createdTs1709961164811
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd35000.00
bidValueTypeLUMPSUM
bidValueTypeTextLumpsum
tenderReceiptClose16-03-2024 17:30:00
tenderQueryClose14-03-2024 14:00:25
technicalBidOpen18-03-2024 11:00:20
publishedDate09-03-2024 10:59:37
publishedByPostRDPR_EO_TP_SWPT
publishedByUserKPE19066 - JAYANNA B V
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonAssistant Director
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9481068968
tenderSupplierListNone
tenderSchedule
createdTs1709961164849
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2023-24/BD/WORK_INDENT5384
titleComprehensive Developments of Construction of concrete Drains , clothes washing and drying area and install interlock and other Essential Development works at Kushalnagara Scheduled Caste Pre-Matric Girls Hostel Kushalnagara taluk Kodagu District
descriptionComprehensive Developments of Construction of concrete Drains , clothes washing and drying area and install interlock and other Essential Development works at Kushalnagara Scheduled Caste Pre-Matric Girls Hostel Kushalnagara taluk Kodagu District
categoryWORKS
categoryTextWorks
ecv1398520.30
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location563
locationNameRDPR Taluka Panchayat Office Somvarpet
provisionalAmount1400000.0
groupOverheadTotalNone
fileNumberTP/Spt/ST-Hostel/kus/001/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17099611650000NoneNoneBuildingsComprehensive Developments of Construction of concrete Drains , clothes washing and drying area and install interlock and other Essential Development works at Kushalnagara Scheduled Caste Pre-Matric Girls Hostel Kushalnagara taluk Kodagu District1398520.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297357698528Volume -1-Common SR- Chapter - I- Earth Work1.1Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.Sqm70.070.0219.0FalseNoneNoneFalseNoneFalse15330.00
297357798528Volume -1-Common SR- Chapter - I- Earth Work1.4.1In all kinds of soils Depth upto 1.5 mCum186.0186.023.01FalseNoneNoneFalseNoneFalse4279.860
297357898528Volume-1- Common SR-Chapter -II - Concrete Works2.1.2Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5364.05364.010.31FalseNoneNoneFalseNoneFalse55302.840
297357998528Volume-2-For Buildings Chapter-5-Stone Masonry works5.2Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5611.05611.010.9FalseNoneNoneFalseNoneFalse61159.90
297358098528Volume-2-For Buildings Chapter-5-Stone Masonry works5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5422.05422.06.5FalseNoneNoneFalseNoneFalse35243.00
297358198528Volume-1- Common SR-Chapter -II - Concrete Works2.1.4Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum5926.05926.08.5FalseNoneNoneFalseNoneFalse50371.00
297358298528Volume-2-For Buildings Chapter-6-Masonry works6.4Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Sqm7464.07464.00.5978FalseNoneNoneFalseNoneFalse4461.97920
297358398528Volume-2-For Buildings Chapter-11-Steel and Aluminium Work11.16.2Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.kg136.0136.01452.7059FalseNoneNoneFalseNoneFalse197568.00240
297358498528Volume-2-For Buildings Chapter-20-Repairs To Buildings20.1Supplying and fixing new Mangalore tiles on existing reepers.m425.0425.0101.73FalseNoneNoneFalseNoneFalse43235.250
297358598528Volume-2-For Buildings Chapter-12-Wood & PVC Works12.5Providing Jungle wood such as Nerale, Neem wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete as per specifications.Cum43339.043339.00.6737FalseNoneNoneFalseNoneFalse29197.48430
297358698528Volume-2-For Buildings Chapter-20-Repairs To Buildings20.118Providing & injecting grout of Acrylic Polymer based into honey combs/ cracks for new RCC work / damaged re-work as per direction of Engineer in charge of work.Sqm117.0117.0114.25FalseNoneNoneFalseNoneFalse13367.250
297358798528Volume-2-For Buildings Chapter-20-Repairs To Buildings20.98Providing Mangalore Ridge tiles set in C.M. 1:2 and pointed with C.M. 1:2.m330.0330.016.9FalseNoneNoneFalseNoneFalse5577.00
297358898528Volume-2-For Buildings Chapter-7-Roofing7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per Sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.Sqm556.0556.066.5FalseNoneNoneFalseNoneFalse36974.00
297358998528Volume-2-For Buildings Chapter-13-Water Suppy & Drainage Works13.5.115 mm nominal boreNos.329.0329.017.565FalseNoneNoneFalseNoneFalse5778.8850
297359098528Volume-2-For Buildings Chapter-8-Finishing8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm234.0234.0205.64FalseNoneNoneFalseNoneFalse48119.760
297359198528Volume-2-For Buildings Chapter-21-Conservation of Heritage Buildings21.5Ruled / Flush pointing on Sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime: 1.5 surkhi (50% red and 50% light yellow surkhi ) : 1/2 marble dust}. (The rate is inclusive of all materials & labours involved except scaffolding).Sqm192.0192.015.79FalseNoneNoneFalseNoneFalse3031.680
297359298528Volume-3-For Roads And Bridges - Chapter-9-Pipe Culverts9.1.i1000 mm diam8864.08864.05.344FalseNoneNoneFalseNoneFalse47369.2160
297359398528Volume-2-For Buildings Chapter-11-Steel and Aluminium Work11.3Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Sqm6563.06563.05.31FalseNoneNoneFalseNoneFalse34849.530
297359498528Volume-2-For Buildings Chapter-12-Wood & PVC Works12.87Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 81mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible size – 1519mm x 1519mm (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made)Sqm6722.06722.08.84FalseNoneNoneFalseNoneFalse59422.480
297359598528Volume-2-For Buildings Chapter-8-Finishing8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm105.0105.0983.69FalseNoneNoneFalseNoneFalse103287.450
297359698528Volume-2-For Buildings Chapter-8-Finishing8.4Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm90.090.0246.32FalseNoneNoneFalseNoneFalse22168.80
297359798528Volume-2-For Buildings Chapter-13-Water Suppy & Drainage Works13.1.125 to 40 mm nominal boreNos.471.0471.05.77FalseNoneNoneFalseNoneFalse2717.670
297359898528Volume-1- Common SR-Chapter -II - Concrete Works2.4.2Sqm0 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6256.06256.08.64FalseNoneNoneFalseNoneFalse54051.840
297359998528Volume-3-For Roads And Bridges - Chapter-4 - Sub-Bases, Bases (Non-Bituminous) and Shoulders 4.1.A.iFor Grading -I MaterialCum2349.02349.03.876FalseNoneNoneFalseNoneFalse9104.7240
297360098528NoneIt No19.30Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. (Volume(II) It.No.19.30) Sqm160.16160.16156.95FalseNoneNoneFalseNoneFalse25137.1120
297360198528NoneCOMMON SR FOR BUILDINGS 2023-24, Volume(II) INo 20Making the opening in brick masonry for door/window/clerestory window including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface i/c disposal of mulba/ rubbish to the nearest municipal dumping ground, all complete as per direction of Engineer-in-Charge. (COMMON SR FOR BUILDINGS 2023-24, Volume(II) INo 20.1) Sqm1171.521171.523.15FalseNoneNoneFalseNoneFalse3690.2880
297360298528NoneCOMMON SR FOR 2023-24, Volume(I) INo 1.11)Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR FOR 2023-24, Volume(I) INo 1.11) Cum484.96484.9619.8FalseNoneNoneFalseNoneFalse9602.2080
297360398528NoneCOMMON SR FOR BUILDINGS 2023-24, INo 6.32)Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (COMMON SR FOR BUILDINGS 2023-24, INo 6.32) Sqm1467.21467.261.95FalseNoneNoneFalseNoneFalse90893.040
297360498528NoneCOMMON SR FOR BUILDINGS 2023-24, Volume(II) INo 9.Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x600 mm (COMMON SR FOR BUILDINGS 2023-24, Volume(II) INo 9.17.2) Point1035.01035.02.0FalseNoneNoneFalseNoneFalse2070.00
297360598528NoneBUILDINGS 2023-24, Volume(II) INo 11.34B)Providing and fixing M.S. grills of required pattern in frames of win- dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. (COMMON SR FOR BUILDINGS 2023-24, Volume(II) INo 11.34B) Each173.0173.02.0FalseNoneNoneFalseNoneFalse346.00
297360698528NonePWD Electrical for 2023-24 It-No.3.3Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. (Schedule of Rates for (PWD Electrical) for 2023-24 ( It-No.3.3) ) Each176.0176.014.0FalseNoneNoneFalseNoneFalse2464.00
297360798528NonePWD Electrical for 2023-24 ( It-No.2.3)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (Schedule of Rates for (PWD Electrical) for 2023-24 ( It-No.2.3) ) m31.3331.33180.0FalseNoneNoneFalseNoneFalse5639.40
297360898528NonePWD Electrical) for 2023-24 ( It-No.3.14)Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. (Schedule of Rates for (PWD Electrical) for 2023-24 ( It-No.3.14) ) m74.074.03.0FalseNoneNoneFalseNoneFalse222.00
297360998528NonePWD Electrical) for 2023-24 ( It-No.11.11.4 )PWD Electrical) for 2023-24 ( It-No.11.11.4 )Each154.0154.03.0FalseNoneNoneFalseNoneFalse462.00
297361098528NoneCOMMON SR FOR Electrical Works 2023-24,Volume(VI) COMMON SR FOR Electrical Works 2023-24,Volume(VI) I.No. 6.4.2Each3754.03754.02.0FalseNoneNoneFalseNoneFalse7508.00
297361198528NoneCOMMON SR 2023-24,Volume(I) INo 2.11 (a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(COMMON SR 2023-24,Volume(I) INo 2.11 (a)Tonne100191.0100191.00.18FalseNoneNoneFalseNoneFalse18034.380
297361298528NoneCOMMON SR FOR 2023-24, Volume(III) INo 6.8.1Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification) (COMMON SR FOR 2023-24, Volume(III) INo 6.8.1) Cum1196.161196.1664.25FalseNoneNoneFalseNoneFalse76853.280
297361398528NoneGSTAdd 18% GST as per Govt Letter dated (30/07/2022) and Miscellaneous unforceen charges Rs…………Sqm213629.0213629.01.0FalseNoneNoneFalseNoneFalse213629.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17099611660000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17099611660000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17099611660000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNoneCONTRACTER REGISTRATIONPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor License PWD class - 3 and aboveTrueTechnical Bid
GSTTrueTechnical Bid
ITR last 3 YearsTrueTechnical Bid
Adhar CardTrueTechnical Bid
Bank Pass BookFalseTechnical Bid
PAN CARDTrueTechnical Bid
NON BLOCK LISTED - AFFIDIVITTrueTechnical Bid
WORK DONE CERTIFICATETrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds