createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709631319095
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4200.00
emd252000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-03-2024 16:00:00
tenderQueryClose12-03-2024 16:00:00
technicalBidOpen14-03-2024 16:30:00
publishedDate06-03-2024 11:57:05
publishedByPostPWD_EE_DIV_HSPT
publishedByUserKPE10175 - RAVINDRA R KATTI
bidValidityPeriod90
noOfCalls1
preBidMeetingDate12-03-2024 10:30:30
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee152000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber080394200231
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709631319133
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9093
titleConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.
descriptionConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.
categoryWORKS
categoryTextWorks
ecv16797430.40
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1694
locationNamePWD Division Office Hosapete
provisionalAmount20000000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/HPH/KKRDB/MACRO/CHIGATERIBRIDGE/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17096313190001NoneNoneRoadsConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.( Rigid pavement)- General Works9972677.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
291982796141NoneCOMMON SR 2023-24, Vol-3 Sl.No. 2.5 (ii).A, P.No 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer (A) In area of light jungle100 Sqm412.65412.6567.2FalseNoneNoneFalseNoneFalse27730.080
291982896141NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.1693.0FalseNoneNoneFalseNoneFalse74220.30
291982996141NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.7940.5FalseNoneNoneFalseNoneFalse468086.850
291983096141NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 percent per cum for every 1.50 m heightCum522.59522.593276.58FalseNoneNoneFalseNoneFalse1712307.94220
291983196141NoneCOMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 305Cum517.65517.65880.87FalseNoneNoneFalseNoneFalse455982.35550
291983296141NoneCOMMON SR 2023-24,Vol-3 Sl.No.4.1.A.(v) ,P.No -23Granular Sub-Base A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V MaterialCum2611.352611.35591.74FalseNoneNoneFalseNoneFalse1545240.2490
291983396141NoneCOMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying inCum2686.952686.95607.49FalseNoneNoneFalseNoneFalse1632295.25550
291983496141NoneCOMMON SR 2021-22, Vol-3 Sl.No.16.28 ,P.No - 149Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in charge of the workCum7091.77091.7472.51FalseNoneNoneFalseNoneFalse3350899.1670
291983596141NonePWD SR 2023-24, Vol-3 Page No.78 Item No.8.53Providing & fixing Polymer rubberised factory made Black & Yellow coloured Speed retarders/Breakers with width 350mm & Height 50mm as per IRC 99:2018 with load carrying capacity upto 30t in local streets, parking arena and in areas with speed limit of 20 kmph as per direction of Engineer in-charge.m945.0945.09.0FalseNoneNoneFalseNoneFalse8505.00
291983696141NoneCOMMON SR 2023-24, Vol-3, SL.NO. 8.25, P.NO.69Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811m3822.03822.0180.0FalseNoneNoneFalseNoneFalse687960.00
291983796141NoneCOMMON SR 2023-24, Vol-3, SL.NO. 8.54, P.NO.78Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
17096313190001NoneNoneRoadsConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.(Box culvert)-General Works3764888.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
291983896142NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.1222.39FalseNoneNoneFalseNoneFalse23817.9690
291983996142NoneCOMMON SR 2023-24,Vol-2 P.NO -175, SI.No -17.1Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-chargeCum1052.11052.113.54FalseNoneNoneFalseNoneFalse14245.4340
291984096142NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.713.54FalseNoneNoneFalseNoneFalse6738.8580
291984196142NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4521.34FalseNoneNoneFalseNoneFalse134195.5230
291984296142NoneCOMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6639.26639.215.51FalseNoneNoneFalseNoneFalse102973.9920
291984396142NoneCommon SR 2023-24 volume-1 Pg No:112 SI.No.6Appendix I Additionalities for Formwork, Centering and Scaffolding Bridges Box Culvert 20percentCum1327.841327.8415.51FalseNoneNoneFalseNoneFalse20594.79840
291984496142NoneCOMMON SR 2023-24 Vol-3, P.NO -130, SL No -14.8.BCurtain wall complete as per drawing and Technical specification Cement concrete Grade M15 2507.2Cum6555.26555.218.01FalseNoneNoneFalseNoneFalse118059.1520
291984596142NoneCOMMON SR 2018-19 Sl.No. 14.1 , P.No 129Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40kg each complete as per drawing and Technical specification. 2503Cum2007.62007.615.39FalseNoneNoneFalseNoneFalse30896.9640
291984696142NoneCOMMON SR 2018-19 Sl.No. 14.9 , P.No 130Flexible Apron : Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. 2507.2Cum2151.452151.4538.48FalseNoneNoneFalseNoneFalse82787.7960
291984796142NoneCOMMON SR 2023-24, Vol-1, Sl.No.2.5.2, P.No 17Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1581.03FalseNoneNoneFalseNoneFalse582212.70450
291984896142NoneCommon SR 2023-24 volume-1 Pg No:112 SI.No.6Addendum I Additionalities for Formwork, Centering & Scaffolding -Bridges-Box Culvert 20%Cum1437.031437.0381.03FalseNoneNoneFalseNoneFalse116442.54090
291984996142NoneCOMMON SR 2023-24, Vol-1, Sl.No.2.5.2, P.No 17Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1573.9FalseNoneNoneFalseNoneFalse530982.5850
291985096142NoneCommon SR 2023-24 volume-1 Pg No:112 SI.No.11Appendix I Additionalities for Formwork, Centering & Scaffolding - Earth Retaining structures 10% For Retaining WallCum718.51718.5173.9FalseNoneNoneFalseNoneFalse53097.8890
291985196142NoneCOMMON SR 2023-24 Vol-3 P.NO -123, SI.No -13.13.AProvision of an Reinforced cement concrete crash barrier at the bridge deck & approaches to bridge structure, constructed withReinforced cement concrete with TMT reinforcement conforming to MORT&H specificatios and as per details given in IRC-5 including dowel bars, 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the and approved drawing and at locations directed by the Engineer,all as specified Crash Barrier for Bridges (Height 950 mm) as per details given IRC-5 (fig-1) (Area 0.254 m2 for 1 m length)m4376.44376.442.52FalseNoneNoneFalseNoneFalse186084.5280
291985296142NoneCOMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11 cSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Tonne90754.790754.75.88FalseNoneNoneFalseNoneFalse533637.6360
291985396142NoneCOMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11 dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Tonne90990.990990.95.88FalseNoneNoneFalseNoneFalse535026.4920
291985496142NoneCOMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. 710.1.4.of IRC:78 and 2200Cum2810.92810.945.93FalseNoneNoneFalseNoneFalse129104.6370
291985596142NoneCOMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.3.ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A Granular material 710.1.4.of IRC:78 &2200Cum1226.41226.4116.42FalseNoneNoneFalseNoneFalse142777.4880
291985696142NoneCOMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No 23Granular Sub-Base A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V MaterialCum2611.352611.359.49FalseNoneNoneFalseNoneFalse24781.71150
291985796142NoneCOMMON SR 2023-24,Vol-3 P.NO -121, SI.No -13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification 2700Cum7151.557151.557.59FalseNoneNoneFalseNoneFalse54280.26450
291985896142NoneCOMMON SR 2023-24 Vol-3, P.NO -122, SI.No -13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) 1500, 1600, 1700 & 2704Cum12426.812426.815.18FalseNoneNoneFalseNoneFalse188638.8240
291985996142NoneCOMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.1Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. 2706 & 2200m144.9144.970.0FalseNoneNoneFalseNoneFalse10143.00
291986096142NoneCOMMON SR 2023-24 Vol-3, P.NO -121, SI.No -13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification 2705Nos3434.553434.558.0FalseNoneNoneFalseNoneFalse27476.40
291986196142NoneCOMMON SR 2023-24 Vol-3 Page No.123 SI.No.13.14Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. 800Sqm88.288.2103.96FalseNoneNoneFalseNoneFalse9169.2720
291986296142NoneCOMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding paintingEach679.35679.3540.0FalseNoneNoneFalseNoneFalse27174.00
291986396142NoneVol-5, P.NO -120, SL. No -10.14.16Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. (COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14.16) 75mm(weight of pipe -0.917 kg) m255.15255.15120.0FalseNoneNoneFalseNoneFalse30618.00
291986496142NoneVolume-3 Page No. 61 Item No. 8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (COMMON SR 2023-24 Volume-3 Page No. 61 Item No. 8.29) m2322.62322.610.0FalseNoneNoneFalseNoneFalse23226.00
291986596142NoneVol-2, SL.NO. 11.25.2, P.NO.84Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. (COMMON SR 2023-24, Vol-2, SL.NO. 11.25.2, P.NO.84) Kg142.8142.8180.0FalseNoneNoneFalseNoneFalse25704.00
17096313190000NoneNoneRoadsConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.(CC Drain)-GENERAL Works1562560.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
291986696143NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.1264.0FalseNoneNoneFalseNoneFalse28274.40
291986796143NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4533.0FalseNoneNoneFalseNoneFalse207518.850
291986896143NoneCOMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6639.156639.1592.4FalseNoneNoneFalseNoneFalse613457.460
291986996143NoneCommon SR 2023-24 Vol-1 Pg-111 Sl no 435percent formwork for Cement Concrete Drain Walls as per corregendan 3Cum2323.712323.7192.4FalseNoneNoneFalseNoneFalse214710.8040
291987096143NoneCOMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structuresTonne82961.5582961.556.01FalseNoneNoneFalseNoneFalse498598.91550
17096313190000NoneNoneRoadsConstruction of CC Road and Bridge from Myduru road to PU College at Chigateri Village in Harapanahalli Taluk, Vijayangara District.(Toe wall and pitching)-TSP Works1497304.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
291987196144NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.189.1FalseNoneNoneFalseNoneFalse9542.610
291987296144NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4518.45FalseNoneNoneFalseNoneFalse116021.90250
291987396144NonePWD SR 2023-24, Vol-1 Sl.No.2.2.1 ,P.No - 15Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20mm nominal size graded crushed coarse aggregatesCum6601.356601.35112.73FalseNoneNoneFalseNoneFalse744170.18550
291987496144NoneCommon SR 2023-24 Vol-1 Pg-112 Sl no-11Earth retaining structures 10percentCum660.13660.13112.73FalseNoneNoneFalseNoneFalse74416.45490
291987596144NonePWD SR 2023-24, Vol-3, It.No 14.5, P.No 129Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specificationCum3188.03188.052.25FalseNoneNoneFalseNoneFalse166573.00
291987696144NonePWD SR 2023-24, Vol-3, It.No 14.4.A, P.No 129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/BoulderCum2008.02008.0192.52FalseNoneNoneFalseNoneFalse386580.160
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17096313220000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17096313220000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17096313220001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17096314300000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17096314350000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17096314390000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17096314420000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17096314460000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17096314500000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid. The Original Certificate/Certificates shall be produced at the time of opening of technical Bids for physical verification.None
17096314540000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year(both days inclusive).None
17096314580000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17096314620000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17096314660000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reason.None
17096314700000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KPP-PortalNone
17096314760000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17096314810000NoneNoneELIGIBILITYThe rates of all the items appeared in Bill of Quantities are inclusive of all leads and liftsNone
17096314850000NoneNoneELIGIBILITYAs per circular of Govt. of Karnataka Government Order No. PWD 107 CRM 2013, Bangalore, Dated: 20.02.2014, If the tenderer uploads the Bank Guarantee, but does not produce original at the time of technical scrutiny, such tenders will not be disqualified either in the technical bid stage or financial bid stage. But the qualified tenderer (L1) must submit the original copy of the BG at the time of agreement.None
17096314900000NoneNoneELIGIBILITYThe contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules and any modifications before and after execution of agreementNone
17096314940000NoneNoneELIGIBILITYAfter the award of the contract, the contractor has to furnish the details in respect of labour employed and the EPF details for this work in every RA bill.None
17096315010000NoneNoneELIGIBILITYBidders are advised to note that, 18% GST will be added to the contract amount.None
17096315060000NoneNoneELIGIBILITYThe Increse in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17096315110000NoneNoneELIGIBILITYThe bidder should mention the UDIN No on the turnover certificate, failing which bid is rejected.None
17096315160000NoneNoneELIGIBILITYIf the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.None
17096315210000NoneNoneELIGIBILITYThe star rates inrespect of specified materials ( Cement, Steel and Bitumen) shall be payable as per CIRCULAR NO.PWD 159 CRM 2009 Bangalore Dated 30.09.2010None
17096315280000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next section.None
17096315380000NoneNoneELIGIBILITYThe work should be completed in 09(Nine) Months ( including monsoon)None
17096315420000NoneNoneELIGIBILITYThe earnest money deposit shall be in two parts i.e.,Part (1) Rs.1,00,000 by e.payment and balance Part (2) Rs. Balance amount as specified in the KPP portal shall be in the form of Bank Guarantee in the prescribed format obtained from the Nationalized / Schedule Bank FDR or specified small savings instrument pledged to the Executive Engineer, Public Works Department Division, HOSAPETE payable at HOSAPETE before the prescribed date and time of opening of Technical Bid without failNone
17096316190000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalid thereof shall be referred and settled under the Arbitration centre Karnataka (Domastic and international Rules 2012,by one or more arbitratiors appointed in accordance with its rulesNone
17096316240000NoneNoneELIGIBILITYThe deffect liability period is one year from the date of actual completion of work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21 2021-22 & 2022-23 b) Satisfactorily completed, as prime contractor, at least one similar work such as Bridge Work of value not less than Rs. 83.98LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21 2021-22 & 2022-23 b) Executed in any one year, the following minimum quantities of work: 1 Earth work /Embankment/Sub Grade/Shoulder 5105.00Cum 2 GSB 482.00 Cum 3.CC/PCC/RCC/DLC 792.00 Cum 4.WMM/WBM 487.00 Cum 5.Steel 14.36 TonnesPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneRegistration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21 2021-22 & 2022-23 a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.335.95LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs.60.00 lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etcFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Registration CertificateTrueTechnical Bid
Annual Turnover Certificate Not below the rank of Charterd Accountant,The bidder should mention the UDIN NoTrueTechnical Bid
Single Work Done Certificate Not Below the rank of Executive EngineerTrueTechnical Bid
Quantity Wise Work Done CertificateTrueTechnical Bid
Liquid AssetsTrueTechnical Bid
GST CERTIFICATETrueTechnical Bid
Principal Place of Business.TrueTechnical Bid
Tender Bid CapacityTrueTechnical Bid
List of Existing commitments & Ongoing works- Format-5TrueTechnical Bid
List of works for which tenders acceptence letter received-Format-6TrueTechnical Bid
List of works for which tenders already submitted-Format-7TrueTechnical Bid
Profit and loss ac & Balance sheets for 5 yearsTrueTechnical Bid
Income Tax returns for 5 yearsTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsVijayanagaraHarapanahalliDavangereHARAPANAHALLI (SC)Chigateri VillageNoneNoneNoneNoneNoneNone
RoadsVijayanagaraHarapanahalliDavangereHARAPANAHALLI (SC)Chigateri villageNoneNoneNoneNoneNoneNone
RoadsVijayanagaraHarapanahalliDavangereHARAPANAHALLI (SC)Chigateri villageNoneNoneNoneNoneNoneNone
RoadsVijayanagaraHarapanahalliDavangereHARAPANAHALLI (SC)Chigateri villageNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1709633211000
version0
createdDateNone
modifiedDateNone
blockNumberOffice Of the Executive Engineer, PWD Division, 100 bed Hospital road, Hosapete
streetNone
cityHosapete
stateKarnataka
pin583201
tenderRecallDTONone