1709395793000 | 0 | None | None | Bridges/Culverts | Construction of Minor Bridge near Kambala cross road Manjusha Apartment at ward no.42 in MCC limits | 2709530.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2895124 | 94812 | None | code01 | Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry | Cum | 683.2 | 683.2 | 21.6 | False | None | None | False | None | False | 14757.12 | 0 | 2895125 | 94812 | None | code02 | Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead | Cum | 2682.4 | 2682.4 | 16.2 | False | None | None | False | None | False | 43454.88 | 0 | 2895126 | 94812 | None | code03 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of
labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m | Cum | 283.14 | 283.14 | 63.0 | False | None | None | False | None | False | 17837.82 | 0 | 2895127 | 94812 | None | code04 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical
Specification | Cum | 1308.16 | 1308.16 | 102.0 | False | None | None | False | None | False | 133432.32 | 0 | 2895128 | 94812 | None | code05 | Providing and laying boulders apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg
each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates | Cum | 2141.44 | 2141.44 | 10.8 | False | None | None | False | None | False | 23127.552 | 0 | 2895129 | 94812 | None | code06 | Providing weep holes in Brick masonry/Plain/ Reinforced
concrete abutment, wing wall/ return wall with PVC Pipe
110mm outer dia at 2 kg per m2
, extending through the full
width of the structure with slope of 1V :20H towards drawing
foce. Complete as per drawing and Technical Specifications | Mtr | 267.68 | 267.68 | 56.0 | False | None | None | False | None | False | 14990.08 | 0 | 2895130 | 94812 | None | code07 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. | Cum | 1122.24 | 1122.24 | 18.9 | False | None | None | False | None | False | 21210.336 | 0 | 2895131 | 94812 | None | code08 | Providing and laying in position Cement Concrete
for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour,
Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm and down size graded
crushed coarse aggregates | Cum | 6707.68 | 6707.68 | 12.6 | False | None | None | False | None | False | 84516.768 | 0 | 2895132 | 94812 | None | code09 | Providing and laying in position Cement Concrete
for all Foundation works. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates
as per relevant IS Codes machine mixed with super
plasticizers laid in finished layers, well compacted
using needle vibrators, including all lead & lifts, cost of
all materials, quality confirming to the requirements of
relevant IS codes, labour, Usage charges of machinery,
curing and all the other appurtenances required to
complete the work as per technical specifications. M30 Design Mix Using 20 mm and down size
graded crushed coarse aggregates | Cum | 8734.66 | 8734.66 | 57.6 | False | None | None | False | None | False | 503116.416 | 0 | 2895133 | 94812 | None | code10 | Providing and laying in position Cement Concrete for
all Sub structures of building, Irrigation works, Sub
structure works of bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The granite/trap/
basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed
with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever
necessary, including all lead & lifts, cost of all materials
of quality, confirming to the requirements of relevant
IS codes, labour, Usage charges of machinery, curing
and all other appurtenances required to complete the
work as per technical specifications | Cum | 8498.11 | 8498.11 | 49.5 | False | None | None | False | None | False | 420656.445 | 0 | 2895134 | 94812 | None | code12 | Providing and laying in position Cement Concrete for
all Super structures of building , Road works, Water
works, Irrigation works & super structure works of
bridges upto 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates
as per relevant IS Codes machine mixed with super
plasticisers laid in layers, well compacted using needle
vibrators. The cost includes all lead & lifts, cost of all
materials, quality confirming to the requirements of
relevant IS codes , labour, Usage charges of machinery,
curing and all other appurtenances required to
complete the work as per technical specifications. M30 Design Mix Using 20 mm and down size
graded crushed coarse aggregates | Mtr | 9417.41 | 9417.41 | 44.19 | False | None | None | False | None | False | 416155.3479 | 0 | 2895135 | 94812 | None | code13 | Construction of RCC railing of M30 Grade in-situ with 20 mm
nominal size aggregate, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, centre to centre spacing
between vertical post not to exceed 2000 mm, leaving adequate
space between vertical post for expansion, complete as per
approved drawings and technical specifications. | Cum | 3042.82 | 3042.82 | 18.0 | False | None | None | False | None | False | 54770.76 | 0 | 2895136 | 94812 | None | code14 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification.
Sub structure of Bridges | Tonne | 96804.96 | 96804.96 | 4.27 | False | None | None | False | None | False | 413357.1792 | 0 | 2895137 | 94812 | None | code15 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification.
Super structure of Bridges | Tonne | 97056.96 | 97056.96 | 5.57 | False | None | None | False | None | False | 540607.2672 | 0 | 2895138 | 94812 | None | Code15 | Removal of Unserviceable Soil with Disposal upto a suitable
distance as directed by the Engineer incharge of work | Cum | 95.2 | 95.2 | 79.2 | False | None | None | False | None | False | 7539.84 | 0 |
|