| 1709213921000 | 0 | None | None | Buildings | Construction of compund wall at swm in huliyar t.p limit | 1709383.54 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 2864584 | 93189 | None | tphyra1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m | Cum | 105.06 | 105.06 | 79.31 | False | None | None | False | None | False | 8332.3086 | 0 | | 2864585 | 93189 | None | tphyra2 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.
In all kinds of soils Depth upto 1.5 m | Cum | 249.26 | 249.26 | 26.44 | False | None | None | False | None | False | 6590.4344 | 0 | | 2864586 | 93189 | None | tphyra3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.
Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates | Cum | 6168.67 | 6168.67 | 21.15 | False | None | None | False | None | False | 130467.3705 | 0 | | 2864587 | 93189 | None | tphyra4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) | Cum | 6580.67 | 6580.67 | 101.52 | False | None | None | False | None | False | 668069.6184 | 0 | | 2864588 | 93189 | None | tphyra5 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.
Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6596.12 | 6596.12 | 13.54 | False | None | None | False | None | False | 89311.4648 | 0 | | 2864589 | 93189 | None | tphyra6 | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
All other type of structures | Tonne | 81381.33 | 81381.33 | 1.1 | False | None | None | False | None | False | 89519.463 | 0 | | 2864590 | 93189 | None | tphyra7 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications | Sqm | 1267.93 | 1267.93 | 394.8 | False | None | None | False | None | False | 500578.764 | 0 | | 2864591 | 93189 | None | tphyra8 | Distempering with dry distemper of approved brand and manufacture (two coats) of required shade on new work, over and including water thinnable priming coat to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 111.24 | 111.24 | 977.6 | False | None | None | False | None | False | 108748.224 | 0 | | 2864592 | 93189 | None | tphyra9 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. | Kgs | 140.08 | 140.08 | 750.0 | False | None | None | False | None | False | 105060.0 | 0 | | 2864593 | 93189 | None | tphyra10 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied at 0.90L/10 Sqm over an under coat of primer applied at 0.80 L/10 Sqm of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 143.17 | 143.17 | 18.9 | False | None | None | False | None | False | 2705.913 | 0 |
|