noticeInvitingTenderDTO
createdTs1709516426336
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3800.00
emd227685.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-03-2024 16:30:00
tenderQueryClose11-03-2024 16:00:00
technicalBidOpen14-03-2024 16:00:00
publishedDate05-03-2024 19:48:51
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate06-03-2024 12:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee127685.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709516426375
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT6420
titleConstruction of Government High School in Chaganur Village, Ballari and District Taluk, Under NABARD RIDF-28 for the year 2022-23.
descriptionConstruction of Government High School in Chaganur Village, Ballari and District Taluk, Under NABARD RIDF-28 for the year 2022-23.
categoryWORKS
categoryTextWorks
ecv15179289.36
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount18100000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SDN/BLR/NABARD/CHAGANUR/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17095164260000NoneNoneBuildingsGROUND FLOOR7905176.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289878695051NoneIC: 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (CSR 2023-24 Vol-1, Pg No 8, Sl.no- 1.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.75177.17FalseNoneNoneFalseNoneFalse17672.70750
289878795051NoneIC: 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ( CSR 2023-2024 Vol-2 Sl No. 4.1 P.No-5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm123.9123.9393.7FalseNoneNoneFalseNoneFalse48779.430
289878895051NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition In all kinds of soils Depth upto 3 m (CSR 2023-2024 Vol-1 Sl No 1.14.1 P.No-8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1350.17FalseNoneNoneFalseNoneFalse37503.2070
289878995051NoneIC: 1.4.2Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter,excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. 1.4.2 Depth exceeding 1.5m, but not exceeding 3m. (CSR 2023-24 Volume-I Item Code-1.4.2 P.no 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum271.95271.9538.91FalseNoneNoneFalseNoneFalse10581.57450
289879095051NoneIC: 1.23Provding and filling in plinth with granite /trap broken metal 100mm and down size & with aprroved sand including hand packing watering including cost of all materials and Labour with all lead and lift complete as per Specfcation (CSR 2023-24 Vol-1 Item Code-1.23) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.129.75FalseNoneNoneFalseNoneFalse83778.9750
289879195051NoneIC: 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-1 Item Code-2.1.3 P.no 15 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4584.69FalseNoneNoneFalseNoneFalse532568.83050
289879295051NoneIC: 5.1.1Providing Random rubble masonry with hard stone in foundationand plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 2023-24 Volume-2 sl.no-5.1.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5891.555891.5531.01FalseNoneNoneFalseNoneFalse182696.96550
289879395051NoneIC: 5.2Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 2023-24 Volume-2 sl.no-5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6948.96948.93.32FalseNoneNoneFalseNoneFalse23070.3480
289879495051NoneIC: 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 2023-24 Volume-2 sl.no-5.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6708.456708.4537.1FalseNoneNoneFalseNoneFalse248883.4950
289879595051NoneIC: 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(CSR 2023-2024 Vol-1 Sl No. 1.9 P.No-7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.3233.78FalseNoneNoneFalseNoneFalse65294.7540
289879695051NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work (CSR 2023-24 Volume-I Sl.no-1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7238.61FalseNoneNoneFalseNoneFalse118756.1970
289879795051NoneIC: 2.2.3Footing:-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no-2.2.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6633.156633.1552.19FalseNoneNoneFalseNoneFalse346184.09850
289879895051NoneIC: 2.2.3Additionalities for Formwork, Centering & Scaffolding 8% for footings CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum532.22532.2252.19FalseNoneNoneFalseNoneFalse27776.56180
289879995051NoneIC: 2.2.3Columns-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.86.25FalseNoneNoneFalseNoneFalse41580.00
289880095051NoneIC: 2.2.3Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4656.964656.966.25FalseNoneNoneFalseNoneFalse29106.00
289880195051NoneIC: 2.3.2Plinth Beam-Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregate (CSR 2023-24 Volume-I Sl.no-2.3.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6804.06804.018.62FalseNoneNoneFalseNoneFalse126690.480
289880295051NoneIC: 2.3.2Additionalities for Formwork, Centering & Scaffolding 20% for Beam ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3402.03402.08.64FalseNoneNoneFalseNoneFalse29393.280
289880395051NoneIC: 2.3.2Additionalities for Formwork, Centering & Scaffolding 10% for Retaining Wall CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum680.4680.49.98FalseNoneNoneFalseNoneFalse6790.3920
289880495051NoneIC: 2.5.2Columns Above Plinth-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1512.17FalseNoneNoneFalseNoneFalse87443.27550
289880595051NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5029.65029.612.17FalseNoneNoneFalseNoneFalse61210.2320
289880695051NoneIC: 2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1584.27FalseNoneNoneFalseNoneFalse605492.59050
289880795051NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4311.094311.0923.1FalseNoneNoneFalseNoneFalse99586.1790
289880895051NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3592.583592.5861.17FalseNoneNoneFalseNoneFalse219758.11860
289880995051NoneIC: 2.5.1Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.51.69FalseNoneNoneFalseNoneFalse11764.9350
289881095051NoneIC: 2.5.1Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3132.673132.671.69FalseNoneNoneFalseNoneFalse5294.21230
289881195051NoneIC: 2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-2024 Vol-1 Sl No. 2.1.4 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6527.856527.852.38FalseNoneNoneFalseNoneFalse15536.2830
289881295051NoneIC: 2.1.4Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3916.713916.712.38FalseNoneNoneFalseNoneFalse9321.76980
289881395051NoneIC: 2.5.1Shelves-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no-2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.50.18FalseNoneNoneFalseNoneFalse1253.070
289881495051NoneIC: 2.5.1Formwork, Centering & Scaffolding Charges for Roof (Straight & Arched) @ 50% CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3480.753480.750.18FalseNoneNoneFalseNoneFalse626.5350
289881595051NoneIC: 2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (CSR 2023-2024 Vol-2 Sl No. 2.11.a P.No-18, ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs93929.8593929.8516.91FalseNoneNoneFalseNoneFalse1588353.76350
289881695051NoneIC: 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (CSR 2023-2024 Vol-2 Sl No. 6.8 P.No-14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8367.458367.4581.83FalseNoneNoneFalseNoneFalse684708.43350
289881795051NoneIC: 6.12Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work (CSR 2023-24 Volume-2 Sl.no-6.12 P.no: 14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1053.151053.1581.87FalseNoneNoneFalseNoneFalse86221.39050
289881895051NoneIC: 12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (CSR 2023-24 Vol 2 Sl.no-12.13.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum103755.75103755.750.59FalseNoneNoneFalseNoneFalse61215.89250
289881995051NoneIC: 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (CSR 2023-24 Volume-2 Sl.no-12.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1066.81066.810.0FalseNoneNoneFalseNoneFalse10668.00
289882095051NoneIC: 12.57.5Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial (CSR 2023-24 Volume-II Sl.no-12.57.5 p no 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4091.854091.8527.84FalseNoneNoneFalseNoneFalse113917.1040
289882195051NoneIC: 11.3Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (CSR 2023-24 Volume-II Sl.no-11.3 p no 77) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm8689.88689.88.74FalseNoneNoneFalseNoneFalse75948.8520
289882295051NoneIC: 12.93.2Providing and fixing Factory made single extruded wood polymer composite (wpc) Soild dooe/window, clerestory windows & frames /chowkhat of frames size 65x125mm (CSR 2023-24 VOL 2 Sl.no-12.93.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm802.2802.223.4FalseNoneNoneFalseNoneFalse18771.480
289882395051NoneIC: 12.95Providing & fixing factory made 100% Carpenter friendly ready to use solid plain wood polymer composite (WPC) Flush shutter of 35mm thickness which is anti terminate and having high water absorption property.The cost includes cost of materials,Transportation labours and fixing charges (CSR 2023-2024 Vol-2 Sl No.12.95) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4631.554631.556.3FalseNoneNoneFalseNoneFalse29178.7650
289882495051NoneIC: 12.86roviding & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size - 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.86 p no 109) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5659.55659.552.2FalseNoneNoneFalseNoneFalse295425.90
289882595051NoneIC: 12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6004.956004.952.52FalseNoneNoneFalseNoneFalse15132.4740
289882695051NoneIC: 11.34AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (CSR 2023-2024 Vol-2 Sl No.11.34A P.No.86) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs176.4176.41354.32FalseNoneNoneFalseNoneFalse238902.0480
289882795051NoneIC: 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(CSR 2023-24 Vol-2 Sl.no-8.1.2 p no 41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm253.05253.05740.66FalseNoneNoneFalseNoneFalse187424.0130
289882895051NoneIC: 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.8 P.No.42) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm389.55389.55295.23FalseNoneNoneFalseNoneFalse115006.84650
289882995051NoneIC: 8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-24 Vol-2 Sl.no-8.2.2 p.no 41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm292.95292.9554.75FalseNoneNoneFalseNoneFalse16039.01250
289883095051NoneIC: 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 2023-24 Vol-2 Sl.no-8.51 p.no 50) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm105.0105.01115.1FalseNoneNoneFalseNoneFalse117085.50
289883195051NoneIC: 4.21KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS (2018-19 PWP&IWTD Ballari circle DSR Item No. 4.21 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6545.0FalseNoneNoneFalseNoneFalse1559.250
289883295051NoneIC: 8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.25 p no 45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm143.85143.851115.1FalseNoneNoneFalseNoneFalse160407.1350
289883395051NoneIC: 8.28Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar dropsb and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.28 p no 45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm93.4593.45258.03FalseNoneNoneFalseNoneFalse24112.90350
289883495051NoneIC: 8.29Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.29 P.No.45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm297.15297.1537.2FalseNoneNoneFalseNoneFalse11053.980
289883595051NoneIC: 8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 (Vol-2) Sl No.8.34.1 P.No.47) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm55.6555.6566.82FalseNoneNoneFalseNoneFalse3718.5330
289883695051NoneIC: 8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.33.2 P.No.46) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm144.9144.966.82FalseNoneNoneFalseNoneFalse9682.2180
289883795051NoneIC: 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR rate 2023-24 Vol-2 Sl.no 8.40) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm120.75120.7575.24FalseNoneNoneFalseNoneFalse9085.230
289883895051NoneIC: 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. (CSR 2023-2024 Vol-2 Sl No.9.24 P.No.63) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2994.62994.6110.07FalseNoneNoneFalseNoneFalse329615.6220
289883995051NoneIC: 10.2Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.10.2 P.No.69) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr344.4344.431.8FalseNoneNoneFalseNoneFalse10951.920
289884095051NoneIC: 9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications (CSR 2023-2024 Vol-2 Sl No.9.34 p no 64) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1622.251622.25270.39FalseNoneNoneFalseNoneFalse438640.17750
289884195051NoneIC: 9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm(thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(CSR 2023-2024 Vol-2 Sl No.9.11 P.No.60) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm933.45933.4525.15FalseNoneNoneFalseNoneFalse23476.26750
289884295051NoneIC: 9.38Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications (CSR 2023-2024 Vol-2 Sl No.9.38 P.No.65) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1461.61461.654.75FalseNoneNoneFalseNoneFalse80022.60
289884395051NoneIC: 11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge (CSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs144.9144.9129.6FalseNoneNoneFalseNoneFalse18779.040
289884495051NoneIC: 10.8Providing and fixing granite stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) as per direction of Engineer-in- charge and finished smooth. (CSR 2023-2024 Vol-2 Sl No 10.8 p no 70) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2928.452928.452.7FalseNoneNoneFalseNoneFalse7906.8150
289884595051NoneIC: 12.73.1Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm (CSR 2023-2024 Vol-2 Sl No 12.73.1 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.220.0FalseNoneNoneFalseNoneFalse924.00
289884695051NoneIC: 12.74.1Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm (CSR 2023-2024 Vol-2 Sl No 12.74.1 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.140.0FalseNoneNoneFalseNoneFalse4284.00
289884795051NoneIC: 12.72Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete (CSR 2023-2024 Vol-2 Sl No 12.72 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.110.0FalseNoneNoneFalseNoneFalse861.00
289884895051NoneIC: 12.63Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete (CSR 2023-2024 Vol-2 Sl No 12.63 p no 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each136.5136.540.0FalseNoneNoneFalseNoneFalse5460.00
289884995051NoneIC: 02200220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.011.0FalseNoneNoneFalseNoneFalse6963.00
289885095051NoneIC: 7.18Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications.(CSR 2023-2024 Vol-2 Sl No 7.18 p no 23) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2117.852117.850.99FalseNoneNoneFalseNoneFalse2096.67150
289885195051NoneIC: 8.84Providing wall black board in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc complete .(CSR 2023-2024 Vol-2 Sl No 8.84 p no 55) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm498.75498.7514.4FalseNoneNoneFalseNoneFalse7182.00
17095164260000NoneNoneBuildingsFIRST FLOOR5473166.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289885295052NoneIC: 2.5.2Columns--Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Iteam Code-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.013.03FalseNoneNoneFalseNoneFalse94558.710
289885395052NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5079.95079.913.03FalseNoneNoneFalseNoneFalse66191.0970
289885495052NoneIC: 2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Iteam Code-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.083.57FalseNoneNoneFalseNoneFalse606467.490
289885595052NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4354.24354.222.47FalseNoneNoneFalseNoneFalse97838.8740
289885695052NoneIC: 2.5.2Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3628.53628.561.1FalseNoneNoneFalseNoneFalse221701.350
289885795052NoneIC: 2.5.1Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no 2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.121.08FalseNoneNoneFalseNoneFalse7593.60960
289885895052NoneIC: 2.5.1Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3164.03164.01.08FalseNoneNoneFalseNoneFalse3417.120
289885995052NoneIC: 2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-2024 (Vol-1) Sl No. 2.1.4 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6593.136593.132.28FalseNoneNoneFalseNoneFalse15032.33640
289886095052NoneIC: 2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (CSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne94869.1594869.1511.22FalseNoneNoneFalseNoneFalse1064431.8630
289886195052NoneIC: 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (CSR 2023-2024 (Vol-2) Sl No. 6.8 P.No-14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8451.128451.1284.41FalseNoneNoneFalseNoneFalse713359.03920
289886295052NoneIC: 6.12Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work (CSR 2023-24 Volume-II Iteam Code-6.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1063.681063.6898.59FalseNoneNoneFalseNoneFalse104868.21120
289886395052NoneIC: 12.13.1Providing Salwood frames of doors, windows, clerestory windows,ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum104793.31104793.310.48FalseNoneNoneFalseNoneFalse50300.78880
289886495052NoneIC: 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (CSR 2023-2024 (Vol-2) Sl No. 12.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1077.471077.478.0FalseNoneNoneFalseNoneFalse8619.760
289886595052NoneIC: 12.57.5Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.35 mm thick one side teak and one side commercial (CSR 2023-24 Volume-II Sl.no-12.57.5 p no 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4132.774132.7723.04FalseNoneNoneFalseNoneFalse95219.02080
289886695052NoneIC: 12.86Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size - 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.86 p no 109) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5716.15716.157.15FalseNoneNoneFalseNoneFalse326675.1150
289886795052NoneIC: 11.34AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (CSR 2023-2024 Vol-2 Sl No.11.34A P.No.85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs178.16178.161066.5FalseNoneNoneFalseNoneFalse190007.640
289886895052NoneIC: 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-24 Volume-2 Sl.no-8.1.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm255.58255.58722.14FalseNoneNoneFalseNoneFalse184564.54120
289886995052NoneIC: 8.3.2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-23 Volume-2 Sl.no -8.3.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm353.15353.15443.15FalseNoneNoneFalseNoneFalse156498.42250
289887095052NoneIC: 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 2023-2024 Vol-2 Sl No.8.51 P.No.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm106.05106.051083.64FalseNoneNoneFalseNoneFalse114920.0220
289887195052NoneIC: 4.21KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS ('2018-19 PWP&IWTD Ballari circle DSR Item No. 4.21 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6532.4FalseNoneNoneFalseNoneFalse1122.660
289887295052NoneIC: 8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.8.39 P.No.48) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm134.68134.681083.64FalseNoneNoneFalseNoneFalse145944.63520
289887395052NoneIC: 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm184.53184.53402.36FalseNoneNoneFalseNoneFalse74247.49080
289887495052NoneIC: 8.29Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.29 P.No.45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm300.12300.1240.79FalseNoneNoneFalseNoneFalse12241.89480
289887595052NoneIC: 8.34.1Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.8.34.1 P.No.47) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm56.2156.2155.3FalseNoneNoneFalseNoneFalse3108.4130
289887695052NoneIC: 8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR2023-2024 (Vol-2) Sl No.8.33.2 P.No.46) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm146.35146.3555.3FalseNoneNoneFalseNoneFalse8093.1550
289887795052NoneIC: 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-24 Volume-2 Sl.no -8.40) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm121.96121.9659.25FalseNoneNoneFalseNoneFalse7226.130
289887895052NoneIC: 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. (CSR 2023-2024 Vol-2 Sl No.9.24 P.No.63) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm3024.553024.55114.98FalseNoneNoneFalseNoneFalse347762.7590
289887995052NoneIC: 10.2Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge (CSR 2023-2024 PWD SR Vol-2 Sl No.10.2 P.No.69) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm347.84347.8428.8FalseNoneNoneFalseNoneFalse10017.7920
289888095052NoneIC: 9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications (CSR 2023-2024 Vol-2 Sl No.9.34) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1638.471638.47286.24FalseNoneNoneFalseNoneFalse468995.65280
289888195052NoneIC: 11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge (CSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs146.35146.3581.0FalseNoneNoneFalseNoneFalse11854.350
289888295052NoneIC: 15.11Newly Constructed Roof/Bathroom/Toilet/balcony/utility with Cementatius Waterproof coating - Below 500 m2 Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof, bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break greater than 120% as per ASTM D 412, Tensile strength greater than 1N/mm2 as per ASTM D 412, Adhesion strength: 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification. (CSR 2023-2024 Vol-2 Sl No.15.11 P.No.151) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.76556.76393.7FalseNoneNoneFalseNoneFalse219196.4120
289888395052NoneIC: 12.73.1Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm (CSR 2023-2024 Vol-2 Sl No 12.73.1 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.216.0FalseNoneNoneFalseNoneFalse739.20
289888495052NoneIC: 12.74.1Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm (CSR 2023-2024 Vol-2 Sl No 12.74.1 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.132.0FalseNoneNoneFalseNoneFalse3427.20
289888595052NoneIC: 12.72Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : (CSR 2023-2024 Vol-2 Sl No 12.72 p no 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.18.0FalseNoneNoneFalseNoneFalse688.80
289888695052NoneIC: 12.63Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete (CSR 2023-2024 Vol-2 Sl No 12.63 p no 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos136.5136.532.0FalseNoneNoneFalseNoneFalse4368.00
289888795052NoneIC: 02200220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.08.0FalseNoneNoneFalseNoneFalse5064.00
289888895052NoneIC: 8.84Providing wall black boards in CM 1:3 with two coats of black paint including finishing etc., including cost of materials, labour, HOM complete as per specifications. (CSR 2023-2024 Vol-2 Sl No 8.84 p no 55) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm503.74503.7411.52FalseNoneNoneFalseNoneFalse5803.08480
289888995052NoneIC: 8.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.49 P.No.49) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.cm4.24.25000.0FalseNoneNoneFalseNoneFalse21000.00
17095164260000NoneNoneBuildingsWATER SUPPLY372426.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289889095053NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.193.6FalseNoneNoneFalseNoneFalse10024.560
289889195053NoneIC: 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum168.0168.093.6FalseNoneNoneFalseNoneFalse15724.80
289889295053NoneIC: 13.2.2Providing and fixing brass bib cock of approved quality 20 mm nominal bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos362.25362.2520.0FalseNoneNoneFalseNoneFalse7245.00
289889395053NoneIC: DSRProviding and fixing in position brass PUSH cock of approved quality 20mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. (In Hand Wash) DR ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos168.0168.012.0FalseNoneNoneFalseNoneFalse2016.00
289889495053NoneIC: 13.3.2Providing and fixing brass stop cock of approved quality : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos320.25320.256.0FalseNoneNoneFalseNoneFalse1921.50
289889595053NoneIC: 13.4.3Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 40mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos737.1737.11.0FalseNoneNoneFalseNoneFalse737.10
289889695053NoneIC: 13.4.4Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 50mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos897.75897.751.0FalseNoneNoneFalseNoneFalse897.750
289889795053NoneIC: 13.5.2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 20mm Dia Nominal ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos329.7329.71.0FalseNoneNoneFalseNoneFalse329.70
289889895053NoneIC: 13.5.3Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25mm Dia Nominal ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos348.6348.61.0FalseNoneNoneFalseNoneFalse348.60
289889995053NoneIC: 13.6.1.1Providing and fixing gun metal non- return valve of approved quality (screwed end) : 25mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos651.0651.01.0FalseNoneNoneFalseNoneFalse651.00
289890095053NoneIC: 13.6.2.1Providing and fixing gun metal non- return valve of approved quality (screwed end) : 32mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos849.45849.451.0FalseNoneNoneFalseNoneFalse849.450
289890195053NoneIC: 13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions : 30 cm length 15 mm nominal bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos87.1587.153.0FalseNoneNoneFalseNoneFalse261.450
289890295053NoneIC: 13.32.2Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. Concealed work, including cutting chases and making good the walls etc 20mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr397.95397.9545.0FalseNoneNoneFalseNoneFalse17907.750
289890395053NoneIC: 13.32.3Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. Concealed work, including cutting chases and making good the walls etc 25mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr500.85500.8530.0FalseNoneNoneFalseNoneFalse15025.50
289890495053NoneIC: 13.32.4Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. Concealed work, including cutting chases and making good the walls etc 32mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr584.85584.8530.0FalseNoneNoneFalseNoneFalse17545.50
289890595053NoneIC: 13.31.3Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & testing of joints complete as per direction of engineer in charge. Internal work- exposed on wall 25mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr333.9333.930.0FalseNoneNoneFalseNoneFalse10017.00
289890695053NoneIC: 13.31.4Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & testing of joints complete as per direction of engineer in charge. Internal work- exposed on wall 32mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr420.0420.030.0FalseNoneNoneFalseNoneFalse12600.00
289890795053NoneIC: 13.33.6Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of engineer in charge. External work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr757.05757.0590.0FalseNoneNoneFalseNoneFalse68134.50
289890895053NoneIC: DSRProviding and fixing in position / brass / gun metal easy clean strainer of approved make with stainless steel strainer etc.., complete -PVC - Supreme / Prince / Mahesh ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3858.03858.03.0FalseNoneNoneFalseNoneFalse11574.00
289890995053NoneIC: 17.1Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr52.552.515.0FalseNoneNoneFalseNoneFalse787.50
289891095053NoneIC: 13.48Providing and fixing on wall face unplasticised rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointimg with seal ring conforming to IS: 5382, leaving 10mm gap for termal expansion, (i) single socketed pipes 100mm diameter ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr305.55305.5540.0FalseNoneNoneFalseNoneFalse12222.00
289891195053NoneIC: 16.1.2Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing.150mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr610.05610.0560.0FalseNoneNoneFalseNoneFalse36603.00
289891295053NoneIC: 16.8Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5030.555030.554.0FalseNoneNoneFalseNoneFalse20122.20
289891395053NoneIC: 16.9Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5726.75726.72.0FalseNoneNoneFalseNoneFalse11453.40
289891495053NoneIC: 11.47KSRB 12-7.1 : Making connection of drain or sewer line of size 100 to 230mm external dia with existing manhole including breaking into and making good the walls, floors with cement concrete M 15 with 20mm and downsize granite metal, cement plastered on both sides of mix 1:3, finished with a floating coat of neat cement, and making necessary channels for the drain, including cost of materials, labour charges, curing complete as per specifications. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos2828.72828.71.0FalseNoneNoneFalseNoneFalse2828.70
289891595053NoneIC: 14.25.1Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings :Flat back wash basin of size 630x450 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1035.31035.33.0FalseNoneNoneFalseNoneFalse3105.90
289891695053NoneIC: DSRC.P brass piller tap elbow operated for sinks ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Unit650.0650.03.0FalseNoneNoneFalseNoneFalse1950.00
289891795053NoneIC: 14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1068.91068.91.0FalseNoneNoneFalseNoneFalse1068.90
289891895053NoneIC: 14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each520.8520.81.0FalseNoneNoneFalseNoneFalse520.80
289891995053NoneIC: 12.113.1Providing and fixing CI Nahani trap of approved make conforming to ISI specifications and construction of Cistern in M-15 as per directions (Rate is inclusive of cost of materials and fixtures and conveyance of materials to work spot). - -do- 10cms x 7.5cms ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each262.5262.520.0FalseNoneNoneFalseNoneFalse5250.00
289892095053NoneIC: 13.34Providing and placing on terrace(at all floor levels) polyethylene water storage tank, IS: 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9.459.451000.0FalseNoneNoneFalseNoneFalse9450.00
289892195053NoneIC: 14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pan5128.25128.22.0FalseNoneNoneFalseNoneFalse10256.40
289892295053NoneIC: 14.3.1Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pan6275.856275.852.0FalseNoneNoneFalseNoneFalse12551.70
289892395053NoneXLV item no 3Supplying and fixing of 2/1.5 H.P. Monolbock Pump of approved make with all accessories conforming to ISI specification including cost of all materials, labour, with all lead and lift etc. complete as per directions of the Engineer-in-cahrge of the work. ---- With all lead and lifts etc., complete as per specification and as per the directions of the Engineer-In-Charge of the work. XLV item no 3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos11443.9511443.951.0FalseNoneNoneFalseNoneFalse11443.950
289892495053NoneIC: 14.6.1Providing and fixing one piece construction white vitreous china squatting plate with an integral longitudinal flushing pipe, white P.V.C. automatic flushing cistern, with fittings, standard size G.I. / PVC flush pipe for back and front flush with standard spreader pipes with fittings, G.I clamps and C.P. brass coupling complete, including painting of fittings and cutting and making good the walls and floors etc. wherever required: Single squatting plate with 5 liter P.V.C automatic flushing cistern. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos6951.06951.03.0FalseNoneNoneFalseNoneFalse20853.00
289892595053NoneIC: 14.5.1Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushingcistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS: 2556, C.I. trap with outlet grating and other couplings in C.P. brass,including painting of fittings and cutting and making good the walls and floors wherever required :Single half stall urinal with 5 litre P.V.C. automatic flushing cistern ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos9074.19074.12.0FalseNoneNoneFalseNoneFalse18148.20
17095164260000NoneNoneBuildingsINTERNAL ELECTRIFICATION740339.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289892695054NoneIC: 1.2.10Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr66.066.0600.0FalseNoneNoneFalseNoneFalse39600.00
289892795054NoneIC: 1.2.20Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr78.078.0200.0FalseNoneNoneFalseNoneFalse15600.00
289892895054NoneIC: 1.2.30Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 32mm dia 2.5mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr103.0103.050.0FalseNoneNoneFalseNoneFalse5150.00
289892995054NoneIC: 1.2.40Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 40 mm dia 2.5 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr147.0147.030.0FalseNoneNoneFalseNoneFalse4410.00
289893095054NoneIC: 1.4.10Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each106.0106.010.0FalseNoneNoneFalseNoneFalse1060.00
289893195054NoneIC: 1.4.20Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 100x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each118.0118.08.0FalseNoneNoneFalseNoneFalse944.00
289893295054NoneIC: 1.4.30Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 135 x 75 x 65 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each139.0139.04.0FalseNoneNoneFalseNoneFalse556.00
289893395054NoneIC: 1.4.40Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 180X90X65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.012.0FalseNoneNoneFalseNoneFalse1932.00
289893495054NoneIC: 1.4.50Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 200x90x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each179.0179.02.0FalseNoneNoneFalseNoneFalse358.00
289893595054NoneIC: 1.4.70Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 200x200x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each348.0348.01.0FalseNoneNoneFalseNoneFalse348.00
289893695054NoneIC: 1.5.10Supplying and fixing PVC/metal conduit Deep junction box 19/20mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each49.049.030.0FalseNoneNoneFalseNoneFalse1470.00
289893795054NoneIC: 1.5.20Supplying and fixing PVC/metal conduit Deep junction box 25mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each56.056.020.0FalseNoneNoneFalseNoneFalse1120.00
289893895054NoneIC: 1.7.10Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. upto 50mm Conduit in Brick Walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr29.029.0250.0FalseNoneNoneFalseNoneFalse7250.00
289893995054NoneIC: 1.130Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos117.0117.052.0FalseNoneNoneFalseNoneFalse6084.00
289894095054NoneIC: 2.2.10Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A Short piont up to 3 Mtr from tapping piont out let via switch. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point269.0269.0150.0FalseNoneNoneFalseNoneFalse40350.00
289894195054NoneIC: 2.2.20Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A medium point above 3m to 6 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point379.0379.045.0FalseNoneNoneFalseNoneFalse17055.00
289894295054NoneIC: 2.2.30Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A Short piont up to 10 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point555.0555.030.0FalseNoneNoneFalseNoneFalse16650.00
289894395054NoneIC: 2.3.20Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr26.026.0600.0FalseNoneNoneFalseNoneFalse15600.00
289894495054NoneIC: 2.3.30Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr42.042.0800.0FalseNoneNoneFalseNoneFalse33600.00
289894595054NoneIC: 2.3.40Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr63.063.0300.0FalseNoneNoneFalseNoneFalse18900.00
289894695054NoneIC: 2.3.50Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 6 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr92.092.0250.0FalseNoneNoneFalseNoneFalse23000.00
289894795054NoneIC: 2.3.60Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 10 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr167.0167.060.0FalseNoneNoneFalseNoneFalse10020.00
289894895054NoneIC: 3.5.20Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 1 to 3 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.010.0FalseNoneNoneFalseNoneFalse1610.00
289894995054NoneIC: 3.5.30Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 4 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each175.0175.08.0FalseNoneNoneFalseNoneFalse1400.00
289895095054NoneIC: 3.5.40Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 6 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each234.0234.04.0FalseNoneNoneFalseNoneFalse936.00
289895195054NoneIC: 3.5.50Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 8 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each284.0284.012.0FalseNoneNoneFalseNoneFalse3408.00
289895295054NoneIC: 3.5.60Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 10-12 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each363.0363.02.0FalseNoneNoneFalseNoneFalse726.00
289895395054NoneIC: 3.5.70Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 16 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each397.0397.01.0FalseNoneNoneFalseNoneFalse397.00
289895495054NoneIC: 3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each102.0102.0200.0FalseNoneNoneFalseNoneFalse20400.00
289895595054NoneIC: 3.6.20Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps two way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each166.0166.02.0FalseNoneNoneFalseNoneFalse332.00
289895695054NoneIC: 3.6.40Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped fan regulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each357.0357.052.0FalseNoneNoneFalseNoneFalse18564.00
289895795054NoneIC: 3.6.70Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16Amps one way switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each180.0180.060.0FalseNoneNoneFalseNoneFalse10800.00
289895895054NoneIC: 3.6.90Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32Amps DP switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each326.0326.020.0FalseNoneNoneFalseNoneFalse6520.00
289895995054NoneIC: 3.6.100Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps universal socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each236.0236.065.0FalseNoneNoneFalseNoneFalse15340.00
289896095054NoneIC: 3.6.110Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each156.0156.01.0FalseNoneNoneFalseNoneFalse156.00
289896195054NoneIC: 3.70Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts,50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each646.0646.01.0FalseNoneNoneFalseNoneFalse646.00
289896295054NoneIC: 5.2.10Supplying fully automatic star-delta starter unit push button type with suitable wires, 3 contactors, one adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/440 volts 3 phase and wired after fixing to the existing wooden board for motor. Upto 12.5HP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each7455.07455.01.0FalseNoneNoneFalseNoneFalse7455.00
289896395054NoneIC: 5.18.10Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps SP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each415.0415.03.0FalseNoneNoneFalseNoneFalse1245.00
289896495054NoneIC: 5.18.30Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each739.0739.02.0FalseNoneNoneFalseNoneFalse1478.00
289896595054NoneIC: 5.19.90Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. II - Double Door 12 Way SP & N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2329.02329.03.0FalseNoneNoneFalseNoneFalse6987.00
289896695054NoneIC: 5.19.110Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. III - Double Door 4 Way TP&N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4038.04038.02.0FalseNoneNoneFalseNoneFalse8076.00
289896795054NoneIC: 5.210Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9255.09255.02.0FalseNoneNoneFalseNoneFalse18510.00
289896895054NoneIC: 5.40.20Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. 250Amps 4x30x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3435.03435.03.0FalseNoneNoneFalseNoneFalse10305.00
289896995054NoneIC: 5.40.30Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. 400Amps 4x50x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr4445.04445.01.0FalseNoneNoneFalseNoneFalse4445.00
289897095054NoneIC: 5.330Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9315.09315.01.0FalseNoneNoneFalseNoneFalse9315.00
289897195054NoneIC: 5.310Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4390.04390.01.0FalseNoneNoneFalseNoneFalse4390.00
289897295054NoneIC: P430A0Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipments on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No3750.03750.02.0FalseNoneNoneFalseNoneFalse7500.00
289897395054NoneBESCOM III-32.070Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 3.5 core 25 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr139.55139.5530.0FalseNoneNoneFalseNoneFalse4186.50
289897495054NoneBESCOM IV-32.070Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. 25 sqmm to 75 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr23.6523.6530.0FalseNoneNoneFalseNoneFalse709.50
289897595054NoneBESCOM-IV--29.010Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc.,complete.(As per Civil SR KSRB I-2, P-7) In Soil (Ordinary) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr889.0889.030.0FalseNoneNoneFalseNoneFalse26670.00
289897695054NoneBESCOM-IV--29.070Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr58.058.030.0FalseNoneNoneFalseNoneFalse1740.00
289897795054NoneBESCOM-III--35.010Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each382.0382.08.0FalseNoneNoneFalseNoneFalse3056.00
289897895054NoneIC: 6.2.10Supplying of 1440rpm heavy duty exhaust fan with bracketblades suitable to operate on 230V 50Hz, AC Supply complete. 12 Sweep (300mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2969.02969.02.0FalseNoneNoneFalseNoneFalse5938.00
289897995054NoneIC: 6.3.10Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-3741979 and with double ball bearing system. 48 Sweep (1200mm) Regular model ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2984.02984.052.0FalseNoneNoneFalseNoneFalse155168.00
289898095054NoneIC: 11.3.20Supplying of ......feet - PVC Batten with integrated LED tube .....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4- 20/22 w ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each690.0690.020.0FalseNoneNoneFalseNoneFalse13800.00
289898195054NoneIC: 11.5.20Supply of round/square recess/surface mounted rolling type LED Down light with W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED square or round down light 10-12W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each885.0885.030.0FalseNoneNoneFalseNoneFalse26550.00
289898295054NoneIC: 12.210Supplying and fixing of 5-80 Watts of T8 Fluorescent Tube with 54W power consumption with low 3mg Mercury content less phosphor coating. Operating voltage range from 180V to 265V, 50Hz AC power Supply ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos520.0520.030.0FalseNoneNoneFalseNoneFalse15600.00
289898395054NoneIC: 12.25.20Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. 1 x 4 Tube light fitting. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each340.0340.030.0FalseNoneNoneFalseNoneFalse10200.00
289898495054NoneIC: 13.7.10Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall / ceiling / Rafter / Girders ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each122.0122.080.0FalseNoneNoneFalseNoneFalse9760.00
289898595054NoneIC: 13.110Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and S hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each315.0315.052.0FalseNoneNoneFalseNoneFalse16380.00
289898695054NoneIC: 13.130Fixingoneexhaustfanaftermakingasuitablenotchinthewallandfinishingwithcementmortarandcolouringtomatchtheexistingwallorbrackets,withboltsandnutsanda5A,ceilingrosewithsufficientlengthof23/0.0076inchPVCinsulatedtwincorewireofapproved make with wire mesh and wooden frame. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each707.0707.02.0FalseNoneNoneFalseNoneFalse1414.00
289898795054NoneIC: 13.190Fixing all types and all capacities of 1x4 / 2x2 LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each490.0490.050.0FalseNoneNoneFalseNoneFalse24500.00
289898895054NoneIC: 5.340Supplying, fixing and wiring 50/5 to 400/5Amps 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound., with all lead, lifts, loading, un-loading charges, including cost of all materials, cost oflabour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental andequipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each562.0562.02.0FalseNoneNoneFalseNoneFalse1124.00
289898995054NoneIC: 5.380Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440v A.C. 50 Hz 12/24v D.C. 125 Amps 25kA. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each515.0515.03.0FalseNoneNoneFalseNoneFalse1545.00
17095164260000NoneNoneBuildingsUG SUMP89238.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289899095055NoneIC: 1.4.2Earth work excavation for Foundation by manual means for all Buildings,Bridges, Retaining walls, Abutment Piers and such similar works as per drawing and technical Specifications, including setting out, providing shoring & strutting,barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils Depth exceeding 1.5m, but not exceeding 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum271.95271.956.83FalseNoneNoneFalseNoneFalse1857.41850
289899195055NoneIC: 1.5.1Earth work excavation for Foundation by manual means for all Buildings,Bridges, Retaining walls, Abutment Piers and such similar works as per drawing and technical Specifications, including setting out, providing shoring & strutting,barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum313.95313.953.73FalseNoneNoneFalseNoneFalse1171.03350
289899295055NoneIC: 2.21KSRB 2.14-1 : Extra for additional lift of 1.5 m. or part thereof for excavation in loose / soft or hard soil including cost of materials, labour complete as per specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum21.021.03.726FalseNoneNoneFalseNoneFalse78.2460
289899395055NoneIC: 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm and down size graded crushed coarse aggregate ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.450.52FalseNoneNoneFalseNoneFalse3269.9940
289899495055NoneIC: 2.3.1Base slab, Vertical Wall, Top slab-providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.153.81FalseNoneNoneFalseNoneFalse25295.16150
289899595055NoneIC: 2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs93929.8593929.850.46FalseNoneNoneFalseNoneFalse43207.7310
289899695055NoneIC: 2.3.1Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase (Revised w.e.f. from 01-09-2022) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3319.583319.580.76FalseNoneNoneFalseNoneFalse2522.88080
289899795055NoneIC: 2.3.1Additionalities for Formwork, Centering & Scaffolding 10% for earth retaining structures (Revised w.e.f. from 01-09-2022) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum663.92663.922.29FalseNoneNoneFalseNoneFalse1520.37680
289899895055NoneIC: 8.5.2Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm366.45366.4520.64FalseNoneNoneFalseNoneFalse7563.5280
289899995055NoneIC: 8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm133.35133.3520.64FalseNoneNoneFalseNoneFalse2752.3440
17095164260000NoneNoneBuildingsSOAK PIT133871.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289900095056NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.154.99FalseNoneNoneFalseNoneFalse5889.4290
289900195056NoneIC: 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.32.28FalseNoneNoneFalseNoneFalse636.8040
289900295056NoneIC: 5.1.1Providing Random rubble masonry with hard stone in foundationand plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5891.555891.5511.1FalseNoneNoneFalseNoneFalse65396.2050
289900395056NoneIC: 1.11Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2285.852285.8512.72FalseNoneNoneFalseNoneFalse29076.0120
289900495056NoneIC: 0056Providing and filling brick aggregate 25 mm (Nominal) (2018-19 PWP&IWTD Ballari circle DSR I/0056) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum622.88622.8811.2FalseNoneNoneFalseNoneFalse6976.2560
289900595056NoneIC: 2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.151.39FalseNoneNoneFalseNoneFalse9987.35850
289900695056NoneIC: 2.5.2Formwork, Centering & Scaffolding Charges for Roof (Straight & Arched) @ 50% (Sl no.12) P.No-115 Vol-1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3592.583592.581.39FalseNoneNoneFalseNoneFalse4993.68620
289900795056NoneIC: 2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs93929.8593929.850.11FalseNoneNoneFalseNoneFalse10332.28350
289900895056NoneIC: 13.70.6Waste WATER OUTLET PIPE (2018-19 PWP&IWTD Ballari circle DSR Item No.13.70.6 P.No-96) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr583.8583.81.0FalseNoneNoneFalseNoneFalse583.80
17095164260000NoneNoneBuildingsBOREWELL250303.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289900995057NoneIC: 12.4Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geologicalformation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and rojection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5552.45552.41.0FalseNoneNoneFalseNoneFalse5552.40
289901095057NoneIC: 12.1.2Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 0.00 to 50.00 Mtrs ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Rmtr388.5388.550.0FalseNoneNoneFalseNoneFalse19425.00
289901195057NoneIC: 12.1.2Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 50.00 to 100.00 Mtrs ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Rmtr487.2487.250.0FalseNoneNoneFalseNoneFalse24360.00
289901295057NoneIC: 12.1.3Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 100.00 to 150.00 Mtrs ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Rmtr517.65517.6550.0FalseNoneNoneFalseNoneFalse25882.50
289901395057NoneIC: 10.1.10Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 200mm dia., 6 kg/sqcm & class 3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Rmtr1170.751170.7550.0FalseNoneNoneFalseNoneFalse58537.50
289901495057NoneIC: 12.33Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos157.5157.51.0FalseNoneNoneFalseNoneFalse157.50
289901595057NoneIC: 12.34Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set172.2172.21.0FalseNoneNoneFalseNoneFalse172.20
289901695057NoneIC: 13.11.3Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications to work site ,as per necessary ammendments and instructions of engineer incharge of work. 3.00 HP - 135 LPM @ 56m = 8 STG Outlet Dia - 2.00” 3.00 HP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each27205.527205.51.0FalseNoneNoneFalseNoneFalse27205.50
289901795057NoneIC: 13.23.3Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOLDirect Online Starter 2) S-D- Star Delta Starter 6 to 15 HP pumps ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each16695.016695.01.0FalseNoneNoneFalseNoneFalse16695.00
289901895057NoneIC: 11.3.5Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: Heavy Duty GI pipe of 40mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Rmtr522.9522.970.0FalseNoneNoneFalseNoneFalse36603.00
289901995057NoneIC: 11.7.5Supply and delivery at site wrought middle steel (galvanized) GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for:For 40 mm dia GI elbow ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each216.3216.32.0FalseNoneNoneFalseNoneFalse432.60
289902095057NoneIC: 6Submersible cables-PVC 1x3x2.50 Sq.m(PW,P & IWTD SR Ballari circle 2018-19, Page no XLVII item no 6). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr189.0189.090.0FalseNoneNoneFalseNoneFalse17010.00
289902195057NoneIC: 13.32Labour charges for Erection, Electrification and commissioning of Pumpsets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Job6825.06825.01.0FalseNoneNoneFalseNoneFalse6825.00
289902295057NoneIC: 12.19Providing Main connection from poll PVC insulated sheathed steel/wire cable 3.5x10 including cost of all materials with all lead and lifts loading and unloading charges, cost of labour, HOM charges of all machineries incidental and equipment charges and implementation of environmental and social safeguards etc complete and as per the direction of engineer in charge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr60.960.9100.0FalseNoneNoneFalseNoneFalse6090.00
289902395057NoneIC: 13.33Labour charges for erection of indoor type panel board and meter boardunits with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1417.51417.51.0FalseNoneNoneFalseNoneFalse1417.50
289902495057NoneIC: 13.39Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Job3937.53937.51.0FalseNoneNoneFalseNoneFalse3937.50
17095164270000NoneNoneBuildingsEXTERNAL ELECTRIFICATION214766.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
289902595058NoneIC: 1.010RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) asper IS-785 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos7076.07076.09.0FalseNoneNoneFalseNoneFalse63684.00
289902695058NoneIC: 19.020Lightning Arrester as per IEC-60099-4 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1584.01584.03.0FalseNoneNoneFalseNoneFalse4752.00
289902795058NoneIC: 20.010HG Fuse Unit as per IS-5350 Part-2 11 kV, HG Fuse Unit with Solid Core Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1069.01069.03.0FalseNoneNoneFalseNoneFalse3207.00
289902895058NoneIC: 24.010GOS as per IS-9921, IS-1977 11 kV, 200 Amps Single Break GOS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set9450.09450.06.0FalseNoneNoneFalseNoneFalse56700.00
289902995058NoneIC: 25.010DOLO Cutout as per IS-9385, Part-1 to 3 11 kV, DOLO Cutout Conventional to Erstwhile KEB Specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set5875.05875.01.0FalseNoneNoneFalseNoneFalse5875.00
289903095058NoneIC: 32.1301.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 70 Sqmm, 3.5 Core, (18 GI Strips - 4 x 0.8 mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km317912.0317912.00.05FalseNoneNoneFalseNoneFalse15895.60
289903195058NoneIC: 35.020Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable 3.5 x 70/95/120 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set382.0382.01.0FalseNoneNoneFalseNoneFalse382.00
289903295058NoneIC: 5.80Supplying of Switch disconnector fuse unit (TPN) HRC type (but without HRC fuses). With AC-23A duty and as per IS- 13947. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos2312.02312.01.0FalseNoneNoneFalseNoneFalse2312.00
289903395058NoneIC: 51.010Grounding Material Pipe Grounding GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Mnimum Weight of GI Pipe: 7.3 Kg ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each743.0743.08.0FalseNoneNoneFalseNoneFalse5944.00
289903495058NoneIC: 51.020Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each676.0676.08.0FalseNoneNoneFalseNoneFalse5408.00
289903595058NoneIC: 51.030Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each310.0310.08.0FalseNoneNoneFalseNoneFalse2480.00
289903695058NoneIC: 7.020ACSR Conductor as per IS-398 (Part - 2/1996) Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km46234.046234.00.36FalseNoneNoneFalseNoneFalse16644.240
289903795058NoneIC: 6.010Insulator as per IS-1445 for Ceremic, IS- 7935 for GI Pin, IEC-61109 for Polymeric 11 kV Ceramic Pin Insulator (Shell only) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No83.083.06.0FalseNoneNoneFalseNoneFalse498.00
289903895058NoneIC: 6.02011 kV GI Pin for 11 kV Ceramic Shell Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No66.066.09.0FalseNoneNoneFalseNoneFalse594.00
289903995058NoneIC: 6.080DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No510.0510.06.0FalseNoneNoneFalseNoneFalse3060.00
289904095058NoneIC: 8.020Guy Wire & GI Wire as per IS-2141 8 SWG GI Wire (4.064 mm Dia), Std Wt: 125 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km75040.075040.00.1FalseNoneNoneFalseNoneFalse7504.00
289904195058NoneIC: 1.1.10Digging of Pit Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. Ordinary Soil Per Pit 416 478 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pit629.0629.09.0FalseNoneNoneFalseNoneFalse5661.00
289904295058NoneIC: 1.6.10Digging of Pit for providing GI Pipe type Earthing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pit759.0759.09.0FalseNoneNoneFalseNoneFalse6831.00
289904395058NoneIC: 1.8.10Concrete works Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pit273.0273.09.0FalseNoneNoneFalseNoneFalse2457.00
289904495058NoneIC: 1.8.30Providing Coping for Pole with CC 1:2:4 (As per actuals) a) 150 mm all around the Pole for an height of 300 mm for RCC ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pit542.0542.09.0FalseNoneNoneFalseNoneFalse4878.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17095164270000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17095164270000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17095164270001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date and time of bid submission.None
17095164810000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP portal due to internet connectivity issues and technical glitches at bidders end.None
17095165070000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17095165160000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17095165240000NoneNoneELIGIBILITYBidders shall not be under a declaration of in eligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17095165610000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17095165680000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17095165760000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17095165830000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17095165930000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17095166040000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17095166140000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17095166230000NoneNoneELIGIBILITYThe tenderer shall maintain the Building during the defect liability period.None
17095166320000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KPP Portal.None
17095166510000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2022-23. And Value at 2022-23 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24) in the Technical Qualification Criteria mentioned in the next section.None
17095166620000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17095166710000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17095166950000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the KPP portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17095167070000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17095167150000NoneNoneELIGIBILITYThe time stipulated for completion of work is 11 (Eleven) calendar months including rainy season.None
17095167220000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17095167300000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17095168080000NoneNoneELIGIBILITYThe defect liability period is 2 years from the date of actual completion of workNone
17095168180000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17095168270000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17095168360000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17095168500000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date of bid submission.None
17095168580000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP portal due to internet connectivity issues and technical glitches.None
17095168670000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17095168790000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17095168890000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082099 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17095168970000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17095169050000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17095169130000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17095169230000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17095169310000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17095169500000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17095169570000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17095169670000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17095169750000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17095169850000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17095169970000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply etc., before commencement of the work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20 , 2020-21,2021-22 & 2022-23 (c)executed in any one year, the following minimum quantities of work: (a) Earthwork Excavation -949.78Cum, (b) Cement concrete works such as PCC/RCC - 289.92Cum, (c) steel - 23.76 Metric Tone, (d) BBM/SSM/Cement concrete Solid Block and similar masonry walls - 220.6 cum, (e) Plastering - 1804sqm & Flooring-712.30 sqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executie Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 , 2020-21,2021-22 and 2022-23 - satisfactorily completed as prime contractor, at least one similar work such as - CONSTRUCTION OF BUILDING WORKS of value not less than Rs.75.89Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneNot ApplicableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneNot ApplicableCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Liquid Assets and /or availability of credit facilities of not less than Rs.41.39 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker s Certificate - Information in Format-9
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 , 2020-21,2021-22 and 2022-23 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of of value not less than Rs.303.58Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneDeclaration by the Bidder on the Letter HeadOthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Principal Place of Business.
NoneNoneNoneNoneCopy of Registration for having registered in KPWD under Class-I categoryOthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- KPWD Registration Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Annual Turnover Certificate for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Similar Nature CONSTRUCTION OF BUILDING WORKS work Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1709645361000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Executive Engineer, PWD division fort Ballari
streetNone
cityBALLARI
stateKarnataka
pin583102
tenderRecallDTONone