createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709893051370
version10
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2000000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-04-2024 17:00:00
tenderQueryClose18-03-2024 17:00:00
technicalBidOpen05-04-2024 11:00:00
publishedDate08-03-2024 17:08:06
publishedByPostKUIDFC_EE_SCP_HOD
publishedByUserKPE13331 - Vidyulata
bidValidityPeriod90
noOfCalls2
preBidMeetingDate20-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonVidyulata
splitEmdRequiredYnTrue
emdBankGuarantee1900000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08025196124
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1709893051372
version16
createdDateNone
modifiedDateNone
tenderNumberKUIDFC/2023-24/OW/WORK_INDENT5/CALL-2
titleConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 5
descriptionDESIGN, BUILT, OPERATE AND TRANFER OF FAECAL SLUDGE TREATMENT PLANT (FSTP) UNDER USED WATER MANAGEMENT PROJECT IN 8 ULBs (PACKAGE -5)
categoryWORKS
categoryTextWorks
ecv191279548.45
deptNameKarnataka Urban Infrastructure Development and Finance Corporation Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location6061
locationNameKUIDFC Managing Director Office Bengaluru
provisionalAmount264600000.0
groupOverheadTotalNone
fileNumberUWM-FSTP-5
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17098930510000NoneNoneOther WorksConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 5191279548.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297109498398Nonecode01Design, construction and successful commissioning of 3KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No5011758.05011758.01.0FalseNoneNoneFalseNoneFalse5011758.00
297109598398Nonecode02For 3 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8079372.08079372.01.0FalseNoneNoneFalseNoneFalse8079372.00
297109698398Nonecode03For 3 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297109798398Nonecode04For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
297109898398Nonecode05For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1399729.621399729.621.0FalseNoneNoneFalseNoneFalse1399729.620
297109998398Nonecode06For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1539702.581539702.581.0FalseNoneNoneFalseNoneFalse1539702.580
297110098398Nonecode07For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1693672.841693672.841.0FalseNoneNoneFalseNoneFalse1693672.840
297110198398Nonecode08For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1863040.121863040.121.0FalseNoneNoneFalseNoneFalse1863040.120
297110298398Nonecode09Design, construction and successful commissioning of 6KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7374103.07374103.05.0FalseNoneNoneFalseNoneFalse36870515.00
297110398398Nonecode10For 6 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No7972323.07972323.05.0FalseNoneNoneFalseNoneFalse39861615.00
297110498398Nonecode11For 6 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297110598398Nonecode12For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.325.0FalseNoneNoneFalseNoneFalse5583036.60
297110698398Nonecode13For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1467027.481467027.485.0FalseNoneNoneFalseNoneFalse7335137.40
297110798398Nonecode14For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1613730.231613730.235.0FalseNoneNoneFalseNoneFalse8068651.150
297110898398Nonecode15For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1775103.251775103.255.0FalseNoneNoneFalseNoneFalse8875516.250
297110998398Nonecode16For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1952613.581952613.585.0FalseNoneNoneFalseNoneFalse9763067.90
297111098398Nonecode17Design, construction and successful commissioning of 9KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8498782.08498782.01.0FalseNoneNoneFalseNoneFalse8498782.00
297111198398Nonecode18For 9 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No9024773.09024773.01.0FalseNoneNoneFalseNoneFalse9024773.00
297111298398Nonecode19For 9 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297111398398Nonecode20For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
297111498398Nonecode21For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1481779.881481779.881.0FalseNoneNoneFalseNoneFalse1481779.880
297111598398Nonecode22For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1629957.861629957.861.0FalseNoneNoneFalseNoneFalse1629957.860
297111698398Nonecode23For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1792953.651792953.651.0FalseNoneNoneFalseNoneFalse1792953.650
297111798398Nonecode24For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1972249.021972249.021.0FalseNoneNoneFalseNoneFalse1972249.020
297111898398Nonecode25Design, construction and successful commissioning of 12KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No10299824.010299824.01.0FalseNoneNoneFalseNoneFalse10299824.00
297111998398Nonecode26For 12 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No10212890.010212890.01.0FalseNoneNoneFalseNoneFalse10212890.00
297112098398Nonecode27For 12 KLD FSTP Plant and allied infrastructure - OTHERS -if required- to be specified as per assessment of the bidderNo1.01.01.0FalseNoneNoneFalseNoneFalse1.00
297112198398Nonecode28For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1116607.321116607.321.0FalseNoneNoneFalseNoneFalse1116607.320
297112298398Nonecode29For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1523744.591523744.591.0FalseNoneNoneFalseNoneFalse1523744.590
297112398398Nonecode30For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1676119.041676119.041.0FalseNoneNoneFalseNoneFalse1676119.040
297112498398Nonecode31For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1843730.951843730.951.0FalseNoneNoneFalseNoneFalse1843730.950
297112598398Nonecode32For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2028104.042028104.041.0FalseNoneNoneFalseNoneFalse2028104.040
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17098930510000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17098930510000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17098930510000NoneNoneELIGIBILITYConditional tenders will not be accepted..None
17098930510000NoneNoneELIGIBILITYShould comply all the conditions as per the tender documentNone
17098930510000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so everNone
17098930510000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately.None
17098930510000NoneNoneELIGIBILITYTenderers are required to read the Bid Documents and Enclosure -1 carefully before submission of their bidNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Faecal Sludge Treatment Plant (FSTP) /Sewage Treatment plant(STP)/ UGD project with STP / combined water supply & sewerage project with STP/ exclusive water supply projects of value not less than Rs 10 CrorePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneExecuted in any one year of the last five years (2018-19 to 2022-23) the following minimum quantities of work (1) Earthwork excavation in all kinds of soil by mechanical / manual means. (2) Cement concrete (Including RCC & PCC) (3) TMT Steel (4) Wet mix macadam ( WMM) / Water bound macadam (WBM) (5) Bituminous Macadam (BM) / Semi-dense Bituminous concrete (SDBC) / Bituminous Concrete (BC) . As per the minimum quantities of work given in the tender documentPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe Bidder should have Supplied, built, installed, tested and commissioned a Sewage Treatment Plant (STP) of minimum 2 MLD capacity (either as single STP or multiple STPs works, totaling to 2 MLD capacity). OR Faecal Sludge Treatment Plant (FSTP) of minimum 6 KLD capacity (either as a single FSTP or multiple FSTP works , totaling to 6 KLD capacity).Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant documents
NoneNoneNoneNoneAny other relevant document as per bid documentsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Documents
NoneNoneNoneNoneEach Tenderer should further demonstrate availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents ( commitment agreements etc.) for availability for this work are furnished.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Invoices for equipments and Registration certificate for vehicles and lease agreements from owner
NoneNoneNoneNoneTo qualify for award of this contract, in the last five financial years i.e. 2018-19 to 2022-23 each Tenderer in its name should have Achieved in at least two financial years a minimum financial turnover of Rs.40 Crore ( in all classes of civil Engineering construction works only) Audited profit and loss account statement/ balance sheets certified by the chartered accountant, (ii) Turnover certificate with UDIN and (iii) IT returns filed for the above indicated 5 years is to be uploaded along with the technical bidFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneThe intending bidder/ firm/ company shall furnish details of liquid assets/ availability of credit facilities of not less than the equivalent of the estimated cash flow for 3 months in the peak construction period for amount mentioned in bid document for meeting the required funds in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant documents
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Work done certificatesTrueTechnical Bid
Quantity wise work done certificatesTrueTechnical Bid
Line of creditTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1709895547000
version0
createdDateNone
modifiedDateNone
blockNumberKUIDFC Head Office
streetNone
cityBengaluru
stateKarnataka
pin560038
tenderRecallDTONone