createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709719892236
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd20500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose14-03-2024 17:00:00
tenderQueryClose12-03-2024 17:30:00
technicalBidOpenNone
publishedDate07-03-2024 15:55:04
publishedByPostPWD_EE_DIV_CKD
publishedByUserKPE15950 - SUNILKUMAR N BALOL
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShri. Sunilkumar N Balol EE PWD Division Chikodi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08338273859
mobileNumber8338273859
tenderSupplierListNone
tenderSchedule
createdTs1709719892268
version19
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9780
titleConstruction of Head Room, Wall Panelling, Plaster of Paris and Other Works to Shippuur Inspection Bunglow (Additional Rooms) and Providing Flower Pots and Other Works to Sankeshwar Inspection Bunglow in Hukkeri Taluk of Belgaum District Under HOA-2059 for the year 2023-24.
descriptionConstruction of Head Room, Wall Panelling, Plaster of Paris and Other Works to Shippuur Inspection Bunglow (Additional Rooms) and Providing Flower Pots and Other Works to Sankeshwar Inspection Bunglow in Hukkeri Taluk of Belgaum District Under HOA-2059 for the year 2023-24.
categoryWORKS
categoryTextWorks
ecv814756.31
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1686
locationNamePWD Division Office Chikkodi
provisionalAmount1000000.0
groupOverheadTotal0.0
fileNumberKPWD/2059/HUKKERI/Shippur-IB/Sankeshwar-IB/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17097198920000NoneNoneBuildingsConstruction of Head Room, Wall Panelling, Plaster of Paris and Other Works to Shippuur Inspection Bunglow (Additional Rooms) and Providing Flower Pots and Other Works to Sankeshwar Inspection Bunglow in Hukkeri Taluk of Belgaum District Under HOA-2059 for the year 2023-24.814756.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
293797897037NoneVol.1, P.No.15,I.No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.15,I.No.2.1.3) ---- including cost of all materials, labour,HOM,lCum5989.05989.00.58FalseNoneNoneFalseNoneFalse3473.620
293797997037Nonevol.1, P.No.8,I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m ( Vol.1, P.No.8,I.No.1.14.1) ---- including cost of all materials, labour,HOM,lCum102.0102.011.52FalseNoneNoneFalseNoneFalse1175.040
293798097037NoneVol.1, P.No.15,I.No.2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.15,I.No.2.2.3) ---- including cost of all materials, labour,HOM,lCum6336.06336.01.2FalseNoneNoneFalseNoneFalse7603.20
293798197037Nonevolume 1 page no. 115 , Sl No. 1aFormwark for Footings Isolated @ 8% ( (volume 1 page no. 115 / Sl No. 1a ) ---- including cost of all materials, labour,HOM,lCum506.88506.881.2FalseNoneNoneFalseNoneFalse608.2560
293798297037NoneVol.1, P.No.16,I.No.2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.( Vol.1, P.No.16,I.No.2.4.3) ---- including cost of all materials, labour,HOM,lCum6336.06336.00.4FalseNoneNoneFalseNoneFalse2534.40
293798397037Nonevolume 1 page no. 115 , Sl No. 9Formwark for Columns @ 70% (volume 1 page no. 115 / Sl No. 9) ---- including cost of all materials, labour,HOM,lCum4435.24435.20.4FalseNoneNoneFalseNoneFalse1774.080
293798497037NoneVol.1, P.No.16,I.No.2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.( Vol.1, P.No.16,I.No.2.5.2) ---- including cost of all materials, labour,HOM,lCum6843.06843.04.37FalseNoneNoneFalseNoneFalse29903.910
293798597037Nonevolume 1 page no. 115 , Sl No. 9Formwark for Columns @ 70% (volume 1 page no. 115 / Sl No. 9) ---- including cost of all materials, labour,HOM,lCum4790.14790.12.3FalseNoneNoneFalseNoneFalse11017.230
293798697037Nonevolume 1 page no. 116 , Sl No. 19Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (volume 1 page no. 116 / Sl No. 19) ---- including cost of all materials, labour,HOM,lCum3079.353079.352.0655FalseNoneNoneFalseNoneFalse6360.3974250
293798797037NoneVol.1, P.No.18,I.No.2.11aSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Vol.1, P.No.18,I.No.2.11a) ---- including cost of all materials, labour,HOM,lt89457.089457.00.446FalseNoneNoneFalseNoneFalse39897.8220
293798897037NoneVol.2 P.No.14, I. No. 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Vol.2 P.No.14, I. No. 6.8) ---- including cost of all materials, labour,HOM,lCum7969.07969.012.6FalseNoneNoneFalseNoneFalse100409.40
293798997037NoneVol.2, P.No.41, I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.41, I.No.8.1.1) ---- including cost of all materials, labour,HOM,lSqm255.0255.052.3364FalseNoneNoneFalseNoneFalse13345.7820
293799097037NoneVol.2, P.No.42, I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol.2, P.No.42, I.No.8.8 ) ---- including cost of all materials, labour,HOM,lSqm371.0371.0106.04FalseNoneNoneFalseNoneFalse39340.840
293799197037NoneVol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.30) ---- including cost of all materials, labour,HOM,lSqm174.0174.0112.77FalseNoneNoneFalseNoneFalse19621.980
293799297037NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labour,HOM,lSqm158.0158.052.34FalseNoneNoneFalseNoneFalse8269.720
293799397037NoneVol.2, P.No.25, I.No.7.31Providing and fixing in position 12mm thick plaster of paris (Gypsum anhydrous) for ceiling reinforced with hessian cloth flat surface with ceiling tiles up to a height of 5 m above floor level over aluminium strips 25mm x 6mm and rendered smooth with plaster of paris including cost of materials, labour, curing complete as per specifications.(Vol.2, P.No.25, I.No.7.31) ---- including cost of all materials, labour,HOM,lSqm1171.01171.042.06FalseNoneNoneFalseNoneFalse49252.260
293799497037None2018-19 SR, P.No.324, I.No.39.2Providing and fixing Acoustic Veneer paneling, over the 50mm x 35mm sal wood frame work at spacing not exceeding 600mm c/c fixed to the wall filled with 50mm thick 32kg density glass wool and top covered out of 4mm thick approved quality Veneer, fixed over 19mm thick ply strips of 1OOmm to 200mm with a gap of 6mm to 1Omm in between strips of approved brand, termite and water resistant, finished with melamine polish, complete including cost and conveyance of all materials, labour for all items of work, HOM complete as per specification. (2018-19 SR, P.No.324, I.No.39.2) ---- including cost of all materials, labour,HOM,lSqm6263.06263.057.77FalseNoneNoneFalseNoneFalse361813.510
293799597037NoneVol. 2, P. No.63, I.No.9.23Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : ** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent. (Vol. 2, P. No.63, I.No.9.23) ---- including cost of all materials, labour,HOM,lSqm2466.02466.08.06FalseNoneNoneFalseNoneFalse19875.960
293799697037NoneVol. 2, P. No.83, I.No.11.16.3Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Vol. 2, P. No.83, I.No.11.16.3) ---- including cost of all materials, labour,HOM,lKg122.0122.0246.25FalseNoneNoneFalseNoneFalse30042.50
293799797037NoneVol. 2, P. No.26, I.No.7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277,in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.(Vol. 2, P. No.26, I.No.7.38) ---- including cost of all materials, labour,HOM,lSqm568.0568.027.3FalseNoneNoneFalseNoneFalse15506.40
293799897037NoneS.E.B.C letter No.05154 dated 28-01-2022, S.No.03Single bed sheet premium of brand Trident/ Bombay dyeing of size 275x275cm". The rate inclusive of all leads and lifts, loading and unloading, cost and conveyance of all materials, labour charges, and all other incidental charges, all taxes etc. complete as per direction of Engineer incharge.(As per S.E.B.C aprroved letter No.05154 dated 28-01-2022, S.No.03 ) ---- including cost of all materials, labour,HOM,lEach600.0600.012.0FalseNoneNoneFalseNoneFalse7200.00
293799997037NoneS.E.B.C ltr No.05154 dated 28-01-2022,S.No.04King size premium white bedsheet of brand Nos Jasmine/ 225X275cm". The rate inclusive of all leads and lifts, Classic/ Bombay Dyeing of size 4 loading and unloading, cost and conveyance of all materials, labour charges, and all other incidental charges, all taxes etc. complete as per direction of Engineer incharge ( As per S.E.B.C aprroved letter No.05154 dated 28-01-2022, S.No.04 ) ---- including cost of all materials, labour,HOM,lEach950.0950.023.0FalseNoneNoneFalseNoneFalse21850.00
293800097037NoneS.E.B.C ltr No.05154 dated 28-01-2022, S.No.05 Napkins turkish premium of brand Trident/ Bombay Dyeing of size 40X60cm". The rate inclusive of all leads and lifts, loading and unloading, cost and conveyance of all materials, labour charges, and all other incidental charges, all taxes etc. complete as per direction of Engineer incharge ( As per S.E.B.C aprroved letter No.05154 dated 28-01-2022, S.No.05 ) ---- including cost of all materials, labour,HOM,lEach190.0190.012.0FalseNoneNoneFalseNoneFalse2280.00
293800197037NoneS.E.B.C ltr No.5396 dated 06-01-2018,S.No.06Premimum towel of brand trident/ classic/ bombay dyeing of size 75X150cm". The rate inclusive of all leads and lifts, loading and unloading, cost and conveyance of all materials, labour charges, and all other incidental charges, all taxes etc. complete as per direction of Engineer incharge. ( As per S.E.B.C aprroved letter No.5396 dated 06-01-2018, S.No.06 ) ---- including cost of all materials, labour,HOM,lEach1800.01800.012.0FalseNoneNoneFalseNoneFalse21600.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17097198930000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17097198930000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17097198930000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17097198930000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17097198930000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17097198930000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17097198930000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17097198930000NoneNoneELIGIBILITYBanker DetailsNone
17097199410000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17097199500000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17097199570000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17097199650000NoneNoneELIGIBILITYAs per karnataka state government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Govt letter No.PW/134/BMS /2007/dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17097200040000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17097200130000NoneNoneELIGIBILITYAll the documents to be uploaded shall be neatly scanned and the documents scanned shall be in original.None
17097200230000NoneNoneELIGIBILITYAny discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected.None
17097200320000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner. ( section 3 & 4 of the bid document ) and shall be uploaded properly, signed by Tenderer . Necessary Certificates shall be uploaded along with the formats wherever required. General documents Section can be used for this purpose.None
17097200420000NoneNoneELIGIBILITYEarnest Money Deposit will have to be in any one of the forms as per the instructions in the financial bid document and shall have to be valid for 45 days beyond the validity of the tenderNone
17097200510000NoneNoneELIGIBILITYTenderers are requested to read the Bid Documents before submission of their bidNone
17097200580000NoneNoneELIGIBILITYDepartment will not supply any materialsNone
17097200650000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17097200740000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing KP Procurement PortalNone
17097200850000NoneNoneELIGIBILITYThe Employer reserves the rights reject one or all tender without assigning any reasonsNone
17097200940000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Chikodi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentionedNone
17097201010000NoneNoneELIGIBILITYThe Tenderer are should be present during opening of the tender and also submit the uploaded documents duly attested by the Gazetted Officer not below the Rank of Executive EngineerNone
17097201090000NoneNoneELIGIBILITYContractors should Registered in KPWD and copy should be uploaded in E-portal Attested by the Gazzeted officers not below the rank of Executive EngineerNone
17097201150000NoneNoneELIGIBILITYGST shall be paid to the tendered amount seperatelyNone
17097201240000NoneNoneELIGIBILITYThe Increase in G.S.T shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17097201300000NoneNoneELIGIBILITYWork Completion/Execution Period three (3) monthsNone
17097201710001NoneNoneELIGIBILITYThe Tenderer shall obtain similar the workdone certificate from financial year 2018-19 to 2022-23 (50% of the Amount Put to Tender i.e., Rs.4.07 Lakhs) in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the BidNone
17097201780000NoneNoneELIGIBILITYDifference amount should submit at the time of Agreement.None
17097201890001NoneNoneELIGIBILITYThe Contractor should maintain the building in good conditionNone
17097202040000NoneNoneELIGIBILITYThe EMD of Rs. 20,500.00/- shall be paid in full through e-payment in favour of Executive Engineer, PWD, Chikodi Dn, ChikodiNone
17097202260000NoneNoneELIGIBILITYThe Tenderer shall achieved in at least two financial years an average annual financial turnover from financial year 2018-19 to 2022-23 of 8.15 Lakhs (not less than the estimated cost under this contract)None
17097202370000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next sectionNone
17097202490000NoneNoneELIGIBILITYIf the contractor has not done the maintenance work satisfactorily in previous years such bids will be rejectedNone
17097203890000NoneNoneELIGIBILITYAs per Government Circular No. FD/263/EXP-12/2022,Dated 11/05/2022 L1 tenderer EMD amount is forfeited and tender will be rejectedNone
17097920880000NoneNoneELIGIBILITYThe Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself with the Site of Works and its surroundings including source of earth, water, road aggregates, availability of labor etc. and obtain all information that may be necessary for preparing the Bid and entering into a contract for undertaking the maintenance Works. The costs of visiting the site shall be at the Bidders own expense. The following certificate/Affidavit shall be undertaken by contractor during the submission of tenders. I have inspected the building and I am ready to maintain the buildingNone
17097921690000NoneNoneELIGIBILITYThe Contractor shall maintain the building Assets in proper condition that comply with the building Maintenance Standards and ensure building users safety and comfort. The maintenance activitiesshall be so planned that the defects are repaired well before they reach maximum condition asper the permissible tolerance.None
17098053830000NoneNoneELIGIBILITYIf no bid received auto extension will be done by KPPP portal by itself for 2 daysNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2018-19 to 2022-23TrueTechnical Bid
Similar Financial Work Done Certificate 50percentage of APTTrueTechnical Bid
Any other related documentsTrueTechnical Bid
Ongoing work detailsTrueTechnical Bid
GST RegistratationTrueTechnical Bid
UDIN form practicing Chartered Account is preferredTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsBelagaviHukkeriChikkodiCHIKKODI (SC)ShippurNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone