createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709108481760
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd33750.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose12-03-2024 17:00:00
tenderQueryClose06-03-2024 17:00:00
technicalBidOpenNone
publishedDate29-02-2024 11:36:24
publishedByPostRDPR_EE_DIV_VJN
publishedByUserKPE12111 - J R PAMPAPATHI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEE OFFICE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9482100616
tenderSupplierListNone
tenderSchedule
createdTs1709108481809
version7
createdDateNone
modifiedDateNone
tenderNumberRDPR/2023-24/OW/WORK_INDENT4952
titleConstruction of CC road and box drain towards graveyard of Gundagatti village of Harapanahalli taluk
descriptionConstruction of CC road and box drain towards graveyard of Gundagatti village of Harapanahalli taluk
categoryWORKS
categoryTextWorks
ecv1342686.41
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location943
locationNameRDPR Division Office Vijayanagara
provisionalAmount1350000.0
groupOverheadTotal204816.57
fileNumberPREDSD/HRP/2023-24/KKRDB/49
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17091084820001NoneNoneOther WorksConstruction of CC road and box drain towards graveyard of Gundagatti village of Harapanahalli taluk1137869.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
283740491955Nonecode01Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of workCum89.2589.25165.9FalseNoneNoneFalseNoneFalse14806.5750
283740591955Nonecode02Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.747.4FalseNoneNoneFalseNoneFalse23590.980
283740691955Nonecode03Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Cum2686.952686.9547.4FalseNoneNoneFalseNoneFalse127361.430
283740791955Nonecode04Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.Cum6692.76692.771.1FalseNoneNoneFalseNoneFalse475850.970
283740891955Nonecode05Construction of Earthen Shoulders Construction of sub-grade and earthen shoulders withapproved material obtained from borrow pits with all lifts &leads, transporting to site, sCOMMONading, grading to required slope and compacted to meet requirement of table No. 300-2Cum517.65517.6535.55FalseNoneNoneFalseNoneFalse18402.45750
283740991955Nonecode06Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.Cum254.1254.1104.28FalseNoneNoneFalseNoneFalse26497.5480
283741091955Nonecode07Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4513.035FalseNoneNoneFalseNoneFalse81969.945750
283741191955Nonecode08Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) MIX 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregatesCum6724.26724.223.7FalseNoneNoneFalseNoneFalse159363.540
283741291955Nonecode09Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works -35%Cum2353.472353.4723.7FalseNoneNoneFalseNoneFalse55777.2390
283741391955Nonecode10Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - All other type of structuresMT82961.5582961.551.659FalseNoneNoneFalseNoneFalse137633.211450
283741491955Nonecode11Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirementcomplete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.721.33FalseNoneNoneFalseNoneFalse10615.9410
283741591955Nonecode12Providing Name board for the workNos6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17091084860000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17091084860000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17091084860000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17091084860000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17091084860000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17091084860000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17091084860000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17091084860000NoneNoneELIGIBILITYBanker DetailsNone
17091084980000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17091085050000NoneNoneELIGIBILITYCorrigendum, modifications, correction if any, will be published in the website only,None
17091085110000NoneNoneELIGIBILITYDefect liability period will be one yearNone
17091085180000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2018-19 to 2022-23 a. Achieved in at least two financial years a minimum financial turnover in all classes of civil engineering construction works only of Amount Put Tender (Turn over With compulsory UDIN Number)None
17091085240000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2018-19 to 2022-23 b. Satisfactorily completed, as prime contractor, at least one similar work of value not less than 50% of the amount put tender (Workdone with indent No)None
17091085310000NoneNoneELIGIBILITYIf the tenderer has quoted below the schedule-B amount the difference amount should be paid in the form of F.D.R or D.D (As per G.O) in the name of Executive Engineer, PRE Division, Vijayanagara Hosapete from Nationalized Bank only and upload the scanned copy of the same in e-portal at the time of applying the tender The Same Scanned copy for Different work will be liable for RejectionNone
17091085380000NoneNoneELIGIBILITYSubmit the Site visiting letter from concerned AEE, other wise bid will be not consideredNone
17091085430000NoneNoneELIGIBILITYWork completion period will be 4 months (IMP)None
17091085490000NoneNoneELIGIBILITYAll other conditions and requirements has to be fulfilled as per the standard bid document and attached General conditionsNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Valid PWD Registration copyTrueTechnical Bid
Similar Nature Work done certificate with eproc Indent NoTrueTechnical Bid
Last 5 years Audit Report with UDIN NoTrueTechnical Bid
Difference Amount DD or FDR Scanned copyTrueTechnical Bid
Ongoing commitments and other KW DocumentsTrueTechnical Bid
Submit the Site visiting letter from concerned AEETrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Other WorksVijayanagaraHarapanahalliDavangereHARAPANAHALLI (SC)GundagatiNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone