1709550091000 | 0 | None | None | Buildings | Construction of Kitchen Room at Anglo Urdu High School in TownShip Dandeli Taluk(SC) | 339173.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2906566 | 95452 | None | code01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. In lime mortar( Vol-2/ P. No.163/ I.No.19.7.2) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 883.68 | 883.68 | 0.48 | False | None | None | False | None | False | 424.1664 | 0 | 2906567 | 95452 | None | code02 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ( Vol-01/ P. No. 5/ I. No. 1.4.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 208.32 | 208.32 | 9.52 | False | None | None | False | None | False | 1983.2064 | 0 | 2906568 | 95452 | None | code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.No.2.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 5830.72 | 5830.72 | 1.27 | False | None | None | False | None | False | 7405.0144 | 0 | 2906569 | 95452 | None | code04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ( Vol-02/ P. No. 9/ I. No. 5.2) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 5320.0 | 5320.0 | 7.23 | False | None | None | False | None | False | 38463.6 | 0 | 2906570 | 95452 | None | code05 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.No.2.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 6415.36 | 6415.36 | 3.01 | False | None | None | False | None | False | 19310.2336 | 0 | 2906571 | 95452 | None | code06 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ( Vol-02/ P. No. 14/ I. No. 6.8) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 7499.52 | 7499.52 | 10.92 | False | None | None | False | None | False | 81894.7584 | 0 | 2906572 | 95452 | None | code07 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 11078.14 | 11078.14 | 0.72 | False | None | None | False | None | False | 7976.2608 | 0 | 2906573 | 95452 | None | code08 | slab ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 10385.76 | 10385.76 | 3.14 | False | None | None | False | None | False | 32611.2864 | 0 | 2906574 | 95452 | None | code09 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Vol-02/ P. No.84/ I. no.11.32) ---- WORK COMPLETE WITHIN 3 MONTHS | Kgs | 103.04 | 103.04 | 294.0 | False | None | None | False | None | False | 30293.76 | 0 | 2906575 | 95452 | None | code10 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge( Vol-02/ P. No.42/ I. No. 8.6.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 257.6 | 257.6 | 106.83 | False | None | None | False | None | False | 27519.408 | 0 | 2906576 | 95452 | None | code11 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 175.84 | 175.84 | 68.04 | False | None | None | False | None | False | 11964.1536 | 0 | 2906577 | 95452 | None | code12 | PProviding & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 7180.32 | 7180.32 | 3.24 | False | None | None | False | None | False | 23264.2368 | 0 | 2906578 | 95452 | None | code13 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 84385.28 | 84385.28 | 0.05 | False | None | None | False | None | False | 4219.264 | 0 | 2906579 | 95452 | None | code14 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) (Vol-02/ P. No.101/ I. No.12.21) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 5102.72 | 5102.72 | 1.71 | False | None | None | False | None | False | 8725.6512 | 0 | 2906580 | 95452 | None | code15 | Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 48.16 | 48.16 | 4.5 | False | None | None | False | None | False | 216.72 | 0 | 2906581 | 95452 | None | code16 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 117.6 | 117.6 | 4.5 | False | None | None | False | None | False | 529.2 | 0 | 2906582 | 95452 | None | code17 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 1234.24 | 1234.24 | 15.75 | False | None | None | False | None | False | 19439.28 | 0 | 2906583 | 95452 | None | code18 | Cuddapah slab 2.5cmc thick ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 336.0 | 336.0 | 13.84 | False | None | None | False | None | False | 4650.24 | 0 | 2906584 | 95452 | None | code19 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ( Vol-02/ P. No.45/ I. No. 8.25) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 117.6 | 117.6 | 53.2 | False | None | None | False | None | False | 6256.32 | 0 | 2906585 | 95452 | None | code20 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 73.92 | 73.92 | 53.63 | False | None | None | False | None | False | 3964.3296 | 0 | 2906586 | 95452 | None | code21 | SRB13-10.1 : Providing and fixing to wall, ceiling and floor midium density polythene pipes 6.00 kgf/sq.cm working pressure 20mm outside diameter chemp plast / Wavin or equivalent make with pipe fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications.Specification No.KBS 13.2.15.4 / 13.9 fpr internal water supply conection(p.no 93 item no 13.66 KSRB 13-8.DO-20MM Dia ---- WORK COMPLETE WITHIN 3 MONTHS | Mtr | 123.05 | 123.05 | 10.0 | False | None | None | False | None | False | 1230.5 | 0 | 2906587 | 95452 | None | code22 | White glazed fire clay kitchen sink of size 600x450x250mm ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 2816.8 | 2816.8 | 1.0 | False | None | None | False | None | False | 2816.8 | 0 | 2906588 | 95452 | None | code23 | Polythene water storage tank of specified capacity and make ---- WORK COMPLETE WITHIN 3 MONTHS | Ltr | 5.84 | 5.84 | 500.0 | False | None | None | False | None | False | 2920.0 | 0 | 2906589 | 95452 | None | code24 | Proving and fixing brass bib cock of approved quality ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 365.12 | 365.12 | 2.0 | False | None | None | False | None | False | 730.24 | 0 | 2906590 | 95452 | None | code25 | Providing and fixing brass stop cock of approved quality 150m nominal bore ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 365.12 | 365.12 | 1.0 | False | None | None | False | None | False | 365.12 | 0 |
|