tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710146329000 | 0 | None | None | Roads | PKG 607 estimate of pavement | 154406116.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2985948 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29 | Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 19021.12 | 19021.12 | 2.0 | False | None | None | False | None | False | 38042.24 | 0 | 2985949 | 99064 | None | UNI SR 2023-24 V-3 Pg. No. 9 I. No.2.5(ii) a | Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 486.93 | 486.93 | 192.0 | False | None | None | False | None | False | 93490.56 | 0 | 2985950 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (ii) | Cutting of Trees, excluding removal of stumps and roots of trees
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 1172.09 | 1172.09 | 7.0 | False | None | None | False | None | False | 8204.63 | 0 | 2985951 | 99064 | None | UNI SR 2023-24 V-3Pg. No. 17 I. No.3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 7.43 | 7.43 | 34087.5 | False | None | None | False | None | False | 253270.125 | 0 | 2985952 | 99064 | None | UNI SR 2023-24 V-1 Pg. No. 8 I. No.1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 117.71 | 117.71 | 11809.17 | False | None | None | False | None | False | 1390057.4007 | 0 | 2985953 | 99064 | None | UNI SR 2023-24 V-1Pg. No. 7 I. No.1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3).
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 147.44 | 147.44 | 6238.56 | False | None | None | False | None | False | 919813.2864 | 0 | 2985954 | 99064 | None | UNI SR 2023-24 V-1 Pg. No. 7 I. No.1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 Percentage per for every 1.50 m height or part there of Deduct 5Percentage per if rollers are not used and tamping is done manually Add 8 Percentage per Cum for works under foul & sullage situation.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 24309.83 | False | None | None | False | None | False | 14276920.0607 | 0 | 2985955 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 610.83 | 610.83 | 30862.13 | False | None | None | False | None | False | 18851514.8679 | 0 | 2985956 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5 | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2922.8 | 2922.8 | 10578.99 | False | None | None | False | None | False | 30920271.972 | 0 | 2985957 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17 | Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 3170.6 | 3170.6 | 11360.0 | False | None | None | False | None | False | 36018016.0 | 0 | 2985958 | 99064 | None | UNI SR 2023-24 V-3 Pg. No. 31 I. No.5.1 A (i | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 50.8 | 50.8 | 43107.5 | False | None | None | False | None | False | 2189861.0 | 0 | 2985959 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 31 I. No.5.4 (ii) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 17.35 | 17.35 | 43107.5 | False | None | None | False | None | False | 747915.125 | 0 | 2985960 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 31 I. No.5.3 (i) | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 14.87 | 14.87 | 1912.5 | False | None | None | False | None | False | 28438.875 | 0 | 2985961 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 11707.31 | 11707.31 | 2591.55 | False | None | None | False | None | False | 30340079.2305 | 0 | 2985962 | 99064 | None | UNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 13572.01 | 13572.01 | 1350.59 | False | None | None | False | None | False | 18330220.9859 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 Traffic safety measures | 4487756.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2985963 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 11163.39 | 11163.39 | 9.0 | False | None | None | False | None | False | 100470.51 | 0 | 2985964 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 5882.77 | 5882.77 | 40.0 | False | None | None | False | None | False | 235310.8 | 0 | 2985965 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (viii | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 5388.41 | 5388.41 | 21.0 | False | None | None | False | None | False | 113156.61 | 0 | 2985966 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (X) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 6820.7 | 6820.7 | 2.0 | False | None | None | False | None | False | 13641.4 | 0 | 2985967 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (Xii) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 5294.25 | 5294.25 | 34.0 | False | None | None | False | None | False | 180004.5 | 0 | 2985968 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 8208.37 | 8208.37 | 4.0 | False | None | None | False | None | False | 32833.48 | 0 | 2985969 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
(Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 656.67 | 656.67 | 1901.25 | False | None | None | False | None | False | 1248493.8375 | 0 | 2985970 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 452.23 | 452.23 | 1160.0 | False | None | None | False | None | False | 524586.8 | 0 | 2985971 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc
5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 6295.36 | 6295.36 | 2.0 | False | None | None | False | None | False | 12590.72 | 0 | 2985972 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc
(ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 3626.55 | 3626.55 | 7.0 | False | None | None | False | None | False | 25385.85 | 0 | 2985973 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc
(iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 1043.24 | 1043.24 | 32.0 | False | None | None | False | None | False | 33383.68 | 0 | 2985974 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iii | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 64265.69 | 64265.69 | 4.0 | False | None | None | False | None | False | 257062.76 | 0 | 2985975 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 | Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 2504.02 | 2504.02 | 24.0 | False | None | None | False | None | False | 60096.48 | 0 | 2985976 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.18 | Boundary Pillars Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 638.0 | False | None | None | False | None | False | 591279.26 | 0 | 2985977 | 99065 | None | UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 522.0 | False | None | None | False | None | False | 65970.36 | 0 | 2985978 | 99065 | None | UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) | Cable Duct Across the Road
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 2740.66 | 2740.66 | 362.5 | False | None | None | False | None | False | 993489.25 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 Estimate of Junction | 2300919.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2985979 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a | Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 486.92 | 486.92 | 2.28 | False | None | None | False | None | False | 1110.1776 | 0 | 2985980 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 7.43 | 7.43 | 813.75 | False | None | None | False | None | False | 6046.1625 | 0 | 2985981 | 99066 | None | UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 117.7 | 117.7 | 76.95 | False | None | None | False | None | False | 9057.015 | 0 | 2985982 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 610.83 | 610.83 | 248.21 | False | None | None | False | None | False | 151614.1143 | 0 | 2985983 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5) | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2922.8 | 2922.8 | 206.1 | False | None | None | False | None | False | 602389.08 | 0 | 2985984 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17 | Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 3170.6 | 3170.6 | 210.56 | False | None | None | False | None | False | 667601.536 | 0 | 2985985 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i) | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 50.8 | 50.8 | 813.75 | False | None | None | False | None | False | 41338.5 | 0 | 2985986 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 31 I. No.5.4 (ii) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 17.35 | 17.35 | 813.75 | False | None | None | False | None | False | 14118.5625 | 0 | 2985987 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 11707.31 | 11707.31 | 40.7 | False | None | None | False | None | False | 476487.517 | 0 | 2985988 | 99066 | None | UNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 13572.0 | 13572.0 | 24.4 | False | None | None | False | None | False | 331156.8 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 Estimate for CD Works -1 ROW NP4 1200 mm dia pipe culvert at Ch 17.015 | 955503.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2985989 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead
By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 890.84 | 890.84 | 7.56 | False | None | None | False | None | False | 6734.7504 | 0 | 2985990 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1357.94 | 1357.94 | 7.5 | False | None | None | False | None | False | 10184.55 | 0 | 2985991 | 99067 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 45.35 | False | None | None | False | None | False | 5731.333 | 0 | 2985992 | 99067 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 150.79 | False | None | None | False | None | False | 88557.4591 | 0 | 2985993 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (a) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification
Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 1447.15 | 1447.15 | 13.95 | False | None | None | False | None | False | 20187.7425 | 0 | 2985994 | 99067 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 3.64 | False | None | None | False | None | False | 27010.1468 | 0 | 2985995 | 99067 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 53.87 | False | None | None | False | None | False | 455790.2991 | 0 | 2985996 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii | Providing and laying Reinforced Cement Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 12.5 | False | None | None | False | None | False | 166753.875 | 0 | 2985997 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.1(A | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 5.04 | False | None | None | False | None | False | 11939.6088 | 0 | 2985998 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 9.0 | False | None | None | False | None | False | 21320.73 | 0 | 2985999 | 99067 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 1.17 | False | None | None | False | None | False | 114536.7171 | 0 | 2986000 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No8.18 | Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 | 2986001 | 99067 | None | PWD SR 2023 - 24 ,V-3,Page No 66 Item No8.10. | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 135.05 | 135.05 | 60.87 | False | None | None | False | None | False | 8220.4935 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 Estimate for CD Works -2 ROWS NP4 1200 mm dia pipe culvert at Ch 0,18.835 | 1059533.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986002 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead
By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 890.84 | 890.84 | 7.96 | False | None | None | False | None | False | 7091.0864 | 0 | 2986003 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1357.94 | 1357.94 | 22.5 | False | None | None | False | None | False | 30553.65 | 0 | 2986004 | 99068 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 50.55 | False | None | None | False | None | False | 6388.509 | 0 | 2986005 | 99068 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 104.45 | False | None | None | False | None | False | 61342.4405 | 0 | 2986006 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (a) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification
Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 1447.15 | 1447.15 | 31.28 | False | None | None | False | None | False | 45266.852 | 0 | 2986007 | 99068 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 3.41 | False | None | None | False | None | False | 25303.4617 | 0 | 2986008 | 99068 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 45.74 | False | None | None | False | None | False | 387002.9382 | 0 | 2986009 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii | Providing and laying Reinforced Cement Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 25.0 | False | None | None | False | None | False | 333507.75 | 0 | 2986010 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.1(A | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 6.38 | False | None | None | False | None | False | 15114.0286 | 0 | 2986011 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 9.0 | False | None | None | False | None | False | 21320.73 | 0 | 2986012 | 99068 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 1.04 | False | None | None | False | None | False | 101810.4152 | 0 | 2986013 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No8.18 | Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 | 2986014 | 99068 | None | PWD SR 2023 - 24 ,V-3,Page No 66 Item No8.10. | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 135.05 | 135.05 | 46.62 | False | None | None | False | None | False | 6296.031 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 Estimate for CD Works -2 ROWs(SKEW) NP4 1200 mm dia pipe culvert at Ch 0,20.555 | 1191101.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986015 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead
By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 890.84 | 890.84 | 7.92 | False | None | None | False | None | False | 7055.4528 | 0 | 2986016 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix) B | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1357.94 | 1357.94 | 30.0 | False | None | None | False | None | False | 40738.2 | 0 | 2986017 | 99069 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 53.46 | False | None | None | False | None | False | 6756.2748 | 0 | 2986018 | 99069 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 128.01 | False | None | None | False | None | False | 75178.9929 | 0 | 2986019 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (a) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification
Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 1447.15 | 1447.15 | 38.65 | False | None | None | False | None | False | 55932.3475 | 0 | 2986020 | 99069 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 3.41 | False | None | None | False | None | False | 25303.4617 | 0 | 2986021 | 99069 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 48.52 | False | None | None | False | None | False | 410524.3236 | 0 | 2986022 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii | Providing and laying Reinforced Cement Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 30.0 | False | None | None | False | None | False | 400209.3 | 0 | 2986023 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.1(A | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 6.38 | False | None | None | False | None | False | 15114.0286 | 0 | 2986024 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 9.0 | False | None | None | False | None | False | 21320.73 | 0 | 2986025 | 99069 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 1.1 | False | None | None | False | None | False | 107684.093 | 0 | 2986026 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No8.18 | Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 | 2986027 | 99069 | None | PWD SR 2023 - 24 ,V-3,Page No 66 Item No8.10. | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 135.05 | 135.05 | 49.97 | False | None | None | False | None | False | 6748.4485 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 2 ROWs(SKEW) NP4 1200 mm dia pipe culvert at Ch 0,21.82 | 1073644.7 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986028 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii)A | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead
By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 890.84 | 890.84 | 16.2 | False | None | None | False | None | False | 14431.608 | 0 | 2986029 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix)B | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1357.94 | 1357.94 | 7.5 | False | None | None | False | None | False | 10184.55 | 0 | 2986030 | 99070 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 50.55 | False | None | None | False | None | False | 6388.509 | 0 | 2986031 | 99070 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 104.45 | False | None | None | False | None | False | 61342.4405 | 0 | 2986032 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (a) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification
Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 1447.15 | 1447.15 | 31.28 | False | None | None | False | None | False | 45266.852 | 0 | 2986033 | 99070 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 3.41 | False | None | None | False | None | False | 25303.4617 | 0 | 2986034 | 99070 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 48.2 | False | None | None | False | None | False | 407816.826 | 0 | 2986035 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii | Providing and laying Reinforced Cement Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 25.0 | False | None | None | False | None | False | 333507.75 | 0 | 2986036 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.1(A | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 6.38 | False | None | None | False | None | False | 15114.0286 | 0 | 2986037 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 9.0 | False | None | None | False | None | False | 21320.73 | 0 | 2986038 | 99070 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 1.1 | False | None | None | False | None | False | 107684.093 | 0 | 2986039 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No8.18 | Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 | 2986040 | 99070 | None | PWD SR 2023 - 24 ,V-3,Page No 66 Item No8.10. | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 135.05 | 135.05 | 49.97 | False | None | None | False | None | False | 6748.4485 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 CONSTRUCTION OF BOX CULVERT 1 VENT 1.2 X 1.2 m size at ch 22.33,0 | 1459124.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986041 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B) | Dismantling Stone Masonry. Rubble stone masonry in cement mortar.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 755.79 | 755.79 | 5.76 | False | None | None | False | None | False | 4353.3504 | 0 | 2986042 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No 2.17(ix)B | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1357.94 | 1357.94 | 7.5 | False | None | None | False | None | False | 10184.55 | 0 | 2986043 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 86.36 | False | None | None | False | None | False | 10914.1768 | 0 | 2986044 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 11 Item No 1.23 | Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 3322.99 | 3322.99 | 8.08 | False | None | None | False | None | False | 26849.7592 | 0 | 2986045 | 99071 | None | PWD SR 2023 - 24 V-1,Page No 7 Item No 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 52.27 | False | None | None | False | None | False | 30697.6483 | 0 | 2986046 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 9.68 | False | None | None | False | None | False | 71829.1816 | 0 | 2986047 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8331.28 | 8331.28 | 2.68 | False | None | None | False | None | False | 22327.8304 | 0 | 2986048 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 9420.36 | 9420.36 | 28.46 | False | None | None | False | None | False | 268103.4456 | 0 | 2986049 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8478.32 | 8478.32 | 8.72 | False | None | None | False | None | False | 73930.9504 | 0 | 2986050 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 10174.17 | 10174.17 | 8.76 | False | None | None | False | None | False | 89125.7292 | 0 | 2986051 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 2.43 | False | None | None | False | None | False | 237883.9509 | 0 | 2986052 | 99071 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 0.71 | False | None | None | False | None | False | 69505.1873 | 0 | 2986053 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 121 Item No 13.8. | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8438.83 | 8438.83 | 6.48 | False | None | None | False | None | False | 54683.6184 | 0 | 2986054 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 122 Item No 13.9. | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 15396.75 | 15396.75 | 10.8 | False | None | None | False | None | False | 166284.9 | 0 | 2986055 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 124 Item No 13.16 | Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 2224.0 | 2224.0 | 24.0 | False | None | None | False | None | False | 53376.0 | 0 | 2986056 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 121 Item No 13.2. | M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 18175.58 | 18175.58 | 4.86 | False | None | None | False | None | False | 88333.3188 | 0 | 2986057 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No 14.2 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 3040.51 | 3040.51 | 3.6 | False | None | None | False | None | False | 10945.836 | 0 | 2986058 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 3316.8 | 3316.8 | 30.12 | False | None | None | False | None | False | 99902.016 | 0 | 2986059 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Mtr | 296.12 | 296.12 | 8.0 | False | None | None | False | None | False | 2368.96 | 0 | 2986060 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No 8.18 | Boundary pillar / Guard stone
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 16.0 | False | None | None | False | None | False | 14828.32 | 0 | 2986061 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 121 Item No 13.7. | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 4052.77 | 4052.77 | 2.0 | False | None | None | False | None | False | 8105.54 | 0 | 2986062 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 123 Item No 13.14 | Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 104.08 | 104.08 | 30.1 | False | None | None | False | None | False | 3132.808 | 0 | 2986063 | 99071 | None | PWD SR 2023 - 24 ,V-3,Page No 146 Item No 16.15 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 4132.06 | 4132.06 | 7.5 | False | None | None | False | None | False | 30990.45 | 0 | 2986064 | 99071 | None | PWD SR 2023 - 24 Page No 64 Item No8.5 (A) (xii | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 5233.54 | 5233.54 | 2.0 | False | None | None | False | None | False | 10467.08 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 improvements of existing CD | 592163.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986065 | 99072 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 117.7 | 117.7 | 763.8 | False | None | None | False | None | False | 89899.26 | 0 | 2986066 | 99072 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 34.58 | False | None | None | False | None | False | 292578.9594 | 0 | 2986067 | 99072 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 60.0 | False | None | None | False | None | False | 142138.2 | 0 | 2986068 | 99072 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.69 | 97894.69 | 0.69 | False | None | None | False | None | False | 67547.3361 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 ESTIMATE OF DRAIN | 18125343.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986069 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 38 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 2867.5 | False | None | None | False | None | False | 362394.65 | 0 | 2986070 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 235.0 | False | None | None | False | None | False | 1743786.95 | 0 | 2986071 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7834.19 | 7834.19 | 304.5 | False | None | None | False | None | False | 2385510.855 | 0 | 2986072 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 10576.16 | 10576.16 | 465.0 | False | None | None | False | None | False | 4917914.4 | 0 | 2986073 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 9401.04 | 9401.04 | 304.5 | False | None | None | False | None | False | 2862616.68 | 0 | 2986074 | 99073 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 59.79 | False | None | None | False | None | False | 5853119.9277 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 ESTIMATE OF PROTECTION WORKS | 15126332.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986075 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 1493.0 | False | None | None | False | None | False | 188685.34 | 0 | 2986076 | 99074 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 1680.0 | False | None | None | False | None | False | 3979869.6 | 0 | 2986077 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 167.2 | False | None | None | False | None | False | 98194.888 | 0 | 2986078 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 83.6 | False | None | None | False | None | False | 620342.932 | 0 | 2986079 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8635.33 | 8635.33 | 394.92 | False | None | None | False | None | False | 3410264.5236 | 0 | 2986080 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 271.65 | False | None | None | False | None | False | 2298411.6345 | 0 | 2986081 | 99074 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 46.28 | False | None | None | False | None | False | 4530563.4764 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 ESTIMATE OF FIELD CDS | 8166658.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986082 | 99075 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 234.2 | False | None | None | False | None | False | 29598.196 | 0 | 2986083 | 99075 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 202.5 | False | None | None | False | None | False | 2701412.775 | 0 | 2986084 | 99075 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 5558.45 | False | None | None | False | None | False | 3264422.1005 | 0 | 2986085 | 99075 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 14.85 | False | None | None | False | None | False | 110192.4945 | 0 | 2986086 | 99075 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 188.52 | False | None | None | False | None | False | 1595054.5236 | 0 | 2986087 | 99075 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.69 | 97894.69 | 4.76 | False | None | None | False | None | False | 465978.7244 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 WATER SUPPLY WORKS | 2322258.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986088 | 99076 | None | UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 324.62 | 324.62 | 604.8 | False | None | None | False | None | False | 196330.176 | 0 | 2986089 | 99076 | None | UNI SR 2023-24 , V - 5 Pg No. ,51 I.No 4.1.1 | Providing and laying Ductile Iron pipes of class conforming to IS 8329:2000 with latest amendments, conveying to work site, rolling and lowering into trenches, laying true to line, level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations, cutting of pipes wherever necessary, jointing with DI specials (excluding cost of specials) and rubber gaskets, cleaning the socket and spigot end with soap solution, applying soft soap to the socket and spigot ends before insertion of rubber gaskets, jacking and fixing in perfect conditions etc. The cost to include soap solution, soft soap, waste etc. and giving necessary hydraulic test to the required pressure as per ISS with all lead and lifts and cost of all jointing materials. (The contractor will make his own arrangements for water for testing. Earth work excavation in trenches to be measured and paid for seperately)
Note: In sewerage projects for internal cement mortal lining ( CML ) of DI pipes, if High Alumina Cement ( HAC ) as recommended in Annexure B clause 16.3 of IS8329:2000 is considered in place of Slag or Sulphate Resistance Cement ( SRC ), the cost of pipes may be increased by 5-6% from the prices listed. For DI K9 pipes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1808.94 | 1808.94 | 1120.0 | False | None | None | False | None | False | 2026012.8 | 0 | 2986090 | 99076 | None | UNI SR 2023-24 , V - 5 Pg No. ,52 I.No 4.4.1 | Labour charges for laying & jointing of DI pipes of all classes rolling and lowering into trenches, laying true to line, level and perfect linking at joints and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of DI pipes and specials (excluding cost of pipes,rubber gasket and specials) with rubber gaskets including cleaning the sockets and spigot ends with saop solutions and applying soft soap to the spigot and socket end before insertion of rubber gaskets, jointing and fixing in perfect conditions including the cost of soap solution, soft soap, waste etc. and giving necessary hydraulic test to the required pressure as per ISS etc. with all leads and lifts
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 89.21 | 89.21 | 1120.0 | False | None | None | False | None | False | 99915.2 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 ELECTRICAL WORKS | 1752905.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986091 | 99077 | None | 1.1.1 | Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Pit | 779.33 | 779.33 | 42.0 | False | None | None | False | None | False | 32731.86 | 0 | 2986092 | 99077 | None | 1.01 | RCC Pole - 9 Mtr Long, 145 Kg WL
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 8767.16 | 8767.16 | 42.0 | False | None | None | False | None | False | 368220.72 | 0 | 2986093 | 99077 | None | 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 1379.0 | 1379.0 | 42.0 | False | None | None | False | None | False | 57918.0 | 0 | 2986094 | 99077 | None | 1.06 | PSCC Pole - 9 Mtr Long, 200 Kg WL
(Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)
as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 5202.56 | 5202.56 | 11.0 | False | None | None | False | None | False | 57228.16 | 0 | 2986095 | 99077 | None | 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 1379.0 | 1379.0 | 11.0 | False | None | None | False | None | False | 15169.0 | 0 | 2986096 | 99077 | None | 2.03 | 11 kV, Special 3 Pin Cross Arm - MS
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 1089.08 | 1089.08 | 42.0 | False | None | None | False | None | False | 45741.36 | 0 | 2986097 | 99077 | None | 3.01 | 11 kV, Cross Arm with HT Top Support
(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 890.84 | 890.84 | 42.0 | False | None | None | False | None | False | 37415.28 | 0 | 2986098 | 99077 | None | 6.05 | 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 253.99 | 253.99 | 126.0 | False | None | None | False | None | False | 32002.74 | 0 | 2986099 | 99077 | None | 6.08 | DISC Insulator 45 kN Porcelain
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 631.89 | 631.89 | 14.0 | False | None | None | False | None | False | 8846.46 | 0 | 2986100 | 99077 | None | 1.7.1 | Digging of Pit for GUY SET
Ordinary Soil
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Pit | 405.15 | 405.15 | 4.0 | False | None | None | False | None | False | 1620.6 | 0 | 2986101 | 99077 | None | 6.05 | Releasing of Rabbit Conductor
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Km | 4970.87 | 4970.87 | 5.67 | False | None | None | False | None | False | 28184.8329 | 0 | 2986102 | 99077 | None | 7.02 | ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Kms | 57283.93 | 57283.93 | 5.67 | False | None | None | False | None | False | 324799.8831 | 0 | 2986103 | 99077 | None | 6.02 | Stringing of Rabbit Conductor (including pin binding, providing
jumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Km | 6483.69 | 6483.69 | 5.67 | False | None | None | False | None | False | 36762.5223 | 0 | 2986104 | 99077 | None | 9.03 | PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 126.38 | 126.38 | 126.0 | False | None | None | False | None | False | 15923.88 | 0 | 2986105 | 99077 | None | 10.06 | T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 391.52 | 391.52 | 126.0 | False | None | None | False | None | False | 49331.52 | 0 | 2986106 | 99077 | None | 2.05 | LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 358.07 | 358.07 | 3.0 | False | None | None | False | None | False | 1074.21 | 0 | 2986107 | 99077 | None | 2.07 | LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 163.55 | 163.55 | 3.0 | False | None | None | False | None | False | 490.65 | 0 | 2986108 | 99077 | None | 5.02 | Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 151.16 | 151.16 | 3.0 | False | None | None | False | None | False | 453.48 | 0 | 2986109 | 99077 | None | 5.01 | Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 151.16 | 151.16 | 3.0 | False | None | None | False | None | False | 453.48 | 0 | 2986110 | 99077 | None | 6.03 | 1.1 kV Ceramic Pin Insulator (Shell only)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 38.41 | 38.41 | 15.0 | False | None | None | False | None | False | 576.15 | 0 | 2986111 | 99077 | None | 6.06 | No. 8 Strain Insulator
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 33.45 | 33.45 | 15.0 | False | None | None | False | None | False | 501.75 | 0 | 2986112 | 99077 | None | 2.16 | Spiral Earth Electrode
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 296.12 | 296.12 | 53.0 | False | None | None | False | None | False | 15694.36 | 0 | 2986113 | 99077 | None | 4.03 | Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Mtr | 115.23 | 115.23 | 58.8 | False | None | None | False | None | False | 6775.524 | 0 | 2986114 | 99077 | None | 24.01 | 11 kV, GOS
a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 11708.55 | 11708.55 | 2.0 | False | None | None | False | None | False | 23417.1 | 0 | 2986115 | 99077 | None | 13.02 | Labour for 11 kV, GOS
a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 1367.86 | 1367.86 | 2.0 | False | None | None | False | None | False | 2735.72 | 0 | 2986116 | 99077 | None | 1.8.1.a | A) Base Concreting with CC 1:4: 8
a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 338.25 | 338.25 | 53.0 | False | None | None | False | None | False | 17927.25 | 0 | 2986117 | 99077 | None | 1.8.1.b | b Pole base for 9 Mtr Square Pole (650x650x150mm)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 438.6 | 438.6 | 53.0 | False | None | None | False | None | False | 23245.8 | 0 | 2986118 | 99077 | None | 1.8.2.a | B) Pole Concreting with CC 1:2:4 (without coping)
9 Mtr support (650x500x1700mm)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 3912.76 | 3912.76 | 53.0 | False | None | None | False | None | False | 207376.28 | 0 | 2986119 | 99077 | None | 1.8.2.g | Guy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 247.8 | 247.8 | 2.0 | False | None | None | False | None | False | 495.6 | 0 | 2986120 | 99077 | None | 21.02 | for Poles 25 to 105 Mtr
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Pole | 353.11 | 353.11 | 42.0 | False | None | None | False | None | False | 14830.62 | 0 | 2986121 | 99077 | None | 22.02 | For ACSR Conductors 25 to 105 Mtr
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Per Km | 152.39 | 152.39 | 5.67 | False | None | None | False | None | False | 864.0513 | 0 | 2986122 | 99077 | None | 26.02 | 9 Mtr RCC/PSCC Pole
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 175.94 | 175.94 | 42.0 | False | None | None | False | None | False | 7389.48 | 0 | 2986123 | 99077 | None | 5.06 | Fixing of HT/LT Single Top Support
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 138.76 | 138.76 | 42.0 | False | None | None | False | None | False | 5827.92 | 0 | 2986124 | 99077 | None | 6.08 | DISC Insulator 45 kN Porcelain
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 631.89 | 631.89 | 14.0 | False | None | None | False | None | False | 8846.46 | 0 | 2986125 | 99077 | None | 24.01 | GOS as per IS-9921, IS-1977
174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 11708.55 | 11708.55 | 2.0 | False | None | None | False | None | False | 23417.1 | 0 | 2986126 | 99077 | None | 27.02 | 27 Loading & Unloading of Transformer (when maintaince
men for loading and unloading are not available in store)
Loading
63 kVA
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 353.11 | 353.11 | 3.0 | False | None | None | False | None | False | 1059.33 | 0 | 2986127 | 99077 | None | 27.07 | Un loading
63 kVA
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | No | 353.11 | 353.11 | 3.0 | False | None | None | False | None | False | 1059.33 | 0 | 2986128 | 99077 | None | 26.01 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Set | 7930.84 | 7930.84 | 1.0 | False | None | None | False | None | False | 7930.84 | 0 | 2986129 | 99077 | None | 54.01 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Mtr | 920.58 | 920.58 | 12.0 | False | None | None | False | None | False | 11046.96 | 0 | 2986130 | 99077 | None | 54.02 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 837.56 | 837.56 | 12.0 | False | None | None | False | None | False | 10050.72 | 0 | 2986131 | 99077 | None | 54.03 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 384.09 | 384.09 | 12.0 | False | None | None | False | None | False | 4609.08 | 0 | 2986132 | 99077 | None | 54.04 | Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 2691.1 | 2691.1 | 12.0 | False | None | None | False | None | False | 32293.2 | 0 | 2986133 | 99077 | None | 2023-23 | Mislenieous amount ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rs | 210566.13 | 210566.13 | 1.0 | False | None | None | False | None | False | 210566.13 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 ESTIMATE OF 2 ROWS NP4 1200mm DIA PIPE CULVERT AT cH 14.34,14.43 | 2224816.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986134 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead
By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 890.84 | 890.84 | 7.92 | False | None | None | False | None | False | 7055.4528 | 0 | 2986135 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 1702.39 | 1702.39 | 22.5 | False | None | None | False | None | False | 38303.775 | 0 | 2986136 | 99078 | None | PWD SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 126.38 | 126.38 | 101.09 | False | None | None | False | None | False | 12775.7542 | 0 | 2986137 | 99078 | None | PWD SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 587.29 | 587.29 | 208.9 | False | None | None | False | None | False | 122684.881 | 0 | 2986138 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (a) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification
Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 1447.15 | 1447.15 | 62.58 | False | None | None | False | None | False | 90562.647 | 0 | 2986139 | 99078 | None | PWD SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 7420.37 | 7420.37 | 6.81 | False | None | None | False | None | False | 50532.7197 | 0 | 2986140 | 99078 | None | PWD SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 8460.93 | 8460.93 | 103.78 | False | None | None | False | None | False | 878075.3154 | 0 | 2986141 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii | Providing and laying Reinforced Cement Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | m | 13340.31 | 13340.31 | 50.0 | False | None | None | False | None | False | 667015.5 | 0 | 2986142 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.1(A | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 12.77 | False | None | None | False | None | False | 30251.7469 | 0 | 2986143 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 2368.97 | 2368.97 | 18.0 | False | None | None | False | None | False | 42641.46 | 0 | 2986144 | 99078 | None | PWD SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Tonne | 97894.63 | 97894.63 | 2.38 | False | None | None | False | None | False | 232989.2194 | 0 | 2986145 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 67 Item No8.18 | Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Each | 926.77 | 926.77 | 40.0 | False | None | None | False | None | False | 37070.8 | 0 | 2986146 | 99078 | None | PWD SR 2023 - 24 ,V-3,Page No 66 Item No8.10. | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 135.05 | 135.05 | 110.01 | False | None | None | False | None | False | 14856.8505 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 1ST YEAR MAINTENANCE ESTIMATE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986147 | 99079 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 64) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986148 | 99079 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 4800) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986149 | 99079 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =720) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986150 | 99079 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986151 | 99079 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986152 | 99079 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =540) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 2ND YEAR MAINTENANCE ESTIMATE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986153 | 99080 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =96) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986154 | 99080 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =6400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986155 | 99080 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =720) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986156 | 99080 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986157 | 99080 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986158 | 99080 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =540) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 3RD YEAR MAINTENANCE ESTIMATE | 807651.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986159 | 99081 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | 100 Sqm | 545.35 | 545.35 | 96.0 | False | None | None | False | None | False | 52353.6 | 0 | 2986160 | 99081 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rmtr | 8.33 | 8.33 | 6400.0 | False | None | None | False | None | False | 53312.0 | 0 | 2986161 | 99081 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 54.12 | 54.12 | 720.0 | False | None | None | False | None | False | 38966.4 | 0 | 2986162 | 99081 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 134.6 | 134.6 | 2400.0 | False | None | None | False | None | False | 323040.0 | 0 | 2986163 | 99081 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 591.15 | 591.15 | 220.0 | False | None | None | False | None | False | 130053.0 | 0 | 2986164 | 99081 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 131.83 | 131.83 | 540.0 | False | None | None | False | None | False | 71188.2 | 0 | 2986165 | 99081 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Km | 2753.16 | 2753.16 | 8.0 | False | None | None | False | None | False | 22025.28 | 0 | 2986166 | 99081 | None | UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Km | 285.86 | 285.86 | 8.0 | False | None | None | False | None | False | 2286.88 | 0 | 2986167 | 99081 | None | UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 151.26 | 151.26 | 636.0 | False | None | None | False | None | False | 96201.36 | 0 | 2986168 | 99081 | None | UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | cm | 1.25 | 1.25 | 14580.0 | False | None | None | False | None | False | 18225.0 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 4th YEAR MAINTENANCE ESTIMATE | 692760.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986169 | 99082 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | 100 Sqm | 564.83 | 564.83 | 96.0 | False | None | None | False | None | False | 54223.68 | 0 | 2986170 | 99082 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rmtr | 8.62 | 8.62 | 6400.0 | False | None | None | False | None | False | 55168.0 | 0 | 2986171 | 99082 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 56.05 | 56.05 | 720.0 | False | None | None | False | None | False | 40356.0 | 0 | 2986172 | 99082 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 139.41 | 139.41 | 2400.0 | False | None | None | False | None | False | 334584.0 | 0 | 2986173 | 99082 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 612.26 | 612.26 | 220.0 | False | None | None | False | None | False | 134697.2 | 0 | 2986174 | 99082 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 136.54 | 136.54 | 540.0 | False | None | None | False | None | False | 73731.6 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 5th YEAR MAINTENANCE ESTIMATE | 856024.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986175 | 99083 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | 100 Sqm | 584.31 | 584.31 | 96.0 | False | None | None | False | None | False | 56093.76 | 0 | 2986176 | 99083 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Rmtr | 8.92 | 8.92 | 6400.0 | False | None | None | False | None | False | 57088.0 | 0 | 2986177 | 99083 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 57.99 | 57.99 | 720.0 | False | None | None | False | None | False | 41752.8 | 0 | 2986178 | 99083 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 144.22 | 144.22 | 2400.0 | False | None | None | False | None | False | 346128.0 | 0 | 2986179 | 99083 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 633.38 | 633.38 | 440.0 | False | None | None | False | None | False | 278687.2 | 0 | 2986180 | 99083 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 141.25 | 141.25 | 540.0 | False | None | None | False | None | False | 76275.0 | 0 |
| 1710146329000 | 0 | None | None | Roads | PKG 607 6th year renewal/strenthening estimate | 25162027.05 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986181 | 99084 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Km | 3048.14 | 3048.14 | 8.0 | False | None | None | False | None | False | 24385.12 | 0 | 2986182 | 99084 | None | UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Km | 316.49 | 316.49 | 8.0 | False | None | None | False | None | False | 2531.92 | 0 | 2986183 | 99084 | None | UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 167.46 | 167.46 | 636.0 | False | None | None | False | None | False | 106504.56 | 0 | 2986184 | 99084 | None | UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | cm | 1.38 | 1.38 | 14580.0 | False | None | None | False | None | False | 20120.4 | 0 | 2986185 | 99084 | None | UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 18.44 | 18.44 | 44345.0 | False | None | None | False | None | False | 817721.8 | 0 | 2986186 | 99084 | None | UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (c | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Cum | 16829.29 | 16829.29 | 1330.35 | False | None | None | False | None | False | 22388845.9515 | 0 | 2986187 | 99084 | None | UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Sqm | 814.27 | 814.27 | 1600.0 | False | None | None | False | None | False | 1302832.0 | 0 | 2986188 | 99084 | None | UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all item rates are inclusive of GST | Nos | 560.77 | 560.77 | 890.0 | False | None | None | False | None | False | 499085.3 | 0 |
|
|
---|