1709816372000 | 0 | None | None | Buildings | Construction and Renovation of Sri Basaveshwara Temple at Kadavinahosahalli village, Konanuru Hobli, Arakalgud taluk, Hassan district. | 839447.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2966787 | 98099 | None | V-1 P-5,I NO:1.4.1 | 1.4 Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the
selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of
labour, tools & other appurtenaces required to complete the work. 1.4.1 In all kinds of soils Depth upto 1.5 m (V-1 P-5,I NO:1.4.1) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 254.1 | 254.1 | 60.53 | False | None | None | False | None | False | 15380.673 | 0 | 2966788 | 98099 | None | P.no.15- I.no.2.1.2 v-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation.The granite/trap/basalt crushed graded coarse agregates and fine agregates as per relavant IS codes machine mixed, concrete laid in layers not exceeding 15 cms thick, well compacted, in foundation and plinth,using plate vibraters,including lead & lift, cost of all materials, labour, usage charges of machinery, curing complete as per specification.(the cost of steel reinforcement & Farm work shall be paid separatly) Mix 1:4;8(M5) using 40mm & down size graded crushed coarse agregates. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5947.2 | 5947.2 | 8.72 | False | None | None | False | None | False | 51859.584 | 0 | 2966789 | 98099 | None | P.no.9(V2) - I. no.5.2 | Providing Coursed rubble masonry(first sort)with hard stone in foundation and plinth with cement morter 1: ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6948.9 | 6948.9 | 36.33 | False | None | None | False | None | False | 252453.537 | 0 | 2966790 | 98099 | None | P.no.7- I.no.1.9 v-1 | Filling available excavated earth (excluding rock)in trenches ,plinth,sides of foundationsand other similar work etc.in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering,lead upto 50.0m and lift upto 1.5m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 279.3 | 279.3 | 60.53 | False | None | None | False | None | False | 16906.029 | 0 | 2966791 | 98099 | None | P.no.16-V-1- I.no.2.5.1 | Providing and laying in position reinforced cement concrete for all superdtructure of building ,Road works,Water works,Irrigation works,super structure of Bridges upto 3.5m height.The granite/Trap/Basaltcrushed graded coarse agregates and fine agrigates as per relavant IS code mechine mixed with superplasticisers laid in layers ,well compacted using needle vibraters .The cost includes finishing concrete structure in line all lead and lift,cost of all materialsquality confirming to the requirements of relavant IS code, labour, using charge of machinary ,curing and all other appurantances required to complete the work as per tecnical specification (The cost of steel reinforcement ,dowl bars & farm work to be paid separatly) M20Design mix using 20mm and down size graded crushed coarse agregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6961.5 | 6961.5 | 17.08 | False | None | None | False | None | False | 118902.42 | 0 | 2966792 | 98099 | None | 111 1-A Vol-1 | Additionalities for formwork centering scaffolding charges shall be added on percentage to the finished concrete at 8 of finished rate of concrete ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 556.92 | 556.92 | 8.21 | False | None | None | False | None | False | 4572.3132 | 0 | 2966793 | 98099 | None | 111-2 Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete at 50 Percentage of finished rate of concrete in ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3480.75 | 3480.75 | 5.13 | False | None | None | False | None | False | 17856.2475 | 0 | 2966794 | 98099 | None | 111-9 Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete at 70% of finished rate of concrete in m3 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4873.05 | 4873.05 | 3.74 | False | None | None | False | None | False | 18225.207 | 0 | 2966795 | 98099 | None | P.no.18 -I. no.2.11 v-1 | 2.11 Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | MT | 93929.85 | 93929.85 | 1.45 | False | None | None | False | None | False | 136198.2825 | 0 | 2966796 | 98099 | None | P no13-I no 6.7 v-2 | 6.7 Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8631.0 | 8631.0 | 14.9 | False | None | None | False | None | False | 128601.9 | 0 | 2966797 | 98099 | None | P.no.15- I.no.2.1.6 v-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation.The granite/trap/basalt crushed graded coarse agregates and fine agregates as per relavant IS codes machine mixed, concrete laid in layers not exceeding 15 cms thick, well compacted, in foundation and plinth,using plate vibraters,including lead & lift, cost of all materials, labour, usage charges of machinery, curing complete as per specification.(the cost of steel reinforcement & Farm work shall be paid separatly) 2.1.6 Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6555.15 | 6555.15 | 0.93 | False | None | None | False | None | False | 6096.2895 | 0 | 2966798 | 98099 | None | P. no.41 - V-1,I. no.8.3.1 | Providing 20mm thick cement plaster on rough side of single or half brick wallin with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 371.7 | 371.7 | 129.6 | False | None | None | False | None | False | 48172.32 | 0 | 2966799 | 98099 | None | P.no.46 V-2-I.no.8.32 | 8.31 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-char
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 186.9 | 186.9 | 129.6 | False | None | None | False | None | False | 24222.24 | 0 |
|