createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709813252069
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee590.00
emd28000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose15-03-2024 16:00:00
tenderQueryClose14-03-2024 17:30:00
technicalBidOpenNone
publishedDate07-03-2024 18:01:02
publishedByPostPWD_EE_DIV_CTD
publishedByUserKPE11215 - T S MALLIKARJUN
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEE PWD CTA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08194222446
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709813252104
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9467
titleESTIMATION FOR CONSTRUCTION OF SECOND FLOOR BUILDING AND REPAIR WORKS TO LIBRARY BUILDING AT JAYANAGARA EXTENSION IN HIRIYUR TOWN, CHITRADURGA DISTRICT
descriptionESTIMATION FOR CONSTRUCTION OF SECOND FLOOR BUILDING AND REPAIR WORKS TO LIBRARY BUILDING AT JAYANAGARA EXTENSION IN HIRIYUR TOWN, CHITRADURGA DISTRICT
categoryWORKS
categoryTextWorks
ecv2349397.80
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1703
locationNamePWD Division Office Chitradurga
provisionalAmount3000000.0
groupOverheadTotal0.0
fileNumberPWD/HYR/NO1/8443
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17098132520001NoneNoneBuildingsSECOND FLOOR2297377.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296533898026NoneV-2, P.No.187, I.No.19.7.2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. In lime mortar Basic Rate : 583.00, AW. 3% 17.49, Final Rate : 600.49 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum600.49600.4911.23FalseNoneNoneFalseNoneFalse6743.50270
296533998026NoneV-2, P.No.17, I.No.6.31Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work Basic Rate : 7978.00, Lift Charges : 2% 159.56, AW. 3% 244.13, Final Rate : 8381.69 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum8381.698381.6940.28FalseNoneNoneFalseNoneFalse337614.47320
296534098026NoneVol-2, P.No.82, I.No.11.16.2Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge Basic Rate : 147.00, Lift Charges : 2% 2.94, AW. 3% 4.50, Final Rate : 154.44 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workKg154.44154.443687.28FalseNoneNoneFalseNoneFalse569463.52320
296534198026NoneVol-2, P.No.38, I.No.7.67.2Providing,fabricating and fixing Profiled Poly Urethane insulated Roof(PUF Sheet) having modular density 40kg/m2 and size 1.06m width and 7.60m length sheets roof having external sheet of 0.5mm steel, bottom sheet of 0.40mm steel with powder coated finish. The precoated sheet shall be of minimum 240MPa steel conforming to IS 14246 : 1995 and shal have zinc coating with minimum 120gsm as per IS 277:1992,.The roofing system shall have suitable water proof over lapping arrangments and GRIHA ceritifed.The fasting shall be of self tapping screws of required length with PVC head along with washer pre-painted aluminium cap unit with build in seal arrangments. The entire roof shall be firmly fastened to the existng frame including all lead and lifts, loading & unloading ,usage charges of machinery and equipments, transportation charges,labour charges and all other incidental charges etc.,complete as per standard technical detailed specifications and as directed by the Engineer in charge of the work 50mm thickness Basic Rate : 2595.00, Lift Charges : 2% 51.90, AW. 3% 79.41, Final Rate : 2726.31 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm2726.312726.31100.12FalseNoneNoneFalseNoneFalse272958.15720
296534298026NoneV-2, P.No.28, I.No.7.41Providing and Fixing 15 mmthick densified tegular edged eco friendly light weight calcium silicate false ceiling tiles of approved texture of size 595 x 595 mm in true horizontal level, suspended on inter locking metal grid of hot dipped galvanised steel sections galvanising @ 120 grams per m2 including both side) consisting of main ‘T’ runner suitably spaced at joints to get required length and of size 24x38 mm made from 0.33 mm thick (minimum) sheet, spaced 1200 mm centre to centre, and cross “T” of size 24x28 mm made out of 0.33 mm (Minimum) sheet, 1200 mm long spaced between main’T’ at 600 mm centre to centre to form a grid of 1200x600 mm and secondary cross ‘T’ of length 600 mm and size 24 x28 mm made of 0.33 mm thick (Minimum) sheet to be inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm, resting on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size(24x24X3000 mm made of 0.40 mm thick (minimum) sheet with the help of rawl plugs at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm interval and laying 15 mm thick densified edges calicum silicate ceiling tiles of approved texture in the grid, including, cutting/ making opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc., wherever required. Main ‘T’ runners to be suspended from eiling using G.I. slotted cleats of size 25x35x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm G.I. adjustable rods with galvanised steel level clips of size 85 x 30 x 0.8 mm, spaced at 1200 mm centre to centre along main ‘T’, bottom xposed with 24 mm of all T sections shall be pre-painted with polyster baked paint, for all heights, as per specifications, drawings and as directed by Engineer-in-Charge Basic Rate : 1693.00, Lift Charges 2% 33.86, AW. 3% 51.81, Final Rate : 1778.67 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm1778.671778.6788.75FalseNoneNoneFalseNoneFalse157856.96250
296534398026NoneV-1, P.No.16, I.No.2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates Basic Rate : 6630.00, AW. 3% 198.90, Final Rate : 6828.90 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum6828.96828.98.4FalseNoneNoneFalseNoneFalse57362.760
296534498026NoneV-1, P.No.16, I.No.2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing conrcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates Sill, Lintel Beam Basic Rate : 6630.00, Add Formwork 50% 3315.00, Lift Charges 2% 198.90, AW. 3% 304.32, Final Rate : 10448.22 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum10448.2210448.224.27FalseNoneNoneFalseNoneFalse44613.89940
296534598026NoneV-1, P.No.16, I.No.2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates Chejja. Basic Rate :6630.00, Add form Work 45% 2983.50, Lift Charges 2% 192.27, AW. 3% 294.17, Final Rate : 10099.94 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum10099.9410099.940.87FalseNoneNoneFalseNoneFalse8786.94780
296534698026NoneV-1, P.No.18, I.No.2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Basic Rate :89457.00, Lift Charges 2% 1789.14, AW. 3% 2737.38, Final Rate : 93983.52 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workTonne93983.5293983.520.28FalseNoneNoneFalseNoneFalse26315.38560
296534798026NoneV-2 , P.No.86, I.No.11.34A)Providing and fixing M.S. grills of required pattern in frames of win dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. Basic Rate :168.00, Lift Charges 2% 3.36, AW. 3% 5.14, Final Rate : 176.50 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workKg176.5176.5280.67FalseNoneNoneFalseNoneFalse49538.2550
296534898026NoneV-2 , P.No.86, I.No.11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to theexisting T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinge of materials, labour, usage charges of machinery complete as per specifications. Basic Rate :115.00, Lift Charges 2% 2.30, AW. 3% 3.52, Final Rate : 120.82 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workKg120.82120.82140.4FalseNoneNoneFalseNoneFalse16963.1280
296534998026NoneV-2 , P.No.77, I.No.11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Basic Rate :4242.00, Lift Charges 2% 84.84, AW. 3% 129.81, Final Rate : 4456.65 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm4456.654456.6513.36FalseNoneNoneFalseNoneFalse59540.8440
296535098026NoneV-2 , P.No.100, I.No.12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications Basic Rate :98815.00, Lift Charges 2% 1976.30, AW. 3% 3023.74, Final Rate : 103815.039 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum103815.04103815.040.1FalseNoneNoneFalseNoneFalse10381.5040
296535198026NoneV-2 , P.No.104, I.No.12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Basic Rate :1016.00, Lift Charges 2% 20.32, AW. 3% 31.09, Final Rate : 1067.41 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workEach1067.411067.414.0FalseNoneNoneFalseNoneFalse4269.640
296535298026NoneV-2 , P.No.100, I.No.12.20Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 80mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges omplete as per specifications. (excluding cost of fixtures. Basic Rate :6150.00, Lift Charges 2% 123.00, AW. 3% 188.19, Final Rate : 6461.19 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm6461.196461.194.2FalseNoneNoneFalseNoneFalse27136.9980
296535398026NoneV-2 , P.No.104, I.No.12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. Basic Rate :318.00, Lift Charges 2% 6.36, AW. 3% 9.73, Final Rate : 334.09 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm334.09334.0912.4FalseNoneNoneFalseNoneFalse4142.7160
296535498026NoneV-2 , P.No.104, I.No.12.55.1Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC She5m joined together with solvent cement adhesive etc., Ccharge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelam Basic Rate :2366.00, Lift Charges 2% 47.32, AW. 3% 72.40, Final Rate : 2485.72 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm2485.722485.724.2FalseNoneNoneFalseNoneFalse10440.0240
296535598026NoneV-2 , P.No.61, I.No.9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 mm Basic Rate :1175.00, Lift Charges 2% 23.50, AW. 3% 35.96, Final Rate : 1234.46 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm1234.451234.4589.44FalseNoneNoneFalseNoneFalse110409.2080
296535698026NoneV-2 , P.No.60, I.No.9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm933.98933.98190.1FalseNoneNoneFalseNoneFalse177549.5980
296535798026NoneV-2 , P.No.85, I.No.11.28Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per suge charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Basic Rate :565.00, Lift Charges 2% 11.30, AW. 3% 17.29, Final Rate : 593.59 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workKg593.59593.5992.25FalseNoneNoneFalseNoneFalse54758.67750
296535898026NoneV-2 , P.No.41, I.No.8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materi als, labour, curing complete as per specifications and as per directions of Engineer-in-charge Basic Rate :241.00, Lift Charges 2% 4.82, AW. 3% 7.37, Final Rate : 253.19 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm253.19253.19257.33FalseNoneNoneFalseNoneFalse65153.38270
296535998026NoneV-2 , P.No.41, I.No.8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Basic Rate :279.00, Lift Charges 2% 5.58, AW. 3% 8.54, Final Rate : 293.12 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm293.12293.12151.37FalseNoneNoneFalseNoneFalse44369.57440
296536098026NoneV-2 , P.No.50, I.No.8.51Providing and applying white cement based putty of average thick ness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Basic Rate :100.00, Lift Charges 2% 2.00, AW. 3% 3.06, Final Rate : 105.06 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm105.06105.06257.33FalseNoneNoneFalseNoneFalse27035.08980
296536198026NoneV-2 , P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exte riors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.s and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Basic Rate :158.00, Lift Charges 2% 3.16, AW. 3% 4.83, Final Rate : 165.99 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm165.99165.99385.99FalseNoneNoneFalseNoneFalse64070.48010
296536298026NoneV-2 , P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Basic Rate :174.00, Lift Charges 2% 3.48, AW. 3% 5.32, Final Rate : 182.80 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm182.8182.8431.12FalseNoneNoneFalseNoneFalse78808.7360
296536398026NoneV-2 , P.No.47, I.No.8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt an and as per directions of Engineer-in-charge Basic Rate :50.00, Lift Charges 2% 1.00, AW. 3% 1.53, Final Rate : 52.53 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm52.5352.5339.35FalseNoneNoneFalseNoneFalse2067.05550
296536498026NoneV-2 , P.No.27, I.No.7.39.6Gutter (600 mm over all girth) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Basic Rate :1074.00, Lift Charges 2% 21.48, AW. 3% 32.86, Final Rate : 1128.34 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workm1128.341128.348.0FalseNoneNoneFalseNoneFalse9026.720
17098132520000NoneNoneBuildingsWater Supply52020.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296536598027NoneVol-2, P.No.131, I.No.14.3.1Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overfl fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid Basic Rate :5977.00, Lift Charges 2% 119.54, AW. 3% 182.90, Final Rate : 6279.44 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo6279.446279.441.0FalseNoneNoneFalseNoneFalse6279.440
296536698027NoneVol-2, P.No.131, I.No.14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan )with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, inclug and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Basic Rate :4884.00, Lift Charges 2% 97.68, AW. 3% 149.45, Final Rate : 5131.13 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo5131.135131.131.0FalseNoneNoneFalseNoneFalse5131.130
296536798027NoneVol-5, P.No.120, I.No.10.14.4Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.110mm(weight of pipe -1.315 kg Basic Rate :282.00, AW. 3% 8.46, Final Rate : 290.46 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo290.46290.4620.0FalseNoneNoneFalseNoneFalse5809.20
296536898027NoneVol-5, P.No.120, I.No.10.14.1Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.4 Kg/m2: 63mm(weight of pipe -0.465 kg)) Basic Rate :117.00, AW. 3% 3.51, Final Rate : 120.51 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo120.51120.5120.0FalseNoneNoneFalseNoneFalse2410.20
296536998027NoneVol-5, P.No.120, I.No.10.14.3Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.90mm weight of pipe -0.917 kg Basic Rate : 210.00, AW. 3% 6.30, Final Rate : 216.30 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo216.3216.315.0FalseNoneNoneFalseNoneFalse3244.50
296537098027NoneVol-2, P.No.122, I.No.13.31.3Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass thrxposed on wall - 25mm nominal dia pipes Basic Rate :318.00, Lift Charges 2% 6.36, AW. 3% 9.73, Final Rate : 334.09 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workm334.09334.0940.0FalseNoneNoneFalseNoneFalse13363.60
296537198027NoneVol-2, P.No.132, I.No.14.7.1Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackrass pillar taps Basic Rate :3082.00, Lift Charges 2% 61.64, AW. 3% 94.31, Final Rate : 3237.95 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo3237.953237.951.0FalseNoneNoneFalseNoneFalse3237.950
296537298027NoneVol-2, P.No.137, I.No.14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g Basic Rate :496.00, Lift Charges 2% 9.92, AW. 3% 15.18, Final Rate : 521.10 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workEach521.1521.11.0FalseNoneNoneFalseNoneFalse521.10
296537398027NoneVol-2, P.No.117, I.No.13.3.2Providing and fixing brass stop cock of approved quality 20 mm nominal bore Basic Rate : 305.00, Lift Charges 2% 6.10, AW. 3% 9.33, Final Rate : 320.43 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo320.43320.438.0FalseNoneNoneFalseNoneFalse2563.440
296537498027NoneVol-2, Page No.123, I.No 13.34Providing and placing on terrace, polyethylene water storage tanks as per IS 12701 : 1996 with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and ver flow pipes but without fittings and the base support for tank Basic Rate :9.00, Lift Charges 2% 0.18, AW. 3% 0.28, Final Rate :9.46 ---- Including cost and conveyance of all materials labour HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workNo9.469.461000.0FalseNoneNoneFalseNoneFalse9460.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17098132580000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17098132580001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17098132580001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17098132840000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of eProcurement portal due to internet connectivity issues and technical glitches at bidders endNone
17098132880000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17098132960000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17098133000000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should furnish qualification information as per clause-3 and section- 3 of Standard Tender Document attached to this tender and all the Formats prescribed in the bid documents shall be filled by the tenderer in full and complete manner. Otherwise the tender will be rejectedNone
17098133040000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and legible. At the time of opening of Tender all the original documents should be produced for verification without fail to the Executive Engineer, Superintending Engineer, Chief Engineer. Otherwise the tender will be rejected. During the time of evaluation of bids, if the employer finds any certification / information furnished is false, such tender will be rejectedNone
17098133090000NoneNoneELIGIBILITYWork done certificate should be issued by competent authority not below the rank of Executive EngineerNone
17098133140000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing Karnataka public Procurement portal and the employer is not responsible for non production of uploaded documents in Karnataka public Procurement portal. The tenderer has to ensure that all the documents required are uploaded correctlyNone
17098133180000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents of K.P.W.D. and further orders thereon. The employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17098133220000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit for an amount equivalent to 5percent of the Contract price plus additional security for unbalanced tenders (Difference between amount put to tender and quoted amount)None
17098133270000NoneNoneELIGIBILITYThe tender of any tenderer who does not accept the conditions contained in the tender document is liable to be rejected. Conditional tenders will not be accepted.None
17098133320000NoneNoneELIGIBILITYThe cost of tender form shall not be refundable. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. No interest will be paid by the Government on the Earnest money depositNone
17098133360000NoneNoneELIGIBILITYThe rates quoted shall be through rates for finished items of work inclusive of all lead and lifts, loading and unloading charges, all incidental charges and all taxes Local or General, Royalty etc., complete payable to the Government or Local bodies in the RegionNone
17098133410000NoneNoneELIGIBILITYThe rates quoted shall be inclusive of providing barricading fittings of danger lights, Jungle clearance near work spot / watchman etc., complete and maintained till completion of work and removing on completion as directed by the Engineer-in-charge of work. Rates quoted should includes clearance of site prior to commencement of work and its closure in all respects and holds good for all works under all conditions of site, moisture and weatherNone
17098133450000NoneNoneELIGIBILITYA Cess of 1% of the total approved amount of contract will be deducted from the work bill towards the Building and other construction workers welfare in accordance with the Govt. Order No. LD 300 LET 2006 Bangalore dated 18-1-2007. Royalty on construction materials and other taxes will be deducted as per prevailing Government orders. Contractor should follow strictly the prevailing rules of labour actNone
17098133500000NoneNoneELIGIBILITYAll the materials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost. All quantity and gradation of metal collected for the works should be got approved by the competent authority before useNone
17098133550000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment. The Contractor should maintain the work during defective liability period as per contract conditionsNone
17098133610000NoneNoneELIGIBILITYOmission and Typographical errors which is in the opinion of the Executive Engineer, will not be a ground for claims of extra payment. If any of the dates mentioned happens to be a general holiday, the next working day will holds goodNone
17098133660000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Division, Chitradurga during office hours on all working daysNone
17098133700000NoneNoneELIGIBILITYThe tenderer should have registration under section 7 of Building and other construction works act 1966. (As per G.O. No. LD 95 LET 2013, Bangalore dated 01-4-2013None
17098133760000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of contract for which the contracts alone is responsible for delay as determined by the authority while granting the extension of timeNone
17098133810000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30.07.2022, 18% GST will be added to the Contract amount separately.None
17098133850001NoneNoneELIGIBILITYThe tenderer should be a KPWD registered Class-III and Above ContractorNone
17098133900000NoneNoneELIGIBILITYEstimate are excluding GST as per common SR 2021-22 and Prevailing GST (18% of Amount put to Tender) Amount is kept in form of Lump sum in sanctioned estimate according in Common SR (GO:PWD 51RDF 2019 Bengaluru Dt: 18.03.2022), Therefore, Amount put to Tender and ECV Amount are Excluding GST, KPPP-PORTAL format has no options to add GST Separately at Stage of Draft Tender schedule process for Over all Amount put to tender, tender has been inviting through an option with INCLUSIVE, But the item wise rates do not include GST, Hence , GST will be paid separately for the quoted amount accordingly, Declaration Certificate must be Attached mandatorily.None
17098133950000NoneNoneELIGIBILITYEstimate rates are excluding GST as per common SR 2023-24 and prevailing GST 18 percent of Amount put to tender amount is kept in form of Lump sum in sanctioned estimate according to guidelines in common SR GO PWD 51 RDF 2019 Bangalore dt 18.03.2022, Therefore, amount put to tender and ECV amount are excluding GST. Hence, GST will be paid separately for S.R Item only the quoted amount accordingly. Declaration certificate must be attached mandatorily.None
17098134050000NoneNoneELIGIBILITYIf the contractor is a Firm, then all the partners of members of the firm shall belong to the Scheduled castes as the case may be.None
17098134090000NoneNoneELIGIBILITYThe contractor belonging to the Scheduled castes shall be domicile of the state of Karnataka for more than 10 years.None
17098134140000NoneNoneELIGIBILITYReserved Category Certificate Attach Related Scheduled Caste certificate issued by Compitent AuthorityNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The Tender should be a KPWD Registered Class-III and above contractor Attach Registration CertificateTrueTechnical Bid
To qualify for Award of this contract, Tenderer in his name should have achieved in at least One financial years in the last five years i.e. period of 2018-2019 to 2022-2023, a minimum financial turnover in all classes of civil engineering construction works only of Rs. 27.72 lakhs. Attach Balance sheets & Profit & Loss account statements indicating the contract receipts related to civil engineering construction works received in last 5 years duly certified by the chartered accountant.TrueTechnical Bid
To qualify for Award of this contract, each Tenderer should have in his name in the last five years, satisfactorily completed as prime contractor, at least Any Construction work of value not less than Rs. 6.93 lakhs. Attach Work done Certificate issued by competent authority of rank not less than Executive Engineer.TrueTechnical Bid
The requisite E.M.D. as prescribed in e-portal should be submitted by the contractor.TrueTechnical Bid
Tenderers address and contact detailsTrueTechnical Bid
Statement showing the Existing commitments and ongoing works, in the prescribed proforma as per 1.4 A of Section 3 of Qualification information should be furnished.TrueTechnical Bid
Statement showing Details of works for which tenders are already submitted in the prescribed proforma as per 1.4 B of Section 3 of Qualification information should be furnished.TrueTechnical Bid
If the contractor is a Firm, then all the partners of members of the firm shall belong to the Scheduled castes as the case may be.TrueTechnical Bid
The contractor belonging to the Scheduled castes shall be domicile of the state of Karnataka for more than 10 years.TrueTechnical Bid
Reserved Category Certificate Attach Related Scheduled Caste certificate issued by Compitent AuthorityTrueTechnical Bid
GST Declaration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsChitradurgaHiriyurChitradurgaHIRIYUR (SC)HiriyurNoneNoneNoneNoneNoneNone
BuildingsChitradurgaHiriyurChitradurgaHIRIYUR (SC)HiriyurNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone