noticeInvitingTenderDTO
createdTs1709369586217
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd585105.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose11-03-2024 17:00:00
tenderQueryClose07-03-2024 17:00:00
technicalBidOpen12-03-2024 17:00:01
publishedDate02-03-2024 18:31:10
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDate07-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnTrue
emdBankGuarantee485105.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709369586249
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9623
titleImprovements to road from Thagaduru to join P.Marahalli via Kakkarahatti-Chunchanahalli-Konanuru road from Ch. 11.85 to 12.60 Km and Ch. 14.85 to 16.35 Km at Nanjangudu Taluk.
descriptionImprovements to road from Thagaduru to join P.Marahalli via Kakkarahatti-Chunchanahalli-Konanuru road from Ch. 11.85 to 12.60 Km and Ch. 14.85 to 16.35 Km at Nanjangudu Taluk.
categoryWORKS
categoryTextWorks
ecv39006982.62
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1674
locationNamePWD Division Office Mysuru
provisionalAmount40000000.0
groupOverheadTotal0.0
fileNumberKPWD/MYS/SPL2/ORF/KAKKARAHATTI/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17093695860001NoneNoneRoadsImprovements to road from Thagaduru to join P.Marahalli via Kakkarahatti-Chunchanahalli-Konanuru road from Ch. 11.85 to 12.60 Km and Ch. 14.85 to 16.35 Km at Nanjangudu Taluk.34057244.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288413194336None2.5AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5A ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.100 Sqm463.74463.7469.0FalseNoneNoneFalseNoneFalse31998.060
288413294336None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.361593.68FalseNoneNoneFalseNoneFalse191815.32480
288413394336None3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 17, I.No : 3.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.9123.93105.0FalseNoneNoneFalseNoneFalse384709.50
288413494336None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water, all materials, usage& all other appurtenaces required to complete the work, Inclusive of GST 18 Percent. Common SR Vol- 1 , P.No : 7, I.No : 1.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum559.32559.323463.64FalseNoneNoneFalseNoneFalse1937283.12480
288413594336None4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 23, I.No : 4.1 A(v) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2934.662934.663547.0FalseNoneNoneFalseNoneFalse10409239.020
288413694336None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3019.623019.622322.5FalseNoneNoneFalseNoneFalse7013067.450
288413794336None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 17, I.No : 3.6 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum581.74581.742998.17FalseNoneNoneFalseNoneFalse1744155.41580
288413894336None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction, Inclusive of GST 18 Percent. Common SR Vol- 1 , P.No :7 , I.No : 1.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum140.42140.42796.83FalseNoneNoneFalseNoneFalse111890.86860
288413994336None5.1 A(i)Prime coat over WMM/WBM: Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm48.3848.388715.0FalseNoneNoneFalseNoneFalse421631.70
288414094336None5.4Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom, Inclusive of GST 18 Percent Common. SR Vol-3 , P.No : 31, I.No : 5.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm16.5216.528715.0FalseNoneNoneFalseNoneFalse143971.80
288414194336None5.3Tack coat on Bituminous surface : Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm14.1614.162325.0FalseNoneNoneFalseNoneFalse32922.00
288414294336None5.8CBituminous Macadam Grading - II for traffic Less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, Inclusive of GST 18 Percent. Common SR Vol-33, P.No : 33, I.No :5.8C ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9039.989039.98551.99FalseNoneNoneFalseNoneFalse4989978.56020
288414394336None5.31Semi Dense Bituminous : ConcreteProviding and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 43, I.No : 5.31 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum11979.3611979.36275.99FalseNoneNoneFalseNoneFalse3306183.56640
288414494336None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.15 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm625.4625.4800.0FalseNoneNoneFalseNoneFalse500320.00
288414594336None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 74, I.No : 8.43 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos430.7430.71332.0FalseNoneNoneFalseNoneFalse573692.40
288414694336None8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4252.724252.7216.0FalseNoneNoneFalseNoneFalse68043.520
288414794336None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :65, I.No : 8.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm10631.810631.81.08FalseNoneNoneFalseNoneFalse11482.3440
288414894336None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast), Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.16(ii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
288414994336None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast), Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.16(iii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each993.56993.566.0FalseNoneNoneFalseNoneFalse5961.360
288415094336None8.25(i)Type-A "W" metal beam crash barrier : Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 69, I.No :8.25(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr4295.24295.2500.0FalseNoneNoneFalseNoneFalse2147600.00
288415194336None1.90Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 7, I.No :1.90 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum313.88313.8855.7FalseNoneNoneFalseNoneFalse17483.1160
17093695860001NoneNoneRoadsConstruction of CC Drain at P. Marahalli village1196558.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288415294337None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm120.36120.36215.04FalseNoneNoneFalseNoneFalse25882.21440
288415394337None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.0230.72FalseNoneNoneFalseNoneFalse217098.85440
288415494337None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7461.147461.1460.72FalseNoneNoneFalseNoneFalse453040.42080
288415594337NoneAddendum IForm work 35% : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2611.42611.436.0FalseNoneNoneFalseNoneFalse94010.40
288415694337None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.5.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8074.748074.742.7FalseNoneNoneFalseNoneFalse21801.7980
288415794337NoneAddendum IFor Form Work 35% : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2826.162826.162.7FalseNoneNoneFalseNoneFalse7630.6320
288415894337None17.14Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 550 @ 6kg/ m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete, Inclusive of GST 18 Percent. Common SR Vol-2 , P.No : 177, I.No :17.14 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1380.61380.680.0FalseNoneNoneFalseNoneFalse110448.00
288415994337None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent Common SR Vol-1 , P.No : 18, I.No : 2.11h ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.982.86FalseNoneNoneFalseNoneFalse266646.32280
17093695860001NoneNoneRoadsConstruction of Pipe culvert at ch 11.95 km & 12.05km of Thagaduru Kakkarahatti- Chunchanahalli - Konanuru-P.Maralli road370494.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288416094338None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 8. I.No 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.36114.48FalseNoneNoneFalseNoneFalse13778.81280
288416194338None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 15. I.No 2.1.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.022.16FalseNoneNoneFalseNoneFalse15264.76320
288416294338None2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 16. I.No 2.5.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7823.47823.413.66FalseNoneNoneFalseNoneFalse106867.6440
288416394338NoneAddendum IForm work 8%: Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum625.87625.8713.66FalseNoneNoneFalseNoneFalse8549.38420
288416494338None16.15(b)Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, ackfilling, concrete and masonry works in head walls and parapets Clause 1101.6 .b 1000 mm dia, Inclusive of GST 18 Percent. ( Common SR Vol-3 page No 146. I.No 16.15(b) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr9390.449390.4420.0FalseNoneNoneFalseNoneFalse187808.80
288416594338None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 18. I.No 2.11h) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.980.41FalseNoneNoneFalseNoneFalse38225.52180
17093695860001NoneNoneRoadsConstruction of Retaining wall at ch 15.00 km of Thagaduru Kakkarahatti- Chunchanahalli - Konanuru-P.Maralli road2314366.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288416694339None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.36176.25FalseNoneNoneFalseNoneFalse21213.450
288416794339None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.0223.5FalseNoneNoneFalseNoneFalse166074.970
288416894339None2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.2.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7418.667418.6644.0FalseNoneNoneFalseNoneFalse326421.040
288416994339NoneAddendum IFor Form Work 10% : Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 112, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum741.87741.8744.0FalseNoneNoneFalseNoneFalse32642.280
288417094339None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.5.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8074.748074.7476.5FalseNoneNoneFalseNoneFalse617717.610
288417194339NoneAddendum IFor Form Work 10% : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 112, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum807.47807.4776.5FalseNoneNoneFalseNoneFalse61771.4550
288417294339None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11h ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.987.83FalseNoneNoneFalseNoneFalse730014.23340
288417394339None12.3 ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 117, I.No : 12.3 A ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum1378.281378.28255.0FalseNoneNoneFalseNoneFalse351461.40
288417494339None12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 117, I.No : 12.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr282.02282.0225.0FalseNoneNoneFalseNoneFalse7050.50
17093695860001NoneNoneRoadsMaintenance of road Upto 5 Years (Including 2 years Contract period)1068317.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288417594340NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288417694340NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288417794340NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288417894340None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 93, I.No : 10.15(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm310.34310.3443.12FalseNoneNoneFalseNoneFalse13381.86080
288417994340None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 93, I.No : 10.15(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm310.34310.3486.25FalseNoneNoneFalseNoneFalse26766.8250
288418094340None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.3635.89FalseNoneNoneFalseNoneFalse4319.72040
288418194340None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.3635.89FalseNoneNoneFalseNoneFalse4319.72040
288418294340None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288418394340None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288418494340None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288418594340None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908, Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288418694340None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908, Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288418794340None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908., Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288418894340None16.20Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 147, I.No : 16.20) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos2415.462415.464.0FalseNoneNoneFalseNoneFalse9661.840
288418994340None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 147, I.No : 16.22) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km2341.122341.122.3FalseNoneNoneFalseNoneFalse5384.5760
288419094340None16.24 (i)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synt hetic enamel paint, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km243.08243.082.3FalseNoneNoneFalseNoneFalse559.0840
288419194340None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 148, I.No : 16.24 (ii)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km1339.31339.32.3FalseNoneNoneFalseNoneFalse3080.390
17093721020000NoneNoneRoadsImprovements to road from Thagaduru to join P.Marahalli via Kakkarahatti-Chunchanahalli-Konanuru road from Ch. 11.85 to 12.60 Km and Ch. 14.85 to 16.35 Km at Nanjangudu Taluk.39006982.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288458894366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm120.36120.36215.04FalseNoneNoneFalseNoneFalse25882.21440
288459694366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 8. I.No 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.36114.48FalseNoneNoneFalseNoneFalse13778.81280
288460294366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.36176.25FalseNoneNoneFalseNoneFalse21213.450
288461194366NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288456794366None2.5AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5A ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.100 Sqm463.74463.7469.0FalseNoneNoneFalseNoneFalse31998.060
288456894366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.361593.68FalseNoneNoneFalseNoneFalse191815.32480
288461294366NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288460394366None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.0223.5FalseNoneNoneFalseNoneFalse166074.970
288459794366None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 15. I.No 2.1.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.022.16FalseNoneNoneFalseNoneFalse15264.76320
288458994366None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.0230.72FalseNoneNoneFalseNoneFalse217098.85440
288461394366NoneData rateClearing and grubbing road land including weeds, shrubs, bushes, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle -. By Mechanical Means using weed cutter (heavy), Inclusive of GST 18 Percent. (Data rate) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.ha40768.4340768.436.9FalseNoneNoneFalseNoneFalse281302.1670
288456994366None3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 17, I.No : 3.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.9123.93105.0FalseNoneNoneFalseNoneFalse384709.50
288459894366None2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 16. I.No 2.5.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7823.47823.413.66FalseNoneNoneFalseNoneFalse106867.6440
288459094366None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7461.147461.1460.72FalseNoneNoneFalseNoneFalse453040.42080
288460494366None2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.2.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7418.667418.6644.0FalseNoneNoneFalseNoneFalse326421.040
288460594366NoneAddendum IFor Form Work 10% : Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 112, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum741.87741.8744.0FalseNoneNoneFalseNoneFalse32642.280
288459994366NoneAddendum IForm work 8%: Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum625.87625.8713.66FalseNoneNoneFalseNoneFalse8549.38420
288459194366NoneAddendum IForm work 35% : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2611.42611.436.0FalseNoneNoneFalseNoneFalse94010.40
288457094366None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water, all materials, usage& all other appurtenaces required to complete the work, Inclusive of GST 18 Percent. Common SR Vol- 1 , P.No : 7, I.No : 1.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum559.32559.323463.64FalseNoneNoneFalseNoneFalse1937283.12480
288461494366None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 93, I.No : 10.15(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm310.34310.3443.12FalseNoneNoneFalseNoneFalse13381.86080
288460094366None16.15(b)Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, ackfilling, concrete and masonry works in head walls and parapets Clause 1101.6 .b 1000 mm dia, Inclusive of GST 18 Percent. ( Common SR Vol-3 page No 146. I.No 16.15(b) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr9390.449390.4420.0FalseNoneNoneFalseNoneFalse187808.80
288457194366None4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 23, I.No : 4.1 A(v) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2934.662934.663547.0FalseNoneNoneFalseNoneFalse10409239.020
288460694366None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.5.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8074.748074.7476.5FalseNoneNoneFalseNoneFalse617717.610
288459294366None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.5.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8074.748074.742.7FalseNoneNoneFalseNoneFalse21801.7980
288461594366None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 93, I.No : 10.15(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm310.34310.3486.25FalseNoneNoneFalseNoneFalse26766.8250
288457294366None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3019.623019.622322.5FalseNoneNoneFalseNoneFalse7013067.450
288460194366None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent. ( Common SR Vol-1 page No 18. I.No 2.11h) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.980.41FalseNoneNoneFalseNoneFalse38225.52180
288461694366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.3635.89FalseNoneNoneFalseNoneFalse4319.72040
288460794366NoneAddendum IFor Form Work 10% : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 112, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum807.47807.4776.5FalseNoneNoneFalseNoneFalse61771.4550
288459394366NoneAddendum IFor Form Work 35% : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 111, Addendum I ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2826.162826.162.7FalseNoneNoneFalseNoneFalse7630.6320
288460894366None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11h ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.987.83FalseNoneNoneFalseNoneFalse730014.23340
288459494366None17.14Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 550 @ 6kg/ m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete, Inclusive of GST 18 Percent. Common SR Vol-2 , P.No : 177, I.No :17.14 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1380.61380.680.0FalseNoneNoneFalseNoneFalse110448.00
288461794366None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.3635.89FalseNoneNoneFalseNoneFalse4319.72040
288457394366None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 17, I.No : 3.6 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum581.74581.742998.17FalseNoneNoneFalseNoneFalse1744155.41580
288459594366None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification, Inclusive of GST 18 Percent Common SR Vol-1 , P.No : 18, I.No : 2.11h ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.982.86FalseNoneNoneFalseNoneFalse266646.32280
288461894366None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288457494366None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction, Inclusive of GST 18 Percent. Common SR Vol- 1 , P.No :7 , I.No : 1.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum140.42140.42796.83FalseNoneNoneFalseNoneFalse111890.86860
288460994366None12.3 ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 117, I.No : 12.3 A ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum1378.281378.28255.0FalseNoneNoneFalseNoneFalse351461.40
288461094366None12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 117, I.No : 12.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr282.02282.0225.0FalseNoneNoneFalseNoneFalse7050.50
288457594366None5.1 A(i)Prime coat over WMM/WBM: Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm48.3848.388715.0FalseNoneNoneFalseNoneFalse421631.70
288461994366None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288462094366None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment, Inclusive of GST 18 Percent. .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm114.46114.46172.5FalseNoneNoneFalseNoneFalse19744.350
288457694366None5.4Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom, Inclusive of GST 18 Percent Common. SR Vol-3 , P.No : 31, I.No : 5.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm16.5216.528715.0FalseNoneNoneFalseNoneFalse143971.80
288457794366None5.3Tack coat on Bituminous surface : Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm14.1614.162325.0FalseNoneNoneFalseNoneFalse32922.00
288462194366None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908, Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288457894366None5.8CBituminous Macadam Grading - II for traffic Less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, Inclusive of GST 18 Percent. Common SR Vol-33, P.No : 33, I.No :5.8C ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9039.989039.98551.99FalseNoneNoneFalseNoneFalse4989978.56020
288462294366None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908, Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288457994366None5.31Semi Dense Bituminous : ConcreteProviding and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 43, I.No : 5.31 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum11979.3611979.36275.99FalseNoneNoneFalseNoneFalse3306183.56640
288462394366None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908., Inclusive of GST 18 Percent.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr7.087.084600.0FalseNoneNoneFalseNoneFalse32568.00
288458094366None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.15 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm625.4625.4800.0FalseNoneNoneFalseNoneFalse500320.00
288462494366None16.20Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 147, I.No : 16.20) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos2415.462415.464.0FalseNoneNoneFalseNoneFalse9661.840
288462594366None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 147, I.No : 16.22) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km2341.122341.122.3FalseNoneNoneFalseNoneFalse5384.5760
288458194366None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 74, I.No : 8.43 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos430.7430.71332.0FalseNoneNoneFalseNoneFalse573692.40
288462694366None16.24 (i)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synt hetic enamel paint, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km243.08243.082.3FalseNoneNoneFalseNoneFalse559.0840
288458294366None8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4252.724252.7216.0FalseNoneNoneFalseNoneFalse68043.520
288462794366None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade, Inclusive of GST 18 Percent. (Common SR Vol-3 , P.No : 148, I.No : 16.24 (ii)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km1339.31339.32.3FalseNoneNoneFalseNoneFalse3080.390
288458394366None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :65, I.No : 8.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm10631.810631.81.08FalseNoneNoneFalseNoneFalse11482.3440
288458494366None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast), Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.16(ii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
288458594366None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast), Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :67, I.No : 8.16(iii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each993.56993.566.0FalseNoneNoneFalseNoneFalse5961.360
288458694366None8.25(i)Type-A "W" metal beam crash barrier : Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 69, I.No :8.25(i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr4295.24295.2500.0FalseNoneNoneFalseNoneFalse2147600.00
288458794366None1.90Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 7, I.No :1.90 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum313.88313.8855.7FalseNoneNoneFalseNoneFalse17483.1160
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17093695870000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17093695870000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17093695870000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17093696650000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submissionNone
17093698210000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of Kppp due to internet connectivity issues and technical glitches at bidders endNone
17093698430000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17093698550000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17093699570000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17093699970000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17093700090000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17093700510000NoneNoneELIGIBILITYContractors should be registered as KPWD Class II and Above Civil ContractorNone
17093700650000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17093700770000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17093701030000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approvalNone
17093701520000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17093701730000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17093702160000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the prescribed form in the favour of the Executive Engineer, PWD Division, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders inaccordance with the Conditions of ContractNone
17093702430000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materialsNone
17093702540000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17093702670000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17093702800000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17093702940000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.5 of STD tender document AttachedNone
17093703170000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNone
17093703310000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private propertiesNone
17093703510000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17093703740000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour actNone
17093704050000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17093704190000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17093705440000NoneNoneELIGIBILITYRs 1,00,000.00 of the EMD should be paid through e-payment as specified in e-procurement portal and the remaining balance amount of EMD must be produced in the form of Bank Guarantee by uploading the scan copy of the Bank Guarantee. The original copy should be produced at the time of Technical Bid Opening.None
17093706570000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17093706990000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17093707130000NoneNoneELIGIBILITYBankers E-mail ID & Contact Number must be Up loadedNone
17093707270000NoneNoneELIGIBILITYThe defect liability period for this project shall be total 5 Years (Five) (Initial 2 years DLP without any financial implications and subsequent 3 years DLP nominal maintenance should be carried out as per BOQ)None
17093707690000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Mysore Division, Mysore during office hours on all working days.None
17093708190000NoneNoneELIGIBILITYAs per the clause 13 of KW-4 (Conditions of contract) after the award of the tender The contractor shall prior to commencing the works, effect and there after maintain insurances, in the joint names of the employer and the contractor, (cover from the frst working day after the start date to the end of defects liability period) in the amounts stated in the contract dataNone
17093708450000NoneNoneELIGIBILITYRegarding Appealing aggrieved contractors may appeal to the prescribed (Appellant) authority within 15 days as per KTTP and appeal should be through e-proc only as per Govt.order No:pwd/572/CRM-2020(E) Bangalore DT.09-10-2020. The same will not be considered if appeal through Letters.None
17093709080000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract.None
17093710790000NoneNoneELIGIBILITYEstimate rates are including 18% GSTNone
17093711070000NoneNoneELIGIBILITYFor the vehicles / machineries / equipments for which RTO registration is statutory, for such vehicles / machineries / equipments the contractor should upload the Registration Certifcate documents issued by RTO. For machineries and other equipments for which RTO registration is not applicable, for such machineries and equipments, purchase invoice document should be uploaded. If there is sale deed for such machineries and equipments, original invoice along with registered sale deed attested by Govt. registered NOTARY should be uploaded. Otherwise tender is liable for rejectionNone
17093711570000NoneNoneELIGIBILITYBankers Certificate for the stipulated amount as per clause 3.3 (b) should be submitted in the format as prescribed in the bid document only. Otherwise tender is liable for rejection.None
17093711790000NoneNoneELIGIBILITYThe difference in cost deposited by the lowest successful tenderer (for unbalanced) along with the performance security will be released to the contractor 30 days after the completion of defects liability period.None
17093711960000NoneNoneELIGIBILITYThe returns submitted to the I.T. along with the Profit and Loss account statement submitted to the I.T. Department should be uploaded for the financial turnover criteria as per tender document attested by Chartered Accountant.None
17093712200000NoneNoneELIGIBILITY18%GST shall not be paid to the tendered amount separatelyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. 195.00 Lakhs (50% of estimated cost of tender)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work 1)Earthwork Excavation 1737.00 cum 2) Embankment/Subgrade/Earthen shoulder 5807.00 cum 3)Granular Sub base 2838.00 cum 4) WMM 1858.00 Cum 5)MSS/BM/DBM/SDBC/BC 663.00 Cum 6) CC/PCC/RCC 184.00 cum 7)STEEL 9.00 tonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded 1) Hot Mix Plant Not less than 40/60 1 Own 1 Hire 2) Asphalt Paver Finisher 1 Own 1 Hire 3) Smooth wheeled roller 1 Own 1 Hire 4) Asphalt vibratory rollar 1 Own1 Hire 5) Tipper/HGV 2 own 2 Hire 6) Motar Grader 1 Hire 7) Excavator 1 Own 1 Hire 8) Pugmill 1 Hire 9) Vehicle mounted bitumen sprayer 1 Own 1 Hire 10) Concrete mixer with Hooper 1 Own 1 Hire 11) Water Tanker 2 Own 1 HireCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- machineries
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. 780.00Lakhs)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 234.00 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last fve years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneIncome Tax Balance sheets and Annual Turnover Certificate issued by the CA with Membership No. with UDIN - 2018-19 to 2022-23Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneContractors should be registered as KPWD Class II and above Civil ContractorOthersKPWD registration Certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersExisting Commitments work details
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Income Tax Balance sheets and Annual Turnover Certificate issued by the CA with Membership No. with UDIN - 2018-19 to 2022-23TrueTechnical Bid
KPWD Registration CertificateTrueTechnical Bid
Annual Turnover Certifcate with UDIN from CA and Proft & loss statements with income taxTrueTechnical Bid
Banker Certifcate - Line of Credit in the prescribed formatTrueTechnical Bid
Work Done Certifcate for Similar nature work, duly attested by the Officer Not below the rank of E.ETrueTechnical Bid
List of existing commitments and ongoing worksTrueTechnical Bid
List of works for which tenders already submittedTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsMysuruNanjanagoduMysoreNoneKakkarahattiNoneNoneNoneNoneNoneNone
RoadsMysuruNanjanagoduMysoreNoneP.MarahalliNoneNoneNoneNoneNoneNone
RoadsMysuruNanjanagoduMysoreNoneKakkarattiNoneNoneNoneNoneNoneNone
RoadsMysuruNanjanagoduMysoreNoneKakkarahattiNoneNoneNoneNoneNoneNone
RoadsMysuruNanjanagoduMysoreNoneKakkarahattiNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1709383098000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Executive Engineer, PWD Division, Vinoba Road, Mysuru
streetNone
cityMysore
stateKarnataka
pin570005
tenderRecallDTONone