None | None | None | None | Each tender in its name should have Executed and completed successfully in Urban Conditions Project Management Consultancy for at least one Roads and Drain Work for which the total Value of Construction project is not less than Rs. 17.50 Crs. during last 5 financial year ie 2018-19 to 2022-23. In support of this, the Tenderer shall furnish a Certificate duly certified by the Competent Authority of Rank not below the Executive Engineer along with the Technical Bid. Further, the Value of the Completed Works shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-24 | None | Past Experience | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Work Done Certificate |
|
None | None | None | None | Each tender in its name should have executed and completed Project Management Consultancy of roads of a length of 4.00 kms in towns/urban areas for Central Government / State Government / Urban Local Body during last 5 financial year i.e, 2018-19 to 2022-23. In support of this, the Consultant shall furnish a Certificate duly certified by the Competent Authority of Rank not below the Executive Engineer along with the Technical Proposal. | None | Past Experience | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Work Done Certificate |
|
None | None | None | None | The Consultancy Firm / Company should have been involved in the Civil Engineering Consultancy Services for minimum 7 years. In support of this, the Consultant shall furnish Tax Registration Certificate along with the Technical Proposal | None | Capabilities of Vendor | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- Registration Certificate |
|
None | None | None | None | Consultants must own well equipped laboratory accredited by NABL (in Bangalore apart from having their own necessary infrastructure.) or NAAC Accreditation (Both Mechanical & Chemical). (The Consultant / Firm participating in the bid should have their own lab with NABL/NACC.NABL or NAAC Accreditation and ISO certified or association with NABL Accredited lab equivalent And association with ISO certification in Karnataka State only) | None | Capabilities of Vendor | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- NABL/NAAC |
|
None | None | None | None | Achieved at least in two Financial Years a minimum Average Financial Turnover in all classes of Civil Engineering Consultation Works only of Rs 1.00 Crores. during last 5 financial year i.e 2018 19 to 2022 23. Further, the Financial Turnover of the Previous Years shall be given a Weightage of 10% per year to bring them to the Price Level of 2023 24 In support of this the Consultant shall furnish the Certificate from Chartered Accountant along with the Technical Proposal | None | Financial Status | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Audited CA Certificate of Annual Turnover |
|
None | None | None | None | Consultants must have Key professional required (as detailed in Terms of Reference) having experience in construction of Roads and drains and other utilities to be deployed exclusively for this consultancy contract. The employer or competent authority shall furnish the CVs of the personnel and the availability of the personnel for the project till completion of the assignment. | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | A brief description of the consultants organization and an outline of recent experience on assignments (Section 3B) of a similar nature. For each assignment, the outline should indicate, inter alia, the profiles and names of the staff provided, duration of the assignment, contract amount, and firms involvement | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | Any comments or suggestions on the Terms of Reference and on the data, a list of services, and facilities to be provided by the Client (Section 3C). | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | A description of the methodology and work plan for performing the assignment (Section 3D). | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | The list of the proposed staff team by speciality, the tasks that would be assigned to each staff team member, and their timing (Section 3E). | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | CVs recently signed by the proposed key professional staff and the authorized representative submitting the proposal (Section 3F). Key information should include number of years working for the firm/entity, and degree of responsibility held in various assignments during the last ten (10) years | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | Estimates of the total staff effort (professional and support staff staff time) to be provided to carry out the Assignment, supported by bar chart diagrams showing the time proposed for each key professional staff team member. (Sections 3E and 3G). | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|
None | None | None | None | A detailed description of the proposed methodology, staffing, and monitoring of training, if the Data Sheet specifies training as a major component of the assignment. | None | Others | As per bid document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per bid document |
|