tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1709378356000 | 1 | None | None | Roads | Improvements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km) | 28387264.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888136 | 94527 | None | Item No 2.5 iiB, Page No 9 | Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 571.12 | 571.12 | 48.3 | False | None | None | False | None | False | 27585.096 | 0 | 2888137 | 94527 | None | Item No 3.5, Page No 17 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 7.08 | 7.08 | 2716.88 | False | None | None | False | None | False | 19235.5104 | 0 | 2888138 | 94527 | None | Item No:16.8(b), Page No: 144 Vol -3 | Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. b. Mechanical Means-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 29.5 | 29.5 | 2219.0 | False | None | None | False | None | False | 65460.5 | 0 | 2888139 | 94527 | None | Item No 1.7, Page No 7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 140.42 | 140.42 | 532.56 | False | None | None | False | None | False | 74782.0752 | 0 | 2888140 | 94527 | None | Item No 1.8, Page No 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 559.32 | 559.32 | 1799.95 | False | None | None | False | None | False | 1006748.034 | 0 | 2888141 | 94527 | None | Item No 3.6, Page No 17 | Construction of Subgrade and Earthen Shoulders. Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope
and compacted to meet requirement of table No. 300-2-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 581.74 | 581.74 | 6661.37 | False | None | None | False | None | False | 3875185.3838 | 0 | 2888142 | 94527 | None | Item No 4.2v, Page No 19 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 2783.62 | 2783.62 | 2252.8 | False | None | None | False | None | False | 6270939.136 | 0 | 2888143 | 94527 | None | Item No 4.17, Page No 24 | Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 3019.62 | 3019.62 | 2312.87 | False | None | None | False | None | False | 6983988.5094 | 0 | 2888144 | 94527 | None | Item No 5.1, Page No 31 | Prime Coat over WMM/WBM.Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 48.38 | 48.38 | 9010.0 | False | None | None | False | None | False | 435903.8 | 0 | 2888145 | 94527 | None | Item No 5.33, Page No 43 | Tack coat on Granular surface treated with primer :Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 17.7 | 17.7 | 9010.0 | False | None | None | False | None | False | 159477.0 | 0 | 2888146 | 94527 | None | Item No 5.13 C, Page No 36 | Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 11526.24 | 11526.24 | 450.5 | False | None | None | False | None | False | 5192571.12 | 0 | 2888147 | 94527 | None | Item No 5.17 C, Page No 38 | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 13387.1 | 13387.1 | 270.3 | False | None | None | False | None | False | 3618533.13 | 0 | 2888148 | 94527 | None | Item No 8.15, Page No 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 625.4 | 625.4 | 334.0 | False | None | None | False | None | False | 208883.6 | 0 | 2888149 | 94527 | None | Item No 8.43, Page No 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the
base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 430.7 | 430.7 | 380.0 | False | None | None | False | None | False | 163666.0 | 0 | 2888150 | 94527 | None | Item No 8.6 xv, Page No 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 7817.5 | 7817.5 | 2.0 | False | None | None | False | None | False | 15635.0 | 0 | 2888151 | 94527 | None | Item No 8.6 iv, Page No 64 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 4252.72 | 4252.72 | 8.0 | False | None | None | False | None | False | 34021.76 | 0 | 2888152 | 94527 | None | Item No 8.6 Viii, Page No 64 and 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm circular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 5131.82 | 5131.82 | 2.0 | False | None | None | False | None | False | 10263.64 | 0 | 2888153 | 94527 | None | Item No 8.6 Xii, Page No 64 and 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm x 45 cm rectangular-item are including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Nos | 5042.14 | 5042.14 | 4.0 | False | None | None | False | None | False | 20168.56 | 0 | 2888154 | 94527 | None | Item No 8.7, Page No 65 | Direction and Place Identification Signs upto 0.9 Sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 10631.8 | 10631.8 | 2.7 | False | None | None | False | None | False | 28705.86 | 0 | 2888155 | 94527 | None | Item No 8.4, Page No 63 | Printing New Letter and Figures of any Shade.Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman-item are including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Per cm Height Per Letter | 1.06 | 1.06 | 2000.0 | False | None | None | False | None | False | 2120.0 | 0 | 2888156 | 94527 | None | Item No 8.16 i, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 2888157 | 94527 | None | Item No 8.16 ii, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 3453.86 | 3453.86 | 2.0 | False | None | None | False | None | False | 6907.72 | 0 | 2888158 | 94527 | None | Item No 8.16 iii, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 993.56 | 993.56 | 7.0 | False | None | None | False | None | False | 6954.92 | 0 | 2888159 | 94527 | None | Item No 8.18, Page No 67 | Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 882.64 | 882.64 | 150.0 | False | None | None | False | None | False | 132396.0 | 0 | 2888160 | 94527 | None | Item No 1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 112.1 | 112.1 | 188.55 | False | None | None | False | None | False | 21136.455 | 0 |
| 1709378356000 | 1 | None | None | Roads | Construction of RCC Box Culverts | 1020014.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888161 | 94528 | None | Vol-III Item No 2.10 IV B, Page No 10 | Dismantling of Structures.Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry By Manual means Rubble stone masonry in cement mortar.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 719.8 | 719.8 | 11.02 | False | None | None | False | None | False | 7932.196 | 0 | 2888162 | 94528 | None | Vol-III Item No 2.17 B, Page No 11 | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Rmtr | 1293.28 | 1293.28 | 15.0 | False | None | None | False | None | False | 19399.2 | 0 | 2888163 | 94528 | None | Vol-I Item No 1.14.1, Page No 8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 120.36 | 120.36 | 132.21 | False | None | None | False | None | False | 15912.7956 | 0 | 2888164 | 94528 | None | Vol-I 2 Item No 2.1.3, Page No 1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 7067.02 | 7067.02 | 8.42 | False | None | None | False | None | False | 59504.3084 | 0 | 2888165 | 94528 | None | Vol-I Item No 2.4.3, Page No 16 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18% (Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 8971.78 | 8971.78 | 33.61 | False | None | None | False | None | False | 301541.5258 | 0 | 2888166 | 94528 | None | Vol-I Item No 2.5.2, Page No 16 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18%(Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 9689.69 | 9689.69 | 10.03 | False | None | None | False | None | False | 97187.5907 | 0 | 2888167 | 94528 | None | Vol-I Item No 2.11, Page No 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | MT | 93232.98 | 93232.98 | 4.56 | False | None | None | False | None | False | 425142.3888 | 0 | 2888168 | 94528 | None | Vol-I Item No 1.8, Page No 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 559.32 | 559.32 | 102.6 | False | None | None | False | None | False | 57386.232 | 0 | 2888169 | 94528 | None | Vol-II Item No 8.63, Page No 51 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 96.76 | 96.76 | 7.26 | False | None | None | False | None | False | 702.4776 | 0 | 2888170 | 94528 | None | Vol-III Item No 8.18, Page No 67 | Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | No | 882.64 | 882.64 | 40.0 | False | None | None | False | None | False | 35305.6 | 0 |
| 1709378356000 | 1 | None | None | Roads | Third year Maintenance of the Road | 72838.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888171 | 94529 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888172 | 94529 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888173 | 94529 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 |
| 1709378356000 | 1 | None | None | Roads | Fourth year Maintenance of the Road | 86580.19 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888174 | 94530 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888175 | 94530 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888176 | 94530 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 | 2888177 | 94530 | None | Item No:10.15(i), Page No: 93 Vol-3 | Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 310.34 | 310.34 | 44.28 | False | None | None | False | None | False | 13741.8552 | 0 |
| 1709378356000 | 1 | None | None | Roads | Fifth year Maintenance of the Road | 100318.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888178 | 94531 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888179 | 94531 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888180 | 94531 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 | 2888181 | 94531 | None | Item No:10.15(i), Page No: 93 Vol-3 | Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 310.34 | 310.34 | 88.55 | False | None | None | False | None | False | 27480.607 | 0 |
| 1709378504000 | 1 | None | None | Roads | Improvements to road from SH-154 To Join SH-86 Road Via Basthipura,Hootagalli,Belavadi,Rayanakaere,Udbur,Doora,Hullahalli,Hura,Mullur Beerval From Ch 65.10 to 70.50km in Sarguru Taluk Mysore District. (Working Ch 68.89 to 70.500km Total Length 1.610km) | 29667016.16 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2888451 | 94538 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888447 | 94538 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888444 | 94538 | None | Item No:2.5a, Page No: 9 Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. A)In area of light jungle (Item No.2.5(a) Pg No 9 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 463.74 | 463.74 | 48.3 | False | None | None | False | None | False | 22398.642 | 0 | 2888434 | 94538 | None | Vol-III Item No 2.10 IV B, Page No 10 | Dismantling of Structures.Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cementconcrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry By Manual means Rubble stone masonry in cement mortar.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 719.8 | 719.8 | 11.02 | False | None | None | False | None | False | 7932.196 | 0 | 2888409 | 94538 | None | Item No 2.5 iiB, Page No 9 | Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | 100 Sqm | 571.12 | 571.12 | 48.3 | False | None | None | False | None | False | 27585.096 | 0 | 2888445 | 94538 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888435 | 94538 | None | Vol-III Item No 2.17 B, Page No 11 | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Rmtr | 1293.28 | 1293.28 | 15.0 | False | None | None | False | None | False | 19399.2 | 0 | 2888452 | 94538 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888448 | 94538 | None | Item No:16.19, Page No: 147 Vol-3 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No.16.19 Pg No 147 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 7.08 | 7.08 | 3220.0 | False | None | None | False | None | False | 22797.6 | 0 | 2888410 | 94538 | None | Item No 3.5, Page No 17 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 7.08 | 7.08 | 2716.88 | False | None | None | False | None | False | 19235.5104 | 0 | 2888411 | 94538 | None | Item No:16.8(b), Page No: 144 Vol -3 | Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. b. Mechanical Means-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | m | 29.5 | 29.5 | 2219.0 | False | None | None | False | None | False | 65460.5 | 0 | 2888453 | 94538 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 | 2888449 | 94538 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 | 2888446 | 94538 | None | Item No 10.2, Page No 91 Vol 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Item No. 10.2 Pg No 91 Vol-3) Including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 114.46 | 114.46 | 241.5 | False | None | None | False | None | False | 27642.09 | 0 | 2888436 | 94538 | None | Vol-I Item No 1.14.1, Page No 8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 120.36 | 120.36 | 132.21 | False | None | None | False | None | False | 15912.7956 | 0 | 2888450 | 94538 | None | Item No:10.15(i), Page No: 93 Vol-3 | Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 310.34 | 310.34 | 44.28 | False | None | None | False | None | False | 13741.8552 | 0 | 2888454 | 94538 | None | Item No:10.15(i), Page No: 93 Vol-3 | Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15(i) Pg No 93 Vol-3) Including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 310.34 | 310.34 | 88.55 | False | None | None | False | None | False | 27480.607 | 0 | 2888412 | 94538 | None | Item No 1.7, Page No 7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 140.42 | 140.42 | 532.56 | False | None | None | False | None | False | 74782.0752 | 0 | 2888437 | 94538 | None | Vol-I 2 Item No 2.1.3, Page No 1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 7067.02 | 7067.02 | 8.42 | False | None | None | False | None | False | 59504.3084 | 0 | 2888438 | 94538 | None | Vol-I Item No 2.4.3, Page No 16 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18% (Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 8971.78 | 8971.78 | 33.61 | False | None | None | False | None | False | 301541.5258 | 0 | 2888413 | 94538 | None | Item No 1.8, Page No 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 559.32 | 559.32 | 1799.95 | False | None | None | False | None | False | 1006748.034 | 0 | 2888439 | 94538 | None | Vol-I Item No 2.5.2, Page No 16 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates-item are including GST 18%(Including Formwork for Culvert 20%) ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 9689.69 | 9689.69 | 10.03 | False | None | None | False | None | False | 97187.5907 | 0 | 2888414 | 94538 | None | Item No 3.6, Page No 17 | Construction of Subgrade and Earthen Shoulders. Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope
and compacted to meet requirement of table No. 300-2-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 581.74 | 581.74 | 6661.37 | False | None | None | False | None | False | 3875185.3838 | 0 | 2888440 | 94538 | None | Vol-I Item No 2.11, Page No 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | MT | 93232.98 | 93232.98 | 4.56 | False | None | None | False | None | False | 425142.3888 | 0 | 2888415 | 94538 | None | Item No 4.2v, Page No 19 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 2783.62 | 2783.62 | 2252.8 | False | None | None | False | None | False | 6270939.136 | 0 | 2888441 | 94538 | None | Vol-I Item No 1.8, Page No 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 559.32 | 559.32 | 102.6 | False | None | None | False | None | False | 57386.232 | 0 | 2888416 | 94538 | None | Item No 4.17, Page No 24 | Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 3019.62 | 3019.62 | 2312.87 | False | None | None | False | None | False | 6983988.5094 | 0 | 2888442 | 94538 | None | Vol-II Item No 8.63, Page No 51 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 96.76 | 96.76 | 7.26 | False | None | None | False | None | False | 702.4776 | 0 | 2888417 | 94538 | None | Item No 5.1, Page No 31 | Prime Coat over WMM/WBM.Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 48.38 | 48.38 | 9010.0 | False | None | None | False | None | False | 435903.8 | 0 | 2888443 | 94538 | None | Vol-III Item No 8.18, Page No 67 | Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | No | 882.64 | 882.64 | 40.0 | False | None | None | False | None | False | 35305.6 | 0 | 2888418 | 94538 | None | Item No 5.33, Page No 43 | Tack coat on Granular surface treated with primer :Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 17.7 | 17.7 | 9010.0 | False | None | None | False | None | False | 159477.0 | 0 | 2888419 | 94538 | None | Item No 5.13 C, Page No 36 | Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 11526.24 | 11526.24 | 450.5 | False | None | None | False | None | False | 5192571.12 | 0 | 2888420 | 94538 | None | Item No 5.17 C, Page No 38 | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 13387.1 | 13387.1 | 270.3 | False | None | None | False | None | False | 3618533.13 | 0 | 2888421 | 94538 | None | Item No 8.15, Page No 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 625.4 | 625.4 | 334.0 | False | None | None | False | None | False | 208883.6 | 0 | 2888422 | 94538 | None | Item No 8.43, Page No 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the
base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 430.7 | 430.7 | 380.0 | False | None | None | False | None | False | 163666.0 | 0 | 2888423 | 94538 | None | Item No 8.6 xv, Page No 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 7817.5 | 7817.5 | 2.0 | False | None | None | False | None | False | 15635.0 | 0 | 2888424 | 94538 | None | Item No 8.6 iv, Page No 64 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 4252.72 | 4252.72 | 8.0 | False | None | None | False | None | False | 34021.76 | 0 | 2888425 | 94538 | None | Item No 8.6 Viii, Page No 64 and 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm circular-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 5131.82 | 5131.82 | 2.0 | False | None | None | False | None | False | 10263.64 | 0 | 2888426 | 94538 | None | Item No 8.6 Xii, Page No 64 and 65 | Retro-Reflectorised Traffic Signs.Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm x 45 cm rectangular-item are including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Nos | 5042.14 | 5042.14 | 4.0 | False | None | None | False | None | False | 20168.56 | 0 | 2888427 | 94538 | None | Item No 8.7, Page No 65 | Direction and Place Identification Signs upto 0.9 Sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Sqm | 10631.8 | 10631.8 | 2.7 | False | None | None | False | None | False | 28705.86 | 0 | 2888428 | 94538 | None | Item No 8.4, Page No 63 | Printing New Letter and Figures of any Shade.Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman-item are including GST 18%
---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Per cm Height Per Letter | 1.06 | 1.06 | 2000.0 | False | None | None | False | None | False | 2120.0 | 0 | 2888429 | 94538 | None | Item No 8.16 i, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 2888430 | 94538 | None | Item No 8.16 ii, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 3453.86 | 3453.86 | 2.0 | False | None | None | False | None | False | 6907.72 | 0 | 2888431 | 94538 | None | Item No 8.16 iii, Page No 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 993.56 | 993.56 | 7.0 | False | None | None | False | None | False | 6954.92 | 0 | 2888432 | 94538 | None | Item No 8.18, Page No 67 | Boundary pillar.Reinforced cement concrete M15 grade boundary pillars ofstandard design as per IRC:25, fixed in position including finishing and lettering but excluding painting-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Each | 882.64 | 882.64 | 150.0 | False | None | None | False | None | False | 132396.0 | 0 | 2888433 | 94538 | None | Item No 1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-item are including GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST) | Cum | 112.1 | 112.1 | 188.55 | False | None | None | False | None | False | 21136.455 | 0 |
|
|
---|