noticeInvitingTenderDTO
createdTs1710152372326
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1937000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate12-03-2024 16:49:48
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1837000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710152372361
version8
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9931
titlePKG 608 Improvements to road connecting Khaja Kotanur SH-149 to NH-50 at Mandeval from Ch 47.46 KM to 78.78 KM (in selected reaches) in Afzalpur Taluk of Kalaburgi District
descriptionPKG 608 Improvements to road connecting Khaja Kotanur SH-149 to NH-50 at Mandeval from Ch 47.46 KM to 78.78 KM (in selected reaches) in Afzalpur Taluk of Kalaburgi District
categoryWORKS
categoryTextWorks
ecv193710010.18
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/ST-1/KLB/PKG-608/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17101523720000NoneNoneRoadsPKG 608 PAVEMENT ESTIMATE146222766.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298684199129NoneUNISR2023-24,V-3,Pg.No.149I.No.16.29Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
298684299129NoneUNISR2023-24,V-3,Pg.No.9I.No.2.5(ii) alearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm486.93486.93179.04FalseNoneNoneFalseNoneFalse87179.94720
298684399129NoneUNISR2023-24,V-3,Pg.No.17I.No.3.5.Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm7.437.4326110.0FalseNoneNoneFalseNoneFalse193997.30
298684499129NoneUNISR2023-24,V-1,Pg.No.8I.No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum117.71117.718339.41FalseNoneNoneFalseNoneFalse981631.95110
298684599129NoneUNISR2023-24,V-1,Pg.No.7I.No.1.7.Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum147.44147.442300.63FalseNoneNoneFalseNoneFalse339204.88720
298684699129NoneUNISR2023-24,V-1,Pg.No.7I.No.1.8.Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 percent per m3 for every 1.50 m height or part there of Deduct 5 percent per m3 if rollers are not used and tamping is done manually Add 8 percent per m3 for works under foul and sullage situation ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum587.29587.2921597.9FalseNoneNoneFalseNoneFalse12684230.6910
298684799129NoneUNISR2023-24,V-3,Pg.No.17I.No.3.6.Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum610.83610.8329450.93FalseNoneNoneFalseNoneFalse17989511.57190
298684899129NoneUNISR2023-24,V-3,Pg.No.23I.No.4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2922.82922.810598.3FalseNoneNoneFalseNoneFalse30976711.240
298684999129NoneUNISR2023-24,V-3,Pg.No.26I.No.4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum3170.63170.610856.69FalseNoneNoneFalseNoneFalse34422221.3140
298685099129NoneUNISR2023-24,V-3,Pg.No.31I.No.5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm50.850.841188.83FalseNoneNoneFalseNoneFalse2092392.5640
298685199129NoneUNISR2023-24,v-3,Pg.No.31I.No.5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm17.3517.3541188.83FalseNoneNoneFalseNoneFalse714626.20050
298685299129NoneUNISR2023-24,V-3,Pg.No.35I.No.5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum11707.3111707.312471.33FalseNoneNoneFalseNoneFalse28932626.42230
298685399129NoneUNISR2023-24,V-3,Pg.No.38I.No.5.16(c)Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum13572.0113572.011235.66FalseNoneNoneFalseNoneFalse16770389.87660
17101523720000NoneNoneRoadsPKG 608 ESTIMATE OF JUNCTIONS1555468.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298685499130NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land.Clearingandgrubbingroadlandincludinguprootingrankvegetation,grass,bushes,shrubs,saplingsandtreesgirthupto300mm,removalofstumpsoftreescutearlieranddisposalofunserviceablematerialsandstackingofserviceablematerialtobeusedorauctioned,includingremovalanddisposaloftoporganicsoilnotexceeding150mminthickness.ByMechanicalMeansusingDozerA)Inareaoflightjungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm486.93486.931.56FalseNoneNoneFalseNoneFalse759.61080
298685599130NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5.Scarifyingtheexistingbituminousroadsurfacetoadepthof50mmanddisposalofscarifiedmaterialbyMechanicalMeansusingHydraulicexcavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm7.437.43549.37FalseNoneNoneFalseNoneFalse4081.81910
298685699130NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12.Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthanfoundationinallkindsofsoils&uptodepthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenancesrequiredtocompletethework.Inall kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum117.11117.1152.65FalseNoneNoneFalseNoneFalse6165.84150
298685799130NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen ShouldersConstructionofsub-gradeandearthenshoulderswithapprovedmaterialobtainedfromborrowpitswithalllifts&leads,transportingtosite,spreading,gradingtorequiredslopeandcompactedtomeetrequirementoftableNo.300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum610.83610.83169.06FalseNoneNoneFalseNoneFalse103266.91980
298685899130NoneUNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5)6 By Mix in Place MethodConstructionofGranularSub-BaseofrequiredgradingasperdesignspreadinginuniformlayerswithmotorgraderonpreparedsurfacemixingbymixinplacemethodwithfrontendloaderatOMCandcompactingwithvibratoryrollertoachievethedesireddensity,completeasperclause401B)For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2922.82922.8139.5FalseNoneNoneFalseNoneFalse407730.60
298685999130NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method)Providing,laying,spreadingandcompactinggradedstoneaggregatetowetmixmacadamspecificationincludingpremixingtheMaterialwithwateratOMCinmechanicalmixplantcarriageofmixedMaterialbytippertosite,layinginuniformlayerswithpaver/graderinsub-base/basecourseonwellpreparedsurfaceandcompactingwith vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum3170.63170.6142.22FalseNoneNoneFalseNoneFalse450922.7320
298686099130NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBMProvidingandapplyingprimercoatwithSS1gradeBitumenEmulsiononpreparedsurfaceofgranularbaseincludingcleaningofroadsurfaceandsprayingprimerattherateof0.70kg/m2using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm50.550.5549.37FalseNoneNoneFalseNoneFalse27743.1850
298686199130NoneUNI SR 2023-24, v-3,Pg. No. 31 I. No.5.4ProvidingandapplyingtackcoatwithRS1Bituminous Emulsion usingemulsionpressuredistributorattherateof0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm17.3517.35549.37FalseNoneNoneFalseNoneFalse9531.56950
298686299130NoneUNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c)DenseGradedBituminousMacadamGrading-IIfortraffic less than 20MSA.ProvidingandlayingDenseGradedBituminousMacadamwith40/60TPHcapacityHMPusingcrushedaggregatesofspecifiedgrading,premixedwithbituminousbinderVG-30,@4.5percentbyweightoftotalmixandfiller,transportingthehotmixtoworksite,layingwithmechanicalpaverfinishertotherequiredgrade,levelandalignment,rollingwithsmoothwheeled,vibratoryandtandemrollerstoachievethedesiredcompactionasperMoRTHspecificationclauseNo.505completeinallrespects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum11707.3111707.3127.47FalseNoneNoneFalseNoneFalse321599.80570
298686399130NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c)BituminousConcreteGradingIIfortraffic less than 20MSAProvidingandlayingBituminousConcretewith40/60TPHcapacityhotmixplantusingcrushedaggregatesofspecifiedgrading,premixedwithbituminousbinderVG-30,@5.4percentofmixandfiller,transportingthehotmixtoworksite,layingwithmechanicalpaverfinishertotherequiredgrade,levelandalignment,rollingwith smooth wheeled, vibratory and tandem rollers toachievethedesiredcompactionasperMORTHspecificationclauseNo.507completeinallrespects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum13572.0113572.0116.48FalseNoneNoneFalseNoneFalse223666.72480
17101523720000NoneNoneRoadsPKG 608 ESTIMATE OF TRAFFIC SAFETY2980376.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298686499131NoneUNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7.Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm11163.3911163.391.8FalseNoneNoneFalseNoneFalse20094.1020
298686599131NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach5882.775882.7720.0FalseNoneNoneFalseNoneFalse117655.40
298686699131NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.5 (A) (viiiProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach5388.415388.4118.0FalseNoneNoneFalseNoneFalse96991.380
298686799131NoneUNI SR 2023-24, V-3,Pg. No.64 I. No.8.5 (A) (xii)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach5294.255294.2512.0FalseNoneNoneFalseNoneFalse63531.00
298686899131NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.5 (A) (xv)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach8208.388208.388.0FalseNoneNoneFalseNoneFalse65667.040
298686999131NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15RoadMarkingwithHotAppliedThermoplasticCompoundwithReflectorisingGlassBeadsonBituminousSurfaceProvidingandlayingofhotappliedthermoplasticcompound2.5mmthickincludingreflectorisingglassbeads@250g/m2area,thicknessof2.5mmisexclusiveofsurfaceappliedglassbeads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note:1.Asealingprimermaybeappliedinadvanceoncementconcretepavementtoensureproperbonding.Anylaitanceand/orcuringcompoundtoberemovedwherepaintisrequiredtobeappliedonconcretesurface.2.Costofpainterisalreadyincludedinusagechargesofroadmarkingmachine) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm656.67656.671651.08FalseNoneNoneFalseNoneFalse1084214.70360
298687099131NoneUNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43SupplyingandFixingofMoldedShankRaisedPavementMarkers/Cat'sEyemadeofpolycarbonateandABSmouldedbodyandreflectivepanelswithmicroprismaticlenscapableofprovidingtotalinternalreflectionofthelightenteringthelensfaceandshallsupportaloadof16000kgtestedinaccordancetoASTMD4280TypeHandcomplyingtoSpecificationsofCategoryAofMORTHCircularNoRW/NH/33023/10-97DOIIIDt11.06.1997.Theheight,widthandlengthshallnotexceed50mm,100mmand102+/-2mmandwithminimumreflectiveareaof13cm2oneachsideandtheslopetothebaseshallbe35+/-5degree.Thestrengthofdetachmentoftheintegratedcylindricalshanks,(ofdiameternotlessthan19+/-2mmandheightnotlessthan30+/-2mm)fromthebodyistobeaminimumvalueof500Kg.Fixingwillbebydrillingholesontheroadfortheshankstogoinside,withoutnailsandusingepoxyresinbasedadhesiveaspermanufacturer'srecommendationandcompleteasdirectedbytheengineer.Thecontractorshallsubmitatwoyearwarrantyforsatisfactoryfieldperformanceincludingstipulatedretro-reflectanceofthereflectingpanel,totheEngineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo452.24452.241109.0FalseNoneNoneFalseNoneFalse501534.160
298687199131NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
298687299131NoneUNISR2023-24,V-3,Pg.No.67I.No.8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach3626.553626.557.0FalseNoneNoneFalseNoneFalse25385.850
298687399131NoneUNISR2023-24,V-3,Pg.No.67I.No.8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach1043.241043.2430.0FalseNoneNoneFalseNoneFalse31297.20
298687499131NoneUNISR2023-24,V-3,Pg.No.80I.No.8.60.2iiiProvidingSpeedBreakers/RaisedpedestriancrossingsinTrapezoidalsectionwith2.5mTopwidthandtransitionlengthof0.8mlengthandheightof0.1masperIRC99:2018usingDenseBituminousMacadam(DBM)GrIIandBituminousConcrete(BC)GrIIforentireformationwidth&WBMGrIIfor Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound withreflectingglassbeedsonbituminoussurfaceandproviding2Nos.retroreflectivetrafficsignsasperIRC67-2022Twolanewithformationwidthof9.00 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo64265.6964265.693.0FalseNoneNoneFalseNoneFalse192797.070
298687599131NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17RoadDelineators:Supplyingandinstallationofdelineators(roadwayindicators,hazardmarkers,objectmarkers),80-100cmhighabovegroundlevel,paintedblackandwhitein15cmwidestrips,fittedwith80x100mmrectangularor75mmdiacircularreflectorisedpanelsatthetop,buriedorpressed into the ground and conforming to IRC-79-2019 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach2504.022504.0224.0FalseNoneNoneFalseNoneFalse60096.480
298687699131NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.18Boundary Pillars Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach926.77926.77180.0FalseNoneNoneFalseNoneFalse166818.60
298687799131NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenaces required to complete the work.In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum126.38126.38270.0FalseNoneNoneFalseNoneFalse34122.60
298687899131NoneUNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i)Cable Duct Across the RoadProvidingandlayingofareinforcedcementconcretepipeduct,300mmdia,acrosstheroad(newconstruction),extendingfromdraintodrainincutsandtoeofslopetotoeofslopeinfills,constructingheadwallsatbothends,providingaminimumfillofgranularmaterialovertopandsidesofRCCpipeasperIRC:98-1997,beddedona0.3mthicklayerofgranularmaterialfreeofrockpieces,outertoouterdistanceofpipeatleasthalfdiaofpipesubjecttominimum450mmincaseofdoubleandtriplerowducts,jointstobemadeleakproof,invertlevelofducttobeabovehigherthangroundlevel to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm2740.672740.67187.5FalseNoneNoneFalseNoneFalse513875.6250
17101523720000NoneNoneRoadsPKG 608 ESTIMATE OF WATER SUPPLY PIPE LINE190026.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298687999132NoneUNI SR 2023-24 , V-1 Pg No. ,10 I.No 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum324.62324.62135.0FalseNoneNoneFalseNoneFalse43823.70
298688099132NoneHDPE Grade PE 8-PN 8, 90 mm diaProviding, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm473.3473.3250.0FalseNoneNoneFalseNoneFalse118325.00
298688199132NoneUNI SR 2023-24 , V-5 Pg No. ,121 I.No 10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm111.51111.51250.0FalseNoneNoneFalseNoneFalse27877.50
17101523720000NoneNoneRoadsPKG 608 Electrical Pole shifting347287.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298688299133NoneESCOMs SR 2023-24 1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing.Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer Pit779.33779.339.0FalseNoneNoneFalseNoneFalse7013.970
298688399133NoneESCOMs SR 2023-24 1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo8767.168767.169.0FalseNoneNoneFalseNoneFalse78904.440
298688499133NoneESCOMs SR 2023-24 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo1379.011379.019.0FalseNoneNoneFalseNoneFalse12411.090
298688599133NoneESCOMs SR 2023-24 1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo5202.565202.563.0FalseNoneNoneFalseNoneFalse15607.680
298688699133NoneESCOMs SR 2023-24 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo1379.011379.013.0FalseNoneNoneFalseNoneFalse4137.030
298688799133NoneESCOMs SR 2023-24 2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo1089.081089.089.0FalseNoneNoneFalseNoneFalse9801.720
298688899133NoneESCOMs SR 2023-24 3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet890.84890.849.0FalseNoneNoneFalseNoneFalse8017.560
298688999133NoneESCOMs SR 2023-24 6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo254.0254.027.0FalseNoneNoneFalseNoneFalse6858.00
298689099133NoneESCOMs SR 2023-24 6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo631.89631.893.0FalseNoneNoneFalseNoneFalse1895.670
298689199133NoneESCOMs SR 2023-24 1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
298689299133NoneESCOMs SR 2023-24 6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer KVAR4970.874970.871.215FalseNoneNoneFalseNoneFalse6039.607050
298689399133NoneESCOMs SR 2023-24 7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTKms57283.9357283.931.215FalseNoneNoneFalseNoneFalse69599.974950
298689499133NoneESCOMs SR 2023-24 6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer KVAR6483.696483.691.215FalseNoneNoneFalseNoneFalse7877.683350
298689599133NoneESCOMs SR 2023-24 9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo126.38126.3827.0FalseNoneNoneFalseNoneFalse3412.260
298689699133NoneESCOMs SR 2023-24 10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet391.52391.5227.0FalseNoneNoneFalseNoneFalse10571.040
298689799133NoneESCOMs SR 2023-24 2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo358.07358.071.0FalseNoneNoneFalseNoneFalse358.070
298689899133NoneESCOMs SR 2023-24 2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo163.55163.551.0FalseNoneNoneFalseNoneFalse163.550
298689999133NoneESCOMs SR 2023-24 5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
298690099133NoneESCOMs SR 2023-24 5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
298690199133NoneESCOMs SR 2023-24 6.031.1 kV Ceramic Pin Insulator (Shell only) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo38.4138.415.0FalseNoneNoneFalseNoneFalse192.050
298690299133NoneESCOMs SR 2023-24 6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo33.4533.455.0FalseNoneNoneFalseNoneFalse167.250
298690399133NoneESCOMs SR 2023-24 2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo296.12296.1212.0FalseNoneNoneFalseNoneFalse3553.440
298690499133NoneESCOMs SR 2023-24 4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTMtr115.23115.2312.6FalseNoneNoneFalseNoneFalse1451.8980
298690599133NoneESCOMs SR 2023-24 24.011 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
298690699133NoneESCOMs SR 2023-24 13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
298690799133NoneESCOMs SR 2023-24 1.8.1AA) Base Concreting with CC 1:4: 8 ESCOMs SR 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach338.25338.2512.0FalseNoneNoneFalseNoneFalse4059.00
298690899133NoneESCOMs SR 2023-24 1.8.1.bA) Base Concreting with CC 1:4: 8 b Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach438.61438.6112.0FalseNoneNoneFalseNoneFalse5263.320
298690999133NoneESCOMs SR 2023-24 1.8.2.aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach3912.763912.7612.0FalseNoneNoneFalseNoneFalse46953.120
298691099133NoneESCOMs SR 2023-24 1.8.2.gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
298691199133NoneESCOMs SR 2023-24 21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer Pole353.12353.129.0FalseNoneNoneFalseNoneFalse3178.080
298691299133NoneESCOMs SR 2023-24 22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTPer Km152.4152.41.215FalseNoneNoneFalseNoneFalse185.1660
298691399133NoneESCOMs SR 2023-24 26.0222.02 For ACSR Conductors 25 to 105 Mtr Per KM 1.215 129.15 156.92 39 Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading.9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo175.94175.949.0FalseNoneNoneFalseNoneFalse1583.460
298691499133NoneESCOMs SR 2023-24 5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach138.77138.779.0FalseNoneNoneFalseNoneFalse1248.930
298691599133NoneESCOMs SR 2023-24 6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNo631.89631.893.0FalseNoneNoneFalseNoneFalse1895.670
298691699133NoneESCOMs SR 2023-24 24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
298691799133NoneESCOMs SR 2023-24 26.01 DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSet7930.847930.841.0FalseNoneNoneFalseNoneFalse7930.840
17101523720000NoneNoneRoadsPKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 1 ROW OF 1200mm DIA5090437.27
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298691899134NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii) (Dismantling of StructuresDismantlingofexistingstructureslikeculverts,bridges,retainingwallsandotherstructurecomprisingofmasonry,cementconcrete,woodwork,steelwork,includingT&Pandscaffoldingwherevernecessary,sortingthedismantledmaterial,disposalofunserviceablematerialandstackingtheserviceable material withall lifts and leadByMechanicalMeansCementConcrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum890.84890.8472.24FalseNoneNoneFalseNoneFalse64354.28160
298691999134NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 RemovingalltypeofHumePipesandStackingincludingEarthworkandDismantling of Masonry Works.(b)Above600mmto900mmdiaHume pipe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm1357.941357.9452.5FalseNoneNoneFalseNoneFalse71291.850
298692099134NoneUNISR2023-24,V-1,PageNo8Item No1.14.1EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletetheworkInallkindsofsoilsDepthupto3m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum126.38126.38224.39FalseNoneNoneFalseNoneFalse28358.40820
298692199134NoneUNISR2023-24,V-1,PageNo7Item No1.8.ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredtocomplete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum587.26587.26609.41FalseNoneNoneFalseNoneFalse357882.11660
298692299134NoneUNISR2023-24,V-3,PageNo117Item No12.3 (a)Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasperdrawingandTechnical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum1447.151447.1597.6FalseNoneNoneFalseNoneFalse141241.840
298692399134NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3rovidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincludingcostofformwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum7420.317420.3116.56FalseNoneNoneFalseNoneFalse122880.33360
298692499134NoneUNISR2023-24,V-1,PageNo16Item No2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggre ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum8460.938460.93255.87FalseNoneNoneFalseNoneFalse2164898.15910
298692599134NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii)ProvidingandlayingReinforcedCement Concrete Pipe NP4 as per LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeon First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksin head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm13340.3113340.3187.5FalseNoneNoneFalseNoneFalse1167277.1250
298692699134NoneUNISR2023-24,V-3,PageNo129Item No14.1(A)Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawing and Technical specification.A)BoulderLaidDryWithoutWireCrates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.9725.42FalseNoneNoneFalseNoneFalse60219.21740
298692799134NoneUNISR2023-24,V-3,PageNo129Item No14.4(A)ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingand Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.9763.0FalseNoneNoneFalseNoneFalse149245.110
298692899134NoneUNISR2023-24,V-1,PageNo18Item No2.11.hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTt97894.6397894.636.04FalseNoneNoneFalseNoneFalse591283.56520
298692999134NoneUNISR2023-24,V-3,PageNo67Item No8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingandletteringbutexcludingpainting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach926.77926.77140.0FalseNoneNoneFalseNoneFalse129747.80
298693099134NoneUNISR2023-24,V-3,PageNo66Item No8.10.PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplasteredconcretesurfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm135.05135.05309.2FalseNoneNoneFalseNoneFalse41757.460
17101523720000NoneNoneRoadsPKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 4 ROWS OF 1200mm5798965.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298693199135NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (ii) (1 Dismantling of StructuresDismantlingofexistingstructureslikeculverts,bridges,retainingwallsandotherstructurecomprisingofmasonry,cementconcrete,woodwork,steelwork,includingT&Pandscaffoldingwherevernecessary,sortingthedismantledmaterial,disposalofunserviceablematerialandstackingtheserviceablematerialwithall lifts and leadByMechanicalMeansCementConcreteGrade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum890.84890.8433.12FalseNoneNoneFalseNoneFalse29504.62080
298693299135NoneUNISR2023-24,V-3,PageNo11ItemNo2.17(ix) (C)RemovingalltypeofHumePipesandStackingincludingEarthworkandDismantlingof Masonry Works. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm1702.391702.3990.0FalseNoneNoneFalseNoneFalse153215.10
298693399135NoneUNISR2023-24,V-1,PageNo8ItemNo1.14.1EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletethework In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum126.38126.38262.61FalseNoneNoneFalseNoneFalse33188.65180
298693499135NoneUNISR2023-24,V-1,PageNo7ItemNo1.8.ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequired to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum587.29587.29417.68FalseNoneNoneFalseNoneFalse245299.28720
298693599135NoneUNISR2023-24,V-3,PageNo117ItemNo12.3 (a)Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasper drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum1447.151447.15197.85FalseNoneNoneFalseNoneFalse286318.62750
298693699135NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincluding cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum7420.377420.3716.46FalseNoneNoneFalseNoneFalse122139.29020
298693799135NoneUNISR2023-24,V-1,PageNo16ItemNo2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggregatesincludingcostofformwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum8460.938460.93247.71FalseNoneNoneFalseNoneFalse2095856.97030
298693899135NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii)ProvidingandlayingReinforcedCementConcrete Pipe NP4 as per design LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworks in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm13340.3113340.31150.0FalseNoneNoneFalseNoneFalse2001046.50
298693999135NoneUNISR2023-24,V-3,PageNo129ItemNo14.1(A)Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawingandTechnicalspecification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.9735.68FalseNoneNoneFalseNoneFalse84524.84960
298694099135NoneUNISR2023-24,V-3,PageNo129ItemNo14.4(A)ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnicalspecificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.9727.0FalseNoneNoneFalseNoneFalse63962.190
298694199135NoneUNISR2023-24,V-1,PageNo18ItemNo2.11.hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials, ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTt97894.6397894.635.52FalseNoneNoneFalseNoneFalse540378.35760
298694299135NoneUNISR2023-24,V-3,PageNo67ItemNo8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach926.77926.7760.0FalseNoneNoneFalseNoneFalse55606.20
298694399135NoneUNISR2023-24,V-3,PageNo66ItemNo8.10.PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm135.05135.05230.06FalseNoneNoneFalseNoneFalse31069.6030
298694499135NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.2.Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNos / Rmtr296.12296.12192.0FalseNoneNoneFalseNoneFalse56855.040
17101523720000NoneNoneRoadsPKG 608 SUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 1 ROW OF 1200mm At CH 5.46758683.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298694599136NoneNISR2023-24,V-1,PageNo8ItemNo1.14.1EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletethe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum126.38126.3833.44FalseNoneNoneFalseNoneFalse4226.14720
298694699136NoneUNISR2023-24,V-1,PageNo7ItemNo1.8.ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredtocompletethe work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum587.29587.29106.85FalseNoneNoneFalseNoneFalse62751.93650
298694799136NoneUNISR2023-24,V-3,PageNo117Item No12.3 (a)Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasperdrawingandTechnicalSpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum1447.151447.1517.24FalseNoneNoneFalseNoneFalse24948.8660
298694899136NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery,curing,andalltheotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsMix ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum7420.377420.372.37FalseNoneNoneFalseNoneFalse17586.27690
298694999136NoneUNISR2023-24,V-1,PageNo16ItemNo2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegradedcrushedcoarseaggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum8460.938460.9336.69FalseNoneNoneFalseNoneFalse310431.52170
298695099136NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii)ProvidingandlayingReinforcedCement Concrete Pipe NP4 as per LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClass Bedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksinheadwallsand parapets ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm13340.3113340.3115.0FalseNoneNoneFalseNoneFalse200104.650
298695199136NoneUNISR2023-24,V-3,PageNo129Item No14.1(A)Providingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawingandTechnical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.973.64FalseNoneNoneFalseNoneFalse8623.05080
298695299136NoneUNISR2023-24,V-3,PageNo129Item No14.4(A)ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
298695399136NoneUNISR2023-24,V-1,PageNo18ItemNo2.11.hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTt97894.6397894.630.86FalseNoneNoneFalseNoneFalse84189.38180
298695499136NoneUNISR2023-24,V-3,PageNo67ItemNo8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
298695599136NoneUNISR2023-24,V-3,PageNo66ItemNo8.10.PaintingTwoCoatsonNewConcreteSurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadeson new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm135.05135.0544.17FalseNoneNoneFalseNoneFalse5965.15850
17101523720000NoneNoneRoadsPKG 608 Estimate CD,s Repairs23479.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298695699137NoneUNISR2023-24,V-1,PageNo8ItemNo1.12.Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthanfoundationinallkindsofsoils&uptodepthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenancesrequiredtocompletethework.Inallkindsofsoilsupto300mmdepth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum117.71117.7142.0FalseNoneNoneFalseNoneFalse4943.820
298695799137NoneUNISR2023-24,V-3,PageNo67ItemNo8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingand lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
17101523720000NoneNoneRoadsPKG 608 CONSTRUCTION OF FIELD APPROACH5287011.98
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298695899138NoneUNISR2023-24,V-1,PageNo8ItemNo1.14.1EarthworkexcavationforFoundationbymechanicalmeansforallworks&depthupto3m,asperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,includingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenacesrequiredtocompletetheworkInallkindsofsoilsDepthupto ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum126.39126.39251.55FalseNoneNoneFalseNoneFalse31793.40450
298695999138NoneUNISR2023-24,V-3,PageNo87ItemNo9.1.(ii)LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBeddingin Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworksinheadwallsandparapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTm13340.3113340.31217.5FalseNoneNoneFalseNoneFalse2901517.4250
298696099138NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredto complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum587.29587.2937.35FalseNoneNoneFalseNoneFalse21935.28150
298696199138NoneUNISR2023-24,V-1,PageNo15ItemNo2.1.3ProvidingandlayinginpositionCementConcreteforlevellingcourseforallworksinfoundation.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixed,laidinlayersnotexceeding150mmthickness,wellcompactedusingplatevibrators,includingalllead&lifts,costofallmaterialsofquality,labour,Usagechargesofmachinery, curing, and all the other appurtenances requiredtocompletetheworkaspertechnicalspecificationsMix1:3:6Using40mmnominalsizegradedcrushedcoarseaggregatesincludingcostof ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum7420.377420.3715.95FalseNoneNoneFalseNoneFalse118354.90150
298696299138NoneUNISR2023-24,V-1,PageNo16ItemNo2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecificationsM20DesignMixUsing20mmnominalsizegraded crushed coarse aggregates including cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum8460.938460.93202.48FalseNoneNoneFalseNoneFalse1713169.10640
298696399138NoneUNISR2023-24,V-1,PageNo18ItemNo2.11.hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawingandtechnical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTt97894.6997894.695.11FalseNoneNoneFalseNoneFalse500241.86590
17101523720000NoneNoneRoadsPKG 608 1st year maintenance estimate0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298696499139None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 59.68) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298696599139None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 4476) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298696699139None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =671.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298696799139None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2238) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298696899139None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298696999139None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =335.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17101523720000NoneNoneRoadsPKG 608 2nd year maintenance estimate0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298697099140None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =89.52) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298697199140None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =5968) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298697299140None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =671.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298697399140None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2238) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298697499140None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
298697599140None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =335.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17101523720000NoneNoneRoadsPKG 608 3rd year maintenance estimate706610.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298697699141NoneUNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm545.35545.3589.52FalseNoneNoneFalseNoneFalse48819.7320
298697799141NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTRmtr8.338.335968.0FalseNoneNoneFalseNoneFalse49713.440
298697899141NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm54.1254.12671.4FalseNoneNoneFalseNoneFalse36336.1680
298697999141NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm134.6134.62238.0FalseNoneNoneFalseNoneFalse301234.80
298698099141NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm591.15591.15205.15FalseNoneNoneFalseNoneFalse121274.42250
298698199141NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum131.83131.83335.7FalseNoneNoneFalseNoneFalse44255.3310
298698299141NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTKm2753.162753.167.46FalseNoneNoneFalseNoneFalse20538.57360
298698399141NoneUNI SR 2023-24, V-3, Page No. 148, Item No. 16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTKm285.86285.867.46FalseNoneNoneFalseNoneFalse2132.51560
298698499141NoneUNI SR 2023-24, V-3, Page No. 66, Item No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm151.26151.26395.38FalseNoneNoneFalseNoneFalse59805.17880
298698599141NoneUNI SR 2023-24, V-3, Page No. 63, Item No. 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTcm1.251.2518000.0FalseNoneNoneFalseNoneFalse22500.00
17101523720000NoneNoneRoadsPKG 608 4th year maintenance estimate623080.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298698699142NoneUNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm564.83564.8389.52FalseNoneNoneFalseNoneFalse50563.58160
298698799142NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTRmtr8.628.625968.0FalseNoneNoneFalseNoneFalse51444.160
298698899142NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm56.0556.05671.4FalseNoneNoneFalseNoneFalse37631.970
298698999142NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm139.41139.412238.0FalseNoneNoneFalseNoneFalse311999.580
298699099142NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm612.26612.26205.15FalseNoneNoneFalseNoneFalse125605.1390
298699199142NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum136.54136.54335.7FalseNoneNoneFalseNoneFalse45836.4780
17101523720000NoneNoneRoadsPKG 608 5th year maintenance estimate774534.27
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298699299143NoneUNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST100 Sqm584.31584.3189.52FalseNoneNoneFalseNoneFalse52307.43120
298699399143NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTRmtr8.928.925968.0FalseNoneNoneFalseNoneFalse53234.560
298699499143NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm57.9957.99671.4FalseNoneNoneFalseNoneFalse38934.4860
298699599143NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm144.22144.222238.0FalseNoneNoneFalseNoneFalse322764.360
298699699143NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm633.38633.38410.3FalseNoneNoneFalseNoneFalse259875.8140
298699799143NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum141.25141.25335.7FalseNoneNoneFalseNoneFalse47417.6250
17101523720000NoneNoneRoadsPKG 608 6th year renewal estimate23351282.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
298699899144NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTKm3048.143048.147.46FalseNoneNoneFalseNoneFalse22739.12440
298699999144NoneUNI SR 2023-24, V-3, Page No. 148, Item No. 16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTKm316.49316.497.46FalseNoneNoneFalseNoneFalse2361.01540
298700099144NoneUNI SR 2023-24, V-3, Page No. 66, Item No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm167.46167.46395.38FalseNoneNoneFalseNoneFalse66210.33480
298700199144NoneUNI SR 2023-24, V-3, Page No. 63, Item No. 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTcm1.381.3818000.0FalseNoneNoneFalseNoneFalse24840.00
298700299144NoneUNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm18.4418.4441188.83FalseNoneNoneFalseNoneFalse759522.02520
298700399144NoneUNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (cBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTCum16829.2916829.291235.66FalseNoneNoneFalseNoneFalse20795280.48140
298700499144NoneUNI SR 2023-24, V-3, Page No. 67, Item No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTSqm814.27814.271492.0FalseNoneNoneFalseNoneFalse1214890.840
298700599144NoneUNI SR 2023-24, V-3, Page No. 72, Item No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GSTNos560.77560.77830.0FalseNoneNoneFalseNoneFalse465439.10
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17101523750000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17101523750000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17101523750001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17101524920000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17101525060000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17101525180000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17101525550000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has beenissued to bidderNone
17101525740000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17101525940000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17101526060000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17101526180000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17101526270000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17101526370000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17101526480000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17101526580000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17101526680000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17101526830000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17101526950000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17101527050000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17101527140000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17101527250000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17101527330000NoneNoneELIGIBILITYItem rates are inclusive of 18 percent GST.Hence the bidders must quote the rates including 18 percent GST.None
17101527430000NoneNoneELIGIBILITYGST will not be paid separatelyNone
17101527580000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP & maintenance periodNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.968.55Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work1. Earth Work for Embankment/ Subgrade/ Shoulders : 52246.43Cum2. GSB/WMM : 17389.38Cum3. BM/SDBC/DBM/BC : 3989.28Cum4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 41.07cum5. Reinforced Cement Concrete (RCC) M20 & higher grades : 594.26cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No2.Mechanical Paver Finisher:1 No3. Static Road Roller: 1 No.4. Vibratory Road Roller: 1 No.5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- refer KW4 Document uploaded
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity is (AXNX1.5 - B) Where, A is Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress.N is Number of years prescribed for completion of the works for which tenders are invited.B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneCopies of Tax RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.3(b)iiMachineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill :1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No6.Excavator 0.90 Cum Bucket Capacity:2 No7.Tipper Trucks:6 Nos8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos 9. Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Refer kw4 document uploaded
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3874.2 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.581.13 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneDetails of Committed WorksOthersothers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
GST RegistrationTrueTechnical Bid
Section 2 ITT 3.2 as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.3 as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.7 as mentioned in bid documentTrueTechnical Bid
Workdone certificate issued by an Officer not below the rank of EE or equivalentTrueTechnical Bid
KPWD Registration CertificateTrueTechnical Bid
Line of creditTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710239273000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Project Officer, Project Implementation Unit,State Highway Development ProjectPWD Annex Building, K.R. Circle
streetNone
cityBangalore
stateKarnataka
pin560001
tenderRecallDTONone