| 2817688 | 91009 | None | code01 | SUBESTIMATE-1 (Six class room building) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in- charge. ---- work complete within 11 months | Cum | 883.68 | 883.68 | 20.29 | False | None | None | False | None | False | 17929.8672 | 0 |
| 2817689 | 91009 | None | code02 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. ---- work complete within 11 months | Cum | 2080.96 | 2080.96 | 7.2 | False | None | None | False | None | False | 14982.912 | 0 |
| 2817690 | 91009 | None | code03 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerin-charge. ---- work complete within 11 months | Cum | 1444.8 | 1444.8 | 9.4 | False | None | None | False | None | False | 13581.12 | 0 |
| 2817691 | 91009 | None | code04 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without ---- work complete within 11 months | Cum | 304.64 | 304.64 | 143.36 | False | None | None | False | None | False | 43673.1904 | 0 |
| 2817692 | 91009 | None | code05 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- work complete within 11 months | Cum | 6220.48 | 6220.48 | 18.14 | False | None | None | False | None | False | 112839.5072 | 0 |
| 2817693 | 91009 | None | code06 | Providing and constructing laterite size stone masonary including cost and conveyance of all materials curing etc complete as per specification. I.S. 3620/1979 having compressive strength not less then 35N/mm2 for saturated dry samples.For foundation in CM 1:6 ---- work complete within 11 months | Cum | 6265.28 | 6265.28 | 30.91 | False | None | None | False | None | False | 193659.8048 | 0 |
| 2817694 | 91009 | None | code07 | Providing and constructing laterite size stone masonary including cost and conveyance of all materials curing etc complete as per specification. I.S. 3620/1979 having compressive strength not less then
35N/mm2 for saturated dry samples.For Basement in CM 1:6 ---- work complete within 11 months | Cum | 6328.0 | 6328.0 | 26.34 | False | None | None | False | None | False | 166679.52 | 0 |
| 2817695 | 91009 | None | code08 | Providing and laying in position Reinforced cement concrete for levelling course for all works in foundation. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 months | Cum | 7232.2 | 7232.2 | 26.69 | False | None | None | False | None | False | 193027.418 | 0 |
| 2817696 | 91009 | None | code09 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite /trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 months | Cum | 10066.56 | 10066.56 | 6.26 | False | None | None | False | None | False | 63016.6656 | 0 |
| 2817697 | 91009 | None | code10 | Providing and constructing laterite size stone masonary including cost and conveyance of all materials curing etc complete as per specification I.S 3620/1979 having compressive strength not less then 3.5N/mm2 for saturated dry samples. For superstructure in CM 1:6 for GROUND FLOOR ---- work complete within 11 months | Cum | 6611.36 | 6611.36 | 25.13 | False | None | None | False | None | False | 166143.4768 | 0 |
| 2817698 | 91009 | None | code11 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Cum | 6677.47 | 6677.47 | 37.17 | False | None | None | False | None | False | 248201.5599 | 0 |
| 2817699 | 91009 | None | code12 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Cum | 6743.59 | 6743.59 | 47.49 | False | None | None | False | None | False | 320253.0891 | 0 |
| 2817700 | 91009 | None | code13 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Cum | 6743.59 | 6743.59 | 43.96 | False | None | None | False | None | False | 296448.2164 | 0 |
| 2817701 | 91009 | None | code14 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . FOR GROUND FLOOR ---- work complete within 11 months | Cum | 11778.14 | 11778.14 | 11.25 | False | None | None | False | None | False | 132504.075 | 0 |
| 2817702 | 91009 | None | code15 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Cum | 11790.76 | 11790.76 | 6.19 | False | None | None | False | None | False | 72984.8044 | 0 |
| 2817703 | 91009 | None | code16 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Cum | 11803.38 | 11803.38 | 6.19 | False | None | None | False | None | False | 73062.9222 | 0 |
| 2817704 | 91009 | None | code17 | DO-- FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Cum | 11803.38 | 11803.38 | 3.35 | False | None | None | False | None | False | 39541.323 | 0 |
| 2817705 | 91009 | None | code18 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . FOR GROUND FLOOR ---- work complete within 11 months | Cum | 11085.31 | 11085.31 | 17.89 | False | None | None | False | None | False | 198316.1959 | 0 |
| 2817706 | 91009 | None | code19 | DO-- FOR FIRST FLOOR ---- work complete within 11 months | Cum | 11154.6 | 11154.6 | 20.68 | False | None | None | False | None | False | 230677.128 | 0 |
| 2817707 | 91009 | None | code20 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Cum | 11223.88 | 11223.88 | 19.74 | False | None | None | False | None | False | 221559.3912 | 0 |
| 2817708 | 91009 | None | code21 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Cum | 11223.88 | 11223.88 | 13.39 | False | None | None | False | None | False | 150287.7532 | 0 |
| 2817709 | 91009 | None | code22 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. FOR GROUND FLOOR ---- work complete within 11 months | Cum | 10046.06 | 10046.06 | 0.47 | False | None | None | False | None | False | 4721.6482 | 0 |
| 2817710 | 91009 | None | code23 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Cum | 10146.52 | 10146.52 | 0.97 | False | None | None | False | None | False | 9842.1244 | 0 |
| 2817711 | 91009 | None | code24 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Cum | 10246.99 | 10246.99 | 0.97 | False | None | None | False | None | False | 9939.5803 | 0 |
| 2817712 | 91009 | None | code25 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Cum | 10246.99 | 10246.99 | 0.48 | False | None | None | False | None | False | 4918.5552 | 0 |
| 2817713 | 91009 | None | code26 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. FOR GROUND FLOOR ---- work complete within 11 months | Cum | 10392.48 | 10392.48 | 28.66 | False | None | None | False | None | False | 297848.4768 | 0 |
| 2817714 | 91009 | None | code27 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Cum | 10496.4 | 10496.4 | 28.66 | False | None | None | False | None | False | 300826.824 | 0 |
| 2817715 | 91009 | None | code28 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Cum | 10600.33 | 10600.33 | 28.66 | False | None | None | False | None | False | 303805.4578 | 0 |
| 2817716 | 91009 | None | code29 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Cum | 10600.33 | 10600.33 | 14.29 | False | None | None | False | None | False | 151478.7157 | 0 |
| 2817717 | 91009 | None | code30 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) FOR GROUND FLOOR ---- work complete within 11 months | Kg | 103.04 | 103.04 | 7638.39 | False | None | None | False | None | False | 787059.7056 | 0 |
| 2817718 | 91009 | None | code31 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Kg | 104.07 | 104.07 | 4724.19 | False | None | None | False | None | False | 491646.4533 | 0 |
| 2817719 | 91009 | None | code32 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Kg | 105.1 | 105.1 | 4667.81 | False | None | None | False | None | False | 490586.831 | 0 |
| 2817720 | 91009 | None | code33 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Kg | 105.1 | 105.1 | 2569.14 | False | None | None | False | None | False | 270016.614 | 0 |
| 2817721 | 91009 | None | code34 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- work complete within 11 months | Cum | 228.48 | 228.48 | 126.28 | False | None | None | False | None | False | 28852.4544 | 0 |
| 2817722 | 91009 | None | code35 | Providing and filling in foundation with granite/trep broken metal 100mm and down size with approved sand including hand packing, ramming,watering, including cost of materials and labour with all lead and lift. Complete as per specifications ---- work complete within 11 months | Cum | 2868.32 | 2868.32 | 12.63 | False | None | None | False | None | False | 36226.8816 | 0 |
| 2817723 | 91009 | None | code36 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 months | Cum | 6415.36 | 6415.36 | 18.39 | False | None | None | False | None | False | 117978.4704 | 0 |
| 2817724 | 91009 | None | code37 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge 8.3.2. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 309.12 | 309.12 | 286.98 | False | None | None | False | None | False | 88711.2576 | 0 |
| 2817725 | 91009 | None | code38 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 312.21 | 312.21 | 414.89 | False | None | None | False | None | False | 129532.8069 | 0 |
| 2817726 | 91009 | None | code39 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 315.3 | 315.3 | 505.41 | False | None | None | False | None | False | 159355.773 | 0 |
| 2817727 | 91009 | None | code40 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 315.3 | 315.3 | 276.76 | False | None | None | False | None | False | 87262.428 | 0 |
| 2817728 | 91009 | None | code41 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 221.76 | 221.76 | 112.56 | False | None | None | False | None | False | 24961.3056 | 0 |
| 2817729 | 91009 | None | code42 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 223.98 | 223.98 | 192.18 | False | None | None | False | None | False | 43044.4764 | 0 |
| 2817730 | 91009 | None | code43 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 226.2 | 226.2 | 192.18 | False | None | None | False | None | False | 43471.116 | 0 |
| 2817731 | 91009 | None | code44 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 226.2 | 226.2 | 96.77 | False | None | None | False | None | False | 21889.374 | 0 |
| 2817732 | 91009 | None | code45 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 1335.04 | 1335.04 | 99.4 | False | None | None | False | None | False | 132702.976 | 0 |
| 2817733 | 91009 | None | code46 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 1348.39 | 1348.39 | 175.76 | False | None | None | False | None | False | 236993.0264 | 0 |
| 2817734 | 91009 | None | code47 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 1361.74 | 1361.74 | 175.76 | False | None | None | False | None | False | 239339.4224 | 0 |
| 2817735 | 91009 | None | code48 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 1361.74 | 1361.74 | 87.01 | False | None | None | False | None | False | 118484.9974 | 0 |
| 2817736 | 91009 | None | code49 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 1161.44 | 1161.44 | 6.62 | False | None | None | False | None | False | 7688.7328 | 0 |
| 2817737 | 91009 | None | code50 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 1173.05 | 1173.05 | 13.23 | False | None | None | False | None | False | 15519.4515 | 0 |
| 2817738 | 91009 | None | code51 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 1184.67 | 1184.67 | 13.23 | False | None | None | False | None | False | 15673.1841 | 0 |
| 2817739 | 91009 | None | code52 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 1184.67 | 1184.67 | 6.62 | False | None | None | False | None | False | 7842.5154 | 0 |
| 2817740 | 91009 | None | code53 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 132.16 | 132.16 | 92.56 | False | None | None | False | None | False | 12232.7296 | 0 |
| 2817741 | 91009 | None | code54 | DO-- FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 133.48 | 133.48 | 208.62 | False | None | None | False | None | False | 27846.5976 | 0 |
| 2817742 | 91009 | None | code55 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 133.48 | 133.48 | 208.62 | False | None | None | False | None | False | 27846.5976 | 0 |
| 2817743 | 91009 | None | code56 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 133.48 | 133.48 | 116.06 | False | None | None | False | None | False | 15491.6888 | 0 |
| 2817744 | 91009 | None | code57 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops.and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 232.96 | 232.96 | 320.74 | False | None | None | False | None | False | 74719.5904 | 0 |
| 2817745 | 91009 | None | code58 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 235.29 | 235.29 | 634.61 | False | None | None | False | None | False | 149317.3869 | 0 |
| 2817746 | 91009 | None | code59 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 237.62 | 237.62 | 516.51 | False | None | None | False | None | False | 122733.1062 | 0 |
| 2817747 | 91009 | None | code60 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 237.62 | 237.62 | 387.3 | False | None | None | False | None | False | 92030.226 | 0 |
| 2817748 | 91009 | None | code61 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charges. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 4099.2 | 4099.2 | 13.77 | False | None | None | False | None | False | 56445.984 | 0 |
| 2817749 | 91009 | None | code62 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 4140.19 | 4140.19 | 27.54 | False | None | None | False | None | False | 114020.8326 | 0 |
| 2817750 | 91009 | None | code63 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 4181.18 | 4181.18 | 27.54 | False | None | None | False | None | False | 115149.6972 | 0 |
| 2817751 | 91009 | None | code64 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 4181.18 | 4181.18 | 13.77 | False | None | None | False | None | False | 57574.8486 | 0 |
| 2817752 | 91009 | None | code65 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. FOR GROUND FLOOR ---- work complete within 11 months | Kg | 162.4 | 162.4 | 581.25 | False | None | None | False | None | False | 94395.0 | 0 |
| 2817753 | 91009 | None | code66 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Kg | 164.02 | 164.02 | 862.5 | False | None | None | False | None | False | 141467.25 | 0 |
| 2817754 | 91009 | None | code67 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Kg | 165.65 | 165.65 | 862.5 | False | None | None | False | None | False | 142873.125 | 0 |
| 2817755 | 91009 | None | code68 | DO-- FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Kg | 165.65 | 165.65 | 581.25 | False | None | None | False | None | False | 96284.0625 | 0 |
| 2817756 | 91009 | None | code69 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FOR GROUND FLOOR ---- work complete within 11 months | Sqm | 118.72 | 118.72 | 13.77 | False | None | None | False | None | False | 1634.7744 | 0 |
| 2817757 | 91009 | None | code70 | DO--FOR FIRST FLOOR ---- work complete within 11 months | Sqm | 119.91 | 119.91 | 27.54 | False | None | None | False | None | False | 3302.3214 | 0 |
| 2817758 | 91009 | None | code71 | DO--FOR SECOND FLOOR ---- work complete within 11 months | Sqm | 121.09 | 121.09 | 27.54 | False | None | None | False | None | False | 3334.8186 | 0 |
| 2817759 | 91009 | None | code72 | DO--FOR SECOND FLOOR (ABOVE EXISTING BUILDING) ---- work complete within 11 months | Sqm | 121.09 | 121.09 | 13.77 | False | None | None | False | None | False | 1667.4093 | 0 |
| 2817760 | 91009 | None | code73 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.. ---- work complete within 11 months | Kg | 560.0 | 560.0 | 43.65 | False | None | None | False | None | False | 24444.0 | 0 |
| 2817761 | 91009 | None | code74 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- work complete within 11 months | Cum | 6415.36 | 6415.36 | 4.2 | False | None | None | False | None | False | 26944.512 | 0 |
| 2817762 | 91009 | None | code75 | Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied @ 1.2L/per m2,having tensile strength greater than 1.5N/mm2, elongation greater than 300% with solid content not less than 60% in 2 coats including surface preparation, priming the surface with water based acrylic primer @0.1 L/m2, and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge ---- work complete within 11 months | Sqm | 656.88 | 656.88 | 267.53 | False | None | None | False | None | False | 175735.1064 | 0 |
| 2817763 | 91009 | None | code76 | Providing wall black boards in CM 1:3 with two coats of black paint including finishing etc., complete ---- work complete within 11 months | Sqm | 901.6 | 901.6 | 14.4 | False | None | None | False | None | False | 12983.04 | 0 |
| 2817764 | 91009 | None | code77 | SUBESTIMATE-2 (Electrification) Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary25mm dia 2mm thick ---- work complete within 11 months | Mtr | 70.0 | 70.0 | 300.0 | False | None | None | False | None | False | 21000.0 | 0 |
| 2817765 | 91009 | None | code78 | Supplying and fixing PVC/metal conduit Deep junction box 25mm deep junction box ---- work complete within 11 months | No | 51.0 | 51.0 | 48.0 | False | None | None | False | None | False | 2448.0 | 0 |
| 2817766 | 91009 | None | code79 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete.upto 50mm conduit in brick wall ---- work complete within 11 months | Mtr | 26.0 | 26.0 | 18.0 | False | None | None | False | None | False | 468.0 | 0 |
| 2817767 | 91009 | None | code80 | Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts, 50Hz AC supply & completely wired on existing box. ---- work complete within 11 months | No | 747.0 | 747.0 | 6.0 | False | None | None | False | None | False | 4482.0 | 0 |
| 2817768 | 91009 | None | code81 | Supplying and drawing PVC insulated flexible copper wire of approved make..23/0.0040” ---- work complete within 11 months | Mtr | 18.0 | 18.0 | 600.0 | False | None | None | False | None | False | 10800.0 | 0 |
| 2817769 | 91009 | None | code82 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1.5 sqmm ---- work complete within 11 months | Mtr | 26.0 | 26.0 | 600.0 | False | None | None | False | None | False | 15600.0 | 0 |
| 2817770 | 91009 | None | code83 | Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 ---- work complete within 11 months | No | 121.0 | 121.0 | 24.0 | False | None | None | False | None | False | 2904.0 | 0 |
| 2817771 | 91009 | None | code84 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. ---- work complete within 11 months | No | 88.0 | 88.0 | 48.0 | False | None | None | False | None | False | 4224.0 | 0 |
| 2817772 | 91009 | None | code85 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. 4-5Way ---- work complete within 11 months | No | 122.0 | 122.0 | 48.0 | False | None | None | False | None | False | 5856.0 | 0 |
| 2817773 | 91009 | None | code86 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.1 to 3 Module ---- work complete within 11 months | No | 152.0 | 152.0 | 12.0 | False | None | None | False | None | False | 1824.0 | 0 |
| 2817774 | 91009 | None | code87 | Supplying PVC/GI flexible conduit pipe…mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely ---- work complete within 11 months | Mtr | 25.0 | 25.0 | 48.0 | False | None | None | False | None | False | 1200.0 | 0 |
| 2817775 | 91009 | None | code88 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- work complete within 11 months | No | 162.0 | 162.0 | 12.0 | False | None | None | False | None | False | 1944.0 | 0 |
| 2817776 | 91009 | None | code89 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system.48" Sweep (1200mm) Regular model ---- work complete within 11 months | No | 2085.0 | 2085.0 | 19.0 | False | None | None | False | None | False | 39615.0 | 0 |
| 2817777 | 91009 | None | code90 | Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.. ---- work complete within 11 months | No | 486.0 | 486.0 | 16.0 | False | None | None | False | None | False | 7776.0 | 0 |
| 2817778 | 91009 | None | code91 | Supplying of ---feet PVC Batten with integrated LED tube.....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI grater then 80 . Power Input: 220-240V @ 50/60Hz & Power factor grater then 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' -3640 W ---- work complete within 11 months | No | 1197.0 | 1197.0 | 12.0 | False | None | None | False | None | False | 14364.0 | 0 |
| 2817779 | 91009 | None | code92 | Supplying of recess mounting non integrated type LED down light ...... W luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clamps, LED of Power/COB with CCT 6500 degree K, CRI grater then 70%. efficacy 100 lumen per watt, 120degree beam spread, life grater then 25000 burning hours and ompliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhancesthe lighting level. LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF grater then 0.95, power loss should less then 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.1) 5-6W ---- work complete within 11 months | No | 1217.0 | 1217.0 | 12.0 | False | None | None | False | None | False | 14604.0 | 0 |
| 2817780 | 91009 | None | code93 | Supplying & Fixing of 70-150 Watts lamp holder 2 Pin ---- work complete within 11 months | No | 118.0 | 118.0 | 50.0 | False | None | None | False | None | False | 5900.0 | 0 |
| 2817781 | 91009 | None | code94 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet..Short point upto 3m from tapping point to out let via switch box ---- work complete within 11 months | No | 251.0 | 251.0 | 18.0 | False | None | None | False | None | False | 4518.0 | 0 |
| 2817782 | 91009 | None | code95 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts,washers and check ---- work complete within 11 months | No | 2999.7 | 2999.7 | 1.0 | False | None | None | False | None | False | 2999.7 | 0 |