tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1709552246000 | 1 | None | None | Roads | Widening & Strengthening | 7723780.25 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2907660 | 95498 | None | Item No. VOL-III-2.5-ii-B Page No.9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 463.74 | 463.74 | 26.16 | False | None | None | False | None | False | 12131.4384 | 0 | 2907661 | 95498 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 112.1 | 112.1 | 2772.96 | False | None | None | False | None | False | 310848.816 | 0 | 2907662 | 95498 | None | Item No. VOL-III-4.2-v Page No.23 | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2783.62 | 2783.62 | 697.6 | False | None | None | False | None | False | 1941853.312 | 0 | 2907663 | 95498 | None | Item No. VOL-III-4.17 Page No.26 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3019.62 | 3019.62 | 545.0 | False | None | None | False | None | False | 1645692.9 | 0 | 2907664 | 95498 | None | Item No. VOL-III-5.1-A Page No.31 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 48.38 | 48.38 | 1962.0 | False | None | None | False | None | False | 94921.56 | 0 | 2907665 | 95498 | None | Item No. VOL-III-5.3 Page No.31 | Tack coat on Bituminous surface
Providing and applying tack coat with VG10 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 14.16 | 14.16 | 5995.0 | False | None | None | False | None | False | 84889.2 | 0 | 2907666 | 95498 | None | Item No. VOL-III-5.12-C Page No.35 | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA
Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 11149.82 | 11149.82 | 98.1 | False | None | None | False | None | False | 1093797.342 | 0 | 2907667 | 95498 | None | Item No. VOL-III-5.16-C Page No.38 | Bituminous Concrete Grading II for traffic less than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 12925.72 | 12925.72 | 179.85 | False | None | None | False | None | False | 2324690.742 | 0 | 2907668 | 95498 | None | Item No. VOL-I-1.7 Page No.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 140.42 | 140.42 | 1530.8 | False | None | None | False | None | False | 214954.936 | 0 |
| 1709552246000 | 1 | None | None | Roads | Road Furnitures. | 225144.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2907669 | 95499 | None | Item No. VOL-III-8.15 Page No.67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 625.4 | 625.4 | 360.0 | False | None | None | False | None | False | 225144.0 | 0 |
| 1709552246000 | 1 | None | None | Roads | Construction of CC DRAIN 0.60 x 0.60m | 2040808.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2907670 | 95500 | None | Item No. VOL-I-1.14.1 Page No.8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 120.36 | 120.36 | 422.4 | False | None | None | False | None | False | 50840.064 | 0 | 2907671 | 95500 | None | Item No. VOL-I-2.1.3 Page No.15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7067.02 | 7067.02 | 44.0 | False | None | None | False | None | False | 310948.88 | 0 | 2907672 | 95500 | None | Item No. VOL-I-2.11-h Page No.18 | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 93232.98 | 93232.98 | 5.28 | False | None | None | False | None | False | 492270.1344 | 0 | 2907673 | 95500 | None | Item No. VOL-I-2.4.2 Page No.16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7461.14 | 7461.14 | 88.0 | False | None | None | False | None | False | 656580.32 | 0 | 2907674 | 95500 | None | P.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1 | Additionalities for Formwork, Centering & Scaffolding- For Foundation , Substructure of Cross drainage @ 35% (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3081.45 | 3081.45 | 88.0 | False | None | None | False | None | False | 271167.6 | 0 | 2907675 | 95500 | None | Item No. VOL-I-2.5.2 Page No.16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.6 | 8211.6 | 25.6 | False | None | None | False | None | False | 210216.96 | 0 | 2907676 | 95500 | None | P.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1 | Additionalities for Formwork, Centering & Scaffolding- For Foundation , Slab of Cross drainage @ 20% (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1905.64 | 1905.64 | 25.6 | False | None | None | False | None | False | 48784.384 | 0 |
| 1709552889000 | 0 | None | None | Roads | Resurfacing of road from Sri rangapatna Malai Mahadeshwara Hills SH-79, Jagajeevanagrama to Join Ramegowdanapura Road via Ukkalagere, M L Hundi, Chidarahalli Village from Ch 2.60km to 4.70 Km in T Narasipura Taluk, Mysore District. | 9989732.58 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2908081 | 95518 | None | Item No. VOL-I-1.14.1 Page No.8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 120.36 | 120.36 | 422.4 | False | None | None | False | None | False | 50840.064 | 0 | 2908080 | 95518 | None | Item No. VOL-III-8.15 Page No.67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 625.4 | 625.4 | 360.0 | False | None | None | False | None | False | 225144.0 | 0 | 2908071 | 95518 | None | Item No. VOL-III-2.5-ii-B Page No.9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 463.74 | 463.74 | 26.16 | False | None | None | False | None | False | 12131.4384 | 0 | 2908082 | 95518 | None | Item No. VOL-I-2.1.3 Page No.15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7067.02 | 7067.02 | 44.0 | False | None | None | False | None | False | 310948.88 | 0 | 2908072 | 95518 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 112.1 | 112.1 | 2772.96 | False | None | None | False | None | False | 310848.816 | 0 | 2908083 | 95518 | None | Item No. VOL-I-2.11-h Page No.18 | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 93232.98 | 93232.98 | 5.28 | False | None | None | False | None | False | 492270.1344 | 0 | 2908073 | 95518 | None | Item No. VOL-III-4.2-v Page No.23 | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2783.62 | 2783.62 | 697.6 | False | None | None | False | None | False | 1941853.312 | 0 | 2908074 | 95518 | None | Item No. VOL-III-4.17 Page No.26 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3019.62 | 3019.62 | 545.0 | False | None | None | False | None | False | 1645692.9 | 0 | 2908084 | 95518 | None | Item No. VOL-I-2.4.2 Page No.16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7461.14 | 7461.14 | 88.0 | False | None | None | False | None | False | 656580.32 | 0 | 2908075 | 95518 | None | Item No. VOL-III-5.1-A Page No.31 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 48.38 | 48.38 | 1962.0 | False | None | None | False | None | False | 94921.56 | 0 | 2908085 | 95518 | None | P.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1 | Additionalities for Formwork, Centering & Scaffolding- For Foundation , Substructure of Cross drainage @ 35% (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3081.45 | 3081.45 | 88.0 | False | None | None | False | None | False | 271167.6 | 0 | 2908086 | 95518 | None | Item No. VOL-I-2.5.2 Page No.16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.6 | 8211.6 | 25.6 | False | None | None | False | None | False | 210216.96 | 0 | 2908076 | 95518 | None | Item No. VOL-III-5.3 Page No.31 | Tack coat on Bituminous surface
Providing and applying tack coat with VG10 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 14.16 | 14.16 | 5995.0 | False | None | None | False | None | False | 84889.2 | 0 | 2908077 | 95518 | None | Item No. VOL-III-5.12-C Page No.35 | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA
Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 11149.82 | 11149.82 | 98.1 | False | None | None | False | None | False | 1093797.342 | 0 | 2908087 | 95518 | None | P.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1 | Additionalities for Formwork, Centering & Scaffolding- For Foundation , Slab of Cross drainage @ 20% (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1905.64 | 1905.64 | 25.6 | False | None | None | False | None | False | 48784.384 | 0 | 2908078 | 95518 | None | Item No. VOL-III-5.16-C Page No.38 | Bituminous Concrete Grading II for traffic less than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 12925.72 | 12925.72 | 179.85 | False | None | None | False | None | False | 2324690.742 | 0 | 2908079 | 95518 | None | Item No. VOL-I-1.7 Page No.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 140.42 | 140.42 | 1530.8 | False | None | None | False | None | False | 214954.936 | 0 |
|
|
---|