| 1709644163000 | 0 | None | None | Other Works | Construction Compound Wall To Garden Site On Lingat Gudi Road At Ward No 08 Vijayapur City. (General Fund) | 1415268.14 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2927209 | 96504 | None | PWD SR Valum-1, Sl No-1.14.1,page no 39 | Earth work excavation for Foundation by mechanical means for all rks & depth upto 3 m, as per drawing and technical specifications, cluding setting out, shoring, strutting, barricading, caution lights, includingng of excavated surfaces, disposing off or levelling the excavated eart or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour, tools, usage of machinery & erappurtenaces required to complete the work | Cum | 107.1 | 107.1 | 59.4 | False | None | None | False | None | False | 6361.74 | 0 | | 2927210 | 96504 | None | PWD SR Valum-1, Sl No-2.1.4,page no 15 | Providing and laying in position plain cement concrete for levelling rse for all works in foundation. The granite/trap/basalt crusheded coarse aggregates and fine aggregates as per relevant IS Codes achine mixed, laid in layers not exceeding 150 mm thickness, well ompactedusing plate vibrators, including all lead & lifts, cost of allials of, labour, Usage charges of machineries, curing, and all the other nances required to complete the work as per technical specifications. (Thest of steel reinforcement & formwork shall be paid separatelyix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse gregates | Cum | 6527.85 | 6527.85 | 18.15 | False | None | None | False | None | False | 118480.4775 | 0 | | 2927211 | 96504 | None | PWD SR Valum-2 , Sl No-5.3, page no 9 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) | Cum | 6515.25 | 6515.25 | 89.1 | False | None | None | False | None | False | 580508.775 | 0 | | 2927212 | 96504 | None | PWD SR Valum-2 , Sl No-5.8, page no 9 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work | Cum | 8367.45 | 8367.45 | 11.6 | False | None | None | False | None | False | 97062.42 | 0 | | 2927213 | 96504 | None | PWD SR volum- 2 I No-8.3.2, page no 41 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required asmooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 349.65 | 349.65 | 202.0095 | False | None | None | False | None | False | 70632.621675 | 0 | | 2927214 | 96504 | None | PWD SR Valum-1 , Sl No-1.8 page no 07 | Construction of Embankment by excavating the available approvedel/Murrum deposited at a place or borrow pits during or prior excavation with all liftand lead, transportation to site, spreading, grading to required slope ncompacting to meet the requirement complete as per specifications,cluding cost of our,rolling,water,all materials,usage& all other appurtenacesuired to complete the work. | Cum | 497.7 | 497.7 | 99.0 | False | None | None | False | None | False | 49272.3 | 0 | | 2927215 | 96504 | None | PWD SR Valum-1 , Sl No-11.31 page no 86 | Providing and fixing angle iron frames for doors, windows and
ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred
and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the
existing T-iron frame or to the wall with dash fastener, including fixing of
necessary butt hinges and screws and applying a priming coat of approved
steel primer, all complete as per the direction of Engineer-In-charge
including cost of materials, labour, usage charges of machinery complete
as per specifications | Kg | 120.75 | 120.75 | 4082.4 | False | None | None | False | None | False | 492949.8 | 0 |
|