1709893190000 | 0 | None | None | Other Works | Construction of Faecal Sludge Treatment Plants (FSTP) in 12 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model (Package-9) | 283427256.55 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2971182 | 98402 | None | code01 | Design, construction and successful commissioning of 3KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 5011758.0 | 5011758.0 | 1.0 | False | None | None | False | None | False | 5011758.0 | 0 | 2971183 | 98402 | None | code02 | For 3 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 8079372.0 | 8079372.0 | 1.0 | False | None | None | False | None | False | 8079372.0 | 0 | 2971184 | 98402 | None | code03 | For 3 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidder | No | 1.0 | 1.0 | 1.0 | False | None | None | False | None | False | 1.0 | 0 | 2971185 | 98402 | None | code04 | For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost only | No | 1116607.32 | 1116607.32 | 1.0 | False | None | None | False | None | False | 1116607.32 | 0 | 2971186 | 98402 | None | code05 | For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1399729.62 | 1399729.62 | 1.0 | False | None | None | False | None | False | 1399729.62 | 0 | 2971187 | 98402 | None | code06 | For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1539702.58 | 1539702.58 | 1.0 | False | None | None | False | None | False | 1539702.58 | 0 | 2971188 | 98402 | None | code07 | For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1693672.84 | 1693672.84 | 1.0 | False | None | None | False | None | False | 1693672.84 | 0 | 2971189 | 98402 | None | code08 | For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1863040.12 | 1863040.12 | 1.0 | False | None | None | False | None | False | 1863040.12 | 0 | 2971190 | 98402 | None | code09 | Design, construction and successful commissioning of 6KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 7374103.0 | 7374103.0 | 8.0 | False | None | None | False | None | False | 58992824.0 | 0 | 2971191 | 98402 | None | code10 | For 6 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 7972323.0 | 7972323.0 | 8.0 | False | None | None | False | None | False | 63778584.0 | 0 | 2971192 | 98402 | None | code11 | For 6 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidder | No | 1.0 | 1.0 | 1.0 | False | None | None | False | None | False | 1.0 | 0 | 2971193 | 98402 | None | code12 | For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost only | No | 1116607.32 | 1116607.32 | 8.0 | False | None | None | False | None | False | 8932858.56 | 0 | 2971194 | 98402 | None | code13 | For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1467027.48 | 1467027.48 | 8.0 | False | None | None | False | None | False | 11736219.84 | 0 | 2971195 | 98402 | None | code14 | For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1613730.23 | 1613730.23 | 8.0 | False | None | None | False | None | False | 12909841.84 | 0 | 2971196 | 98402 | None | code15 | For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1775103.25 | 1775103.25 | 8.0 | False | None | None | False | None | False | 14200826.0 | 0 | 2971197 | 98402 | None | code16 | For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1952613.58 | 1952613.58 | 8.0 | False | None | None | False | None | False | 15620908.64 | 0 | 2971198 | 98402 | None | code17 | Design, construction and successful commissioning of 9KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 8498782.0 | 8498782.0 | 3.0 | False | None | None | False | None | False | 25496346.0 | 0 | 2971199 | 98402 | None | code18 | For 9 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run. | No | 9024773.0 | 9024773.0 | 3.0 | False | None | None | False | None | False | 27074319.0 | 0 | 2971200 | 98402 | None | code19 | For 9 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidder | No | 1.0 | 1.0 | 1.0 | False | None | None | False | None | False | 1.0 | 0 | 2971201 | 98402 | None | code20 | For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost only | No | 1116607.32 | 1116607.32 | 3.0 | False | None | None | False | None | False | 3349821.96 | 0 | 2971202 | 98402 | None | code21 | For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1481779.88 | 1481779.88 | 3.0 | False | None | None | False | None | False | 4445339.64 | 0 | 2971203 | 98402 | None | code22 | For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1629957.86 | 1629957.86 | 3.0 | False | None | None | False | None | False | 4889873.58 | 0 | 2971204 | 98402 | None | code23 | For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1792953.65 | 1792953.65 | 3.0 | False | None | None | False | None | False | 5378860.95 | 0 | 2971205 | 98402 | None | code24 | For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost . | No | 1972249.02 | 1972249.02 | 3.0 | False | None | None | False | None | False | 5916747.06 | 0 |
|