tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710152372000 | 0 | None | None | Roads | PKG 608 PAVEMENT ESTIMATE | 146222766.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986841 | 99129 | None | UNISR2023-24,V-3,Pg.No.149I.No.16.29 | Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 2986842 | 99129 | None | UNISR2023-24,V-3,Pg.No.9I.No.2.5(ii) a | learing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 486.93 | 486.93 | 179.04 | False | None | None | False | None | False | 87179.9472 | 0 | 2986843 | 99129 | None | UNISR2023-24,V-3,Pg.No.17I.No.3.5. | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 7.43 | 7.43 | 26110.0 | False | None | None | False | None | False | 193997.3 | 0 | 2986844 | 99129 | None | UNISR2023-24,V-1,Pg.No.8I.No.1.12. | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 117.71 | 117.71 | 8339.41 | False | None | None | False | None | False | 981631.9511 | 0 | 2986845 | 99129 | None | UNISR2023-24,V-1,Pg.No.7I.No.1.7. | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 147.44 | 147.44 | 2300.63 | False | None | None | False | None | False | 339204.8872 | 0 | 2986846 | 99129 | None | UNISR2023-24,V-1,Pg.No.7I.No.1.8. | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 percent per m3 for every 1.50 m height or part there of Deduct 5 percent per m3 if rollers are not used and tamping is done manually Add 8 percent per m3 for works under foul and sullage situation ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.29 | 587.29 | 21597.9 | False | None | None | False | None | False | 12684230.691 | 0 | 2986847 | 99129 | None | UNISR2023-24,V-3,Pg.No.17I.No.3.6. | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 610.83 | 610.83 | 29450.93 | False | None | None | False | None | False | 17989511.5719 | 0 | 2986848 | 99129 | None | UNISR2023-24,V-3,Pg.No.23I.No.4.2.(B) (5) | By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2922.8 | 2922.8 | 10598.3 | False | None | None | False | None | False | 30976711.24 | 0 | 2986849 | 99129 | None | UNISR2023-24,V-3,Pg.No.26I.No.4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3170.6 | 3170.6 | 10856.69 | False | None | None | False | None | False | 34422221.314 | 0 | 2986850 | 99129 | None | UNISR2023-24,V-3,Pg.No.31I.No.5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 50.8 | 50.8 | 41188.83 | False | None | None | False | None | False | 2092392.564 | 0 | 2986851 | 99129 | None | UNISR2023-24,v-3,Pg.No.31I.No.5.4 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 17.35 | 17.35 | 41188.83 | False | None | None | False | None | False | 714626.2005 | 0 | 2986852 | 99129 | None | UNISR2023-24,V-3,Pg.No.35I.No.5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 11707.31 | 11707.31 | 2471.33 | False | None | None | False | None | False | 28932626.4223 | 0 | 2986853 | 99129 | None | UNISR2023-24,V-3,Pg.No.38I.No.5.16(c) | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 13572.01 | 13572.01 | 1235.66 | False | None | None | False | None | False | 16770389.8766 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 ESTIMATE OF JUNCTIONS | 1555468.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986854 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a | Clearing and Grubbing Road Land.Clearingandgrubbingroadlandincludinguprootingrankvegetation,grass,bushes,shrubs,saplingsandtreesgirthupto300mm,removalofstumpsoftreescutearlieranddisposalofunserviceablematerialsandstackingofserviceablematerialtobeusedorauctioned,includingremovalanddisposaloftoporganicsoilnotexceeding150mminthickness.ByMechanicalMeansusingDozerA)Inareaoflightjungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 486.93 | 486.93 | 1.56 | False | None | None | False | None | False | 759.6108 | 0 | 2986855 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5. | Scarifyingtheexistingbituminousroadsurfacetoadepthof50mmanddisposalofscarifiedmaterialbyMechanicalMeansusingHydraulicexcavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 7.43 | 7.43 | 549.37 | False | None | None | False | None | False | 4081.8191 | 0 | 2986856 | 99130 | None | UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12. | Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthanfoundationinallkindsofsoils&uptodepthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenancesrequiredtocompletethework.Inall kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 117.11 | 117.11 | 52.65 | False | None | None | False | None | False | 6165.8415 | 0 | 2986857 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6. | Construction of Subgrade and Earthen ShouldersConstructionofsub-gradeandearthenshoulderswithapprovedmaterialobtainedfromborrowpitswithalllifts&leads,transportingtosite,spreading,gradingtorequiredslopeandcompactedtomeetrequirementoftableNo.300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 610.83 | 610.83 | 169.06 | False | None | None | False | None | False | 103266.9198 | 0 | 2986858 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5) | 6
By Mix in Place MethodConstructionofGranularSub-BaseofrequiredgradingasperdesignspreadinginuniformlayerswithmotorgraderonpreparedsurfacemixingbymixinplacemethodwithfrontendloaderatOMCandcompactingwithvibratoryrollertoachievethedesireddensity,completeasperclause401B)For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2922.8 | 2922.8 | 139.5 | False | None | None | False | None | False | 407730.6 | 0 | 2986859 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17 | Wet Mix Macadam (Plant mix method)Providing,laying,spreadingandcompactinggradedstoneaggregatetowetmixmacadamspecificationincludingpremixingtheMaterialwithwateratOMCinmechanicalmixplantcarriageofmixedMaterialbytippertosite,layinginuniformlayerswithpaver/graderinsub-base/basecourseonwellpreparedsurfaceandcompactingwith vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3170.6 | 3170.6 | 142.22 | False | None | None | False | None | False | 450922.732 | 0 | 2986860 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i) | Prime Coat over WMM/WBMProvidingandapplyingprimercoatwithSS1gradeBitumenEmulsiononpreparedsurfaceofgranularbaseincludingcleaningofroadsurfaceandsprayingprimerattherateof0.70kg/m2using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 50.5 | 50.5 | 549.37 | False | None | None | False | None | False | 27743.185 | 0 | 2986861 | 99130 | None | UNI SR 2023-24, v-3,Pg. No. 31 I. No.5.4 | ProvidingandapplyingtackcoatwithRS1Bituminous Emulsion usingemulsionpressuredistributorattherateof0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 17.35 | 17.35 | 549.37 | False | None | None | False | None | False | 9531.5695 | 0 | 2986862 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c) | DenseGradedBituminousMacadamGrading-IIfortraffic
less than 20MSA.ProvidingandlayingDenseGradedBituminousMacadamwith40/60TPHcapacityHMPusingcrushedaggregatesofspecifiedgrading,premixedwithbituminousbinderVG-30,@4.5percentbyweightoftotalmixandfiller,transportingthehotmixtoworksite,layingwithmechanicalpaverfinishertotherequiredgrade,levelandalignment,rollingwithsmoothwheeled,vibratoryandtandemrollerstoachievethedesiredcompactionasperMoRTHspecificationclauseNo.505completeinallrespects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 11707.31 | 11707.31 | 27.47 | False | None | None | False | None | False | 321599.8057 | 0 | 2986863 | 99130 | None | UNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c) | BituminousConcreteGradingIIfortraffic less than 20MSAProvidingandlayingBituminousConcretewith40/60TPHcapacityhotmixplantusingcrushedaggregatesofspecifiedgrading,premixedwithbituminousbinderVG-30,@5.4percentofmixandfiller,transportingthehotmixtoworksite,layingwithmechanicalpaverfinishertotherequiredgrade,levelandalignment,rollingwith smooth wheeled, vibratory and tandem rollers toachievethedesiredcompactionasperMORTHspecificationclauseNo.507completeinallrespects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 13572.01 | 13572.01 | 16.48 | False | None | None | False | None | False | 223666.7248 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 ESTIMATE OF TRAFFIC SAFETY | 2980376.56 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986864 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 11163.39 | 11163.39 | 1.8 | False | None | None | False | None | False | 20094.102 | 0 | 2986865 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 5882.77 | 5882.77 | 20.0 | False | None | None | False | None | False | 117655.4 | 0 | 2986866 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.5 (A) (viii | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 5388.41 | 5388.41 | 18.0 | False | None | None | False | None | False | 96991.38 | 0 | 2986867 | 99131 | None | UNI SR 2023-24, V-3,Pg. No.64 I. No.8.5 (A) (xii) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 5294.25 | 5294.25 | 12.0 | False | None | None | False | None | False | 63531.0 | 0 | 2986868 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.5 (A) (xv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 8208.38 | 8208.38 | 8.0 | False | None | None | False | None | False | 65667.04 | 0 | 2986869 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 | RoadMarkingwithHotAppliedThermoplasticCompoundwithReflectorisingGlassBeadsonBituminousSurfaceProvidingandlayingofhotappliedthermoplasticcompound2.5mmthickincludingreflectorisingglassbeads@250g/m2area,thicknessof2.5mmisexclusiveofsurfaceappliedglassbeads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note:1.Asealingprimermaybeappliedinadvanceoncementconcretepavementtoensureproperbonding.Anylaitanceand/orcuringcompoundtoberemovedwherepaintisrequiredtobeappliedonconcretesurface.2.Costofpainterisalreadyincludedinusagechargesofroadmarkingmachine) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 656.67 | 656.67 | 1651.08 | False | None | None | False | None | False | 1084214.7036 | 0 | 2986870 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 | SupplyingandFixingofMoldedShankRaisedPavementMarkers/Cat'sEyemadeofpolycarbonateandABSmouldedbodyandreflectivepanelswithmicroprismaticlenscapableofprovidingtotalinternalreflectionofthelightenteringthelensfaceandshallsupportaloadof16000kgtestedinaccordancetoASTMD4280TypeHandcomplyingtoSpecificationsofCategoryAofMORTHCircularNoRW/NH/33023/10-97DOIIIDt11.06.1997.Theheight,widthandlengthshallnotexceed50mm,100mmand102+/-2mmandwithminimumreflectiveareaof13cm2oneachsideandtheslopetothebaseshallbe35+/-5degree.Thestrengthofdetachmentoftheintegratedcylindricalshanks,(ofdiameternotlessthan19+/-2mmandheightnotlessthan30+/-2mm)fromthebodyistobeaminimumvalueof500Kg.Fixingwillbebydrillingholesontheroadfortheshankstogoinside,withoutnailsandusingepoxyresinbasedadhesiveaspermanufacturer'srecommendationandcompleteasdirectedbytheengineer.Thecontractorshallsubmitatwoyearwarrantyforsatisfactoryfieldperformanceincludingstipulatedretro-reflectanceofthereflectingpanel,totheEngineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 452.24 | 452.24 | 1109.0 | False | None | None | False | None | False | 501534.16 | 0 | 2986871 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 6295.36 | 6295.36 | 1.0 | False | None | None | False | None | False | 6295.36 | 0 | 2986872 | 99131 | None | UNISR2023-24,V-3,Pg.No.67I.No.8.16(ii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 3626.55 | 3626.55 | 7.0 | False | None | None | False | None | False | 25385.85 | 0 | 2986873 | 99131 | None | UNISR2023-24,V-3,Pg.No.67I.No.8.16(iii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 1043.24 | 1043.24 | 30.0 | False | None | None | False | None | False | 31297.2 | 0 | 2986874 | 99131 | None | UNISR2023-24,V-3,Pg.No.80I.No.8.60.2iii | ProvidingSpeedBreakers/RaisedpedestriancrossingsinTrapezoidalsectionwith2.5mTopwidthandtransitionlengthof0.8mlengthandheightof0.1masperIRC99:2018usingDenseBituminousMacadam(DBM)GrIIandBituminousConcrete(BC)GrIIforentireformationwidth&WBMGrIIfor Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound withreflectingglassbeedsonbituminoussurfaceandproviding2Nos.retroreflectivetrafficsignsasperIRC67-2022Twolanewithformationwidthof9.00 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 64265.69 | 64265.69 | 3.0 | False | None | None | False | None | False | 192797.07 | 0 | 2986875 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 | RoadDelineators:Supplyingandinstallationofdelineators(roadwayindicators,hazardmarkers,objectmarkers),80-100cmhighabovegroundlevel,paintedblackandwhitein15cmwidestrips,fittedwith80x100mmrectangularor75mmdiacircularreflectorisedpanelsatthetop,buriedorpressed into the ground and conforming to IRC-79-2019 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 2504.02 | 2504.02 | 24.0 | False | None | None | False | None | False | 60096.48 | 0 | 2986876 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.18 | Boundary Pillars Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 180.0 | False | None | None | False | None | False | 166818.6 | 0 | 2986877 | 99131 | None | UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 | EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenaces required to complete the work.In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 270.0 | False | None | None | False | None | False | 34122.6 | 0 | 2986878 | 99131 | None | UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) | Cable Duct Across the RoadProvidingandlayingofareinforcedcementconcretepipeduct,300mmdia,acrosstheroad(newconstruction),extendingfromdraintodrainincutsandtoeofslopetotoeofslopeinfills,constructingheadwallsatbothends,providingaminimumfillofgranularmaterialovertopandsidesofRCCpipeasperIRC:98-1997,beddedona0.3mthicklayerofgranularmaterialfreeofrockpieces,outertoouterdistanceofpipeatleasthalfdiaofpipesubjecttominimum450mmincaseofdoubleandtriplerowducts,jointstobemadeleakproof,invertlevelofducttobeabovehigherthangroundlevel to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 2740.67 | 2740.67 | 187.5 | False | None | None | False | None | False | 513875.625 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 ESTIMATE OF WATER SUPPLY PIPE LINE | 190026.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986879 | 99132 | None | UNI SR 2023-24 , V-1 Pg No. ,10 I.No 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 324.62 | 324.62 | 135.0 | False | None | None | False | None | False | 43823.7 | 0 | 2986880 | 99132 | None | HDPE Grade PE 8-PN 8, 90 mm dia | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 473.3 | 473.3 | 250.0 | False | None | None | False | None | False | 118325.0 | 0 | 2986881 | 99132 | None | UNI SR 2023-24 , V-5 Pg No. ,121 I.No 10.15.6 | Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 111.51 | 111.51 | 250.0 | False | None | None | False | None | False | 27877.5 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 Electrical Pole shifting | 347287.25 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986882 | 99133 | None | ESCOMs SR 2023-24 1.1.1 | Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing.Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pit | 779.33 | 779.33 | 9.0 | False | None | None | False | None | False | 7013.97 | 0 | 2986883 | 99133 | None | ESCOMs SR 2023-24 1.01 | RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 8767.16 | 8767.16 | 9.0 | False | None | None | False | None | False | 78904.44 | 0 | 2986884 | 99133 | None | ESCOMs SR 2023-24 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1379.01 | 1379.01 | 9.0 | False | None | None | False | None | False | 12411.09 | 0 | 2986885 | 99133 | None | ESCOMs SR 2023-24 1.06 | PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 5202.56 | 5202.56 | 3.0 | False | None | None | False | None | False | 15607.68 | 0 | 2986886 | 99133 | None | ESCOMs SR 2023-24 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1379.01 | 1379.01 | 3.0 | False | None | None | False | None | False | 4137.03 | 0 | 2986887 | 99133 | None | ESCOMs SR 2023-24 2.03 | 11 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1089.08 | 1089.08 | 9.0 | False | None | None | False | None | False | 9801.72 | 0 | 2986888 | 99133 | None | ESCOMs SR 2023-24 3.01 | 11 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 890.84 | 890.84 | 9.0 | False | None | None | False | None | False | 8017.56 | 0 | 2986889 | 99133 | None | ESCOMs SR 2023-24 6.05 | 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 254.0 | 254.0 | 27.0 | False | None | None | False | None | False | 6858.0 | 0 | 2986890 | 99133 | None | ESCOMs SR 2023-24 6.08 | DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 631.89 | 631.89 | 3.0 | False | None | None | False | None | False | 1895.67 | 0 | 2986891 | 99133 | None | ESCOMs SR 2023-24 1.7.1 | Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pit | 405.15 | 405.15 | 4.0 | False | None | None | False | None | False | 1620.6 | 0 | 2986892 | 99133 | None | ESCOMs SR 2023-24 6.05 | Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per KVAR | 4970.87 | 4970.87 | 1.215 | False | None | None | False | None | False | 6039.60705 | 0 | 2986893 | 99133 | None | ESCOMs SR 2023-24 7.02 | ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Kms | 57283.93 | 57283.93 | 1.215 | False | None | None | False | None | False | 69599.97495 | 0 | 2986894 | 99133 | None | ESCOMs SR 2023-24 6.02 | Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per KVAR | 6483.69 | 6483.69 | 1.215 | False | None | None | False | None | False | 7877.68335 | 0 | 2986895 | 99133 | None | ESCOMs SR 2023-24 9.03 | PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 126.38 | 126.38 | 27.0 | False | None | None | False | None | False | 3412.26 | 0 | 2986896 | 99133 | None | ESCOMs SR 2023-24 10.06 | T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 391.52 | 391.52 | 27.0 | False | None | None | False | None | False | 10571.04 | 0 | 2986897 | 99133 | None | ESCOMs SR 2023-24 2.05 | LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 358.07 | 358.07 | 1.0 | False | None | None | False | None | False | 358.07 | 0 | 2986898 | 99133 | None | ESCOMs SR 2023-24 2.07 | LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 163.55 | 163.55 | 1.0 | False | None | None | False | None | False | 163.55 | 0 | 2986899 | 99133 | None | ESCOMs SR 2023-24 5.02 | Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 151.16 | 151.16 | 1.0 | False | None | None | False | None | False | 151.16 | 0 | 2986900 | 99133 | None | ESCOMs SR 2023-24 5.01 | Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 151.16 | 151.16 | 1.0 | False | None | None | False | None | False | 151.16 | 0 | 2986901 | 99133 | None | ESCOMs SR 2023-24 6.03 | 1.1 kV Ceramic Pin Insulator (Shell only) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 38.41 | 38.41 | 5.0 | False | None | None | False | None | False | 192.05 | 0 | 2986902 | 99133 | None | ESCOMs SR 2023-24 6.06 | No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 33.45 | 33.45 | 5.0 | False | None | None | False | None | False | 167.25 | 0 | 2986903 | 99133 | None | ESCOMs SR 2023-24 2.16 | Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 296.12 | 296.12 | 12.0 | False | None | None | False | None | False | 3553.44 | 0 | 2986904 | 99133 | None | ESCOMs SR 2023-24 4.03 | Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Mtr | 115.23 | 115.23 | 12.6 | False | None | None | False | None | False | 1451.898 | 0 | 2986905 | 99133 | None | ESCOMs SR 2023-24 24.01 | 1 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 11708.55 | 11708.55 | 1.0 | False | None | None | False | None | False | 11708.55 | 0 | 2986906 | 99133 | None | ESCOMs SR 2023-24 13.02 | Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 1367.86 | 1367.86 | 1.0 | False | None | None | False | None | False | 1367.86 | 0 | 2986907 | 99133 | None | ESCOMs SR 2023-24 1.8.1A | A) Base Concreting with CC 1:4: 8 ESCOMs SR 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 338.25 | 338.25 | 12.0 | False | None | None | False | None | False | 4059.0 | 0 | 2986908 | 99133 | None | ESCOMs SR 2023-24 1.8.1.b | A) Base Concreting with CC 1:4: 8 b Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 438.61 | 438.61 | 12.0 | False | None | None | False | None | False | 5263.32 | 0 | 2986909 | 99133 | None | ESCOMs SR 2023-24 1.8.2.a | B) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 3912.76 | 3912.76 | 12.0 | False | None | None | False | None | False | 46953.12 | 0 | 2986910 | 99133 | None | ESCOMs SR 2023-24 1.8.2.g | Guy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 2986911 | 99133 | None | ESCOMs SR 2023-24 21.02 | Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pole | 353.12 | 353.12 | 9.0 | False | None | None | False | None | False | 3178.08 | 0 | 2986912 | 99133 | None | ESCOMs SR 2023-24 22.02 | For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Km | 152.4 | 152.4 | 1.215 | False | None | None | False | None | False | 185.166 | 0 | 2986913 | 99133 | None | ESCOMs SR 2023-24 26.02 | 22.02
For ACSR Conductors 25 to 105 Mtr
Per KM
1.215
129.15
156.92
39
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading.9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 175.94 | 175.94 | 9.0 | False | None | None | False | None | False | 1583.46 | 0 | 2986914 | 99133 | None | ESCOMs SR 2023-24 5.06 | Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 138.77 | 138.77 | 9.0 | False | None | None | False | None | False | 1248.93 | 0 | 2986915 | 99133 | None | ESCOMs SR 2023-24 6.08 | DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 631.89 | 631.89 | 3.0 | False | None | None | False | None | False | 1895.67 | 0 | 2986916 | 99133 | None | ESCOMs SR 2023-24 24.01 | GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 11708.55 | 11708.55 | 1.0 | False | None | None | False | None | False | 11708.55 | 0 | 2986917 | 99133 | None | ESCOMs SR 2023-24 26.01 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 7930.84 | 7930.84 | 1.0 | False | None | None | False | None | False | 7930.84 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 1 ROW OF 1200mm DIA | 5090437.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986918 | 99134 | None | UNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii) ( | Dismantling of StructuresDismantlingofexistingstructureslikeculverts,bridges,retainingwallsandotherstructurecomprisingofmasonry,cementconcrete,woodwork,steelwork,includingT&Pandscaffoldingwherevernecessary,sortingthedismantledmaterial,disposalofunserviceablematerialandstackingtheserviceable material withall lifts and leadByMechanicalMeansCementConcrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 890.84 | 890.84 | 72.24 | False | None | None | False | None | False | 64354.2816 | 0 | 2986919 | 99134 | None | UNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 | RemovingalltypeofHumePipesandStackingincludingEarthworkandDismantling of Masonry Works.(b)Above600mmto900mmdiaHume pipe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 1357.94 | 1357.94 | 52.5 | False | None | None | False | None | False | 71291.85 | 0 | 2986920 | 99134 | None | UNISR2023-24,V-1,PageNo8Item No1.14.1 | EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletetheworkInallkindsofsoilsDepthupto3m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 224.39 | False | None | None | False | None | False | 28358.4082 | 0 | 2986921 | 99134 | None | UNISR2023-24,V-1,PageNo7Item No1.8. | ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredtocomplete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.26 | 587.26 | 609.41 | False | None | None | False | None | False | 357882.1166 | 0 | 2986922 | 99134 | None | UNISR2023-24,V-3,PageNo117Item No12.3 (a) | Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasperdrawingandTechnical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 1447.15 | 1447.15 | 97.6 | False | None | None | False | None | False | 141241.84 | 0 | 2986923 | 99134 | None | UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | rovidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincludingcostofformwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.31 | 7420.31 | 16.56 | False | None | None | False | None | False | 122880.3336 | 0 | 2986924 | 99134 | None | UNISR2023-24,V-1,PageNo16Item No2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggre ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 255.87 | False | None | None | False | None | False | 2164898.1591 | 0 | 2986925 | 99134 | None | UNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) | ProvidingandlayingReinforcedCement Concrete Pipe NP4 as per
LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeon First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksin head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 13340.31 | 13340.31 | 87.5 | False | None | None | False | None | False | 1167277.125 | 0 | 2986926 | 99134 | None | UNISR2023-24,V-3,PageNo129Item No14.1(A) | Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawing and Technical specification.A)BoulderLaidDryWithoutWireCrates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 25.42 | False | None | None | False | None | False | 60219.2174 | 0 | 2986927 | 99134 | None | UNISR2023-24,V-3,PageNo129Item No14.4(A) | ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingand Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 63.0 | False | None | None | False | None | False | 149245.11 | 0 | 2986928 | 99134 | None | UNISR2023-24,V-1,PageNo18Item No2.11.h | Steel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | t | 97894.63 | 97894.63 | 6.04 | False | None | None | False | None | False | 591283.5652 | 0 | 2986929 | 99134 | None | UNISR2023-24,V-3,PageNo67Item No8.18 | Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingandletteringbutexcludingpainting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 140.0 | False | None | None | False | None | False | 129747.8 | 0 | 2986930 | 99134 | None | UNISR2023-24,V-3,PageNo66Item No8.10. | PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplasteredconcretesurfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 135.05 | 135.05 | 309.2 | False | None | None | False | None | False | 41757.46 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 4 ROWS OF 1200mm | 5798965.29 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986931 | 99135 | None | UNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii) ( | 1
Dismantling of StructuresDismantlingofexistingstructureslikeculverts,bridges,retainingwallsandotherstructurecomprisingofmasonry,cementconcrete,woodwork,steelwork,includingT&Pandscaffoldingwherevernecessary,sortingthedismantledmaterial,disposalofunserviceablematerialandstackingtheserviceablematerialwithall lifts and leadByMechanicalMeansCementConcreteGrade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 890.84 | 890.84 | 33.12 | False | None | None | False | None | False | 29504.6208 | 0 | 2986932 | 99135 | None | UNISR2023-24,V-3,PageNo11ItemNo2.17(ix) (C) | RemovingalltypeofHumePipesandStackingincludingEarthworkandDismantlingof Masonry Works. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 1702.39 | 1702.39 | 90.0 | False | None | None | False | None | False | 153215.1 | 0 | 2986933 | 99135 | None | UNISR2023-24,V-1,PageNo8ItemNo1.14.1 | EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletethework In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 262.61 | False | None | None | False | None | False | 33188.6518 | 0 | 2986934 | 99135 | None | UNISR2023-24,V-1,PageNo7ItemNo1.8. | ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequired to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.29 | 587.29 | 417.68 | False | None | None | False | None | False | 245299.2872 | 0 | 2986935 | 99135 | None | UNISR2023-24,V-3,PageNo117ItemNo12.3 (a) | Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasper drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 1447.15 | 1447.15 | 197.85 | False | None | None | False | None | False | 286318.6275 | 0 | 2986936 | 99135 | None | UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincluding cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 16.46 | False | None | None | False | None | False | 122139.2902 | 0 | 2986937 | 99135 | None | UNISR2023-24,V-1,PageNo16ItemNo2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggregatesincludingcostofformwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 247.71 | False | None | None | False | None | False | 2095856.9703 | 0 | 2986938 | 99135 | None | UNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) | ProvidingandlayingReinforcedCementConcrete Pipe NP4 as per design
LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworks in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 13340.31 | 13340.31 | 150.0 | False | None | None | False | None | False | 2001046.5 | 0 | 2986939 | 99135 | None | UNISR2023-24,V-3,PageNo129ItemNo14.1(A) | Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawingandTechnicalspecification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 35.68 | False | None | None | False | None | False | 84524.8496 | 0 | 2986940 | 99135 | None | UNISR2023-24,V-3,PageNo129ItemNo14.4(A) | ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnicalspecificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 27.0 | False | None | None | False | None | False | 63962.19 | 0 | 2986941 | 99135 | None | UNISR2023-24,V-1,PageNo18ItemNo2.11.h | Steel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials, ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | t | 97894.63 | 97894.63 | 5.52 | False | None | None | False | None | False | 540378.3576 | 0 | 2986942 | 99135 | None | UNISR2023-24,V-3,PageNo67ItemNo8.18 | Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 60.0 | False | None | None | False | None | False | 55606.2 | 0 | 2986943 | 99135 | None | UNISR2023-24,V-3,PageNo66ItemNo8.10. | PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 135.05 | 135.05 | 230.06 | False | None | None | False | None | False | 31069.603 | 0 | 2986944 | 99135 | None | UNI SR 2023 - 24 ,V-3,Page No 117 Item No12.2. | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Nos / Rmtr | 296.12 | 296.12 | 192.0 | False | None | None | False | None | False | 56855.04 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 1 ROW OF 1200mm At CH 5.46 | 758683.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986945 | 99136 | None | NISR2023-24,V-1,PageNo8ItemNo1.14.1 | EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletethe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 33.44 | False | None | None | False | None | False | 4226.1472 | 0 | 2986946 | 99136 | None | UNISR2023-24,V-1,PageNo7ItemNo1.8. | ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredtocompletethe work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.29 | 587.29 | 106.85 | False | None | None | False | None | False | 62751.9365 | 0 | 2986947 | 99136 | None | UNISR2023-24,V-3,PageNo117Item No12.3 (a) | Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasperdrawingandTechnicalSpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 1447.15 | 1447.15 | 17.24 | False | None | None | False | None | False | 24948.866 | 0 | 2986948 | 99136 | None | UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 | ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 2.37 | False | None | None | False | None | False | 17586.2769 | 0 | 2986949 | 99136 | None | UNISR2023-24,V-1,PageNo16ItemNo2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 36.69 | False | None | None | False | None | False | 310431.5217 | 0 | 2986950 | 99136 | None | UNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) | ProvidingandlayingReinforcedCement Concrete Pipe NP4 as per
LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClass Bedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksinheadwallsand parapets ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 13340.31 | 13340.31 | 15.0 | False | None | None | False | None | False | 200104.65 | 0 | 2986951 | 99136 | None | UNISR2023-24,V-3,PageNo129Item No14.1(A) | Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawingandTechnical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 3.64 | False | None | None | False | None | False | 8623.0508 | 0 | 2986952 | 99136 | None | UNISR2023-24,V-3,PageNo129Item No14.4(A) | ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 9.0 | False | None | None | False | None | False | 21320.73 | 0 | 2986953 | 99136 | None | UNISR2023-24,V-1,PageNo18ItemNo2.11.h | Steel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | t | 97894.63 | 97894.63 | 0.86 | False | None | None | False | None | False | 84189.3818 | 0 | 2986954 | 99136 | None | UNISR2023-24,V-3,PageNo67ItemNo8.18 | Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 | 2986955 | 99136 | None | UNISR2023-24,V-3,PageNo66ItemNo8.10. | PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadeson new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 135.05 | 135.05 | 44.17 | False | None | None | False | None | False | 5965.1585 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 Estimate CD,s Repairs | 23479.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986956 | 99137 | None | UNISR2023-24,V-1,PageNo8ItemNo1.12. | Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthanfoundationinallkindsofsoils&uptodepthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenancesrequiredtocompletethework.Inallkindsofsoilsupto300mmdepth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 117.71 | 117.71 | 42.0 | False | None | None | False | None | False | 4943.82 | 0 | 2986957 | 99137 | None | UNISR2023-24,V-3,PageNo67ItemNo8.18 | Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 20.0 | False | None | None | False | None | False | 18535.4 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 CONSTRUCTION OF FIELD APPROACH | 5287011.98 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986958 | 99138 | None | UNISR2023-24,V-1,PageNo8ItemNo1.14.1 | EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletetheworkInallkindsofsoilsDepthupto ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.39 | 126.39 | 251.55 | False | None | None | False | None | False | 31793.4045 | 0 | 2986959 | 99138 | None | UNISR2023-24,V-3,PageNo87ItemNo9.1.(ii) | LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBeddingin Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksinheadwallsandparapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 13340.31 | 13340.31 | 217.5 | False | None | None | False | None | False | 2901517.425 | 0 | 2986960 | 99138 | None | UNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8. | ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredto complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.29 | 587.29 | 37.35 | False | None | None | False | None | False | 21935.2815 | 0 | 2986961 | 99138 | None | UNISR2023-24,V-1,PageNo15ItemNo2.1.3 | ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery, curing, and all the other appurtenances requiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincludingcostof ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 15.95 | False | None | None | False | None | False | 118354.9015 | 0 | 2986962 | 99138 | None | UNISR2023-24,V-1,PageNo16ItemNo2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegraded crushed coarse aggregates including cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 202.48 | False | None | None | False | None | False | 1713169.1064 | 0 | 2986963 | 99138 | None | UNISR2023-24,V-1,PageNo18ItemNo2.11.h | Steel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawingandtechnical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | t | 97894.69 | 97894.69 | 5.11 | False | None | None | False | None | False | 500241.8659 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 1st year maintenance estimate | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986964 | 99139 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 59.68) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986965 | 99139 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 4476) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986966 | 99139 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =671.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986967 | 99139 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2238) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986968 | 99139 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986969 | 99139 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =335.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 2nd year maintenance estimate | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986970 | 99140 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =89.52) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986971 | 99140 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =5968) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986972 | 99140 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =671.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986973 | 99140 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2238) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986974 | 99140 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 2986975 | 99140 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =335.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 3rd year maintenance estimate | 706610.16 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986976 | 99141 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 545.35 | 545.35 | 89.52 | False | None | None | False | None | False | 48819.732 | 0 | 2986977 | 99141 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.33 | 8.33 | 5968.0 | False | None | None | False | None | False | 49713.44 | 0 | 2986978 | 99141 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 54.12 | 54.12 | 671.4 | False | None | None | False | None | False | 36336.168 | 0 | 2986979 | 99141 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 134.6 | 134.6 | 2238.0 | False | None | None | False | None | False | 301234.8 | 0 | 2986980 | 99141 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 591.15 | 591.15 | 205.15 | False | None | None | False | None | False | 121274.4225 | 0 | 2986981 | 99141 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 131.83 | 131.83 | 335.7 | False | None | None | False | None | False | 44255.331 | 0 | 2986982 | 99141 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 2753.16 | 2753.16 | 7.46 | False | None | None | False | None | False | 20538.5736 | 0 | 2986983 | 99141 | None | UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 285.86 | 285.86 | 7.46 | False | None | None | False | None | False | 2132.5156 | 0 | 2986984 | 99141 | None | UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 151.26 | 151.26 | 395.38 | False | None | None | False | None | False | 59805.1788 | 0 | 2986985 | 99141 | None | UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | cm | 1.25 | 1.25 | 18000.0 | False | None | None | False | None | False | 22500.0 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 4th year maintenance estimate | 623080.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986986 | 99142 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 564.83 | 564.83 | 89.52 | False | None | None | False | None | False | 50563.5816 | 0 | 2986987 | 99142 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.62 | 8.62 | 5968.0 | False | None | None | False | None | False | 51444.16 | 0 | 2986988 | 99142 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 56.05 | 56.05 | 671.4 | False | None | None | False | None | False | 37631.97 | 0 | 2986989 | 99142 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 139.41 | 139.41 | 2238.0 | False | None | None | False | None | False | 311999.58 | 0 | 2986990 | 99142 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 612.26 | 612.26 | 205.15 | False | None | None | False | None | False | 125605.139 | 0 | 2986991 | 99142 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 136.54 | 136.54 | 335.7 | False | None | None | False | None | False | 45836.478 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 5th year maintenance estimate | 774534.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986992 | 99143 | None | UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 584.31 | 584.31 | 89.52 | False | None | None | False | None | False | 52307.4312 | 0 | 2986993 | 99143 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.92 | 8.92 | 5968.0 | False | None | None | False | None | False | 53234.56 | 0 | 2986994 | 99143 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 57.99 | 57.99 | 671.4 | False | None | None | False | None | False | 38934.486 | 0 | 2986995 | 99143 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 144.22 | 144.22 | 2238.0 | False | None | None | False | None | False | 322764.36 | 0 | 2986996 | 99143 | None | UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. | Filling Pot-holes and Patch Repairs with Bituminous
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 633.38 | 633.38 | 410.3 | False | None | None | False | None | False | 259875.814 | 0 | 2986997 | 99143 | None | UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 141.25 | 141.25 | 335.7 | False | None | None | False | None | False | 47417.625 | 0 |
| 1710152372000 | 0 | None | None | Roads | PKG 608 6th year renewal estimate | 23351282.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2986998 | 99144 | None | UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 3048.14 | 3048.14 | 7.46 | False | None | None | False | None | False | 22739.1244 | 0 | 2986999 | 99144 | None | UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 316.49 | 316.49 | 7.46 | False | None | None | False | None | False | 2361.0154 | 0 | 2987000 | 99144 | None | UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 167.46 | 167.46 | 395.38 | False | None | None | False | None | False | 66210.3348 | 0 | 2987001 | 99144 | None | UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | cm | 1.38 | 1.38 | 18000.0 | False | None | None | False | None | False | 24840.0 | 0 | 2987002 | 99144 | None | UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 18.44 | 18.44 | 41188.83 | False | None | None | False | None | False | 759522.0252 | 0 | 2987003 | 99144 | None | UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (c | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 16829.29 | 16829.29 | 1235.66 | False | None | None | False | None | False | 20795280.4814 | 0 | 2987004 | 99144 | None | UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 814.27 | 814.27 | 1492.0 | False | None | None | False | None | False | 1214890.84 | 0 | 2987005 | 99144 | None | UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Nos | 560.77 | 560.77 | 830.0 | False | None | None | False | None | False | 465439.1 | 0 |
|
|
---|