noticeInvitingTenderDTO
createdTs1709707734612
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd40500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose14-03-2024 17:00:00
tenderQueryClose12-03-2024 17:30:00
technicalBidOpenNone
publishedDate07-03-2024 14:06:28
publishedByPostPWD_EE_DIV_CKD
publishedByUserKPE15950 - SUNILKUMAR N BALOL
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShri. Sunilkumar N Balol Exe Engg PWD Div Chikkodi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8338273859
mobileNumber8338273859
tenderSupplierListNone
tenderSchedule
createdTs1709707734722
version8
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9499
titleConstruction of open well, water supply and painting at Arbhavi IB in Mudalagi taluka Under 2059-80-053-4-00-200 for 2023-24
descriptionConstruction of open well, water supply and painting at Arbhavi IB in Mudalagi taluka Under 2059-80-053-4-00-200 for 2023-24
categoryWORKS
categoryTextWorks
ecv1607097.05
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1686
locationNamePWD Division Office Chikkodi
provisionalAmount2000000.0
groupOverheadTotal0.0
fileNumberGkk/2059/Manitenance/03/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17097077350000NoneNoneBuildingsPAINTING WORK588589.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
293392196851NoneVolume 2 Page No. 48 Item No 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour,HOM,lSqm165.9165.91313.42FalseNoneNoneFalseNoneFalse217896.3780
293392296851NoneVolume 2 Page No. 46 Item No 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge . ---- including cost of all materials, labour,HOM,lSqm182.7182.72015.39FalseNoneNoneFalseNoneFalse368211.7530
293392396851NoneVolume 2 Page No. 47 Item No 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour,HOM,lSqm145.95145.9517.0FalseNoneNoneFalseNoneFalse2481.150
17097077350000NoneNoneBuildingsOPEN WELL1018507.77
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
293392496852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum151.2151.2265.11FalseNoneNoneFalseNoneFalse40084.6320
293392596852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum158.76158.76214.74FalseNoneNoneFalseNoneFalse34092.12240
293392696852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum166.32166.32169.67FalseNoneNoneFalseNoneFalse28219.51440
293392796852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum173.88173.88129.9FalseNoneNoneFalseNoneFalse22587.0120
293392896852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum181.44181.4495.44FalseNoneNoneFalseNoneFalse17316.63360
293392996852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum189.0189.075.41FalseNoneNoneFalseNoneFalse14252.490
293393096852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum196.56196.5642.42FalseNoneNoneFalseNoneFalse8338.07520
293393196852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum204.12204.1242.42FalseNoneNoneFalseNoneFalse8658.77040
293393296852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum211.68211.6842.42FalseNoneNoneFalseNoneFalse8979.46560
293393396852NonePWD COMMON SR 2023-24 Vol-I Page No - 15 Item No 2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) ---- including cost of all materials, labour,HOM,lCum6527.856527.851.16FalseNoneNoneFalseNoneFalse7572.3060
293393496852NonePWD COMMON SR 2023-24 Vol-I Page No - 15 Item No 2Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour,HOM,lCum6652.86652.847.1FalseNoneNoneFalseNoneFalse313346.880
293393596852NonePWD COMMON SR 2023-24 Vol-I Page No - 18 Item No 2Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h.All other type of structure ---- including cost of all materials, labour,HOM,lTonne82961.5582961.553.8622FalseNoneNoneFalseNoneFalse320414.098410
293393696852NoneCOMMON SR 2021-22 P. No-7 I.No- 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost of all materials, labour,HOM,lCum279.3279.3663.61FalseNoneNoneFalseNoneFalse185346.2730
293393796852NonePWD COMMON SR 2023-24 Vol-I Page No - 8 Item No 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worke. In all kinds of soils Depth above 6 m ---- including cost of all materials, labour,HOM,lCum219.24219.2442.417FalseNoneNoneFalseNoneFalse9299.503080
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17097077360000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17097077360000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17097077360000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17097077360000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17097077360002NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17097077360002NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17097077360002NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17097077360002NoneNoneELIGIBILITYBanker DetailsNone
17097089150000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17097089230000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17097089290000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17097089420000NoneNoneELIGIBILITYAs per karnataka state government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Govt letter No.PW/134/BMS /2007/dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17097089540000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17097089640000NoneNoneELIGIBILITYAll the documents to be uploaded shall be neatly scanned and the documents scanned shall be in original.None
17097089730000NoneNoneELIGIBILITYAny discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected.None
17097089850000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner. ( section 3 & 4 of the bid document ) and shall be uploaded properly, signed by Tenderer . Necessary Certificates shall be uploaded along with the formats wherever required. General documents Section can be used for this purpose.None
17097089990000NoneNoneELIGIBILITYEarnest Money Deposit will have to be in any one of the forms as per the instructions in the financial bid document and shall have to be valid for 45 days beyond the validity of the tenderNone
17097090110000NoneNoneELIGIBILITYTenderers are requested to read the Bid Documents before submission of their bidNone
17097090200000NoneNoneELIGIBILITYDepartment will not supply any materialsNone
17097090300000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17097090380000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing KP Procurement PortalNone
17097090450000NoneNoneELIGIBILITYThe Employer reserves the rights reject one or all tender without assigning any reasonsNone
17097090540000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Chikodi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentionedNone
17097090640000NoneNoneELIGIBILITYThe Tenderer are should be present during opening of the tender and also submit the uploaded documents duly attested by the Gazetted Officer not below the Rank of Executive EngineerNone
17097090730000NoneNoneELIGIBILITYContractors should Registered in KPWD and copy should be uploaded in E-portal Attested by the Gazzeted officers not below the rank of Executive EngineerNone
17097090830000NoneNoneELIGIBILITYGST shall be paid to the tendered amount seperatelyNone
17097090940000NoneNoneELIGIBILITYThe Increase in G.S.T shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17097091030000NoneNoneELIGIBILITYWork Completion/Execution Period three (3) monthsNone
17097091140001NoneNoneELIGIBILITYThe Tenderer shall obtain similar the workdone certificate from financial year 2018-19 to 2022-23 (50% of the Amount Put to Tender i.e., Rs.8.03 Lakhs) in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the BidNone
17097091210000NoneNoneELIGIBILITYDifference amount should submit at the time of Agreement.None
17097091370001NoneNoneELIGIBILITYThe EMD of Rs. 40,500.00/- shall be paid in full through e-payment in favour of Executive Engineer, PWD, Chikodi Dn, ChikodiNone
17097091440001NoneNoneELIGIBILITYThe Tenderer shall achieved in at least two financial years an average annual financial turnover from financial year 2018-19 to 2022-23 of Rs 16.07 Lakhs (not less than the estimated cost under this contract)None
17097091530000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next sectionNone
17097091660001NoneNoneELIGIBILITYThe Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself with the Site of Works and its surroundings including source of earth, water, road aggregates, availability of labor etc. and obtain all information that may be necessary for preparing the Bid and entering into a contract for undertaking the maintenance Works. The costs of visiting the site shall be at the Bidders own expense. The following certificate/Affidavit shall be undertaken by contractor during the submission of tenders. I have inspected the building and I am ready to maintain the buildingNone
17097091870000NoneNoneELIGIBILITYIf the contractor has not done the maintenance work satisfactorily in previous years such bids will be rejectedNone
17097091980000NoneNoneELIGIBILITYAs per Government Circular No. FD/263/EXP-12/2022,Dated 11/05/2022 L1 tenderer EMD amount is forfeited and tender will be rejectedNone
17097980790000NoneNoneELIGIBILITYThe Contractor shall maintain the building Assets in proper condition that comply with the building Maintenance Standards and ensure building users safety and comfort. The maintenance activitiesshall be so planned that the defects are repaired well before they reach maximum condition asper the permissible tolerance.None
17097981040000NoneNoneELIGIBILITYThe Contractor should maintain the building in good conditionNone
17098003900000NoneNoneELIGIBILITYIf no bid received auto extension will be done by KPPP Portal itself for 2 daysNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2018-19 to 2022-23TrueTechnical Bid
Similar Financial Work Done Certificate 50percentage of APTTrueTechnical Bid
Any other related documentsTrueTechnical Bid
Ongoing work detailsTrueTechnical Bid
GST RegistratationTrueTechnical Bid
Unique Document Identification Number UDIN form practicing Chartered Account is preferredTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsBelagaviMudalgiBelgaumARABHAVIARABHAVINoneNoneNoneNoneNoneNone
BuildingsBelagaviMudalgiBelgaumARABHAVIARABHAVINoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone