1709366793000 | 0 | None | None | Buildings | Construction of 10 Class Rooms at Government High School in Devalapura Village, Ballari and District Taluk, Under NABARD RIDF-28 for the year 2022-23. | 14927082.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2882806 | 94273 | None | 1.15.2 | In ordinary/soft rock without blasting. Depth exceeding 1.5 m, but not exceeding 3 m Note: Cost of De-watering upto 7.5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition (COMMON SR, Vol-1, 2023-24, SL.No. 1.15.2, P. No.9). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 446.25 | 446.25 | 1200.0 | False | None | None | False | None | False | 535500.0 | 0 | 2882807 | 94273 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( SR 2023-24 / Item No : 1.14.1 , Page No : 8 Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 399.56 | False | None | None | False | None | False | 42792.876 | 0 | 2882808 | 94273 | None | 2.1.3 | P/L PCC of mix 1:3:6 (M 10) : Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 30.99 | False | None | None | False | None | False | 194879.0655 | 0 | 2882809 | 94273 | None | 5.3 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)) (COMMON SR 2023-24,Vol-2, SL.No. 5.3, p. No.9). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6515.25 | 6515.25 | 57.15 | False | None | None | False | None | False | 372346.5375 | 0 | 2882810 | 94273 | None | 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) (SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6708.45 | 6708.45 | 33.22 | False | None | None | False | None | False | 222854.709 | 0 | 2882811 | 94273 | None | 8.3.1 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24, Vol-2,SL.No. 8.3.1, P. No.41). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 371.7 | 371.7 | 95.48 | False | None | None | False | None | False | 35489.916 | 0 | 2882812 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1) Footing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 19.66 | False | None | None | False | None | False | 130794.048 | 0 | 2882813 | 94273 | None | code08 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22 , Appendix 1 , Page No : 115, Vol 1) Percentage on finished rate of concrete per m3 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 532.22 | 532.22 | 19.66 | False | None | None | False | None | False | 10463.4452 | 0 | 2882814 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Combined Footing, SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 36.04 | False | None | None | False | None | False | 239766.912 | 0 | 2882815 | 94273 | None | code10 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22 , Appendix 1 , Page No: 115, Vol 1) Percentage on finished rate of concrete per m3, 3% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 199.58 | 199.58 | 36.04 | False | None | None | False | None | False | 7192.8632 | 0 | 2882816 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Columns upto Plinth Beam Bottom. SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 6.93 | False | None | None | False | None | False | 46103.904 | 0 | 2882817 | 94273 | None | code12 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22, Appendix 1, Page No: 115, Vol 1) Percentage on finished rate of concrete per m3, 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4656.96 | 4656.96 | 6.93 | False | None | None | False | None | False | 32272.7328 | 0 | 2882818 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Plinth Beam. SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 20.15 | False | None | None | False | None | False | 134053.92 | 0 | 2882819 | 94273 | None | code14 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22, Appendix 1, Page No : 115, Vol 1) Percentage on finished rate of concrete per m3, 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3326.4 | 3326.4 | 20.15 | False | None | None | False | None | False | 67026.96 | 0 | 2882820 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 10.14 | False | None | None | False | None | False | 72857.421 | 0 | 2882821 | 94273 | None | code16 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22, Appendix 1, Page No :115 , Vol 1) Percentage on finished rate of concrete per m3, 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5029.61 | 5029.61 | 10.14 | False | None | None | False | None | False | 51000.2454 | 0 | 2882822 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : RCC Lintel. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 5.35 | False | None | None | False | None | False | 38440.5525 | 0 | 2882823 | 94273 | None | code18 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22, Appendix 1, Page No :115, Vol 1) Percentage on finished rate of concrete per m3, 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4311.09 | 4311.09 | 5.35 | False | None | None | False | None | False | 23064.3315 | 0 | 2882824 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Roof Beam. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 21.99 | False | None | None | False | None | False | 158001.4485 | 0 | 2882825 | 94273 | None | code20 | Additionalities for Formwork, Centering & Scaffolding (SR 2021-22, Appendix 1, Page No: 115, Vol 1) Percentage on finished rate of concrete per m3, 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4311.09 | 4311.09 | 21.99 | False | None | None | False | None | False | 94800.8691 | 0 | 2882826 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Roof Slab. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 52.19 | False | None | None | False | None | False | 374992.9785 | 0 | 2882827 | 94273 | None | code22 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3592.58 | 3592.58 | 52.19 | False | None | None | False | None | False | 187496.7502 | 0 | 2882828 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : For Staircase. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 2.54 | False | None | None | False | None | False | 18250.281 | 0 | 2882829 | 94273 | None | code24 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3592.58 | 3592.58 | 2.54 | False | None | None | False | None | False | 9125.1532 | 0 | 2882830 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Chejja for windows & Ventilators. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 1.56 | False | None | None | False | None | False | 11208.834 | 0 | 2882831 | 94273 | None | code26 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3233.32 | 3233.32 | 1.56 | False | None | None | False | None | False | 5043.9792 | 0 | 2882832 | 94273 | None | 2.1.4 | P/L PCC works M10 for Cill Concrete : Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the\ work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.1.4 , Page No : 15 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6527.85 | 6527.85 | 3.12 | False | None | None | False | None | False | 20366.892 | 0 | 2882833 | 94273 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 93929.85 | 93929.85 | 19.71 | False | None | None | False | None | False | 1851357.3435 | 0 | 2882834 | 94273 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 119.39 | False | None | None | False | None | False | 33345.627 | 0 | 2882835 | 94273 | None | 2.1.3 | P/L Floor Bed PCC of mix 1:3:6 (M 10) : Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 36.06 | False | None | None | False | None | False | 226761.507 | 0 | 2882836 | 94273 | None | 6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8376.9 | 8376.9 | 109.17 | False | None | None | False | None | False | 914506.173 | 0 | 2882837 | 94273 | None | 6.13 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1024.8 | 1024.8 | 56.79 | False | None | None | False | None | False | 58198.392 | 0 | 2882838 | 94273 | None | 11.5.2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24 Ballari Circle Item No.11.5.2., Page No.77 vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4454.1 | 4454.1 | 55.12 | False | None | None | False | None | False | 245509.992 | 0 | 2882839 | 94273 | None | 12.93.1 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm (PWD SR 2023-24 Ballari Circle Item No.12.93.1., Page No.111 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 737.1 | 737.1 | 18.0 | False | None | None | False | None | False | 13267.8 | 0 | 2882840 | 94273 | None | 12.94.1 | Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness (PWD SR 2023-24 Ballari Circle Item No.12.94.1., Page No.112 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 3659.25 | 3659.25 | 4.72 | False | None | None | False | None | False | 17271.66 | 0 | 2882841 | 94273 | None | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size-1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (PWD SR 2023-24 Ballari Circle Item No.12.85, Page No.109 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 4.5 | False | None | None | False | None | False | 27022.275 | 0 | 2882842 | 94273 | None | 11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD SR 2021-22 Ballari Circle Item No.11.34B, Page No.85 Vol 2) Co-efficient 21 Kg / Sqm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 192.15 | 192.15 | 793.8 | False | None | None | False | None | False | 152528.67 | 0 | 2882843 | 94273 | None | 8.1.2 | Providing 12 mm cement plaster ( Internal ) : Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.1.2, Page No.41 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 253.05 | 253.05 | 1017.04 | False | None | None | False | None | False | 257361.972 | 0 | 2882844 | 94273 | None | 8.8 | Providing 18 mm cement plaster ( External ): Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.8, Page No.42 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 389.55 | 389.55 | 413.93 | False | None | None | False | None | False | 161246.4315 | 0 | 2882845 | 94273 | None | 9.12.2 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm (PWD SR 2023-24 Ballari Circle Item No.9.12.2, Page No.60 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1202.25 | 1202.25 | 369.14 | False | None | None | False | None | False | 443798.565 | 0 | 2882846 | 94273 | None | 9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (PWD SR 2023-24 Ballari Circle Item No.9.38, Page No.65 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1461.6 | 1461.6 | 24.13 | False | None | None | False | None | False | 35268.408 | 0 | 2882847 | 94273 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. (PWD SR 2023-24 Ballari Circle Item No.9.11, Page No.60 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 933.45 | 933.45 | 25.29 | False | None | None | False | None | False | 23606.9505 | 0 | 2882848 | 94273 | None | 10.14 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD SR 2023-24 Ballari Circle Item No.10.14, Page No.71 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1161.3 | 1161.3 | 57.0 | False | None | None | False | None | False | 66194.1 | 0 | 2882849 | 94273 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (SR 2023-24 Ballari Circle Item No.8.51, Page No.50 Vol 2), Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 1017.04 | False | None | None | False | None | False | 106789.2 | 0 | 2882850 | 94273 | None | 8.54.2 | Internal Wall painting with premium acrylic emulsion paint : Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. (SR 2023-24 Ballari Circle Item No.8.54.2, Page No.50 Vol 2) : Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 115.5 | 115.5 | 1017.04 | False | None | None | False | None | False | 117468.12 | 0 | 2882851 | 94273 | None | 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(SR 2023-24 Ballari Circle Item No.8.27, Page No.45 Vol 2) : Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 55.65 | 55.65 | 1017.04 | False | None | None | False | None | False | 56598.276 | 0 | 2882852 | 94273 | None | 8.27 | Qty as same as external plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 55.65 | 55.65 | 413.93 | False | None | None | False | None | False | 23035.2045 | 0 | 2882853 | 94273 | None | 8.28 | External Painting with water proofing cement paint : Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Ballari Circle Item No.8.28, Page No.45 Vol 2) Quantity same as External Plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 93.45 | 93.45 | 413.93 | False | None | None | False | None | False | 38681.7585 | 0 | 2882854 | 94273 | None | 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.41, Page No.48 vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 175.35 | 175.35 | 85.95 | False | None | None | False | None | False | 15071.3325 | 0 | 2882855 | 94273 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ( SR 2023-24 / Item No : 8.29 , Page No : 45 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 297.15 | 297.15 | 180.0 | False | None | None | False | None | False | 53487.0 | 0 | 2882856 | 94273 | None | 8.49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.49 Page No.49 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 4.2 | 4.2 | 2000.0 | False | None | None | False | None | False | 8400.0 | 0 | 2882857 | 94273 | None | 11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. (PWD SR 2023-24 Ballari Circle Item No.11.25.2, Page No.84 Vol 2) Co-efficient 12 Kg / Sqm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 142.8 | 142.8 | 162.0 | False | None | None | False | None | False | 23133.6 | 0 | 2882858 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 10.97 | False | None | None | False | None | False | 79609.29 | 0 | 2882859 | 94273 | None | code02 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5079.9 | 5079.9 | 10.97 | False | None | None | False | None | False | 55726.503 | 0 | 2882860 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : RCC Lintel. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 5.84 | False | None | None | False | None | False | 42380.88 | 0 | 2882861 | 94273 | None | code04 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4354.2 | 4354.2 | 5.84 | False | None | None | False | None | False | 25428.528 | 0 | 2882862 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Roof Beam. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 23.03 | False | None | None | False | None | False | 167128.71 | 0 | 2882863 | 94273 | None | code06 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4354.2 | 4354.2 | 23.03 | False | None | None | False | None | False | 100277.226 | 0 | 2882864 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Roof Slab. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 54.32 | False | None | None | False | None | False | 394200.24 | 0 | 2882865 | 94273 | None | code08 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3628.5 | 3628.5 | 54.32 | False | None | None | False | None | False | 197100.12 | 0 | 2882866 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : For Staircase. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 2.54 | False | None | None | False | None | False | 18432.78 | 0 | 2882867 | 94273 | None | code10 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3628.5 | 3628.5 | 2.54 | False | None | None | False | None | False | 9216.39 | 0 | 2882868 | 94273 | None | 2.5.2 | P/ L RCC works M25 for Super structures : Chejja for windows & Ventilators. SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 1.17 | False | None | None | False | None | False | 8490.69 | 0 | 2882869 | 94273 | None | code12 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3, 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3265.65 | 3265.65 | 1.17 | False | None | None | False | None | False | 3820.8105 | 0 | 2882870 | 94273 | None | 2.1.4 | P/L PCC works M10 for Cill Concrete : Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the\ work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.1.4 , Page No : 15 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6593.13 | 6593.13 | 3.35 | False | None | None | False | None | False | 22086.9855 | 0 | 2882871 | 94273 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 94869.15 | 94869.15 | 12.28 | False | None | None | False | None | False | 1164993.162 | 0 | 2882872 | 94273 | None | 6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8460.67 | 8460.67 | 94.47 | False | None | None | False | None | False | 799279.4949 | 0 | 2882873 | 94273 | None | 6.13 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1035.05 | 1035.05 | 108.75 | False | None | None | False | None | False | 112561.6875 | 0 | 2882874 | 94273 | None | 11.5.2 | Providing and fixing M.S.Sheet door & Window shutter With Frame : Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24 Ballari Circle Item No.11.5.2., Page No.77 vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4498.64 | 4498.64 | 56.52 | False | None | None | False | None | False | 254263.1328 | 0 | 2882875 | 94273 | None | 11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD SR 2021-22 Ballari Circle Item No.11.34B, Page No.85 Vol 2) Co-efficient 21 Kg / Sqm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 194.07 | 194.07 | 869.4 | False | None | None | False | None | False | 168724.458 | 0 | 2882876 | 94273 | None | 8.1.2 | Providing 12 mm cement plaster ( Internal ): Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.1.2, Page No.41 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 255.58 | 255.58 | 922.82 | False | None | None | False | None | False | 235854.3356 | 0 | 2882877 | 94273 | None | 8.8 | Providing 18 mm cement plaster ( External ) : Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.8, Page No.42 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 393.45 | 393.45 | 606.02 | False | None | None | False | None | False | 238438.569 | 0 | 2882878 | 94273 | None | 9.12.2 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm (PWD SR 2023-24 Ballari Circle Item No.9.12.2, Page No.60 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1214.27 | 1214.27 | 349.48 | False | None | None | False | None | False | 424363.0796 | 0 | 2882879 | 94273 | None | 9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (PWD SR 2023-24 Ballari Circle Item No.9.38, Page No.65 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1476.22 | 1476.22 | 14.84 | False | None | None | False | None | False | 21907.1048 | 0 | 2882880 | 94273 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (SR 2023-24 Ballari Circle Item No.8.51, Page No.50 Vol 2) Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 106.05 | 106.05 | 922.82 | False | None | None | False | None | False | 97865.061 | 0 | 2882881 | 94273 | None | 8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. (SR 2023-24 Ballari Circle Item No.8.54.2, Page No.50 Vol 2) Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 116.66 | 116.66 | 922.82 | False | None | None | False | None | False | 107656.1812 | 0 | 2882882 | 94273 | None | 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(SR 2023-24 Ballari Circle Item No.8.27, Page No.45 Vol 2) Qty as same as internal plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 922.82 | False | None | None | False | None | False | 51871.7122 | 0 | 2882883 | 94273 | None | 8.27 | Qty as same as external plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 606.02 | False | None | None | False | None | False | 34064.3842 | 0 | 2882884 | 94273 | None | 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Ballari Circle Item No.8.28, Page No.45 Vol 2) Quantity same as External Plastering ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 94.38 | 94.38 | 606.02 | False | None | None | False | None | False | 57196.1676 | 0 | 2882885 | 94273 | None | 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.41, Page No.48 vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 177.1 | 177.1 | 66.6 | False | None | None | False | None | False | 11794.86 | 0 | 2882886 | 94273 | None | 8.49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.49 Page No.49 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 4.24 | 4.24 | 2000.0 | False | None | None | False | None | False | 8480.0 | 0 | 2882887 | 94273 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (PWD SR 2023-24 Ballari Circle Item No.15.1 Page No.149 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 866.43 | 866.43 | 429.33 | False | None | None | False | None | False | 371984.3919 | 0 | 2882888 | 94273 | None | 14.44 | Providing and fixing white vitreous china extended wall mounting water closet of size 780x370x690 mm of approved shape including providing & fixing white vitreous china cistern with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover, and cistern fittings, nuts, bolts and gasket etc complete. ( SR 2023-24 / Item No : 14.44 , Page No : 138 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 11785.2 | 11785.2 | 3.0 | False | None | None | False | None | False | 35355.6 | 0 | 2882889 | 94273 | None | 14.25.1 | Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings Flat back wash basin of size 630x450 mm. ( SR 2023-24 / Item No : 14.25.1 , Page No : 135 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1035.3 | 1035.3 | 3.0 | False | None | None | False | None | False | 3105.9 | 0 | 2882890 | 94273 | None | 13.27.2 | Providing and fixing unplasticised P.V.C. connection pipe with PTMT Nuts, collar and bush of approved quality and colour. 15 mm nominal bore with 450 mm length ( SR 2023-24/ Item No : 13.27.2 , Page No : 121 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 121.8 | 121.8 | 3.0 | False | None | None | False | None | False | 365.4 | 0 | 2882891 | 94273 | None | 14.23 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. ( SR 2023-24 / Item No : 14.23 , Page No : 135 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1211.7 | 1211.7 | 3.0 | False | None | None | False | None | False | 3635.1 | 0 | 2882892 | 94273 | None | 14.43 | Providing and fixing PTMT urinal cock of approved quality and colour using 15 mm nominal bore, 80 mm long, 42 mm high and 30mm wide with BSP female threads weighing not less than 48 g.. ( SR 2023-24 / Item No : 14.43 , Page No : 138 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 171.15 | 171.15 | 3.0 | False | None | None | False | None | False | 513.45 | 0 | 2882893 | 94273 | None | 14.42 | Providing and fixing PTMT 15 mm Urinal spreader size 95x69x100 mm with 1/2" BSP thread and shapes, weighing not less than 60 g. ( SR 2023-24 / Item No : 14.42 , Page No : 138 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 96.6 | 96.6 | 3.0 | False | None | None | False | None | False | 289.8 | 0 | 2882894 | 94273 | None | 14.28.1.1 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.32 mm dia ( SR 2023-24 / Item No : 14.28.1.1 , Page No : 136 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 79.8 | 79.8 | 6.0 | False | None | None | False | None | False | 478.8 | 0 | 2882895 | 94273 | None | 13.14 | Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 g. ( SR 2023-24 / Item No : 13.14 , Page No : 119 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 888.3 | 888.3 | 10.0 | False | None | None | False | None | False | 8883.0 | 0 | 2882896 | 94273 | None | 13.16 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 ( SR 2023-24 / Item No : 13.16 , Page No : 119 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 651.0 | 651.0 | 2.0 | False | None | None | False | None | False | 1302.0 | 0 | 2882897 | 94273 | None | 13.22.2 | Providing and fixing PTMT grating of approved quality and colour. Rectangular type with openable circular lid ( SR 2023-24/ Item No : 13.22.2 , Page No : 120 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 212.1 | 212.1 | 7.0 | False | None | None | False | None | False | 1484.7 | 0 | 2882898 | 94273 | None | 13.6.1.1 | Providing and fixing gun metal non- return valve of approved quality (screwed end) : 25 mm nominal bore Horizontal (SR 2023-24 / Item No : 13.6.1.1 , Page No : 117 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 651.0 | 651.0 | 2.0 | False | None | None | False | None | False | 1302.0 | 0 | 2882899 | 94273 | None | 13.5.3 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore ( SR 2023-24 / Item No : 13.5.3 , Page No : 116 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 348.6 | 348.6 | 2.0 | False | None | None | False | None | False | 697.2 | 0 | 2882900 | 94273 | None | 14.38 | Providing and fixing PTMT liquid soap container 109 mm wide, 125 mm high and 112 mm distance from wall of standard shape with bracket of the same materials with snap fittings of approved quality and colour, weighing not less than 105 g. (SR 2023-24 / Item No : 14.38 , Page No : 137 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 152.25 | 152.25 | 5.0 | False | None | None | False | None | False | 761.25 | 0 | 2882901 | 94273 | None | 13.33.6 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 50 mm nominal dia Pipes (SR 2023-24 / Item No : 13.33.6 , Page No : 123 Vol 2) CPVC 50mm dia. pipes ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 757.05 | 757.05 | 45.0 | False | None | None | False | None | False | 34067.25 | 0 | 2882902 | 94273 | None | 13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. (SR 2023-24 / Item No : 13.32.3 , Page No : 122 Vol 2) CPVC 25mm dia. pipes ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 500.85 | 500.85 | 60.0 | False | None | None | False | None | False | 30051.0 | 0 | 2882903 | 94273 | None | 13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ( SR 2023-24 / Item No : 13.34 , Page No : 123 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Ltr | 9.45 | 9.45 | 1000.0 | False | None | None | False | None | False | 9450.0 | 0 | 2882904 | 94273 | None | 1.15.2 | SANITARY WORK :Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. Depth exceeding 1.5 m, but not exceeding 3 m ( SR 2023-24 / Item No : 1.15.2 , Page No : 9 Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 446.25 | 446.25 | 7.13 | False | None | None | False | None | False | 3181.7625 | 0 | 2882905 | 94273 | None | 16.9 | Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.. (SR 2023-24 / Item No : 16.9, Page No : 191, Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5726.7 | 5726.7 | 3.0 | False | None | None | False | None | False | 17180.1 | 0 | 2882906 | 94273 | None | 7.3 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. (PWD SR 2023-24 Ballari Circle Item No.7.3, Page No.111 Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2247.0 | 2247.0 | 3.0 | False | None | None | False | None | False | 6741.0 | 0 | 2882907 | 94273 | None | 10.2.2 | Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 110mm dia. ( SR 2023-24 / Item No : 10.2.2, Page No : 113&114 Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 302.4 | 302.4 | 96.0 | False | None | None | False | None | False | 29030.4 | 0 | 2882908 | 94273 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( SR 2023-24 , Item No : 1.9 , Page No : 34 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 6.48 | False | None | None | False | None | False | 1809.864 | 0 | 2882909 | 94273 | None | 1.15.2 | Earth work excavation for Foundation : In ordinary/soft rock without blasting. Depth exceeding 1.5 m, but not exceeding 3 m Note: Cost of De-watering upto 7.5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition (COMMON SR, Vol-1, 2023-24, SL.No. 1.15.2, P. No.9). UNDER GROUND WATER TANK-3X2x1.8m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 446.25 | 446.25 | 30.0 | False | None | None | False | None | False | 13387.5 | 0 | 2882910 | 94273 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( PWD SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 1.8 | False | None | None | False | None | False | 11319.21 | 0 | 2882911 | 94273 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( PWD SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) Top Slab ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 2.0 | False | None | None | False | None | False | 13305.6 | 0 | 2882912 | 94273 | None | code04 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3326.4 | 3326.4 | 2.0 | False | None | None | False | None | False | 6652.8 | 0 | 2882913 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Bottom Raft, PWD SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 2.96 | False | None | None | False | None | False | 19692.288 | 0 | 2882914 | 94273 | None | code06 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 532.22 | 532.22 | 2.96 | False | None | None | False | None | False | 1575.3712 | 0 | 2882915 | 94273 | None | 2.4.3 | RCC works M25 For Foundation work : Side walls, PWD SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 3.4 | False | None | None | False | None | False | 22619.52 | 0 | 2882916 | 94273 | None | code08 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 665.28 | 665.28 | 3.4 | False | None | None | False | None | False | 2261.952 | 0 | 2882917 | 94273 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 93929.85 | 93929.85 | 0.84 | False | None | None | False | None | False | 78901.074 | 0 | 2882918 | 94273 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (PWD SR 2023-24,Vol-1 SL.No. 1.9, P. No. 7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 5.83 | False | None | None | False | None | False | 1628.319 | 0 | 2882919 | 94273 | None | 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (PWD SR 2023-24, Item no.6.32, Page No.17 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1375.5 | 1375.5 | 19.08 | False | None | None | False | None | False | 26244.54 | 0 | 2882920 | 94273 | None | 8.9 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 ,Item No.8.9, Page No.42 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 404.25 | 404.25 | 34.68 | False | None | None | False | None | False | 14019.39 | 0 | 2882921 | 94273 | None | 7.3 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. (PWD SR 2023-24 Ballari Circle Item No.7.3, Page No.111 Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2247.0 | 2247.0 | 1.0 | False | None | None | False | None | False | 2247.0 | 0 | 2882922 | 94273 | None | 1.15.2 | In ordinary/soft rock without blasting. Depth exceeding 1.5 m, but not exceeding 3 m Note: Cost of De-watering upto 7.5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition. (COMMON SR, Vol-1, 2023-24, SL.No. 1.15.2, P. No.9). ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 446.25 | 446.25 | 20.81 | False | None | None | False | None | False | 9286.4625 | 0 | 2882923 | 94273 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 0.51 | False | None | None | False | None | False | 3207.1095 | 0 | 2882924 | 94273 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (SR 2023-24 , Item No : 2.4.3, Page No : 16, Vol 1) Bottom Raft ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 0.38 | False | None | None | False | None | False | 2528.064 | 0 | 2882925 | 94273 | None | code04 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 532.22 | 532.22 | 0.38 | False | None | None | False | None | False | 202.2436 | 0 | 2882926 | 94273 | None | 2.4.3 | Top Slab, SR 2023-24 , Item No : 2.4.3, Page No : 16, Vol 1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 0.38 | False | None | None | False | None | False | 2528.064 | 0 | 2882927 | 94273 | None | code06 | Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3326.4 | 3326.4 | 0.38 | False | None | None | False | None | False | 1264.032 | 0 | 2882928 | 94273 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings. (SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 93929.85 | 93929.85 | 0.077 | False | None | None | False | None | False | 7232.59845 | 0 | 2882929 | 94273 | None | 16.62.2 | Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with appurtenances., complete. 1200 mmx1250 mm. (SR 2023-24 / Item No : 16.62.2, Page No.208 Volume 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10021.2 | 10021.2 | 6.0 | False | None | None | False | None | False | 60127.2 | 0 | 2882930 | 94273 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 2.36 | False | None | None | False | None | False | 659.148 | 0 | 2882931 | 94273 | None | 8.3.2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (COMMON SR 2023-24 - Vol-2- SL. No. - 8.3.2, Page No.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 349.65 | 349.65 | 34.44 | False | None | None | False | None | False | 12041.946 | 0 | 2882932 | 94273 | None | 15.2 | Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied @ 1.2 l/per m2 , having tensile strength greater than 1.5N/mm2, elongation greater than 300% with solid content not less than 60% in 2 coats including surface preparation, priming the surface with water based acrylic primer @0.1 l/m2 , and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (PWD SR 2023-24 , Item No.15.2 Page No.149 Vol 2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 773.85 | 773.85 | 34.44 | False | None | None | False | None | False | 26651.394 | 0 | 2882933 | 94273 | None | 7.3 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. (PWD SR 2023-24 Ballari Circle Item No.7.3, Page No.111 Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2247.0 | 2247.0 | 2.0 | False | None | None | False | None | False | 4494.0 | 0 | 2882934 | 94273 | None | 10.14.4 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.110mm(weight of pipe -1.315 kg) (PWD SR 2023-24 Ballari Circle Item No.10.14.4, Page No.120 Vol 5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 296.1 | 296.1 | 26.0 | False | None | None | False | None | False | 7698.6 | 0 | 2882935 | 94273 | None | 12.4 | Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geologicalformation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and rojection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. Commom 2023-2024 PWD SR (Vol-5) Sl No.12.4 P.No.140 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5552.4 | 5552.4 | 1.0 | False | None | None | False | None | False | 5552.4 | 0 | 2882936 | 94273 | None | 12.1.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete. Commom 2023-2024 PWD SR (Vol-5) Sl No.12.1.1 & 12.1.2 P.No.139, Borewell depth of 0 to 50 Mtrs ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 388.5 | 388.5 | 50.0 | False | None | None | False | None | False | 19425.0 | 0 | 2882937 | 94273 | None | 12.1.2 | Commom 2023-2024 PWD SR (Vol-5) Sl No. 12.1.2 P.No.139, Borewell depth of 50 to 100 Mtrs ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 487.2 | 487.2 | 50.0 | False | None | None | False | None | False | 24360.0 | 0 | 2882938 | 94273 | None | 10.1.10 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 200mm dia., 6 kg/sqcm & class 3, Commom 2023-2024 PWD SR (Vol-5) Sl No.10.1.10 P.No.113 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 1170.75 | 1170.75 | 100.0 | False | None | None | False | None | False | 117075.0 | 0 | 2882939 | 94273 | None | 12.33 | Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments Commom 2023-2024 PWD SR (Vol-5) Sl No.12.33 P.No.143 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 157.5 | 157.5 | 1.0 | False | None | None | False | None | False | 157.5 | 0 | 2882940 | 94273 | None | 12.34 | Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge Commom 2023-2024 PWD SR (Vol-5) Sl No.12.34 P.No.143 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 172.2 | 172.2 | 1.0 | False | None | None | False | None | False | 172.2 | 0 | 2882941 | 94273 | None | P140E | Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. 6.50 HP - 135 LPM @ 110 m = 8 STG Outlet Dia - 2.00” Commom 2021-2022 PWD SR (Vol-5) Sl No.P140E P.No.160 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 36226.05 | 36226.05 | 1.0 | False | None | None | False | None | False | 36226.05 | 0 | 2882942 | 94273 | None | 13.23.3 | Supply, installing, testing and commissioning COMMON control panel consisting of the following INCOMING: 1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOLDirect Online Starter 2) S-D- Star Delta Starter 6 to 15 HP pumps Commom 2023-2024 PWD SR (Vol-5) Sl No.13.23.3 P.No.155 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 16695.0 | 16695.0 | 1.0 | False | None | None | False | None | False | 16695.0 | 0 | 2882943 | 94273 | None | 11.3.5 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: Heavy Duty GI pipe of 40mm dia, Commom 2023-2024 PWD SR (Vol-5) Sl No.11.3.5 P.No.127&128 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 522.9 | 522.9 | 60.0 | False | None | None | False | None | False | 31374.0 | 0 | 2882944 | 94273 | None | 11.7.5 | Supply and delivery at site wrought middle steel (galvanized) GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for: For 40 mm dia GI elbow, Commom 2023-2024 PWD SR (Vol-5) Sl No.11.7.5 P.No.129 For 40 mm dia GI elbow ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 216.3 | 216.3 | 2.0 | False | None | None | False | None | False | 432.6 | 0 | 2882945 | 94273 | None | 13.22.2 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. Commom 2023-2024 PWD SR (Vol-5) Sl No.13.22.2 P.No.154, 1x3x2.5 sqm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 89.25 | 89.25 | 80.0 | False | None | None | False | None | False | 7140.0 | 0 | 2882946 | 94273 | None | 13.32 | Labour charges for Erection, Electrification and commissioning of Pumpsets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. Commom 2023-2024 PWD SR (Vol-5) Sl No.13.32, P.No.156 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Job | 6825.0 | 6825.0 | 1.0 | False | None | None | False | None | False | 6825.0 | 0 | 2882947 | 94273 | None | 13.35.3 | Labour charges for providing connection using insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materials, tools and equipments, as per specificationswith testing of as per instructions of engineer incharge of work. Commom 2023-2024 PWD SR (Vol-5) Sl No.13.35.3, P.No.156, 3 and half x 10 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 204.75 | 204.75 | 50.0 | False | None | None | False | None | False | 10237.5 | 0 | 2882948 | 94273 | None | 13.33 | Labour charges for erection of indoor type panel board and meter boardunits with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work. Commom 2023-2024 PWD SR (Vol-5) Sl No.13.33, P.No.156 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Job | 1417.5 | 1417.5 | 1.0 | False | None | None | False | None | False | 1417.5 | 0 | 2882949 | 94273 | None | 13.39 | Earthing: Supplying and fixing and wiring earth electrode for groundingcircuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. (Commom 2023-2024 PWD SR (Vol-5) Sl No.13.39, P.No.157) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Job | 3937.5 | 3937.5 | 1.0 | False | None | None | False | None | False | 3937.5 | 0 | 2882950 | 94273 | None | BESCOM -II-21.02 | Supply and erection of Double Pole TC structural set including all hardwares suitable for 100 to 300 KVA transformers etc.,complete as per standard technical specifications of For 25/63/100 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - GI, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM -II-21.02, P.No.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 25490.85 | 25490.85 | 1.0 | False | None | None | False | None | False | 25490.85 | 0 | 2882951 | 94273 | None | BESCOM-II-24.06 | H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-24.06, P.No.11 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 4548.6 | 4548.6 | 1.0 | False | None | None | False | None | False | 4548.6 | 0 | 2882952 | 94273 | None | BESCOM-II-24.03 | 11 kV, 200 Amps Single Break GOS, Vertically Operated, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-24.03, P.No.11 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 14413.35 | 14413.35 | 1.0 | False | None | None | False | None | False | 14413.35 | 0 | 2882953 | 94273 | None | BESCOM-II-20.01 | HG Fuse Unit as per IS-5350 11 kV, HG Fuse Unit with Solid Core Insulator (Dwg No. BESCOM/GM/QS&S/21 Dtd 24.11.2018), COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-20.01, P.No.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 1122.45 | 1122.45 | 1.0 | False | None | None | False | None | False | 1122.45 | 0 | 2882954 | 94273 | None | BESCOM-II-37.07 | 9.6 kV, 200 Amps long duration porcelain housed Surge arrestors, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-37.07, P.No.16 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1581.3 | 1581.3 | 1.0 | False | None | None | False | None | False | 1581.3 | 0 | 2882955 | 94273 | None | BESCOM-II-1.01 | Supplying and erection of ……Mtr RCC pole including earth work etc. complete as per the standard technical specification -RCC Pole - 9 Mtr Long, 145 Kg WL(Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-1.01, P.No.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 7429.8 | 7429.8 | 5.0 | False | None | None | False | None | False | 37149.0 | 0 | 2882956 | 94273 | None | BESCOM-II-1.03 | Supplying and Erection pole including earthwork etc. complete as per the standard technical specifications. (Dwg No. BESCOM/GM/QS&S/05 Dtd 24.11.2018) as per IS-785. 8Mtr 115Kg WL, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-1.03, P.No.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 5385.45 | 5385.45 | 3.0 | False | None | None | False | None | False | 16156.35 | 0 | 2882957 | 94273 | None | BESCOM-II-2.03 | 11kV Special 3 Pin X Arm-MS, Horrizontal.50x450x6mm - 980mm, Dwg No. BESCOM/GM/QS&S/03 Dtd 24.11.2018), COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-2.03, P.No.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 922.95 | 922.95 | 8.0 | False | None | None | False | None | False | 7383.6 | 0 | 2882958 | 94273 | None | BESCOM-II-2.11 | Supplying and fixing ……. including all Hardwares etc complete as per the standard technical specification HT ST Support 50x8mm Flat - MS (Dwg No.BESCOM/GM/QS&S/04 Dtd 24.11.2018), COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-2.11, P.No.4 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 95.55 | 95.55 | 8.0 | False | None | None | False | None | False | 764.4 | 0 | 2882959 | 94273 | None | BESCOM-II-5.01 | Supplying and fixing ……. including all Hardwares etc complete as per the standard technical specification. RCC Pole Clamp - MS (Dwg No. BESCOM/GM/QS&S/30 Dtd 24.11.2018). COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-5.01, P.No.4 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 89.25 | 89.25 | 8.0 | False | None | None | False | None | False | 714.0 | 0 | 2882960 | 94273 | None | BESCOM-II-9.01 | Supplying and fixing P.G. clamp including all hardwares complete as per the standard technical specifications- Lynx ACSR, COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-9.01, P.No.6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 374.85 | 374.85 | 8.0 | False | None | None | False | None | False | 2998.8 | 0 | 2882961 | 94273 | None | KPTCL-I-21.2.3 | Supplying and fixing Disc Insulator 90 KN including all hardwares complete as per the standard technical specifications- COMMON SCHEDULE OF RATES 2023-24, Vol-6, KPTCL-I-21.2.3, P.No.45 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 622.65 | 622.65 | 25.0 | False | None | None | False | None | False | 15566.25 | 0 | 2882962 | 94273 | None | BESCOM-II-6.02 | Supplying and fixing 11 kV GI Pin for 11 kV Ceramic Shell Insulator including all hardwares complete as per the standard technical specifications. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-6.02, P.No.5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 69.3 | 69.3 | 200.0 | False | None | None | False | None | False | 13860.0 | 0 | 2882963 | 94273 | None | BESCOM-II-XXIII,a | Supplying and fixing GUY set including all hardwares complete as per the standard technical specifications- Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07, BESCOM-II-XXIII,a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 1209.0 | 1209.0 | 8.0 | False | None | None | False | None | False | 9672.0 | 0 | 2882964 | 94273 | None | BESCOM-II-2.16 | Supplying and fixing of spiral Earth Electrodes as per stndard technical specificaion. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-2.16, P.No.4 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 250.95 | 250.95 | 8.0 | False | None | None | False | None | False | 2007.6 | 0 | 2882965 | 94273 | None | BESCOM-II-2.05 | Supply and fixing of …. Cross arm including all Hardwares complete as per the standard technical specifications BESCOM.- c)LT 4 Pin Cross Arm - MS. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-2.05, P.No.4 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 303.45 | 303.45 | 10.0 | False | None | None | False | None | False | 3034.5 | 0 | 2882966 | 94273 | None | BESCOM-II-7.02 | Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-7.02, P.No.5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 48545.7 | 48545.7 | 0.5 | False | None | None | False | None | False | 24272.85 | 0 | 2882967 | 94273 | None | BESCOM-II-XXXV A,a | Pole Base Concrete For 11/9.5/9/8 Mtr Pole (500x650x150 mm). BESCOM-II-XXXV A,a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 273.0 | 273.0 | 8.0 | False | None | None | False | None | False | 2184.0 | 0 | 2882968 | 94273 | None | BESCOM-II-XXXV B,b | Pole Concrete For 9 Mtr Pole (650x500x1700 mm). BESCOM-II-XXXV B,b) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3158.0 | 3158.0 | 8.0 | False | None | None | False | None | False | 25264.0 | 0 | 2882969 | 94273 | None | BESCOM-II-XXXV D,a | Guy Concrete Providing cement concrete 1:2:4 for Anchor Rod in Marshy/ Black Cotton Soil 600x600x450 mm. BESCOM-II-XXXV D,a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 881.0 | 881.0 | 8.0 | False | None | None | False | None | False | 7048.0 | 0 | 2882970 | 94273 | None | BESCOM-II-6.08 | Supplying and fixing…... including all hardwares complete as per the standard technical specifications. No.15 Strain insulator. COMMON SCHEDULE OF RATES 2023-24, Vol-6, BESCOM-II-6.08, P.No.5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 61.95 | 61.95 | 8.0 | False | None | None | False | None | False | 495.6 | 0 | 2882971 | 94273 | None | 1.2.1 | Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. PWD Electrical SR 2023-24, It.No.1.2.1, Page No.2, Vol-6, 19/20 mm dia 2 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 69.3 | 69.3 | 150.0 | False | None | None | False | None | False | 10395.0 | 0 | 2882972 | 94273 | None | 1.2.2 | PWD Electrical SR 2023-24, It.No.1.2.2, Page No.2, Vol-6,25 mm dia 2 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 81.9 | 81.9 | 250.0 | False | None | None | False | None | False | 20475.0 | 0 | 2882973 | 94273 | None | 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box. PWD Electrical SR 2023-24, It.No.1.5.1, Page No.2, Vol-6, 19/20 mm deep Junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 51.45 | 51.45 | 50.0 | False | None | None | False | None | False | 2572.5 | 0 | 2882974 | 94273 | None | 1.5.2 | PWD Electrical SR 2023-24, It.No.1.5.2, Page No.2, Vol-6, 25 mm deep Junction box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 58.8 | 58.8 | 80.0 | False | None | None | False | None | False | 4704.0 | 0 | 2882975 | 94273 | None | 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. PWD Electrical SR 2023-24, It.No.3.4.5, Page No.8, Vol-6, 8 Way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 274.05 | 274.05 | 12.0 | False | None | None | False | None | False | 3288.6 | 0 | 2882976 | 94273 | None | 3.4.6 | PWD Electrical SR 2023-24, It.No.3.4.6, Page No.8, Vol-6, 10-12 Way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 334.95 | 334.95 | 15.0 | False | None | None | False | None | False | 5024.25 | 0 | 2882977 | 94273 | None | 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. PWD Electrical SR 2023-24, It.No.3.5.5, Page No.8, Vol-6, 8 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 298.2 | 298.2 | 12.0 | False | None | None | False | None | False | 3578.4 | 0 | 2882978 | 94273 | None | 3.5.6 | PWD Electrical SR 2023-24, It.No.3.5.6, Page No.8, Vol-6, 10-12 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 361.2 | 361.2 | 15.0 | False | None | None | False | None | False | 5418.0 | 0 | 2882979 | 94273 | None | 1.7.1 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. PWD Electrical SR 2023-24, It.No.1.7.1, Page No.3, Vol-6, upto 50mm Conduit in Brick Walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 30.45 | 30.45 | 400.0 | False | None | None | False | None | False | 12180.0 | 0 | 2882980 | 94273 | None | 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. PWD Electrical SR 2023-24, It.No.1.13, Page No. 4, Vol-6, Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 122.85 | 122.85 | 45.0 | False | None | None | False | None | False | 5528.25 | 0 | 2882981 | 94273 | None | 2.2.1 | Point wiring Copper without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. PWD Electrical SR 2023-24, It.No.2.2.1, Page No.5, Vol-6, Short piont up to 3 Mtr from tapping piont out let via switch. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 282.45 | 282.45 | 30.0 | False | None | None | False | None | False | 8473.5 | 0 | 2882982 | 94273 | None | 2.2.2 | Medium point above 3 Mtr upto 6Mtr from tapping point to outlet via switch box. PWD Electrical SR 2023-24, It.No.2.2.2, Page No.5, Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 20.0 | False | None | None | False | None | False | 7959.0 | 0 | 2882983 | 94273 | None | 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. PWD Electrical SR 2023-24, It.No.2.3.2, Page No.5, Vol-6, 1.5 mm2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 27.3 | 27.3 | 320.0 | False | None | None | False | None | False | 8736.0 | 0 | 2882984 | 94273 | None | 2.3.3 | PWD Electrical SR 2023-24, It.No.2.3.3, Page No.5, Vol-6, 2.5 mm2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 44.1 | 44.1 | 180.0 | False | None | None | False | None | False | 7938.0 | 0 | 2882985 | 94273 | None | 2.3.4 | PWD Electrical SR 2023-24, It.No.2.3.4, Page No.5, Vol-6, 4 mm2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 66.15 | 66.15 | 120.0 | False | None | None | False | None | False | 7938.0 | 0 | 2882986 | 94273 | None | 2.3.5 | PWD Electrical SR 2023-24, It.No.2.3.5, Page No.5, Vol-6, 6 mm2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 96.6 | 96.6 | 120.0 | False | None | None | False | None | False | 11592.0 | 0 | 2882987 | 94273 | None | 3.6.2 | Modular Switches/Sockets/Regulators etc, Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. PWD Electrical SR 2023-24, It.No.3.6.2, Page No.9, Vol-6, 6Amps two way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 174.3 | 174.3 | 45.0 | False | None | None | False | None | False | 7843.5 | 0 | 2882988 | 94273 | None | 3.6.4 | PWD Electrical SR 2023-24, It.No.3.6.4, Page No.9, Vol-6, Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 374.85 | 374.85 | 45.0 | False | None | None | False | None | False | 16868.25 | 0 | 2882989 | 94273 | None | 3.6.9 | PWD Electrical SR 2023-24, It.No.3.6.9, Page No.9, Vol-6, 32A DP Switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 342.3 | 342.3 | 15.0 | False | None | None | False | None | False | 5134.5 | 0 | 2882990 | 94273 | None | 3.6.11 | PWD Electrical SR 2023-24, It.No.3.6.11, Page No.9, Vol-6, TV/Telephone Socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 163.8 | 163.8 | 2.0 | False | None | None | False | None | False | 327.6 | 0 | 2882991 | 94273 | None | 3.6.7 | PWD Electrical SR 2023-24, It.No.3.6.7, Page No.9, Vol-6, 16A One Way Switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 189.0 | 189.0 | 180.0 | False | None | None | False | None | False | 34020.0 | 0 | 2882992 | 94273 | None | 3.6.10 | PWD Electrical SR 2023-24, It.No.3.6.10, Page No.9, Vol-6, 6/16A Universal Socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 40.0 | False | None | None | False | None | False | 9912.0 | 0 | 2882993 | 94273 | None | 3.14.5 | Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. PWD Electrical SR 2023-24, It.No.3.14.5, Page No.10, Vol-6, 6A Bakelite Ceiling Rose ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 81.9 | 81.9 | 30.0 | False | None | None | False | None | False | 2457.0 | 0 | 2882994 | 94273 | None | 3.14.6 | PWD Electrical SR 2023-24, It.No.3.14.6, Page No.10, Vol-6, 6A Pendant Holder ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 74.55 | 74.55 | 35.0 | False | None | None | False | None | False | 2609.25 | 0 | 2882995 | 94273 | None | 11.3.2 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI Greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor Greater than0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. PWD Electrical SR 2023-24, It.No.11.3.2, Page No.43, Vol-6, LED light fighting 1 x4'- 20/22 w ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 25.0 | False | None | None | False | None | False | 18112.5 | 0 | 2882996 | 94273 | None | 11.5.2 | Supply of round/square recess/surface mounted rolling type LED Down light with .......W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI Greater than 80. Power Input: 220-240V @ 50/60Hz & Power factor Greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. PWD Electrical SR 2023-24, It.No.11.5.2, Page No.44, Vol-6, LED square or round down light 10-12W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 929.25 | 929.25 | 25.0 | False | None | None | False | None | False | 23231.25 | 0 | 2882997 | 94273 | None | 12.25.2 | Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. PWD Electrical SR 2023-24, It.No.12.25.2, Page No.50, Vol-6, 1 x 4' Tube light fitting. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 357.0 | 357.0 | 25.0 | False | None | None | False | None | False | 8925.0 | 0 | 2882998 | 94273 | None | 6.4.2 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated airdelivery 210 +/- 10% Cubic Meter Minimum, Rated servicevalue 4.2 CMM / W, Three Blades of blade leaf 1.05 mm thickAluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over andambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty. PWD Electrical SR 2023-24, It.No.6.4.2, Page No.30, Vol-6, 56" Sweep 5 Star (1400 mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3941.7 | 3941.7 | 45.0 | False | None | None | False | None | False | 177376.5 | 0 | 2882999 | 94273 | None | 13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. PWD Electrical SR 2023-24, It.No.13.7.1, Page No.56, Vol-6, On wall / ceiling / Rafter / Girders ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 128.1 | 128.1 | 50.0 | False | None | None | False | None | False | 6405.0 | 0 | 2883000 | 94273 | None | 13.11 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired., PWD Electrical SR 2023-24, It.No.13.11, Page No.57, Vol-6, Ceiling Fan ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 330.75 | 330.75 | 45.0 | False | None | None | False | None | False | 14883.75 | 0 | 2883001 | 94273 | None | 5.19.8 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. II - Double Door. PWD Electrical SR 2023-24, It.No.5.19.8, Page No.13, Vol-6, 8 Way SP & N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1946.7 | 1946.7 | 4.0 | False | None | None | False | None | False | 7786.8 | 0 | 2883002 | 94273 | None | 5.18.1 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. PWD Electrical SR 2023-24, It.No.5.18.1, Page No.17, Vol-6, 6-32 Amps SP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 435.75 | 435.75 | 3.0 | False | None | None | False | None | False | 1307.25 | 0 | 2883003 | 94273 | None | 5.18.4 | PWD Electrical SR 2023-24, It.No.5.18.4, Page No.17, Vol-6, 6-32 Amps DP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 775.95 | 775.95 | 3.0 | False | None | None | False | None | False | 2327.85 | 0 | 2883004 | 94273 | None | 5.7.2 | Supplying & fixing of Porcelain fuse channel with cut out onexisting wooden/panel using necessary nuts, bolts andwashers. PWD Electrical SR 2023-24, It.No.5.7.2, Page No.14, Vol-6, 32 A ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 253.05 | 253.05 | 2.0 | False | None | None | False | None | False | 506.1 | 0 | 2883005 | 94273 | None | code35 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg, ESCOMs SR 2023-24, Page No.22, Vol-6) For LT Panel & Floors, Earth electrode ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 780.15 | 780.15 | 2.0 | False | None | None | False | None | False | 1560.3 | 0 | 2883006 | 94273 | None | code36 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each. ESCOMs SR 2023-24, Page No.22, Vol-6) Charcoal ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 709.8 | 709.8 | 5.0 | False | None | None | False | None | False | 3549.0 | 0 | 2883007 | 94273 | None | code37 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag. ESCOMs SR 2023-24, Page No.22, Vol-6, Salt ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Bag | 325.5 | 325.5 | 5.0 | False | None | None | False | None | False | 1627.5 | 0 | 2883008 | 94273 | None | code38 | GESCOM DEPOSITE ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 25000.0 | 25000.0 | 1.0 | False | None | None | False | None | False | 25000.0 | 0 |
|