1709814723000 | 1 | None | None | Buildings | Construction and Renovation of Sri Mutturayaswamy (Sri Lakshmi Venkateshwara) Temple at Narasikuppe village, Kasaba Hobli, Arakalgud taluk, Hassan district. | 845003.54 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2966307 | 98065 | None | Vol I-5 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 254.1 | 254.1 | 35.15 | False | None | None | False | None | False | 8931.615 | 0 | 2966308 | 98065 | None | Vol I-15 2.1.2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5947.2 | 5947.2 | 4.93 | False | None | None | False | None | False | 29319.696 | 0 | 2966309 | 98065 | None | Vol II-9 5.2 | 5.2 Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6948.9 | 6948.9 | 19.73 | False | None | None | False | None | False | 137101.797 | 0 | 2966310 | 98065 | None | Vol 1-15, 2.2.1 | 2.2 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. 2.2.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6601.35 | 6601.35 | 1.07 | False | None | None | False | None | False | 7063.4445 | 0 | 2966311 | 98065 | None | Vol I-7, 1.9 | 1.9 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 279.3 | 279.3 | 38.71 | False | None | None | False | None | False | 10811.703 | 0 | 2966312 | 98065 | None | Vol-2 13, 6.6 | 6.6 Providing Brick work with common burnt clay machine moulded perforated bricks of class designation 5.0 conforming to IS: 2222 in superstructure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand) With Modular bricks including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 12205.2 | 12205.2 | 12.16 | False | None | None | False | None | False | 148415.232 | 0 | 2966313 | 98065 | None | Vol-1, 16, 2.5.1 | 2.5 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.5.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6961.5 | 6961.5 | 15.73 | False | None | None | False | None | False | 109504.395 | 0 | 2966314 | 98065 | None | P.no.18 - I. no.2.11 v-1 | 2.11 Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 93929.85 | 93929.85 | 1.34 | False | None | None | False | None | False | 125865.999 | 0 | 2966315 | 98065 | None | Vol II-99, 12.12 | 12.12 Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 130412.1 | 130412.1 | 0.53 | False | None | None | False | None | False | 69118.413 | 0 | 2966316 | 98065 | None | Vol II-100, 12.15 | 12.15 Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 7816.2 | 7816.2 | 5.15 | False | None | None | False | None | False | 40253.43 | 0 | 2966317 | 98065 | None | Vol II-103, 12.46 | 12.46 Providing and fixing in position fully glazed for windows shutters with Honne wood stiles and rails of 30mm. thick, 75mm wide in single shutters with 4mm thick plain glass fixed with wooden beading including cost of materials, labour charges, usage charges complete as per specifications.( excluding cost of fixtures ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 5415.9 | 5415.9 | 5.95 | False | None | None | False | None | False | 32224.605 | 0 | 2966318 | 98065 | None | Vol II-72, 10.19 | 10.19 Providing and fixing 20mm thick gang saw water cut Lakared granite for cladding in CM 1:3 (1 cement : 3 coarse sand) proportion with a coat of rough plastering using CM 1:4 (1 cement : 4 fine sand), cut to required shape, pattern with paper joints, finished with cement mortar using white cement and colour pigments to match the colour of slab making through jointing with sealant, grooves in joints including cost of curing etc., complete including cost and conveyance of all materials, mortar, labour for all items of work, usage charges of machinery etc., complete as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 3787.35 | 3787.35 | 22.0 | False | None | None | False | None | False | 83321.7 | 0 | 2966319 | 98065 | None | 112, 14, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [112/14, Vol-1 at 60% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4176.9 | 4176.9 | 3.03 | False | None | None | False | None | False | 12656.007 | 0 | 2966320 | 98065 | None | 112, 19, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [112/19, Vol-1 at 45% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3132.68 | 3132.68 | 2.07 | False | None | None | False | None | False | 6484.6476 | 0 | 2966321 | 98065 | None | 111, 1-A, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/1-A, Vol-1 at 8% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 556.92 | 556.92 | 3.2 | False | None | None | False | None | False | 1782.144 | 0 | 2966322 | 98065 | None | 111, 1-B, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/1-B, Vol-1 at 3% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 208.85 | 208.85 | 1.62 | False | None | None | False | None | False | 338.337 | 0 | 2966323 | 98065 | None | 111, 9, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/9, Vol-1 at 70% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4873.05 | 4873.05 | 1.14 | False | None | None | False | None | False | 5555.277 | 0 | 2966324 | 98065 | None | 111, 15, Vol-1 | Additionalities for formwork,centrening,scaffolding charges shall be added on percentage to the finished concrete [ 111/15, Vol-1 at 50% of finished rate of concrete in m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3480.75 | 3480.75 | 4.67 | False | None | None | False | None | False | 16255.1025 | 0 |
|