tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1709823639000 | 0 | None | None | Buildings | 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Ground floor | 763215.53 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2967467 | 98162 | None | 8-1.14.1 Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 126.38 | 126.38 | 10.87 | False | None | None | False | None | False | 1373.7506 | 0 | 2967468 | 98162 | None | 10-2.9b Vol-3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. Dismantling Brick / Tile work by manual means. In cement mortor
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 755.79 | 755.79 | 0.69 | False | None | None | False | None | False | 521.4951 | 0 | 2967469 | 98162 | None | 15-2.1.4 Vol-1 | Providing and laying in position Cement Concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7702.86 | 7702.86 | 10.87 | False | None | None | False | None | False | 83730.0882 | 0 | 2967470 | 98162 | None | 15-2.2.1 Vol-1 | Providing and laying in position Cement Concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7789.59 | 7789.59 | 10.87 | False | None | None | False | None | False | 84672.8433 | 0 | 2967471 | 98162 | None | 16-2.3.1 Vol-1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7834.2 | 7834.2 | 15.59 | False | None | None | False | None | False | 122135.178 | 0 | 2967472 | 98162 | None | 99-12.12 Vol-2 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 153886.28 | 153886.28 | 0.1 | False | None | None | False | None | False | 15388.628 | 0 | 2967473 | 98162 | None | 100-12.17 Vol-2 | Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 8778.32 | 8778.32 | 2.52 | False | None | None | False | None | False | 22121.3664 | 0 | 2967474 | 98162 | None | 41-8.1.1 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 315.95 | 315.95 | 50.4 | False | None | None | False | None | False | 15923.88 | 0 | 2967475 | 98162 | None | 62-9.21.2 Vol-2 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately) Size of Tile 600x600 mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1533.88 | 1533.88 | 22.77 | False | None | None | False | None | False | 34926.4476 | 0 | 2967476 | 98162 | None | 64-9.32 Vol-2 | Providing and laying Black Lapotra Granite stone flooring in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 3199.1 | 3199.1 | 17.78 | False | None | None | False | None | False | 56879.998 | 0 | 2967477 | 98162 | None | 65-9.40 Vol-2 | Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1154.75 | 1154.75 | 45.25 | False | None | None | False | None | False | 52252.4375 | 0 | 2967478 | 98162 | None | 110-12.88 Vol-2 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Window shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 6678.21 | 6678.21 | 3.24 | False | None | None | False | None | False | 21637.4004 | 0 | 2967479 | 98162 | None | 109-12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 7085.84 | 7085.84 | 1.08 | False | None | None | False | None | False | 7652.7072 | 0 | 2967480 | 98162 | None | 50-8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 123.9 | 123.9 | 415.35 | False | None | None | False | None | False | 51461.865 | 0 | 2967481 | 98162 | None | 45-8.27 Vol-2 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 65.67 | 65.67 | 510.16 | False | None | None | False | None | False | 33502.2072 | 0 | 2967482 | 98162 | None | 50-8.53.2 Vol-2 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 122.66 | 122.66 | 510.16 | False | None | None | False | None | False | 62576.2256 | 0 | 2967483 | 98162 | None | 48-8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 142.49 | 142.49 | 13.68 | False | None | None | False | None | False | 1949.2632 | 0 | 2967484 | 98162 | None | 48-8.37 Vol-2 | Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :New work (two coats) including a coat of approved steel primer but excluding a coat of mordant solution including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 162.31 | 162.31 | 8.4 | False | None | None | False | None | False | 1363.404 | 0 | 2967485 | 98162 | None | 45-8.28 Vol-2 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 110.27 | 110.27 | 218.36 | False | None | None | False | None | False | 24078.5572 | 0 | 2967486 | 98162 | None | A25-444 Vol-2 | Providing and Fixing MS hold fasts
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 61.95 | 61.95 | 3.0 | False | None | None | False | None | False | 185.85 | 0 | 2967487 | 98162 | None | 218-22.15.2 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS door handles
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 681.45 | 681.45 | 2.0 | False | None | None | False | None | False | 1362.9 | 0 | 2967488 | 98162 | None | 219-22.15.4 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS aldrops
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 464.63 | 464.63 | 1.0 | False | None | None | False | None | False | 464.63 | 0 | 2967489 | 98162 | None | 219-22.15.6 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS tower bolts 200x10mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 185.85 | 185.85 | 2.0 | False | None | None | False | None | False | 371.7 | 0 | 2967490 | 98162 | None | 219-22.15.8 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS door hinges 125mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 61.95 | 61.95 | 3.0 | False | None | None | False | None | False | 185.85 | 0 | 2967491 | 98162 | None | 93-11.47 Vol-2 | Providing and fixing Brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete including cost of materials, labour, usage charges of machinery complete as per specifications.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 541.44 | 541.44 | 1.0 | False | None | None | False | None | False | 541.44 | 0 | 2967492 | 98162 | None | 85-11.30.2 Vol-2 | Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 5.5 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1558.66 | 1558.66 | 7.2 | False | None | None | False | None | False | 11222.352 | 0 | 2967493 | 98162 | None | 13-6.7 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 10173.43 | 10173.43 | 5.38 | False | None | None | False | None | False | 54733.0534 | 0 |
| 1709823639000 | 0 | None | None | Buildings | 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. First floor and Terrace | 3502716.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2967494 | 98163 | None | 16-2.5.1 Vol-1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8296.72 | 8296.72 | 61.5 | False | None | None | False | None | False | 510248.28 | 0 | 2967495 | 98163 | None | 111-9 Vol-1 | Adding formwork for columns
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5807.7 | 5807.7 | 8.64 | False | None | None | False | None | False | 50178.528 | 0 | 2967496 | 98163 | None | 112-14 Vol-1 | Adding formwork for beams & lintels
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4978.03 | 4978.03 | 11.28 | False | None | None | False | None | False | 56152.1784 | 0 | 2967497 | 98163 | None | 112-15 Vol-1 | Adding formwork for roof slab
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4148.36 | 4148.36 | 34.53 | False | None | None | False | None | False | 143242.8708 | 0 | 2967498 | 98163 | None | 112-16 Vol-1 | Adding formwork for staircase
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4148.36 | 4148.36 | 6.34 | False | None | None | False | None | False | 26300.6024 | 0 | 2967499 | 98163 | None | 112-19 Vol-1 | Adding formwork for chejjas
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3733.52 | 3733.52 | 0.72 | False | None | None | False | None | False | 2688.1344 | 0 | 2967500 | 98163 | None | 18-2.11 (a) Vol-1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | t | 111945.6 | 111945.6 | 7.38 | False | None | None | False | None | False | 826158.528 | 0 | 2967501 | 98163 | None | 13-6.7 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 10275.16 | 10275.16 | 32.84 | False | None | None | False | None | False | 337436.2544 | 0 | 2967502 | 98163 | None | 13-6.7 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 10376.9 | 10376.9 | 11.32 | False | None | None | False | None | False | 117466.508 | 0 | 2967503 | 98163 | None | 16-2.3.1 Vol-1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7912.54 | 7912.54 | 0.86 | False | None | None | False | None | False | 6804.7844 | 0 | 2967504 | 98163 | None | 86-11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Kg | 229.0 | 229.0 | 374.22 | False | None | None | False | None | False | 85696.38 | 0 | 2967505 | 98163 | None | 99-12.12 Vol-2 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 155425.14 | 155425.14 | 0.12 | False | None | None | False | None | False | 18651.0168 | 0 | 2967506 | 98163 | None | 100-12.17 Vol-2 | Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 8866.1 | 8866.1 | 3.6 | False | None | None | False | None | False | 31917.96 | 0 | 2967507 | 98163 | None | 43-8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 264.04 | 264.04 | 19.88 | False | None | None | False | None | False | 5249.1152 | 0 | 2967508 | 98163 | None | 41-8.1.1 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 319.1 | 319.1 | 201.75 | False | None | None | False | None | False | 64378.425 | 0 | 2967509 | 98163 | None | 42-8.7 Vol-2 | Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 458.01 | 458.01 | 228.62 | False | None | None | False | None | False | 104710.2462 | 0 | 2967510 | 98163 | None | 23-7.18 Vol-2 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2524.05 | 2524.05 | 7.44 | False | None | None | False | None | False | 18778.932 | 0 | 2967511 | 98163 | None | 62-9.21.2 Vol-2 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately) Size of Tile 600x600 mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1549.22 | 1549.22 | 196.62 | False | None | None | False | None | False | 304607.6364 | 0 | 2967512 | 98163 | None | 64-9.32 Vol-2 | Providing and laying Black Lapotra Granite stone flooring in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3231.09 | 3231.09 | 17.78 | False | None | None | False | None | False | 57448.7802 | 0 | 2967513 | 98163 | None | 110-12.88 Vol-2 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Window shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 6744.99 | 6744.99 | 12.96 | False | None | None | False | None | False | 87415.0704 | 0 | 2967514 | 98163 | None | 109-12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made)
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 7156.7 | 7156.7 | 4.86 | False | None | None | False | None | False | 34781.562 | 0 | 2967515 | 98163 | None | 50-8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 125.14 | 125.14 | 400.07 | False | None | None | False | None | False | 50064.7598 | 0 | 2967516 | 98163 | None | 45-8.27 Vol-2 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 66.32 | 66.32 | 451.26 | False | None | None | False | None | False | 29927.5632 | 0 | 2967517 | 98163 | None | 50-8.53.2 Vol-2 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 123.89 | 123.89 | 451.26 | False | None | None | False | None | False | 55906.6014 | 0 | 2967518 | 98163 | None | 47-8.34.3 Vol-2 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 62.57 | 62.57 | 17.82 | False | None | None | False | None | False | 1114.9974 | 0 | 2967519 | 98163 | None | 48-8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 143.91 | 143.91 | 17.82 | False | None | None | False | None | False | 2564.4762 | 0 | 2967520 | 98163 | None | 47-8.34.1 Vol-2 | Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 66.32 | 66.32 | 9.96 | False | None | None | False | None | False | 660.5472 | 0 | 2967521 | 98163 | None | 46-8.33.2 Vol-2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 172.69 | 172.69 | 9.96 | False | None | None | False | None | False | 1719.9924 | 0 | 2967522 | 98163 | None | 45-8.28 Vol-2 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer in charge"
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 111.37 | 111.37 | 215.24 | False | None | None | False | None | False | 23971.2788 | 0 | 2967523 | 98163 | None | 16-2.5.1 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8378.86 | 8378.86 | 11.9 | False | None | None | False | None | False | 99708.434 | 0 | 2967524 | 98163 | None | 149-15.1 Vol-2 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1032.51 | 1032.51 | 196.71 | False | None | None | False | None | False | 203105.0421 | 0 | 2967525 | 98163 | None | 84-11.26.1 Vol-2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Kg | 172.69 | 172.69 | 458.65 | False | None | None | False | None | False | 79204.2685 | 0 | 2967526 | 98163 | None | A25-444 Vol-2 | Providing and Fixing MS hold fasts
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 62.57 | 62.57 | 6.0 | False | None | None | False | None | False | 375.42 | 0 | 2967527 | 98163 | None | 218-22.15.2 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 688.26 | 688.26 | 4.0 | False | None | None | False | None | False | 2753.04 | 0 | 2967528 | 98163 | None | 219-22.15.4 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS aldrops
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 469.27 | 469.27 | 2.0 | False | None | None | False | None | False | 938.54 | 0 | 2967529 | 98163 | None | 219-22.15.6 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS tower bolts 200x10mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 187.71 | 187.71 | 3.0 | False | None | None | False | None | False | 563.13 | 0 | 2967530 | 98163 | None | 93-11.47 Vol-2 | Providing and fixing Brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete including cost of materials, labour, usage charges of machinery complete as per specifications.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 546.86 | 546.86 | 1.0 | False | None | None | False | None | False | 546.86 | 0 | 2967531 | 98163 | None | 42-8.7 Vol-2 | Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 462.54 | 462.54 | 127.08 | False | None | None | False | None | False | 58779.5832 | 0 | 2967532 | 98163 | None | 219-22.15.8 Vol-2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS door hinges 125mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 62.57 | 62.57 | 8.0 | False | None | None | False | None | False | 500.56 | 0 |
| 1709823639000 | 0 | None | None | Buildings | 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Toilet repair and maintenance | 220675.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2967533 | 98164 | None | 8-1.14.1 Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 126.38 | 126.38 | 44.56 | False | None | None | False | None | False | 5631.4928 | 0 | 2967534 | 98164 | None | 122-13.32.1 Vol-2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 382.85 | 382.85 | 30.0 | False | None | None | False | None | False | 11485.5 | 0 | 2967535 | 98164 | None | 122-13.32.2 Vol-2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 469.58 | 469.58 | 30.0 | False | None | None | False | None | False | 14087.4 | 0 | 2967536 | 98164 | None | 117-13.2.1 Vol-2 | Providing and fixing brass bib cock of approved quality : 15 mm nominal bore
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 354.35 | 354.35 | 10.0 | False | None | None | False | None | False | 3543.5 | 0 | 2967537 | 98164 | None | 117-13.3.2 Vol-2 | Providing and fixing brass stop cock of approved quality: 20 mm nominal bore
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 377.9 | 377.9 | 10.0 | False | None | None | False | None | False | 3779.0 | 0 | 2967538 | 98164 | None | 136-14.32.2 Vol-2 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 453x357 mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1261.3 | 1261.3 | 3.0 | False | None | None | False | None | False | 3783.9 | 0 | 2967539 | 98164 | None | 137-14.40.2 Vol-2 | 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 614.54 | 614.54 | 3.0 | False | None | None | False | None | False | 1843.62 | 0 | 2967540 | 98164 | None | 95-9.1.4 Vol-5 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0 HDPE Grade PE80-PN6.0,110mm dia
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 581.09 | 581.09 | 75.0 | False | None | None | False | None | False | 43581.75 | 0 | 2967541 | 98164 | None | 131-14.1.1 Vol-2 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 6051.28 | 6051.28 | 2.0 | False | None | None | False | None | False | 12102.56 | 0 | 2967542 | 98164 | None | 138-14.44 Vol-2 | Providing and fixing white vitreous china extended wall mounting water closet of size 780x370x690 mm of approved shape including providing & fixing white vitreous china cistern with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover and cistern fittings, nuts, bolts and gasket etc complete.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 13906.54 | 13906.54 | 1.0 | False | None | None | False | None | False | 13906.54 | 0 | 2967543 | 98164 | None | 132-14.7.5 Vol-2 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Angle back wash basin size 600 x 480 mm with single 15mm C.P. brass pillar tap
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 3173.08 | 3173.08 | 2.0 | False | None | None | False | None | False | 6346.16 | 0 | 2967544 | 98164 | None | 123-13.34 Vol-2 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Ltr | 11.15 | 11.15 | 1000.0 | False | None | None | False | None | False | 11150.0 | 0 | 2967545 | 98164 | None | 125-13.49 Vol-2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 703.75 | 703.75 | 75.0 | False | None | None | False | None | False | 52781.25 | 0 | 2967546 | 98164 | None | 126-13.53 Vol-2 | Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3.5
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No. | 6990.44 | 6990.44 | 2.0 | False | None | None | False | None | False | 13980.88 | 0 | 2967547 | 98164 | None | 208-16.62 Vol-5 | Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with appurtenances., complete. 900 mmx1100 mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 7628.52 | 7628.52 | 2.0 | False | None | None | False | None | False | 15257.04 | 0 | 2967548 | 98164 | None | 7-1.9 Vol-1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 329.57 | 329.57 | 22.5 | False | None | None | False | None | False | 7415.325 | 0 |
| 1709823639000 | 0 | None | None | Buildings | Package 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Electrification | 239922.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2967549 | 98165 | None | Chapter-1. I.no.1.1.2, 1.1.4 | Open Conduit System : Supplying heavy gauge PVC conduit pipe …….dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF Screws. a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 100.36 | 100.36 | 30.0 | False | None | None | False | None | False | 3010.8 | 0 | 2967550 | 98165 | None | Chapter-1. I.no.1.1.2, 1.1.4 | Open Conduit System : Supplying heavy gauge PVC conduit pipe …….dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF Screws b) 40 mm dia 2.5mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 184.61 | 184.61 | 30.0 | False | None | None | False | None | False | 5538.3 | 0 | 2967551 | 98165 | None | Chapter-1.I.no.1.2.2 | Concealed Conduit System : Supplying heavy gauge PVC conduit pipe mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 96.64 | 96.64 | 150.0 | False | None | None | False | None | False | 14496.0 | 0 | 2967552 | 98165 | None | Chapter-1.I no.1.3.2 | Supplying heavy gauge PVC Conduit Pipe ….dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 97.88 | 97.88 | 50.0 | False | None | None | False | None | False | 4894.0 | 0 | 2967553 | 98165 | None | Chapter-1.I.no.1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box a) 25mm deep junction box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 69.38 | 69.38 | 25.0 | False | None | None | False | None | False | 1734.5 | 0 | 2967554 | 98165 | None | Chapter-1.I.no.1.13 | Supplyin and Fixing Metal Fan Box with Round Hook. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 144.96 | 144.96 | 9.0 | False | None | None | False | None | False | 1304.64 | 0 | 2967555 | 98165 | None | Chapter-2. I.no.2.2.1, 2.2.2, 2.2.3 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet a) Short point up to 3Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Point | 333.29 | 333.29 | 6.0 | False | None | None | False | None | False | 1999.74 | 0 | 2967556 | 98165 | None | Chapter-2. I.no.2.2.1, 2.2.2, 2.2.3 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet a) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Point | 469.58 | 469.58 | 16.0 | False | None | None | False | None | False | 7513.28 | 0 | 2967557 | 98165 | None | Chapter-2. I.no.2.2.1, 2.2.2, 2.2.3 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS 694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. b) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Point | 687.65 | 687.65 | 24.0 | False | None | None | False | None | False | 16503.6 | 0 | 2967558 | 98165 | None | Chapter-2, I.no.2.3.1, 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.a) 1 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 23.54 | 23.54 | 70.0 | False | None | None | False | None | False | 1647.8 | 0 | 2967559 | 98165 | None | Chapter-2, I.no.2.3.1, 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.b) 2.5 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 52.04 | 52.04 | 140.0 | False | None | None | False | None | False | 7285.6 | 0 | 2967560 | 98165 | None | Chapter-2. I.no.2.6.1 | Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to IS:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100Volts as per IS-694:1990.3C X 2.5Sq.mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 144.96 | 144.96 | 40.0 | False | None | None | False | None | False | 5798.4 | 0 | 2967561 | 98165 | None | Chapter-3. I.no. 3.4.3,3.4.6 | Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall a) 4-5 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 219.3 | 219.3 | 2.0 | False | None | None | False | None | False | 438.6 | 0 | 2967562 | 98165 | None | Chapter-3. I.no. 3.4.3,3.4.6 | Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall b)10-12 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 395.25 | 395.25 | 6.0 | False | None | None | False | None | False | 2371.5 | 0 | 2967563 | 98165 | None | Chapter-3,I.no.3.5.3, 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. a) 4 Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 216.83 | 216.83 | 2.0 | False | None | None | False | None | False | 433.66 | 0 | 2967564 | 98165 | None | Chapter-3,I.no.3.5.3, 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.b) 10-12 Module
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 426.22 | 426.22 | 2.0 | False | None | None | False | None | False | 852.44 | 0 | 2967565 | 98165 | None | Chapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.a) 6Amps one way Switch
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 126.38 | 126.38 | 40.0 | False | None | None | False | None | False | 5055.2 | 0 | 2967566 | 98165 | None | Chapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. b) 6Amps 3 way socket ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 211.87 | 211.87 | 4.0 | False | None | None | False | None | False | 847.48 | 0 | 2967567 | 98165 | None | Chapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. c) Stepped Fan Regulator.Two Module
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 442.32 | 442.32 | 9.0 | False | None | None | False | None | False | 3980.88 | 0 | 2967568 | 98165 | None | Chapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.
d) 32Amps DP switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 403.91 | 403.91 | 9.0 | False | None | None | False | None | False | 3635.19 | 0 | 2967569 | 98165 | None | Chapter-3, I.No.3.14.6 | Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board. a) 6Amps Pendent holder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 87.97 | 87.97 | 26.0 | False | None | None | False | None | False | 2287.22 | 0 | 2967570 | 98165 | None | Chapter-5.I.no.5.7.2 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32 Amps
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 298.6 | 298.6 | 4.0 | False | None | None | False | None | False | 1194.4 | 0 | 2967571 | 98165 | None | Chapter-5.I.no.5.18.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. a) 6 - 32 Amps DP
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 915.62 | 915.62 | 2.0 | False | None | None | False | None | False | 1831.24 | 0 | 2967572 | 98165 | None | Chapter-5, I.no. 5.30 | Supplying,fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with mper Proof Energy Meter.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1709.82 | 1709.82 | 1.0 | False | None | None | False | None | False | 1709.82 | 0 | 2967573 | 98165 | None | Chapter-5.I.no.5.42.2 | Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.16SWG
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sq CM | 0.53 | 0.53 | 7000.0 | False | None | None | False | None | False | 3710.0 | 0 | 2967574 | 98165 | None | Chapter-6, I.no.6.1 | Supplying exhaust fan of 1440 RPM of 300 mm(12') size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1848.59 | 1848.59 | 2.0 | False | None | None | False | None | False | 3697.18 | 0 | 2967575 | 98165 | None | Chapter-6, I.no.6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" sweep. (1200mm) Regular model ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 3697.18 | 3697.18 | 9.0 | False | None | None | False | None | False | 33274.62 | 0 | 2967576 | 98165 | None | Chapter-11.I.no.11.3.3 | Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4'- 36/40 w ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1572.29 | 1572.29 | 21.0 | False | None | None | False | None | False | 33018.09 | 0 | 2967577 | 98165 | None | Chapter-11.I.no.11.11.5 | Supplying & fixing of retrofit type LED bulb.W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per watt, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 12W, 6500K ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 333.29 | 333.29 | 3.0 | False | None | None | False | None | False | 999.87 | 0 | 2967578 | 98165 | None | Chapter-13.I.no.13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 151.16 | 151.16 | 21.0 | False | None | None | False | None | False | 3174.36 | 0 | 2967579 | 98165 | None | Chapter-13.I.no.13.10 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 211.87 | 211.87 | 9.0 | False | None | None | False | None | False | 1906.83 | 0 | 2967580 | 98165 | None | Chapter-13.I.no.13.12 | Extra length of GI pipe of class B 19mm dia for down rod ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 244.2 | 244.2 | 1.0 | False | None | None | False | None | False | 244.2 | 0 | 2967581 | 98165 | None | Chapter-13.I.no.13.14 | Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. Ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 609.59 | 609.59 | 2.0 | False | None | None | False | None | False | 1219.18 | 0 | 2967582 | 98165 | None | Chapter-12.I.no.12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cut outs and other equipment's on the meter board using 40mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of sizeas per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 4348.89 | 4348.89 | 1.0 | False | None | None | False | None | False | 4348.89 | 0 | 2967583 | 98165 | None | SR.P.No.13. I.No.32.02, 32.07 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 (11 GI Strips - 4 x 0.8 mm) [BESCO.SR 2023-24.Material commom a) 10 Sqmm, 2 Core, (9 GI Strips-4 x 0.8mm)
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Km | 98168.45 | 98168.45 | 0.05 | False | None | None | False | None | False | 4908.4225 | 0 | 2967584 | 98165 | None | SR.P.No.52, I.No.21.05 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm [BESCO.SR 2023-24.Labour commom ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Km | 25877.4 | 25877.4 | 0.05 | False | None | None | False | None | False | 1293.87 | 0 | 2967585 | 98165 | None | PWD Civil SR ,Volume-1, Chapter-1, P.No.6, I.No.1 | Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils. Depth upto 1.50m
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 599.68 | 599.68 | 40.0 | False | None | None | False | None | False | 23987.2 | 0 | 2967586 | 98165 | None | W.S & UGD SR-2023-24 Chapter-13 I.No.13.6.1 | Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments 1.00 HP/0.75kW - 7 STG(stage)
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 16501.0 | 16501.0 | 1.0 | False | None | None | False | None | False | 16501.0 | 0 | 2967587 | 98165 | None | W.S & UGD SR-2023-24 Chapter-13 I.No.13.25.1 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1548.75 | 1548.75 | 1.0 | False | None | None | False | None | False | 1548.75 | 0 | 2967588 | 98165 | None | W.S & UGD SR-2023-24 Chapter-13 I.No.13.32 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Job | 8053.5 | 8053.5 | 1.0 | False | None | None | False | None | False | 8053.5 | 0 | 2967589 | 98165 | None | W.S & UGD SR-2023-24 Chapter-13 I.No.13.33 | Labour charges for erection of indoor type panel board and meter board units with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work.
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Job | 1672.65 | 1672.65 | 1.0 | False | None | None | False | None | False | 1672.65 | 0 |
| 1709823639000 | 0 | None | None | Buildings | Package1-2 Construction of roads and drains in horticulture campus at Ulivala in Holenarasipura Taluk. | 4753887.35 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2967590 | 98166 | None | 9-2.5(ii) a Vol-3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using dozer in area of light jungle ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | 100 Sqm | 486.93 | 486.93 | 15.6 | False | None | None | False | None | False | 7596.108 | 0 | 2967591 | 98166 | None | 8-1.14.1 Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 126.38 | 126.38 | 633.3 | False | None | None | False | None | False | 80036.454 | 0 | 2967592 | 98166 | None | 15-2.1.3 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7420.37 | 7420.37 | 29.6 | False | None | None | False | None | False | 219642.952 | 0 | 2967593 | 98166 | None | 16-2.4.2 Vol-1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7834.2 | 7834.2 | 66.0 | False | None | None | False | None | False | 517057.2 | 0 | 2967594 | 98166 | None | 111-3 Vol-1 | Adding formwork for drain raft
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 391.71 | 391.71 | 13.5 | False | None | None | False | None | False | 5288.085 | 0 | 2967595 | 98166 | None | 111-4 Vol-1 | Adding formwork for drain side walls
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2741.97 | 2741.97 | 40.5 | False | None | None | False | None | False | 111049.785 | 0 | 2967596 | 98166 | None | 18-2.11(h) Vol-1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire/soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | t | 97894.63 | 97894.63 | 2.16 | False | None | None | False | None | False | 211452.4008 | 0 | 2967597 | 98166 | None | 7-1.7 Vol-1 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 147.44 | 147.44 | 189.99 | False | None | None | False | None | False | 28012.1256 | 0 | 2967598 | 98166 | None | 7-1.8 Vol-1 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 587.29 | 587.29 | 111.61 | False | None | None | False | None | False | 65547.4369 | 0 | 2967599 | 98166 | None | 23-4.1(v) Vol-3 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Plant Mix Method For Grading -V Material
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3081.39 | 3081.39 | 99.0 | False | None | None | False | None | False | 305057.61 | 0 | 2967600 | 98166 | None | 26-4.17 Vol-3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3170.6 | 3170.6 | 148.5 | False | None | None | False | None | False | 470834.1 | 0 | 2967601 | 98166 | None | 149-16.28 Vol-3 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8368.21 | 8368.21 | 198.0 | False | None | None | False | None | False | 1656905.58 | 0 | 2967602 | 98166 | None | 51-6.8.1 Vol-3 | Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1323.25 | 1323.25 | 518.0 | False | None | None | False | None | False | 685443.5 | 0 | 2967603 | 98166 | None | 74-8.42.3 Vol-3 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra). 600 x 300 x 150 mm size
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 573.66 | 573.66 | 550.0 | False | None | None | False | None | False | 315513.0 | 0 | 2967604 | 98166 | None | 48-8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 142.49 | 142.49 | 522.5 | False | None | None | False | None | False | 74451.025 | 0 |
|
|
---|