createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710134086224
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee590.00
emd50000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-03-2024 16:30:00
tenderQueryClose14-03-2024 11:30:00
technicalBidOpen19-03-2024 17:00:00
publishedDate11-03-2024 10:56:05
publishedByPostPWD_EE_BLD_DIV1_BNG
publishedByUserKPE13287 - J PRAKASH
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonJ PRAKASH
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022255210
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710134086227
version13
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9014/CALL-2
titleRepairs and Improvements to bathroom by providing new fittings, repairs to floorings, water proofing, internal & external painting, repairs to sump tanks, sanitary lines, construction of inspection chamber and other allied works at Qtrs. No 297, Dollars colony, RMV 2nd Stage, Bangalore
descriptionRepairs and Improvements to bathroom by providing new fittings, repairs to floorings, water proofing, internal & external painting, repairs to sump tanks, sanitary lines, construction of inspection chamber and other allied works at Qtrs. No 297, Dollars colony, RMV 2nd Stage, Bangalore
categoryWORKS
categoryTextWorks
ecv2337269.44
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1774
locationNamePWD No.1 Buildings Division Office Bengaluru
provisionalAmount2800000.0
groupOverheadTotal0.0
fileNumberQ297
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17101340860000NoneNoneBuildingsRepairs and Improvements to bathroom by providing new fittings, repairs to floorings, water proofing, internal & external painting, repairs to sump tanks, sanitary lines, construction of inspection chamber and other allied works at Qtrs. No 297, Dollars colony, RMV 2nd Stage, Bangalore2337269.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298278298946None001Dismantling tile work in floors and roofs laid in cement mortar including stacking material to the appropriate disposal area as per direction of Engineer-in-charge. For thickness of tiles 10 mm to 25 mm SR 2023-2024, Vol-2, Item No: 19.22.1Sqm53.3353.3324.07FalseNoneNoneFalseNoneFalse1283.65310
298278398946None002Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground to the appropriate disposal area as per direction of Engineer-in-charge. SR 2023-2024, Vol-2, Item No: 19.55Sqm41.1141.1146.9FalseNoneNoneFalseNoneFalse1928.0590
298278498946None003Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as perdirections of Engineer-in-charge. - I no 8.5.1, Vol -2 SR 2023-24Sqm406.63406.6346.9FalseNoneNoneFalseNoneFalse19070.9470
298278598946None004Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. - Size of Tile 600x600 mm SR 2023-2024, Vol-2, Item No: 9.12.2Sqm1272.11272.126.31FalseNoneNoneFalseNoneFalse33468.9510
298278698946None005Providing,fabricating and fixing Profiled Poly Urethane insulated Roof(PUF Sheet) having modular density 40kg/m2 and size 1.06m width and 7.60m length sheets roof having external sheet of 0.5mm steel, bottom sheet of 0.40mm steel with powder coated finish. The precoated sheet shall be of minimum 240MPa steel conforming to IS 14246 : 1995 and shal have zinc coating with minimum 120gsm as per IS 277:1992,.The roofing system shall have suitable water proof over lapping arrangments and GRIHA ceritifed.The fasting shall be of self tapping screws of required length with PVC head along with washer pre-painted aluminium cap unit with build in seal arrangments. The entire roof shall be firmly fastened to the existng frame including all lead and lifts, loading & unloading,usage charges of machinery and equipments, transportation charges,labour charges and all other incidental charges etc.,complete as per standard technical detailed specifications and as directed by the Engineer in charge of the work. - 50mm thickness SR 2023-2024, Vol-2, Item No: 7.67.2Sqm2854.52854.518.81FalseNoneNoneFalseNoneFalse53693.1450
298278798946None006Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. SR 2023-2024, Vol-2, Item No: 11.16.2Kg163.32163.32689.14FalseNoneNoneFalseNoneFalse112550.34480
298278898946None007Providing and fixing 6mm Clear/opal white/solar bronze/blue/green tinted Multi wall poly carbonate sheet for Tubular structure. The work including cost of all materials, labour charges and usage charges of machinery for cutting, welding, grinding and erection equipments, with all lead, transportation, loading and unloading and all other incidental charges etc. complete as per specification and directions of the Engineer in charge of the work. SR 2023-2024, Vol-2, Item No: 7.34Sqm3437.53437.520.62FalseNoneNoneFalseNoneFalse70881.250
298278998946None008Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete as per specifications. SR 2023-2024, Vol-2, Item No: 20.50Sqm14.314.3390.87FalseNoneNoneFalseNoneFalse5589.4410
298279098946None009Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete as per specifications. SR 2023-2024, Vol-2, Item No: 20.50Sqm14.4414.44135.83FalseNoneNoneFalseNoneFalse1961.38520
298279198946None010Providing and applying white cement based putty of average thickness1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. SR 2023-2024, Vol-2, Item No: 8.51Sqm110.0110.0390.87FalseNoneNoneFalseNoneFalse42995.70
298279298946None011Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. SR 2023-2024, Vol-2, Item No: 8.39Sqm139.7139.7390.87FalseNoneNoneFalseNoneFalse54604.5390
298279398946None012Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. SR 2023-2024, Vol-2, Item No: 9.39Sqm1593.91593.914.01FalseNoneNoneFalseNoneFalse22330.5390
298279498946None013Manufacturing, supplying and fixing wooden ward robe of 0.60m deep using 25mm thick water proof block board for shutter and 19mm plywood for allround ward robe, openable shutters with 25mm x 6mm thick plain teak wood beading, lipping 1.5mm thick commercial ply vertical support finished in approved 1mm lamination sheet of approved colour, shade and quality on all exposed surfaces. Inner surface is finished with 0.8mm lamination sheet of approved colour and shape of good quality, including cost of fittings, parliamentary hinges, C handles, tower bolts, magnetic catches, approved brand lock, adhesives, synthetic resins, nails, screws etc., complete including cost of all materials, labour charges, complete as per specification. ADR 558-21.6.2021 Sl.No 10Sqm13500.013500.022.32FalseNoneNoneFalseNoneFalse301320.00
298279598946None014Repairing door and window frames with available wood to the required size. SR 2023-2024, Vol-2, Item No: 20.103Sqm1072.51072.525.16FalseNoneNoneFalseNoneFalse26984.10
298279698946None015Repairing and fixing shutters (panelled or glazed) to doors, windows, ventilators and cupboards. SR 2023-2024, Vol-2, Item No: 20.104Sqm1072.51072.515.55FalseNoneNoneFalseNoneFalse16677.3750
298279798946None016Removing the old paint or polish from wood and / or wood based surface with paint remover of approved brand / manufacturer and making surface even including cost of materials, labour, complete as per specifications. SR 2023-2024, Vol-2, Item No: 20.56Sqm104.5104.596.15FalseNoneNoneFalseNoneFalse10047.6750
298279898946None017Removing the old paint from steel and / or other metal surface with hand scraping and making surface even including cost of labour, complete as per specifications. SR 2023-2024, Vol-2, Item No: 20.59Sqm133.1133.141.95FalseNoneNoneFalseNoneFalse5583.5450
298279998946None018Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. SR 2023-2024, Vol-2, Item No: 8.41Sqm183.7183.7112.77FalseNoneNoneFalseNoneFalse20715.8490
298280098946None019Providing and fixing flush door shutter made out of solid core block board type, well seasoned, chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 35 mm thick both side commercial SR 2023-2024, Vol-2, Item No: 12.57.6Sqm3654.23654.24.2FalseNoneNoneFalseNoneFalse15347.640
298280198946None020Supplying of Plain Basket of size 17”x20”x4” depth including necessary screws, accessories etc., complete including cost of all materials. SE Letter : 1522 Dated: 25.07.2018 Sl No.2No4200.04200.01.0FalseNoneNoneFalseNoneFalse4200.00
298280298946None021Supplying of Cutlery Basket of size 17”x20”x4” depth including necessary screws, accessories etc., complete including cost of all materials. SE Letter : 1522 Dated: 25.07.2018 Sl No.1No5900.05900.02.0FalseNoneNoneFalseNoneFalse11800.00
298280398946None022Supplying of SS Basket channels of length 20” including necessary screws, accessories etc; complete including cost of all materials. SE Letter : 1522 Dated: 25.07.2018 Sl No.4Set591.0591.012.0FalseNoneNoneFalseNoneFalse7092.00
298280498946None023Cutting out cracks of roof terrace to V - section cleaning out, wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand) including cost of materials, labour, complete as per specifications. - SR 2023-24, VOl 2, Item no.20.83.m28.628.640.0FalseNoneNoneFalseNoneFalse1144.00
298280598946None024INJECTION GROUTS Providing & injecting PU foam injection grouts into walls & ceiling through drilled/ inserted nipples with fixing polymer modified compound.Therafter the holes shall be injected with SIKA injection 101 h Flexible water reactive PUR- Injection foam Sika lnjection-101h is a low viscous, fast foaming and solvent-free water reactive polyurethane injection foam resin, which cures to a dense flexible foam with a fine cellular structure. Sika lnjection-101 h is used for the temporary water stopping of high water intrusions in cracks, joints and cavities in concrete, brickwork and natural stonework using single action piston pump operating at high pressure. By twin piston pump when mixed with water (100:15) to produce foams of different densities. The gaps shall be sealed effectively. Also application details shall be followed as per manufacturers specifications. Methodology : Drill 15-22 mm holes along the side of the crack at 45 angle. Dril the holes tointersect the crack midway. Install injection packers in the holes and tighten. If thecracks to be injected are 10rnrn wide or more at the surface, pack open cell polyurethane foam saturated with Sika Injection-101h into the crack. Spray thesaturated foam with a small amount of water to activate the grout and create a surface seal. Pump Sika Injection-101hat20 bar into or behind fissures or into voids which are allowing water to infiltrate into unwanted areas. lf voids in concrete being injectedContain insufficient moisture to activate the grout inject a small amount of waterprior to injecting the grout. Pump Sika Injection 101h for approximately 15 secondsand then pause to allow the material flow into all the cracks and crevices, Keeppumping, watch for material flow and water to appear at the surface or the nextpacker. When movement stops or Sika Injection-101h appears at the next packermove to the next packer and inject When sealing vertical cracks start at the bottom and work upward. Rate includes cost of all material, labour transportation, ioading and unloading, Scaffolding, al lead and ift, hire charges of cutting, welding, grinding machines and all other incidental charges etc. for successful completion of work and as per the direction of the engineer of work ADR SE Letter 4575 Dated : 26.09.2014 Sl No.3Per Point3972.03972.012.0FalseNoneNoneFalseNoneFalse47664.00
298280698946None025Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:3 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification. - 20.88 SR 2023-24 Vol 2Sqm438.9438.925.68FalseNoneNoneFalseNoneFalse11270.9520
298280798946None026Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P brass screws and washers complete. SR 2023-2024, Vol-2, Item No: 14.31Each1342.01342.03.0FalseNoneNoneFalseNoneFalse4026.00
298280898946None027Providing and fixing P.V.C. waste pipe for sink or wash basin includingP.V.C. waste fittings complete. - flexible pipe 32 mm dia SR 2023-2024, Vol-2, Item No: 14.28.2.1Each101.2101.23.0FalseNoneNoneFalseNoneFalse303.60
298280998946None028Supplying and fixing Jaguar make Health Faucet with 1.00m flexible aluminium coated tube and hook including necessary screws, accessories etc. complete. The rate including necessary threads, white lead, washers, all labour charges, all lead and lift, loading and unloading, transportation charges and all other incidental charges etc. complete as per directions of the Engineer-in-charge of the work (ADR No. : 7904 Dt: 09.02.2018) Sl No 9No5000.05000.03.0FalseNoneNoneFalseNoneFalse15000.00
298281098946None029Supplying and fixing wash basin star white cat No. 10082 with full pedestals size 64x51 cm Hindware or equivalent make as approved including cost and conveyance of all materials, all lead and lift, loading and unloading, charges transportation charges and machinery charges labour and all other incidental charges etc., complete as per the direction of the Engineer in charge of the work. (ADR : No. 7750, Sl. No. 2 dated: 23-01-2016)No13300.013300.03.0FalseNoneNoneFalseNoneFalse39900.00
298281198946None030Providing and fixing Jaguar make heavy duty Bib cock with necessary threads, white lead, washers etc., complete. The rate including necessary threads, white ledd, washers, all labour charges, all lead and lift, loading and unloading, transportation charges and all other incidental charges etc. complete as per directions of the Engineer-in-charge of the work (ADR No. : 7904 Dt: 09.02.2018) Sl no 13No3500.03500.06.0FalseNoneNoneFalseNoneFalse21000.00
298281298946None031Suppying and fixing European closet starwhite size 69x36x74 cm Hindware or Equivalent make as approved including cost and vonveyance of all materials, all lead and lift, loading and unloading, charges transportation charges and machinery charges labour and all other incidental charges etc., complete as per the direction of the Engineer in charge of the work. (ADR : No. 7750, Sl. No. 1 dated: 23-01-2016)No25103.025103.03.0FalseNoneNoneFalseNoneFalse75309.00
298281398946None032Supplying and fixing 3 in 1 wall mixer Jaguar makes with all necesssary fittings with labour charges etc ; complete as per directions of the Engineer in charge of the work (5204 Dt: 31-10-2011) Sl No.6No6300.06300.03.0FalseNoneNoneFalseNoneFalse18900.00
298281498946None033Supplying and fixing Jaguar allied AQN-7731 Soap Dish with all statutory taxes including all lead and lift .loading and unloading, fixing for labour charges etc., complete SE Letter 5979 Dated:20.03.2020 Sl No.12No1404.01404.03.0FalseNoneNoneFalseNoneFalse4212.00
298281598946None034Supplying and fixing Jaguar allied AKP-35761P Double Coat Hook with all statutory taxes including all lead and lift loading and unloading, fixing for labour charges etc., complete. SE Letter 5979 Dated:20.03.2020 Sl No.11No702.0702.04.0FalseNoneNoneFalseNoneFalse2808.00
298281698946None035Wardrobe lock set -SE Letter 4431, Dated : 06.12.2018No526.0526.012.0FalseNoneNoneFalseNoneFalse6312.00
298281798946None036supplying of Mortise Lock SE Letter 3832, Dated 02.12.2019 Sl No. 25No1673.01673.08.0FalseNoneNoneFalseNoneFalse13384.00
298281898946None037Supplying of "JAQUAR" make Over Head Shower with Arm, OHS-CHR-1989 including necessary screws, accessories etc., complete including cost of all materials. The work includes cost of all materials, labour charges with allied & lift, loading & unloding charges with all machineries and all incidental charges etc., complete as per direction of Engineer-in-charge of the work. (ADR No.: 4079, Date: 24-11-2017, Sl. No. 2)No2520.02520.02.0FalseNoneNoneFalseNoneFalse5040.00
298281998946None038Stainless steel Handle SE Letter 4431, Dated : 06.12.2018 Sl No.2No1125.01125.020.0FalseNoneNoneFalseNoneFalse22500.00
298282098946None039Supplying of following hardware items of approved make and quality with necessary screws etc complete Brass and ss finish 10"Door Pull Handles - SE Letter 559 Dated 21.06.2021 17 bNo2100.02100.024.0FalseNoneNoneFalseNoneFalse50400.00
298282198946None040Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. - 20 mm nominal dia pipes SR 2023-24 Vol 2 It No.13.32.2m421.07421.0715.0FalseNoneNoneFalseNoneFalse6316.050
298282298946None041Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. - 25 mm nominal dia pipes SR 2023-24 Vol 2 It No. 13.32.3m529.95529.9515.0FalseNoneNoneFalseNoneFalse7949.250
298282398946None042Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work - 20 mm nominal dia pipes SR 2023-24 Vol 2 It No.13.33.2m241.09241.0920.0FalseNoneNoneFalseNoneFalse4821.80
298282498946None043Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work - 25 mm nominal dia Pipes SR 2023-24 Vol 2 It No.13.33.3m328.86328.8625.0FalseNoneNoneFalseNoneFalse8221.50
298282598946None044Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. SR 2023-2024, Vol-2, Item No: 13.34l10.110.12000.0FalseNoneNoneFalseNoneFalse20200.00
298282698946None045Europa lock -Brass Sl No 9 Se Letter : 4431 Dated : 06.12.2018Nos1700.01700.02.0FalseNoneNoneFalseNoneFalse3400.00
298282798946None046Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two coat applied @ 1.67L/10 m2 over and including priming coat of exterior primer applied @ 2.20 kg/10 m2) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. SR 2023-2024, Vol-2, Item No: 8.30Sqm191.4191.4272.95FalseNoneNoneFalseNoneFalse52242.630
298282898946None047Supplying of following Hardware items of approved make and quality with necessary screws etc., complete. 5" SS Hinges - SE Letter 559 Dated 21.06.2021 17.dNos330.0330.030.0FalseNoneNoneFalseNoneFalse9900.00
298282998946None048Supplying of following Hardware items of approved make and quality with necessary screws etc., complete. SS 10” Tower Bolt - SE Letter 559 Dated 21.06.2021 17.fNos500.0500.030.0FalseNoneNoneFalseNoneFalse15000.00
298283098946None049Stainless steel aldrop -SE Letter 4431, Dated : 06.12.2018 Sl No.29 Sl No.29Nos800.0800.04.0FalseNoneNoneFalseNoneFalse3200.00
298283198946None050Stainless steel Handle SE Letter 4431, Dated : 06.12.2018 Sl No.2Nos1125.01125.08.0FalseNoneNoneFalseNoneFalse9000.00
298283298946None051Stainless steel window hook SE Letter 4431, Dated : 06.12.2018 Sl No.1Nos135.0135.020.0FalseNoneNoneFalseNoneFalse2700.00
298283398946None052Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 12 3 7 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification. SR 2023-2024, Vol-2, Item No: 9.40Sqm1025.21025.292.55FalseNoneNoneFalseNoneFalse94882.260
298283498946None053Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. omplete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete for:PVC pipes 110mm dia., 6 kg/sqcm & class 3 - SR 2023-24, Vol 5, Item No.10.1.7m452.1452.110.0FalseNoneNoneFalseNoneFalse4521.00
298283598946None054Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in-charge. SR 2023-2024, Vol-2, Item No: 20.43Each324.5324.51.0FalseNoneNoneFalseNoneFalse324.50
298283698946None055Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. - Sr 2023-24 Vol 5 It no 16.8Each5270.15270.12.0FalseNoneNoneFalseNoneFalse10540.20
298283798946None056Providing and Applying two component, water-based food grade epoxy resin coating on inside surface of Potable water tank having anti-algae, antifungal, Non-toxic, hygiene cum damp-proof coating Certified by CFTRI as per 21 CFR 175 - 300 of US - FDA, having mixing Ratio (Base: Hardener: Water) - 1:1:1 to be applied @ 0.35 Kg/m2 in 2 coats. Ensure that this coating is applied over the protective plaster, and that Item No. 4 is completed across the entire surface prior to applying the protective plaster. The Waterproofing material shall have Specific Gravity: 1.2, Water vapor permeance: 244.48 g/m2/24 hrs, as per IS 7809/Pt 2/1977, Adhesion strength: 2 N/mm2 as per ASTM D 4541: 02. The finished cost to include surface preparation completely as per specification. 2023-2024, Vol-2, Item No: 15.14Sqm1840.31840.391.0FalseNoneNoneFalseNoneFalse167467.30
298283898946None057Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied @ 1.2 //perm2, having tensile strength greater than 1.5N/mm2, elongation greater than 300% with solid content not less than 60% in 2 coats including surface preparation, priming the surface with water based acrylic primer @0.1 //m2, and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. SR 2023-2024, Vol-2, Item No: 15.2Sqm818.81818.81114.42FalseNoneNoneFalseNoneFalse93688.24020
298283998946None058Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge to the appropriate disposal area. SR 2023-2024, Vol-2, Item No: 19.59Cum400.4400.420.0FalseNoneNoneFalseNoneFalse8008.00
298284098946None059Providing and fixing Mosquito mesh shutters made out of Stainless Steel mosquito proof mesh with 95% and above visibility which is fixed to the powder coated aluminium frame 20mm thick of approved shade. The work including fixing the shutters with necessary accessories, to complete as per specification including the labour charges for fixing the shutter to the existing frames. (Page.64/ Item No.9.104 SR 2018-19 Vol 2)Sqm3132.03132.047.11FalseNoneNoneFalseNoneFalse147548.520
298284198946None060Cleaning of glazed tiles. including cost of materials, labour, HOM complete as per specifications. - 37.34 SR 2018-19Sqm73.4473.44149.64FalseNoneNoneFalseNoneFalse10989.56160
298284298946None061Providing and fixing curtain rods of size 25mm dia stainless steel of heavy gauge pipe with stainless steel end brackets and stainless steel supporting couble brackets and L-brackets whereever necessary of approved design, Work including cost of all materials, labour charges, transportations and all other incidental charges for successful completion of the work and as per the directions of Engineer-in-chargeof the work. (ADR No. No. 8462 Date: 17-01-2014, Sl. No. II-9)Rmtr2100.02100.046.87FalseNoneNoneFalseNoneFalse98427.00
298284398946None062Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. SR 2023-2024, Vol-2, Item No: 11.28Kgs621.5621.5187.04FalseNoneNoneFalseNoneFalse116245.360
298284498946None063Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum Ti02(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) SR 2023-2024, Vol-2, Item No: 12.90Sqm7407.47407.47.05FalseNoneNoneFalseNoneFalse52222.170
298284598946None064Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694 :2010 2.5mm2 (SR 2023-24 Vol 6 It 2.3.3)m46.246.245.0FalseNoneNoneFalseNoneFalse2079.00
298284698946None065Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694 :2010 4mm2 (SR 2023-24 Vol 6 It 2.3.4)m69.369.320.0FalseNoneNoneFalseNoneFalse1386.00
298284798946None066Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-2 Way (SR 2023-24 Vol 6 It 3.4.1)Each151.8151.82.0FalseNoneNoneFalseNoneFalse303.60
298284898946None067Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 3 Way (SR 2023-24 Vol 6 It 3.4.2)Each174.9174.92.0FalseNoneNoneFalseNoneFalse349.80
298284998946None068Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way (SR 2023-24 Vol 6 It 3.4.3)Each194.7194.71.0FalseNoneNoneFalseNoneFalse194.70
298285098946None069Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 Way (SR 2023-24 Vol 6 It 3.4.4)Each242.0242.02.0FalseNoneNoneFalseNoneFalse484.00
298285198946None070Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 Way (SR 2023-24 Vol 6 It 3.4.5)Each287.1287.14.0FalseNoneNoneFalseNoneFalse1148.40
298285298946None071Supplying and replacing ceiling fan regulator 900mm to 1500mm. (SR 2023-24 Vol 6 It 12.6)Each420.2420.25.0FalseNoneNoneFalseNoneFalse2101.00
298285398946None072Fixingaceiling/Wallmounting fan of all capacities and all types to the existing 'S''hook with fan regulator to the existing board together with supplying and fixing5A. ceilingrose,necessarylengthof23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. - (SR 2023-24 Vol 6 It 13.10)Each188.1188.15.0FalseNoneNoneFalseNoneFalse940.50
298285498946None073Supplying and fixing of modular switch& connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket - 3.6.3Each188.1188.110.0FalseNoneNoneFalseNoneFalse1881.00
298285598946None074Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. 6A Two Way Switch - (SR 2023-24 Vol 6 It 3.6.2)Each182.6182.612.0FalseNoneNoneFalseNoneFalse2191.20
298285698946None075Supplying and fixing superior quality modula r switch mounting polycarbonateplate with necessary supporting backplate with required nos.of machine screws, bolts nutsetc.,complete on the existing metal/PVC box. 1 to 2 Module (SR 2023-24 Vol 6 It 3.5.1)Each150.7150.72.0FalseNoneNoneFalseNoneFalse301.40
298285798946None076Supplyingandfixingsuperiorqualitymodularswitchmountingpolycarbonateplatewithnecessarysupportingbackplatewithrequirednos.ofmachinescrews,boltsnutsetc.,completeontheexistingmetal/PVC box. 3 Module (SR 2023-24 Vol 6 It 3.5.2)Each177.1177.12.0FalseNoneNoneFalseNoneFalse354.20
298285898946None077Supplyingandfixingsuperiorqualitymodularswitchmountingpolycarbonateplatewithnecessarysupportingbackplatewithrequirednos.ofmachinescrews,boltsnutsetc.,completeontheexistingmetal/PVC box. 4 Module (SR 2023-24 Vol 6 It 3.5.3)Each192.5192.51.0FalseNoneNoneFalseNoneFalse192.50
298285998946None078Supplyingandfixingsuperiorqualitymodularswitchmountingpolycarbonateplatewithnecessarysupportingbackplatewithrequirednos.ofmachinescrews,boltsnutsetc.,completeontheexistingmetal/PVC box. 6 Module (SR 2023-24 Vol 6 It 3.5.4)Each257.4257.42.0FalseNoneNoneFalseNoneFalse514.80
298286098946None079Supplyingandfixingsuperiorqualitymodularswitchmountingpolycarbonateplatewithnecessarysupportingbackplatewithrequirednos.ofmachinescrews,boltsnutsetc.,completeontheexistingmetal/PVC box. 8 Module (SR 2023-24 Vol 6 It 3.5.5)Each312.4312.45.0FalseNoneNoneFalseNoneFalse1562.00
298286198946None080Supplying capacitor type ceilingfan complete with down rod blades,s hackle,canopiesetc, for operationon 230V,50cycles.SinglephaseACsupplyconformingtoISS-374-1979andwithdoubleballbearingsystem. - 48" Sweep (1200 mm) Regular model SR 2023-24 Vol 6 It No.6.3.1Each3282.43282.46.0FalseNoneNoneFalseNoneFalse19694.40
298286298946None081Supplyingof.feet-PVC Batten with integrated LED tube.Wwith high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input:220-240V@50/60Hz&Powerfactor 0.9alongwithCEapproved.2yearsWarrantyagainstanymanufacturingdefectworkingunderstandardelectrical condition. LED light fitting 1 x 4 - 20/22 W - SR 2023-24 Vol 6 It No.11.3.2Each759.0759.014.0FalseNoneNoneFalseNoneFalse10626.00
298286398946None008-1Providing and fixing 6mm Clear/opal white/solar bronze/blue/green tinted Multi wall poly carbonate sheet for Tubular structure. The work including cost of all materials, labour charges and usage charges of machinery for cutting, welding, grinding and erection equipments, with all lead, transportation, loading and unloading and all other incidental charges etc. complete as per specification and directions of the Engineer in charge of the work. First Floor SR 2023-2024, Vol-2, Item No: 7.34 Sqm3471.883471.8812.0FalseNoneNoneFalseNoneFalse41662.560
298286498946None100Extra for removing white wash or colour wash by steel brushing and or scraping, sand papering the ceiling and or sloping roof surface smooth including repairs to scraches, cost of material, labour, complete as per specifications. SR 2023-2024, Vol-2, Item No:20.51Sqm11.011.0112.16FalseNoneNoneFalseNoneFalse1233.760
298286598946None101Extra for removing white wash or colour wash by steel brushing and / or scraping, sand papering the ceiling and / or sloping roof surface smooth including repairs to scraches, cost of material, labour, complete as per specifications. First Floor SR 2023-2024, Vol-2, Item No: 20.51Sqm11.1111.1148.61FalseNoneNoneFalseNoneFalse540.05710
298286698946None102Providing and applying white cement based putty of average thickness1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 8.51Sqm111.1111.1135.83FalseNoneNoneFalseNoneFalse15090.7130
298286798946None103Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 8.39Sqm141.1141.1135.83FalseNoneNoneFalseNoneFalse19165.6130
298286898946None104Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.FIRST FLOOR SR 2023-2024, Vol-2, Item No: 9.39Sqm1609.841609.8419.47FalseNoneNoneFalseNoneFalse31343.58480
298286998946None104Repairing door and window frames with available wood to the required size. FISRT FLOOR SR 2023-2024, Vol-2, Item No: 20.103Sqm1083.231083.239.36FalseNoneNoneFalseNoneFalse10139.03280
298287098946None105Repairing and fixing shutters (panelled or glazed) to doors, windows, ventilators and cupboards. First Floor SR 2023-2024, Vol-2, Item No: 20.104Sqm1083.231083.235.73FalseNoneNoneFalseNoneFalse6206.90790
298287198946None108Removing the old paint or polish from wood and / or wood based surface with paint remover of approved brand / manufacturer and making surface even including cost of materials, labour, complete as per specifications. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 20.56Sqm105.55105.5536.1FalseNoneNoneFalseNoneFalse3810.3550
298287298946None109Removing the old paint from steel and / or other metal surface with hand scraping and making surface even including cost of labour, complete as per specifications. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 20.59 Sqm134.43134.4311.25FalseNoneNoneFalseNoneFalse1512.33750
298287398946None110Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 8.41Sqm185.54185.5440.13FalseNoneNoneFalseNoneFalse7445.72020
298287498946None111Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P brass screws and washers complete. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 14.31Each1355.421355.422.0FalseNoneNoneFalseNoneFalse2710.840
298287598946None112Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two coat applied @ 1.67L/10 m2 over and including priming coat of exterior primer applied @ 2.20 kg/10 m2) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. FIRST FLOOR SR 2023-2024, Vol-2, Item No: 8.30Sqm193.31193.31118.92FalseNoneNoneFalseNoneFalse22988.42520
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17101340860000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17101340860000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17101340860000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17101340860000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17101340860000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17101340860000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contract value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17101340860000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender documentNone
17101340860000NoneNoneELIGIBILITYThe intending tenderer is instructed to note that they should abide by the detailed instructions and conditions contained in the standard tender documents KW-2,2K.P.W.D. and further orders there onNone
17101340860000NoneNoneELIGIBILITYAll necessary drawings, paper works, etc. and any other formalities required to be observed shall be the responsibility of contractorNone
17101340860000NoneNoneELIGIBILITYWhenever executing authority insist proof of having purchased the materials (used during executing the work) for verification. The contractor has to produce the purchase billsNone
17101340860000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Blore dated 01.01.07 and Government letter no PW/134/BMS/2007 dated 27.07.07, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17101340860000NoneNoneELIGIBILITYConditional tenders are not accepted.None
17101340860000NoneNoneELIGIBILITYThe tenderer shall obtain the workdone certificate in the prescribed format from the competent Authority Executive Engineer (District level Officer) and scan the original Certificate and attach the scanned file Certificate/ Certificates, which shall be produced at the time of opening of technical Bids for physical verificationNone
17101340860000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
17101340860000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reasonNone
17101340860000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reasonNone
17101340860000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E- procurement portal.None
17101340860000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17101340860000NoneNoneELIGIBILITYThe bidder should be a reputed company registered as a Class IV and above Civil Contractor with PWD, Govt. of Karnataka and should have suitable technical, financial & managerial capabilitiesNone
17101340860000NoneNoneELIGIBILITYThe contractor shall not deviate/alter/execute excess quantities or additional items without the prior approvalNone
17101340860000NoneNoneELIGIBILITYThe Cost of the tender form shall not be refundableNone
17101340860000NoneNoneELIGIBILITYFurther particulars, if any, required by the contractor can be had from the O/o the Executive Engineer, No.1 buildings Division during office hoursNone
17101340860000NoneNoneELIGIBILITYThe Tenderer should submit Latest GST registration certificateNone
17101340860000NoneNoneELIGIBILITYThe quantities shown in the schedule are approximate. The actual quantities will be executed as per site condition only. Any balance materials shall be taken back by the contractor.None
17101340860000NoneNoneELIGIBILITYTenderer should be registered in labour department & submit labour registration certificatevNone
17101340860000NoneNoneELIGIBILITYTenderers must provide the address with valid proof of address along with latest photographs off all the employees who are employed in this work to the concerned authorityNone
17101340860000NoneNoneELIGIBILITYTenderers must provide insurance to all the employees executing this work.None
17101340860000NoneNoneELIGIBILITYThe Labors deployed shall mandatorily wear the face mask, hand gloves and take all safety measures to protect labours and staffNone
17101340860000NoneNoneELIGIBILITYBidder should upload the bid capacity calculated as per KW-2 tender condition, The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent. False representations in the statements leads to disqualification of the tender as per clause 3.1None
17101340860000NoneNoneELIGIBILITYThe Quoted Rates Shall be excluding GST, and shall be paid separatelyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years (i.e. 2018-19 to 2022-23 ), (a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 23.38 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turn Over Certificate, Balance sheet, profit & loss statement issued by an registered chartered Accountant
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years (i.e. 2018-19 to 2022-23 ), (b) Satisfactorily completed as prime contractor, at least one similar work of value not less than Rs.11.69 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate issued by an Executive engineer/equivalent
NoneNoneNoneNone3.6 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity - (AxNx2.5 - B), Where, A - Maximum value of civil engineering works executed in any one year during the last five years taking into account the completed as well as works in progress, N - Number of years prescribed for completion of the works for which tenders are invited 3 month, B - Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 3 month, Note :The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalentFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- the value of existing commitments and on-going works as well as the stipulated period of completion
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
NoneNoneNoneNoneNilOthersNil
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Nil
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
tenderWorkLocationList