
| 1512499 | 44749 | None | RDPR48 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- work complete within 11 Months | Sqm | 100.8 | 100.8 | 98.34 | False | None | None | False | None | False | 9912.672 | 0 |
| 1512500 | 44749 | None | RDPR49 | Providing Teak wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. ---- work complete within 11 Months | Cum | 263926.88 | 263926.88 | 0.2 | False | None | None | False | None | False | 52785.376 | 0 |
| 1512501 | 44749 | None | RDPR50 | Providing and fixing in position fully panelled Teak wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) ---- work complete within 11 Months | Sqm | 10454.08 | 10454.08 | 11.52 | False | None | None | False | None | False | 120431.0016 | 0 |
| 1512502 | 44749 | None | RDPR51 | Providing salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- work complete within 11 Months | Cum | 68995.36 | 68995.36 | 1.26 | False | None | None | False | None | False | 86934.1536 | 0 |
| 1512503 | 44749 | None | RDPR52 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. do- 35 mm thick both side commercial ---- work complete within 11 Months | Sqm | 3297.28 | 3297.28 | 45.99 | False | None | None | False | None | False | 151641.9072 | 0 |
| 1512504 | 44749 | None | RDPR53 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm m.S Square tube, the entire door frame to be reinforced with 19x19mm m.S Square tube of 19 gauge. The door frame to be fixed to the wall using m.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- work complete within 11 Months | Sqm | 532.0 | 532.0 | 35.7 | False | None | None | False | None | False | 18992.4 | 0 |
| 1512505 | 44749 | None | RDPR54 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from m.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the m.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. -do- with both side prelam Varnishing with varnish of approved brand and manufacture :Two coats glue sizing with spar varnish or an under coat of flatting varnish to give an even shade and produce a smooth dry and mat surface including ---- work complete within 11 Months | Sqm | 4259.36 | 4259.36 | 35.7 | False | None | None | False | None | False | 152059.152 | 0 |
| 1512506 | 44749 | None | RDPR55 | preparing the surface after thorougly cleaning oil, grease, dirt and foreign mattersand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- work complete within 11 Months | Sqm | 147.84 | 147.84 | 14.98 | False | None | None | False | None | False | 2214.6432 | 0 |
| 1512507 | 44749 | None | RDPR56 | Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDm rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For Fixed Portion: Powder coatedaluminium (minimum thickness of powder coating 50 micron) including cost of materials, labour, usage charges of machinery complete as per ---- work complete within 11 Months | Kg | 434.56 | 434.56 | 761.0 | False | None | None | False | None | False | 330700.16 | 0 |
| 1512508 | 44749 | None | RDPR57 | Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDm rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDm rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron) including cost of materials, labour, usage charges of machinery complete as per specifications. ---- work complete within 11 Months | Kg | 509.6 | 509.6 | 256.85 | False | None | None | False | None | False | 130890.76 | 0 |
| 1512509 | 44749 | None | RDPR58 | Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDm rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10Kg/ m²) including cost of materials, labour, usage chargesof machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- work complete within 11 Months | Sqm | 893.76 | 893.76 | 98.34 | False | None | None | False | None | False | 87892.3584 | 0 |
| 1512510 | 44749 | None | RDPR59 | Providing and fixing m.S. grills of required pattern in frames of windows etc. with m.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- work complete within 11 Months | Kg | 175.84 | 175.84 | 2065.14 | False | None | None | False | None | False | 363134.2176 | 0 |
| 1512511 | 44749 | None | RDPR60 | Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per Specifications. ---- work complete within 11 Months | Sqm | 2682.4 | 2682.4 | 871.62 | False | None | None | False | None | False | 2338033.488 | 0 |
| 1512512 | 44749 | None | RDPR61 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm(thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 Kg/Sqm including pointing the joints with white cement and matching pigment etc., complete. ---- work complete within 11 Months | Sqm | 677.6 | 677.6 | 75.14 | False | None | None | False | None | False | 50914.864 | 0 |
| 1512513 | 44749 | None | RDPR62 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- work complete within 11 Months | Sqm | 1090.88 | 1090.88 | 195.18 | False | None | None | False | None | False | 212917.9584 | 0 |
| 1512514 | 44749 | None | RDPR63 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts,bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- work complete within 11 Months | Kg | 560.0 | 560.0 | 147.6 | False | None | None | False | None | False | 82656.0 | 0 |
| 1512515 | 44749 | None | RDPR64 | Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 Kg per Sqm over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level , including cost of materials, labour and Usage charges of machinery complete as per Specifications. ---- work complete within 11 Months | Sqm | 1217.44 | 1217.44 | 93.88 | False | None | None | False | None | False | 114293.2672 | 0 |
| 1512516 | 44749 | None | RDPR65 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- work complete within 11 Months | Cum | 81.76 | 81.76 | 88.12 | False | None | None | False | None | False | 7204.6912 | 0 |
| 1512517 | 44749 | None | RDPR66 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding150mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications.(The cost of steel reinforcement and formwork shall be paid separately) mix 1:3:6 (m10) Using 40mm nominal size garded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6220.48 | 6220.48 | 3.9 | False | None | None | False | None | False | 24259.872 | 0 |
| 1512518 | 44749 | None | RDPR67 | Providing and laying in position Reinforced cement concrete for all foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizer laid in finished layers, well compacted using needle vibrators, including all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement and formwork to be paid separately) Sqm0 Design mix using 20mm nominal size graded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6656.16 | 6656.16 | 8.47 | False | None | None | False | None | False | 56377.6752 | 0 |
| 1512519 | 44749 | None | RDPR68 | Formwork for Cement concrete drains @ 35% cost of concrete. ---- work complete within 11 Months | Cum | 2329.66 | 2329.66 | 8.47 | False | None | None | False | None | False | 19732.2202 | 0 |
| 1512520 | 44749 | None | RDPR69 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid Separately) Sqm0 Design mix Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 Months | Cum | 6684.16 | 6684.16 | 13.97 | False | None | None | False | None | False | 93377.7152 | 0 |
| 1512521 | 44749 | None | RDPR70 | Formwork for Cement concrete drains @ 35% cost of concrete. ---- work complete within 11 Months | Cum | 2339.46 | 2339.46 | 13.97 | False | None | None | False | None | False | 32682.2562 | 0 |
| 1512522 | 44749 | None | RDPR71 | Providing T.m.T bars of grade Fe-550 for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOm of machinery complete as per specifications. ---- work complete within 11 Months | Kg | 103.04 | 103.04 | 2355.6 | False | None | None | False | None | False | 242721.024 | 0 |
| 1512523 | 44749 | None | RDPR72 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 Kg per Sqm, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- work complete within 11 Months | Nos | 267.68 | 267.68 | 17.0 | False | None | None | False | None | False | 4550.56 | 0 |
| 1512524 | 44749 | None | RDPR73 | Providing and fixing CPVC pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge. External work. 32 mm nominal dia pipes. ---- work complete within 11 Months | m | 400.96 | 400.96 | 90.0 | False | None | None | False | None | False | 36086.4 | 0 |
| 1512525 | 44749 | None | RDPR74 | Providing and fixing CPVC pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and cost cutting chases and making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work- including cutting chases and making good the walls etc. 32 mm nominal dia pipes. ---- work complete within 11 Months | m | 622.72 | 622.72 | 30.0 | False | None | None | False | None | False | 18681.6 | 0 |
| 1512526 | 44749 | None | RDPR75 | Providing and fixing CPVC pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and cost cutting chases and making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work- including cutting chases and making good the walls etc. 25mm nominal dia pipes. ---- work complete within 11 Months | m | 533.12 | 533.12 | 60.0 | False | None | None | False | None | False | 31987.2 | 0 |
| 1512527 | 44749 | None | RDPR76 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN 4, 75mm dia. ---- work complete within 11 Months | m | 228.48 | 228.48 | 50.0 | False | None | None | False | None | False | 11424.0 | 0 |
| 1512528 | 44749 | None | RDPR77 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN 4, 110mm dia. ---- work complete within 11 Months | m | 303.52 | 303.52 | 30.0 | False | None | None | False | None | False | 9105.6 | 0 |
| 1512529 | 44749 | None | RDPR78 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN 4, 160mm dia. ---- work complete within 11 Months | m | 622.72 | 622.72 | 50.0 | False | None | None | False | None | False | 31136.0 | 0 |
| 1512530 | 44749 | None | RDPR79 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN 4, 200mm dia. ---- work complete within 11 Months | m | 906.08 | 906.08 | 50.0 | False | None | None | False | None | False | 45304.0 | 0 |
| 1512531 | 44749 | None | RDPR80 | Constructing brick masonry chamber of internal dimension 450x300mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.. ---- work complete within 11 Months | Each | 3628.8 | 3628.8 | 7.0 | False | None | None | False | None | False | 25401.6 | 0 |
| 1512532 | 44749 | None | RDPR81 | Constructing brick masonry chamber of internal dimension 300x230mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.. ---- work complete within 11 Months | Each | 2835.84 | 2835.84 | 4.0 | False | None | None | False | None | False | 11343.36 | 0 |
| 1512533 | 44749 | None | RDPR82 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: ---- work complete within 11 Months | Each | 4755.52 | 4755.52 | 11.0 | False | None | None | False | None | False | 52310.72 | 0 |
| 1512534 | 44749 | None | RDPR83 | White Vitreous China Surgeon type wash basin of size 660x460 mm with a pair of 15 mm C.P. brass pillar taps with elbow including operated Levers ---- work complete within 11 Months | Each | 3792.32 | 3792.32 | 7.0 | False | None | None | False | None | False | 26546.24 | 0 |
| 1512535 | 44749 | None | RDPR84 | Bottle trap 31mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 260 gms ---- work complete within 11 Months | Each | 273.28 | 273.28 | 7.0 | False | None | None | False | None | False | 1912.96 | 0 |
| 1512536 | 44749 | None | RDPR85 | Providing and fixing trap of self cleansing design with screwed down or or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors * 100mm inlet and 75mm outlet *sand cast iron S&S as per IS-3989 ---- work complete within 11 Months | Each | 1211.0 | 1211.0 | 12.0 | False | None | None | False | None | False | 14532.0 | 0 |
| 1512537 | 44749 | None | RDPR86 | Providing and fixing brass bib cock of approved quality :20 mm nominal bore ---- work complete within 11 Months | Nos | 386.4 | 386.4 | 39.0 | False | None | None | False | None | False | 15069.6 | 0 |
| 1512538 | 44749 | None | RDPR87 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :32mm nominal bore ---- work complete within 11 Months | Nos | 646.24 | 646.24 | 11.0 | False | None | None | False | None | False | 7108.64 | 0 |
| 1512539 | 44749 | None | RDPR88 | Providing and fixing PTmT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- work complete within 11 Months | Nos | 425.6 | 425.6 | 9.0 | False | None | None | False | None | False | 3830.4 | 0 |
| 1512540 | 44749 | None | RDPR89 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank IS:12701 marked, with cover and suitable locking arrangements and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- work complete within 11 Months | Ltr | 8.96 | 8.96 | 5000.0 | False | None | None | False | None | False | 44800.0 | 0 |
| 1512541 | 44749 | None | RDPR90 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- work complete within 11 Months | m | 70.0 | 70.0 | 200.0 | False | None | None | False | None | False | 14000.0 | 0 |
| 1512542 | 44749 | None | RDPR91 | Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick ---- work complete within 11 Months | m | 61.0 | 61.0 | 200.0 | False | None | None | False | None | False | 12200.0 | 0 |
| 1512543 | 44749 | None | RDPR92 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- work complete within 11 Months | m | 80.0 | 80.0 | 200.0 | False | None | None | False | None | False | 16000.0 | 0 |
| 1512544 | 44749 | None | RDPR93 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- work complete within 11 Months | m | 75.0 | 75.0 | 650.0 | False | None | None | False | None | False | 48750.0 | 0 |
| 1512545 | 44749 | None | RDPR94 | Supplying and fixing PVC/metal conduit Deep junction box 32 mm deep Junction box ---- work complete within 11 Months | Each | 69.0 | 69.0 | 70.0 | False | None | None | False | None | False | 4830.0 | 0 |
| 1512546 | 44749 | None | RDPR95 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. ---- work complete within 11 Months | m | 26.0 | 26.0 | 650.0 | False | None | None | False | None | False | 16900.0 | 0 |
| 1512547 | 44749 | None | RDPR96 | Supplying And Fixing metal Fan Box with Round Hook. ---- work complete within 11 Months | Nos | 163.0 | 163.0 | 30.0 | False | None | None | False | None | False | 4890.0 | 0 |
| 1512548 | 44749 | None | RDPR97 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mSqm (Phase & Neutral)& 1x1.0 mSqm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch ---- work complete within 11 Months | Point | 276.0 | 276.0 | 20.0 | False | None | None | False | None | False | 5520.0 | 0 |
| 1512549 | 44749 | None | RDPR98 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mSqm (Phase & Neutral)& 1x1.0 mSqm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. medium point above 3m upto 6m from tapping point to out let via switch ---- work complete within 11 Months | Point | 386.0 | 386.0 | 35.0 | False | None | None | False | None | False | 13510.0 | 0 |
| 1512550 | 44749 | None | RDPR99 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mSqm (Phase & Neutral)& 1x1.0 mSqm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6m upto 10m from tapping point to out let via Switch ---- work complete within 11 Months | Point | 567.0 | 567.0 | 80.0 | False | None | None | False | None | False | 45360.0 | 0 |
| 1512551 | 44749 | None | RDPR100 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 mSqm ---- work complete within 11 Months | m | 59.0 | 59.0 | 800.0 | False | None | None | False | None | False | 47200.0 | 0 |
| 1512552 | 44749 | None | RDPR101 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mSqm ---- work complete within 11 Months | m | 26.0 | 26.0 | 400.0 | False | None | None | False | None | False | 10400.0 | 0 |
| 1512553 | 44749 | None | RDPR102 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, machine/NF screws etc., complete. 16-18 Way ---- work complete within 11 Months | Each | 225.0 | 225.0 | 30.0 | False | None | None | False | None | False | 6750.0 | 0 |
| 1512554 | 44749 | None | RDPR103 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 16-18 module ---- work complete within 11 Months | Each | 403.0 | 403.0 | 30.0 | False | None | None | False | None | False | 12090.0 | 0 |
| 1512555 | 44749 | None | RDPR104 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- work complete within 11 Months | Each | 88.0 | 88.0 | 200.0 | False | None | None | False | None | False | 17600.0 | 0 |
| 1512556 | 44749 | None | RDPR105 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two module ---- work complete within 11 Months | Each | 313.0 | 313.0 | 30.0 | False | None | None | False | None | False | 9390.0 | 0 |
| 1512557 | 44749 | None | RDPR106 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- work complete within 11 Months | Each | 162.0 | 162.0 | 65.0 | False | None | None | False | None | False | 10530.0 | 0 |
| 1512558 | 44749 | None | RDPR107 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.32A DP Switch ---- work complete within 11 Months | Each | 375.0 | 375.0 | 3.0 | False | None | None | False | None | False | 1125.0 | 0 |
| 1512559 | 44749 | None | RDPR108 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6/16A Universal Socket ---- work complete within 11 Months | Each | 249.0 | 249.0 | 3.0 | False | None | None | False | None | False | 747.0 | 0 |
| 1512560 | 44749 | None | RDPR109 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-3 Way ---- work complete within 11 Months | Each | 123.0 | 123.0 | 3.0 | False | None | None | False | None | False | 369.0 | 0 |
| 1512561 | 44749 | None | RDPR110 | Supplying and fixing regular mCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity mCB's single phase/3 phase/single door with powder coated painting made out of 14 SWG mS enclosure. 6 Way SP & N ---- work complete within 11 Months | Each | 1180.0 | 1180.0 | 1.0 | False | None | None | False | None | False | 1180.0 | 0 |
| 1512562 | 44749 | None | RDPR111 | Supplying & fixing miniature circuit breakers on existing mCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- work complete within 11 Months | Each | 523.0 | 523.0 | 6.0 | False | None | None | False | None | False | 3138.0 | 0 |
| 1512563 | 44749 | None | RDPR112 | Supplying, fixing and wiring Earth Leakage miniature Circuit Breaker (ELmCB) 240/450V upto 300mA sensitivity on existing wood/panel board. 32-40 A 2 pole ---- work complete within 11 Months | Each | 2652.0 | 2652.0 | 1.0 | False | None | None | False | None | False | 2652.0 | 0 |
| 1512564 | 44749 | None | RDPR113 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 12" Sweep (300 mm) ---- work complete within 11 Months | Each | 2997.0 | 2997.0 | 1.0 | False | None | None | False | None | False | 2997.0 | 0 |
| 1512565 | 44749 | None | RDPR114 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 56" Sweep (1400 mm) Regular model ---- work complete within 11 Months | Each | 2170.0 | 2170.0 | 30.0 | False | None | None | False | None | False | 65100.0 | 0 |
| 1512566 | 44749 | None | RDPR115 | Supplying of feet PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70 lumen maintenance with CRI 80Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved2 years Warranty against any manufacturing defect working under standard electrical condition LED light fitting 1 x 4' - 36/40 W ---- work complete within 11 Months | Each | 1197.0 | 1197.0 | 100.0 | False | None | None | False | None | False | 119700.0 | 0 |
| 1512567 | 44749 | None | RDPR116 | Supplying, fixing and wiring Electronic Trivector meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy meter. ---- work complete within 11 Months | Each | 1242.0 | 1242.0 | 1.0 | False | None | None | False | None | False | 1242.0 | 0 |
| 1512568 | 44749 | None | RDPR117 | Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2 HP, Size 50x40 Head 22m, Discharge 186 LPm ---- work complete within 11 Months | Each | 17470.0 | 17470.0 | 1.0 | False | None | None | False | None | False | 17470.0 | 0 |
| 1512569 | 44749 | None | RDPR118 | Supply and delivery at site brand new best make starter/ control panel suitable for following HP centrifugal pump confirming with ISI mark and its latest amendments Upto 7.5 HP centrifugal pump ---- work complete within 11 Months | Each | 9500.0 | 9500.0 | 1.0 | False | None | None | False | None | False | 9500.0 | 0 |
| 1512572 | 44749 | None | RDPR121 | Supplying, installation, testing and commissioning of solar hot water heater comprising of solar Flat Plate Collector (FPC) of size 2120x1040x100mm and stainless steel hot water storage tank with stainless steel heat exchanger absorber made of copper sheet and copper tube of following capacity aluminium box collector with appropriate capacity electrical back up arrangement excluding inlet and out let pipes. SS model with 100mm thick of 48Kg/Cumdensity Rock wool insulation with 22SWG Aluminium cladding 300L ---- work complete within 11 Months | Each | 70784.0 | 70784.0 | 2.0 | False | None | None | False | None | False | 141568.0 | 0 |
| 1512570 | 44749 | None | RDPR119 | Supply and delivery at site brand new best make Foot valve suitable for centrifugal pump upto 10HP confirming with ISI mark and its latest amendments ---- work complete within 11 Months | Each | 950.0 | 950.0 | 1.0 | False | None | None | False | None | False | 950.0 | 0 |
| 1512571 | 44749 | None | RDPR120 | Supplying and drawing Flexible multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 2C x 2.5 mSqm ---- work complete within 11 Months | Mtr | 79.0 | 79.0 | 10.0 | False | None | None | False | None | False | 790.0 | 0 |