createdTs1709891658617
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1900000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-04-2024 17:00:00
tenderQueryClose18-03-2024 17:00:00
technicalBidOpen05-04-2024 11:00:00
publishedDate08-03-2024 15:35:55
publishedByPostKUIDFC_EE_SCP_HOD
publishedByUserKPE13331 - Vidyulata
bidValidityPeriod90
noOfCalls2
preBidMeetingDate20-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonVidyulata
splitEmdRequiredYnTrue
emdBankGuarantee1800000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08025196124
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709891658619
version13
createdDateNone
modifiedDateNone
tenderNumberKUIDFC/2023-24/OW/WORK_INDENT2/CALL-2
titleConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 2
descriptionDESIGN, BUILT, OPERATE AND TRANFER OF FAECAL SLUDGE TREATMENT PLANT (FSTP) UNDER USED WATER MANAGEMENT PROJECT IN 8 ULBs (PACKAGE -2)
categoryWORKS
categoryTextWorks
ecv185850035.37
deptNameKarnataka Urban Infrastructure Development and Finance Corporation Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location6061
locationNameKUIDFC Managing Director Office Bengaluru
provisionalAmount257100000.0
groupOverheadTotalNone
fileNumberUWM-FSTP-2
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17098916590000NoneNoneOther WorksConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 2185850035.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297057498376Nonecode0001Design, construction and successful commissioning of 3KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No5011758.05011758.01.0FalseNoneNoneFalseNoneFalse5011758.00
297057598376Nonecode0002For 3 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8079372.08079372.01.0FalseNoneNoneFalseNoneFalse8079372.00
297057698376Nonecode0003For 3 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297057798376Nonecode0004For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
297057898376Nonecode0005For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1399729.621399729.621.0FalseNoneNoneFalseNoneFalse1399729.620
297057998376Nonecode0006For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1539702.581539702.581.0FalseNoneNoneFalseNoneFalse1539702.580
297058098376Nonecode0007For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1693672.841693672.841.0FalseNoneNoneFalseNoneFalse1693672.840
297058198376Nonecode0008For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1863040.121863040.121.0FalseNoneNoneFalseNoneFalse1863040.120
297058298376Nonecode0009Design, construction and successful commissioning of 6KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7374103.07374103.06.0FalseNoneNoneFalseNoneFalse44244618.00
297058398376Nonecode0010For 6 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7972323.07972323.06.0FalseNoneNoneFalseNoneFalse47833938.00
297058498376Nonecode0011For 6 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297058598376Nonecode0012For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.326.0FalseNoneNoneFalseNoneFalse6699643.920
297058698376Nonecode0013For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1467027.481467027.486.0FalseNoneNoneFalseNoneFalse8802164.880
297058798376Nonecode0014For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1613730.231613730.236.0FalseNoneNoneFalseNoneFalse9682381.380
297058898376Nonecode0015For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1775103.251775103.256.0FalseNoneNoneFalseNoneFalse10650619.50
297058998376Nonecode0016For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1952613.581952613.586.0FalseNoneNoneFalseNoneFalse11715681.480
297059098376Nonecode0017Design, construction and successful commissioning of 9KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8498782.08498782.01.0FalseNoneNoneFalseNoneFalse8498782.00
297059198376Nonecode0018For 9 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No9024773.09024773.01.0FalseNoneNoneFalseNoneFalse9024773.00
297059298376Nonecode0019For 9 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297059398376Nonecode0020For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
297059498376Nonecode0021For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1481779.881481779.881.0FalseNoneNoneFalseNoneFalse1481779.880
297059598376Nonecode0022For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1629957.861629957.861.0FalseNoneNoneFalseNoneFalse1629957.860
297059698376Nonecode0023For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1792953.651792953.651.0FalseNoneNoneFalseNoneFalse1792953.650
297059798376Nonecode0024For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1972249.021972249.021.0FalseNoneNoneFalseNoneFalse1972249.020
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17098916590000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17098916590000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17098916590001NoneNoneELIGIBILITYBidders shall ensure upload of all relevant documentNone
17098916590000NoneNoneELIGIBILITYBidders should comply all the conditions of the tender documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Faecal Sludge Treatment Plant (FSTP) /Sewage Treatment plant(STP)/ UGD project with STP / combined water supply & sewerage project with STP of value not less than Rs 10 CroreCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneExecuted in any one year of the last five years (2018-19 to 2022-23) the following minimum quantities of work (as specified in Clause no.3.2(C) of the Informations to the bidders of the RFPCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneavailability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50%can be deployed on lease/hire basis for all works provided, the relevant documents(commitment agreements etc.) for availability for this work are furnishedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of not less than Rs 3.50 Crore ( credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the format below.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender valueCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneAll Other Technical documents as per tender documentCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER TENDER DOCUMENT
NoneNoneNoneNoneTo qualify for award of this contract, in the last five financial years i.e. 2018-19 to 2022-23 each Tenderer in its name should have. (A) Achieved in at least two financial years a minimum financial turnover (i) in all classes of civil engineering construction works only) of Rs 38 Crore. (ii) Audited profit and loss account statement/ balance sheets certified by the chartered accountant, (ii) Turnover certificate with UDIN and (iii) IT returns filed for the above indicated 5 years is to be uploaded along with the technical bidFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1709892140000
version0
createdDateNone
modifiedDateNone
blockNumberKUIDFC Head Office
streetNone
cityBengaluru
stateKarnataka
pin560038
tenderRecallDTONone