createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709883142815
version13
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2000000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-04-2024 17:00:00
tenderQueryClose18-03-2024 17:00:00
technicalBidOpen05-04-2024 11:00:00
publishedDate08-03-2024 13:23:53
publishedByPostKUIDFC_EE_SCP_HOD
publishedByUserKPE13331 - Vidyulata
bidValidityPeriod90
noOfCalls2
preBidMeetingDate20-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonVidyulata
splitEmdRequiredYnTrue
emdBankGuarantee1900000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08025196124
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709883142819
version17
createdDateNone
modifiedDateNone
tenderNumberKUIDFC/2023-24/OW/WORK_INDENT1/CALL-2
titleConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 1
descriptionDESIGN, BUILT, OPERATE AND TRANFER OF FAECAL SLUDGE TREATMENT PLANT (FSTP) UNDER USED WATER MANAGEMENT PROJECT IN 8 ULBs (PACKAGE -1)
categoryWORKS
categoryTextWorks
ecv190341225.11
deptNameKarnataka Urban Infrastructure Development and Finance Corporation Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location6061
locationNameKUIDFC Managing Director Office Bengaluru
provisionalAmount263300000.0
groupOverheadTotalNone
fileNumberUWM-FSTP-1
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17098831430000NoneNoneOther WorksConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 1190341225.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296871198253Nonecode01Design, construction and successful commissioning of 3KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No5011758.05011758.01.0FalseNoneNoneFalseNoneFalse5011758.00
296871298253Nonecode02For 3 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8079372.08079372.01.0FalseNoneNoneFalseNoneFalse8079372.00
296871398253Nonecode03For 3 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
296871498253Nonecode04For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
296871598253Nonecode05For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1399729.621399729.621.0FalseNoneNoneFalseNoneFalse1399729.620
296871698253Nonecode06For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1539702.581539702.581.0FalseNoneNoneFalseNoneFalse1539702.580
296871798253Nonecode07For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1693672.841693672.841.0FalseNoneNoneFalseNoneFalse1693672.840
296871898253Nonecode08For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1863040.121863040.121.0FalseNoneNoneFalseNoneFalse1863040.120
296871998253Nonecode09Design, construction and successful commissioning of 6KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7374103.07374103.04.0FalseNoneNoneFalseNoneFalse29496412.00
296872098253Nonecode10For 6 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7972323.07972323.04.0FalseNoneNoneFalseNoneFalse31889292.00
296872198253Nonecode11For 6 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
296872298253Nonecode12For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.324.0FalseNoneNoneFalseNoneFalse4466429.280
296872398253Nonecode13For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1467027.481467027.484.0FalseNoneNoneFalseNoneFalse5868109.920
296872498253Nonecode14For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1613730.231613730.234.0FalseNoneNoneFalseNoneFalse6454920.920
296872598253Nonecode15For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1775103.251775103.254.0FalseNoneNoneFalseNoneFalse7100413.00
296872698253Nonecode16For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1952613.581952613.584.0FalseNoneNoneFalseNoneFalse7810454.320
296872798253Nonecode17Design, construction and successful commissioning of 9KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8498782.08498782.03.0FalseNoneNoneFalseNoneFalse25496346.00
296872898253Nonecode18For 9 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No9024773.09024773.03.0FalseNoneNoneFalseNoneFalse27074319.00
296872998253Nonecode19For 9 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
296873098253Nonecode20For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.323.0FalseNoneNoneFalseNoneFalse3349821.960
296873198253Nonecode21For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1481779.881481779.883.0FalseNoneNoneFalseNoneFalse4445339.640
296873298253Nonecode22For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1629957.861629957.863.0FalseNoneNoneFalseNoneFalse4889873.580
296873398253Nonecode23For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1792953.651792953.653.0FalseNoneNoneFalseNoneFalse5378860.950
296873498253Nonecode24For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1972249.021972249.023.0FalseNoneNoneFalseNoneFalse5916747.060
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17098831430000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17098831430000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17098831430000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17098831430000NoneNoneELIGIBILITYThe Bidder should comply all the conditions of the tender documentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Faecal Sludge Treatment Plant (FSTP) /Sewage Treatment plant(STP)/ UGD project with STP / combined water supply & sewerage project with STP of value not less than Rs 10 CrorePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year of the last five years (2018-19 to 2022-23) the following minimum quantities of work. (as specified in the clause 3.2(c) of the Information to the Bidders of RFP)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneAvailability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents ( commitment agreements etc.) for availability for this work are to be furnished.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of not less than Rs 3.50 ( credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc.,Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender valueCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Documents
NoneNoneNoneNoneTo qualify for award of this contract, in the last five financial years i.e. 2018-19 to 2022-23 each Tenderer in its name should have. (A) Achieved in at least two financial years a minimum financial turnover (i) in all classes of civil engineering construction works only) of Rs 40 Crore. (ii) Audited profit and loss account statement/ balance sheets certified by the chartered accountant, (ii) Turnover certificate with UDIN and (iii) IT returns filed for the above indicated 5 years is to be uploaded along with the technical bidFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1709883976000
version0
createdDateNone
modifiedDateNone
blockNumberKUIDFC Head Office
streetNone
cityBengaluru
stateKarnataka
pin560038
tenderRecallDTONone