createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709378356189
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd445020.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-03-2024 16:00:00
tenderQueryClose12-03-2024 17:00:00
technicalBidOpen14-03-2024 16:30:00
publishedDate05-03-2024 16:01:27
publishedByPostPWD_EE_DIV_HNS
publishedByUserKPE11888 - S PUTTARAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDate07-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee345020.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08222251855
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709378356225
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9493
titleImprovements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km)
descriptionImprovements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km)
categoryWORKS
categoryTextWorks
ecv29667016.16
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1676
locationNamePWD Division Office Hunasuru
provisionalAmount30000000.0
groupOverheadTotal0.0
fileNumberPWD-HDK-SH-5054-ORF-2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17093783560001NoneNoneRoadsImprovements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km)28387264.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288813694527NoneItem No 2.5 iiB, Page No 9Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm571.12571.1248.3FalseNoneNoneFalseNoneFalse27585.0960
288813794527NoneItem No 3.5, Page No 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm7.087.082716.88FalseNoneNoneFalseNoneFalse19235.51040
288813894527NoneItem No:16.8(b), Page No: 144 Vol -3Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. b. Mechanical Means-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m29.529.52219.0FalseNoneNoneFalseNoneFalse65460.50
288813994527NoneItem No 1.7, Page No 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum140.42140.42532.56FalseNoneNoneFalseNoneFalse74782.07520
288814094527NoneItem No 1.8, Page No 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.321799.95FalseNoneNoneFalseNoneFalse1006748.0340
288814194527NoneItem No 3.6, Page No 17Construction of Subgrade and Earthen Shoulders. Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum581.74581.746661.37FalseNoneNoneFalseNoneFalse3875185.38380
288814294527NoneItem No 4.2v, Page No 19Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum2783.622783.622252.8FalseNoneNoneFalseNoneFalse6270939.1360
288814394527NoneItem No 4.17, Page No 24Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum3019.623019.622312.87FalseNoneNoneFalseNoneFalse6983988.50940
288814494527NoneItem No 5.1, Page No 31Prime Coat over WMM/WBM.Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm48.3848.389010.0FalseNoneNoneFalseNoneFalse435903.80
288814594527NoneItem No 5.33, Page No 43Tack coat on Granular surface treated with primer :Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm17.717.79010.0FalseNoneNoneFalseNoneFalse159477.00
288814694527NoneItem No 5.13 C, Page No 36Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum11526.2411526.24450.5FalseNoneNoneFalseNoneFalse5192571.120
288814794527NoneItem No 5.17 C, Page No 38Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum13387.113387.1270.3FalseNoneNoneFalseNoneFalse3618533.130
288814894527NoneItem No 8.15, Page No 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm625.4625.4334.0FalseNoneNoneFalseNoneFalse208883.60
288814994527NoneItem No 8.43, Page No 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each430.7430.7380.0FalseNoneNoneFalseNoneFalse163666.00
288815094527NoneItem No 8.6 xv, Page No 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each7817.57817.52.0FalseNoneNoneFalseNoneFalse15635.00
288815194527NoneItem No 8.6 iv, Page No 64Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each4252.724252.728.0FalseNoneNoneFalseNoneFalse34021.760
288815294527NoneItem No 8.6 Viii, Page No 64 and 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm circular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each5131.825131.822.0FalseNoneNoneFalseNoneFalse10263.640
288815394527NoneItem No 8.6 Xii, Page No 64 and 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm x 45 cm rectangular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Nos5042.145042.144.0FalseNoneNoneFalseNoneFalse20168.560
288815494527NoneItem No 8.7, Page No 65Direction and Place Identification Signs upto 0.9 Sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing -item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
288815594527NoneItem No 8.4, Page No 63Printing New Letter and Figures of any Shade.Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Per cm Height Per Letter1.061.062000.0FalseNoneNoneFalseNoneFalse2120.00
288815694527NoneItem No 8.16 i, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
288815794527NoneItem No 8.16 ii, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
288815894527NoneItem No 8.16 iii, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each993.56993.567.0FalseNoneNoneFalseNoneFalse6954.920
288815994527NoneItem No 8.18, Page No 67Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each882.64882.64150.0FalseNoneNoneFalseNoneFalse132396.00
288816094527NoneItem No 1.12 Page No.8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum112.1112.1188.55FalseNoneNoneFalseNoneFalse21136.4550
17093783560001NoneNoneRoadsConstruction of RCC Box Culverts1020014.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288816194528NoneVol-III Item No 2.10 IV B, Page No 10Dismantling of Structures.Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry By Manual means Rubble stone masonry in cement mortar.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum719.8719.811.02FalseNoneNoneFalseNoneFalse7932.1960
288816294528NoneVol-III Item No 2.17 B, Page No 11Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Rmtr1293.281293.2815.0FalseNoneNoneFalseNoneFalse19399.20
288816394528NoneVol-I Item No 1.14.1, Page No 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.36132.21FalseNoneNoneFalseNoneFalse15912.79560
288816494528NoneVol-I 2 Item No 2.1.3, Page No 1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum7067.027067.028.42FalseNoneNoneFalseNoneFalse59504.30840
288816594528NoneVol-I Item No 2.4.3, Page No 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18% (Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum8971.788971.7833.61FalseNoneNoneFalseNoneFalse301541.52580
288816694528NoneVol-I Item No 2.5.2, Page No 16Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18%(Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum9689.699689.6910.03FalseNoneNoneFalseNoneFalse97187.59070
288816794528NoneVol-I Item No 2.11, Page No 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)MT93232.9893232.984.56FalseNoneNoneFalseNoneFalse425142.38880
288816894528NoneVol-I Item No 1.8, Page No 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.32102.6FalseNoneNoneFalseNoneFalse57386.2320
288816994528NoneVol-II Item No 8.63, Page No 51Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm96.7696.767.26FalseNoneNoneFalseNoneFalse702.47760
288817094528NoneVol-III Item No 8.18, Page No 67Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)No882.64882.6440.0FalseNoneNoneFalseNoneFalse35305.60
17093783560001NoneNoneRoadsThird year Maintenance of the Road72838.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288817194529NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288817294529NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288817394529NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
17093783560001NoneNoneRoadsFourth year Maintenance of the Road86580.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288817494530NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288817594530NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288817694530NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
288817794530NoneItem No:10.15(i), Page No: 93 Vol-3Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm310.34310.3444.28FalseNoneNoneFalseNoneFalse13741.85520
17093783560001NoneNoneRoadsFifth year Maintenance of the Road100318.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288817894531NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288817994531NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288818094531NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
288818194531NoneItem No:10.15(i), Page No: 93 Vol-3Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm310.34310.3488.55FalseNoneNoneFalseNoneFalse27480.6070
17093785040001NoneNoneRoadsImprovements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km)29667016.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
288845194538NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288844794538NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288844494538NoneItem No:2.5a, Page No: 9 Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.7448.3FalseNoneNoneFalseNoneFalse22398.6420
288843494538NoneVol-III Item No 2.10 IV B, Page No 10Dismantling of Structures.Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry By Manual means Rubble stone masonry in cement mortar.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum719.8719.811.02FalseNoneNoneFalseNoneFalse7932.1960
288840994538NoneItem No 2.5 iiB, Page No 9Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm571.12571.1248.3FalseNoneNoneFalseNoneFalse27585.0960
288844594538NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288843594538NoneVol-III Item No 2.17 B, Page No 11Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Rmtr1293.281293.2815.0FalseNoneNoneFalseNoneFalse19399.20
288845294538NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288844894538NoneItem No:16.19, Page No: 147 Vol-3Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m7.087.083220.0FalseNoneNoneFalseNoneFalse22797.60
288841094538NoneItem No 3.5, Page No 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm7.087.082716.88FalseNoneNoneFalseNoneFalse19235.51040
288841194538NoneItem No:16.8(b), Page No: 144 Vol -3Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. b. Mechanical Means-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m29.529.52219.0FalseNoneNoneFalseNoneFalse65460.50
288845394538NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
288844994538NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
288844694538NoneItem No 10.2, Page No 91 Vol 3Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm114.46114.46241.5FalseNoneNoneFalseNoneFalse27642.090
288843694538NoneVol-I Item No 1.14.1, Page No 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.36132.21FalseNoneNoneFalseNoneFalse15912.79560
288845094538NoneItem No:10.15(i), Page No: 93 Vol-3Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm310.34310.3444.28FalseNoneNoneFalseNoneFalse13741.85520
288845494538NoneItem No:10.15(i), Page No: 93 Vol-3Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm310.34310.3488.55FalseNoneNoneFalseNoneFalse27480.6070
288841294538NoneItem No 1.7, Page No 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum140.42140.42532.56FalseNoneNoneFalseNoneFalse74782.07520
288843794538NoneVol-I 2 Item No 2.1.3, Page No 1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum7067.027067.028.42FalseNoneNoneFalseNoneFalse59504.30840
288843894538NoneVol-I Item No 2.4.3, Page No 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18% (Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum8971.788971.7833.61FalseNoneNoneFalseNoneFalse301541.52580
288841394538NoneItem No 1.8, Page No 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.321799.95FalseNoneNoneFalseNoneFalse1006748.0340
288843994538NoneVol-I Item No 2.5.2, Page No 16Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18%(Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum9689.699689.6910.03FalseNoneNoneFalseNoneFalse97187.59070
288841494538NoneItem No 3.6, Page No 17Construction of Subgrade and Earthen Shoulders. Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum581.74581.746661.37FalseNoneNoneFalseNoneFalse3875185.38380
288844094538NoneVol-I Item No 2.11, Page No 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)MT93232.9893232.984.56FalseNoneNoneFalseNoneFalse425142.38880
288841594538NoneItem No 4.2v, Page No 19Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum2783.622783.622252.8FalseNoneNoneFalseNoneFalse6270939.1360
288844194538NoneVol-I Item No 1.8, Page No 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.32102.6FalseNoneNoneFalseNoneFalse57386.2320
288841694538NoneItem No 4.17, Page No 24Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum3019.623019.622312.87FalseNoneNoneFalseNoneFalse6983988.50940
288844294538NoneVol-II Item No 8.63, Page No 51Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm96.7696.767.26FalseNoneNoneFalseNoneFalse702.47760
288841794538NoneItem No 5.1, Page No 31Prime Coat over WMM/WBM.Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm48.3848.389010.0FalseNoneNoneFalseNoneFalse435903.80
288844394538NoneVol-III Item No 8.18, Page No 67Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)No882.64882.6440.0FalseNoneNoneFalseNoneFalse35305.60
288841894538NoneItem No 5.33, Page No 43Tack coat on Granular surface treated with primer :Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm17.717.79010.0FalseNoneNoneFalseNoneFalse159477.00
288841994538NoneItem No 5.13 C, Page No 36Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum11526.2411526.24450.5FalseNoneNoneFalseNoneFalse5192571.120
288842094538NoneItem No 5.17 C, Page No 38Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum13387.113387.1270.3FalseNoneNoneFalseNoneFalse3618533.130
288842194538NoneItem No 8.15, Page No 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm625.4625.4334.0FalseNoneNoneFalseNoneFalse208883.60
288842294538NoneItem No 8.43, Page No 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each430.7430.7380.0FalseNoneNoneFalseNoneFalse163666.00
288842394538NoneItem No 8.6 xv, Page No 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each7817.57817.52.0FalseNoneNoneFalseNoneFalse15635.00
288842494538NoneItem No 8.6 iv, Page No 64Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each4252.724252.728.0FalseNoneNoneFalseNoneFalse34021.760
288842594538NoneItem No 8.6 Viii, Page No 64 and 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm circular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each5131.825131.822.0FalseNoneNoneFalseNoneFalse10263.640
288842694538NoneItem No 8.6 Xii, Page No 64 and 65Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm x 45 cm rectangular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Nos5042.145042.144.0FalseNoneNoneFalseNoneFalse20168.560
288842794538NoneItem No 8.7, Page No 65Direction and Place Identification Signs upto 0.9 Sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing -item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
288842894538NoneItem No 8.4, Page No 63Printing New Letter and Figures of any Shade.Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Per cm Height Per Letter1.061.062000.0FalseNoneNoneFalseNoneFalse2120.00
288842994538NoneItem No 8.16 i, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
288843094538NoneItem No 8.16 ii, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
288843194538NoneItem No 8.16 iii, Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each993.56993.567.0FalseNoneNoneFalseNoneFalse6954.920
288843294538NoneItem No 8.18, Page No 67Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each882.64882.64150.0FalseNoneNoneFalseNoneFalse132396.00
288843394538NoneItem No 1.12 Page No.8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum112.1112.1188.55FalseNoneNoneFalseNoneFalse21136.4550
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17093783620000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17093783620000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17093783620001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17093810280000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of e Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17093810350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17093810420000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17093810480000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17093810550000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17093810630000NoneNoneELIGIBILITYThe cost of the Tender processing fee shall not be refundable.None
17093810770000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing Karnataka Public Procurement Portal.None
17093810870000NoneNoneELIGIBILITYContractors Should be registered with KPWD as Class-2 and above Contractor.None
17093810940000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17093811000000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17093811050000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17093811180000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17093811270000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents Contractors Should be registered with KPWD as Class-2 and above Contractor and further orders thereon.None
17093811340000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and complete the work at the accepted tender rates irrespective of the cost of the workNone
17093811890000NoneNoneELIGIBILITYThe tenderer should maintain the Road/Bridge/Building works during the defective liability period for 2 years and 3 years maintenance period.None
17093812000000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to any adjacent structures/utilities above or below the ground and also to the existing canal CD works and other similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost. Damage to physical property and personal injury and death will be the personal risk of the contractor.None
17093812070000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17093812130000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own costNone
17093812200000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment till the completion of project.None
17093812280000NoneNoneELIGIBILITYAll materials required for the work like bitumen, steel, cement etc., shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17093812350000NoneNoneELIGIBILITYAll the items in the tender including all lead, lifts,loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and convence of all matiral and all other such incidental charges necessary for successful completion of works as per the detalied technical specification and direction of Engineer-in-charge of this work.None
17093812410000NoneNoneELIGIBILITYWhen embankments are constructed disputes arising on account of damages to the existing field channels, bunds and other private properties, if any, has to be resolved by the contractor. All precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17093812460000NoneNoneELIGIBILITYContractor should follow strictly the privaling rules of labour act & The contractor should employ only registered labours as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009None
17093812520000NoneNoneELIGIBILITYAs per the Government Circular No.PWD:ITC:2008/2099, Dated.2-12-2010, the tendered contractors, should submit the Original Bank Guarantee issued by the Bankers for the said work at the time of opening of the Technical Bids. The Contractors failing to submit the Original Bank Guarantees will be disqualified and the initial amount deposited through E-payment will be forfeited and also such contractors will be Black listed and Debarred from participating in future tenders.None
17093812590000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt. orders. As per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17093812650000NoneNoneELIGIBILITYMinimum One Lakh Rupees of the specified EMD should be paid in any one of the forms mentioned in Clause 13.1, Bank Guarantee must be given for the remaining amount in prescribed format. The copy of the Bank Guarantee must be scanned and submitted along with the Technical bid. The original should be produced during opening of Technical bidNone
17093812720000NoneNoneELIGIBILITYThe successful tenderer should provide monthly physical and financial progress to be achieved in Bar chart/Milestone chart/PERT chart during agreement.None
17093812780000NoneNoneELIGIBILITYThe returns submitted to the I.T. along with the Profit and Loss account statement,Balance sheet should be uploaded for the financial turnover criteria attested by registered Chartered Accountant.None
17093812880000NoneNoneELIGIBILITYThe units /specifications against the item codes in BOQ to be refered as per uni SR 2023-24 Vol-1,2,3,5,6 are final.None
17093812940000NoneNoneELIGIBILITYAll the concrete items inclusive of Form work/ shuttering.None
17093812990000NoneNoneELIGIBILITYThe TMT Steel Grade Fe-500D can be read as Fe-550.None
17093813050000NoneNoneELIGIBILITYThe rates are INCLUSIVE of 18 percent GST.None
17093813100000NoneNoneELIGIBILITYBidders should quote rates INCLUSIVE of 18 percent GST.None
17093813160000NoneNoneELIGIBILITYThe Amount put to tender is INCLUSIVE of 18 percent GST.None
17093814910000NoneNoneELIGIBILITYThe successful bidder has to complete the whole work within 5 months (including rainy season) from the date of handing over of site.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneITT 3.2 - To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (2018-19 to 2022-23) (c) Executed in any one year, the following minimum quantities of work. 1. EWE Foundation/Embankment/Subgrade : 7534 Cum 2. GSB : 1802 Cum 3. WMM : 1850 Cum 4. DBM/SDBC/BC/CC/MSS : 577 Cum 5. PCC/RCC : 42 Cum 6. Steel : 3.65 MTPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneITT 3.2 - To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (2018-19 to 2022-23) (b) Satisfactorily (atleast 90%) completed as prime contractor, at least one similar work such as Road construction work of value not less than Rs. 148.34 Lakhs. (Work-done certificate from not below the rank of an Executive Engineer or equivalent. (Section 3)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.5 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under, Assessed available tender capacity (AxNx1.5 - B) where. A is Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. N is Number of years prescribed for completion of the works for which tenders are invited. B is Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 5 months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneITT 3.2(a) - To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (2018-19 to 2022-23) on at least two financial years annual turnover of Rs. 593.36 lakh (in all classes of civil engineering construction works only) Profit and loss statement and Turnover certificate from Govt Reg Chartered Accountant with UDINFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneITT 3.3 - Each Tenderer should further demonstrate : (b) Liquid assets and /or availability of credit facilities of no less than Rs. 178.01 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (Bankers certificate issued by an nationalized /scheduled bank as prescribed in the kw4)OthersLine of credit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificatefrom CA with UDIN last 5 years TurnoverTrueTechnical Bid
Contractor Registration Sertificate Class 3 and above licenceTrueTechnical Bid
Work Done Certificate in last 5 years any one year Rs. 148.34 lakhs Road work from EE and above rankTrueTechnical Bid
Line of Credit Rs. 178.01 lakhsTrueTechnical Bid
Contractor contact details and sdrres and mobile numberTrueTechnical Bid
GST Certificate, Pan Card & Tin CertificateTrueTechnical Bid
Existing Commitments work details B-Value should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsMysuruHeggadadevanakoteNoneHEGGADADEVANAKOTEMullur Nugu dam RoadNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1709546235000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer PWD Dn Hunsur Near PWD IB
streetNone
cityHunsur
stateKarnataka
pin571105
tenderRecallDTONone