createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709823638587
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2380.00
emd190000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-03-2024 16:00:00
tenderQueryClose20-03-2024 17:30:00
technicalBidOpen22-03-2024 16:30:00
publishedDate12-03-2024 16:10:03
publishedByPostPWD_EE_DIV_HSN
publishedByUserKPE10941 - NATESH H N
bidValidityPeriod90
noOfCalls1
preBidMeetingDate18-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonMEGHANA
splitEmdRequiredYnTrue
emdBankGuarantee90000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08172268437
mobileNumber9945099227
tenderSupplierListNone
tenderSchedule
createdTs1709823638621
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT10291
titlePackage.1- 1 )Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. 2) Construction of roads and drains in horticulture campus at Ulivala in Holenarasipura Taluk.
descriptionPackage.1- 1 )Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. 2) Construction of roads and drains in horticulture campus at Ulivala in Holenarasipura Taluk.
categoryWORKS
categoryTextWorks
ecv9480418.57
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1771
locationNamePWD Division Office Hassan
provisionalAmount10000000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/NO3/HNP/HORTICULTURE/PACKAGE
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17098236390000NoneNoneBuildings1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Ground floor763215.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296746798162None8-1.14.1 Vol-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum126.38126.3810.87FalseNoneNoneFalseNoneFalse1373.75060
296746898162None10-2.9b Vol-3Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. Dismantling Brick / Tile work by manual means. In cement mortor ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum755.79755.790.69FalseNoneNoneFalseNoneFalse521.49510
296746998162None15-2.1.4 Vol-1Providing and laying in position Cement Concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7702.867702.8610.87FalseNoneNoneFalseNoneFalse83730.08820
296747098162None15-2.2.1 Vol-1Providing and laying in position Cement Concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7789.597789.5910.87FalseNoneNoneFalseNoneFalse84672.84330
296747198162None16-2.3.1 Vol-1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7834.27834.215.59FalseNoneNoneFalseNoneFalse122135.1780
296747298162None99-12.12 Vol-2Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum153886.28153886.280.1FalseNoneNoneFalseNoneFalse15388.6280
296747398162None100-12.17 Vol-2Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8778.328778.322.52FalseNoneNoneFalseNoneFalse22121.36640
296747498162None41-8.1.1 Vol-2Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm315.95315.9550.4FalseNoneNoneFalseNoneFalse15923.880
296747598162None62-9.21.2 Vol-2Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately) Size of Tile 600x600 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1533.881533.8822.77FalseNoneNoneFalseNoneFalse34926.44760
296747698162None64-9.32 Vol-2Providing and laying Black Lapotra Granite stone flooring in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm3199.13199.117.78FalseNoneNoneFalseNoneFalse56879.9980
296747798162None65-9.40 Vol-2Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1154.751154.7545.25FalseNoneNoneFalseNoneFalse52252.43750
296747898162None110-12.88 Vol-2Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Window shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm6678.216678.213.24FalseNoneNoneFalseNoneFalse21637.40040
296747998162None109-12.85 Vol-2Providing & fixing of louvered ventilator made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7085.847085.841.08FalseNoneNoneFalseNoneFalse7652.70720
296748098162None50-8.51 Vol-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm123.9123.9415.35FalseNoneNoneFalseNoneFalse51461.8650
296748198162None45-8.27 Vol-2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm65.6765.67510.16FalseNoneNoneFalseNoneFalse33502.20720
296748298162None50-8.53.2 Vol-2Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm122.66122.66510.16FalseNoneNoneFalseNoneFalse62576.22560
296748398162None48-8.40 Vol-2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm142.49142.4913.68FalseNoneNoneFalseNoneFalse1949.26320
296748498162None48-8.37 Vol-2Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :New work (two coats) including a coat of approved steel primer but excluding a coat of mordant solution including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm162.31162.318.4FalseNoneNoneFalseNoneFalse1363.4040
296748598162None45-8.28 Vol-2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm110.27110.27218.36FalseNoneNoneFalseNoneFalse24078.55720
296748698162NoneA25-444 Vol-2Providing and Fixing MS hold fasts ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No61.9561.953.0FalseNoneNoneFalseNoneFalse185.850
296748798162None218-22.15.2 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS door handles ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No681.45681.452.0FalseNoneNoneFalseNoneFalse1362.90
296748898162None219-22.15.4 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS aldrops ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No464.63464.631.0FalseNoneNoneFalseNoneFalse464.630
296748998162None219-22.15.6 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS tower bolts 200x10mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No185.85185.852.0FalseNoneNoneFalseNoneFalse371.70
296749098162None219-22.15.8 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS door hinges 125mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No61.9561.953.0FalseNoneNoneFalseNoneFalse185.850
296749198162None93-11.47 Vol-2Providing and fixing Brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete including cost of materials, labour, usage charges of machinery complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No541.44541.441.0FalseNoneNoneFalseNoneFalse541.440
296749298162None85-11.30.2 Vol-2Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 5.5 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1558.661558.667.2FalseNoneNoneFalseNoneFalse11222.3520
296749398162None13-6.7 Vol-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum10173.4310173.435.38FalseNoneNoneFalseNoneFalse54733.05340
17098236390000NoneNoneBuildings1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. First floor and Terrace3502716.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296749498163None16-2.5.1 Vol-1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8296.728296.7261.5FalseNoneNoneFalseNoneFalse510248.280
296749598163None111-9 Vol-1Adding formwork for columns ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5807.75807.78.64FalseNoneNoneFalseNoneFalse50178.5280
296749698163None112-14 Vol-1Adding formwork for beams & lintels ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4978.034978.0311.28FalseNoneNoneFalseNoneFalse56152.17840
296749798163None112-15 Vol-1Adding formwork for roof slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4148.364148.3634.53FalseNoneNoneFalseNoneFalse143242.87080
296749898163None112-16 Vol-1Adding formwork for staircase ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4148.364148.366.34FalseNoneNoneFalseNoneFalse26300.60240
296749998163None112-19 Vol-1Adding formwork for chejjas ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3733.523733.520.72FalseNoneNoneFalseNoneFalse2688.13440
296750098163None18-2.11 (a) Vol-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.t111945.6111945.67.38FalseNoneNoneFalseNoneFalse826158.5280
296750198163None13-6.7 Vol-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum10275.1610275.1632.84FalseNoneNoneFalseNoneFalse337436.25440
296750298163None13-6.7 Vol-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum10376.910376.911.32FalseNoneNoneFalseNoneFalse117466.5080
296750398163None16-2.3.1 Vol-1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7912.547912.540.86FalseNoneNoneFalseNoneFalse6804.78440
296750498163None86-11.34B Vol-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kg229.0229.0374.22FalseNoneNoneFalseNoneFalse85696.380
296750598163None99-12.12 Vol-2Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum155425.14155425.140.12FalseNoneNoneFalseNoneFalse18651.01680
296750698163None100-12.17 Vol-2Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8866.18866.13.6FalseNoneNoneFalseNoneFalse31917.960
296750798163None43-8.10 Vol-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum264.04264.0419.88FalseNoneNoneFalseNoneFalse5249.11520
296750898163None41-8.1.1 Vol-2Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm319.1319.1201.75FalseNoneNoneFalseNoneFalse64378.4250
296750998163None42-8.7 Vol-2Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm458.01458.01228.62FalseNoneNoneFalseNoneFalse104710.24620
296751098163None23-7.18 Vol-2Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2524.052524.057.44FalseNoneNoneFalseNoneFalse18778.9320
296751198163None62-9.21.2 Vol-2Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately) Size of Tile 600x600 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1549.221549.22196.62FalseNoneNoneFalseNoneFalse304607.63640
296751298163None64-9.32 Vol-2Providing and laying Black Lapotra Granite stone flooring in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3231.093231.0917.78FalseNoneNoneFalseNoneFalse57448.78020
296751398163None110-12.88 Vol-2Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Window shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm6744.996744.9912.96FalseNoneNoneFalseNoneFalse87415.07040
296751498163None109-12.85 Vol-2Providing & fixing of louvered ventilator made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7156.77156.74.86FalseNoneNoneFalseNoneFalse34781.5620
296751598163None50-8.51 Vol-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm125.14125.14400.07FalseNoneNoneFalseNoneFalse50064.75980
296751698163None45-8.27 Vol-2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm66.3266.32451.26FalseNoneNoneFalseNoneFalse29927.56320
296751798163None50-8.53.2 Vol-2Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm123.89123.89451.26FalseNoneNoneFalseNoneFalse55906.60140
296751898163None47-8.34.3 Vol-2Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm62.5762.5717.82FalseNoneNoneFalseNoneFalse1114.99740
296751998163None48-8.40 Vol-2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm143.91143.9117.82FalseNoneNoneFalseNoneFalse2564.47620
296752098163None47-8.34.1 Vol-2Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm66.3266.329.96FalseNoneNoneFalseNoneFalse660.54720
296752198163None46-8.33.2 Vol-2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm172.69172.699.96FalseNoneNoneFalseNoneFalse1719.99240
296752298163None45-8.28 Vol-2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge" ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm111.37111.37215.24FalseNoneNoneFalseNoneFalse23971.27880
296752398163None16-2.5.1 Vol-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8378.868378.8611.9FalseNoneNoneFalseNoneFalse99708.4340
296752498163None149-15.1 Vol-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1032.511032.51196.71FalseNoneNoneFalseNoneFalse203105.04210
296752598163None84-11.26.1 Vol-2Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kg172.69172.69458.65FalseNoneNoneFalseNoneFalse79204.26850
296752698163NoneA25-444 Vol-2Providing and Fixing MS hold fasts ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No62.5762.576.0FalseNoneNoneFalseNoneFalse375.420
296752798163None218-22.15.2 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No688.26688.264.0FalseNoneNoneFalseNoneFalse2753.040
296752898163None219-22.15.4 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge 300mm SS aldrops ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No469.27469.272.0FalseNoneNoneFalseNoneFalse938.540
296752998163None219-22.15.6 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS tower bolts 200x10mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No187.71187.713.0FalseNoneNoneFalseNoneFalse563.130
296753098163None93-11.47 Vol-2Providing and fixing Brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete including cost of materials, labour, usage charges of machinery complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No546.86546.861.0FalseNoneNoneFalseNoneFalse546.860
296753198163None42-8.7 Vol-2Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm462.54462.54127.08FalseNoneNoneFalseNoneFalse58779.58320
296753298163None219-22.15.8 Vol-2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS door hinges 125mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No62.5762.578.0FalseNoneNoneFalseNoneFalse500.560
17098236390000NoneNoneBuildings1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Toilet repair and maintenance220675.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296753398164None8-1.14.1 Vol-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum126.38126.3844.56FalseNoneNoneFalseNoneFalse5631.49280
296753498164None122-13.32.1 Vol-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m382.85382.8530.0FalseNoneNoneFalseNoneFalse11485.50
296753598164None122-13.32.2 Vol-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m469.58469.5830.0FalseNoneNoneFalseNoneFalse14087.40
296753698164None117-13.2.1 Vol-2Providing and fixing brass bib cock of approved quality : 15 mm nominal bore ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No354.35354.3510.0FalseNoneNoneFalseNoneFalse3543.50
296753798164None117-13.3.2 Vol-2Providing and fixing brass stop cock of approved quality: 20 mm nominal bore ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No377.9377.910.0FalseNoneNoneFalseNoneFalse3779.00
296753898164None136-14.32.2 Vol-2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 453x357 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1261.31261.33.0FalseNoneNoneFalseNoneFalse3783.90
296753998164None137-14.40.2 Vol-2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each614.54614.543.0FalseNoneNoneFalseNoneFalse1843.620
296754098164None95-9.1.4 Vol-5Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0 HDPE Grade PE80-PN6.0,110mm dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m581.09581.0975.0FalseNoneNoneFalseNoneFalse43581.750
296754198164None131-14.1.1 Vol-2Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6051.286051.282.0FalseNoneNoneFalseNoneFalse12102.560
296754298164None138-14.44 Vol-2Providing and fixing white vitreous china extended wall mounting water closet of size 780x370x690 mm of approved shape including providing & fixing white vitreous china cistern with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover and cistern fittings, nuts, bolts and gasket etc complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each13906.5413906.541.0FalseNoneNoneFalseNoneFalse13906.540
296754398164None132-14.7.5 Vol-2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Angle back wash basin size 600 x 480 mm with single 15mm C.P. brass pillar tap ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each3173.083173.082.0FalseNoneNoneFalseNoneFalse6346.160
296754498164None123-13.34 Vol-2Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Ltr11.1511.151000.0FalseNoneNoneFalseNoneFalse11150.00
296754598164None125-13.49 Vol-2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m703.75703.7575.0FalseNoneNoneFalseNoneFalse52781.250
296754698164None126-13.53 Vol-2Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3.5 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No.6990.446990.442.0FalseNoneNoneFalseNoneFalse13980.880
296754798164None208-16.62 Vol-5Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with appurtenances., complete. 900 mmx1100 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each7628.527628.522.0FalseNoneNoneFalseNoneFalse15257.040
296754898164None7-1.9 Vol-1Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum329.57329.5722.5FalseNoneNoneFalseNoneFalse7415.3250
17098236390000NoneNoneBuildingsPackage 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. Electrification239922.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296754998165NoneChapter-1. I.no.1.1.2, 1.1.4Open Conduit System : Supplying heavy gauge PVC conduit pipe …….dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF Screws. a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m100.36100.3630.0FalseNoneNoneFalseNoneFalse3010.80
296755098165NoneChapter-1. I.no.1.1.2, 1.1.4Open Conduit System : Supplying heavy gauge PVC conduit pipe …….dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF Screws b) 40 mm dia 2.5mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m184.61184.6130.0FalseNoneNoneFalseNoneFalse5538.30
296755198165NoneChapter-1.I.no.1.2.2Concealed Conduit System : Supplying heavy gauge PVC conduit pipe mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Mtr96.6496.64150.0FalseNoneNoneFalseNoneFalse14496.00
296755298165NoneChapter-1.I no.1.3.2Supplying heavy gauge PVC Conduit Pipe ….dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. a) 25 mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Mtr97.8897.8850.0FalseNoneNoneFalseNoneFalse4894.00
296755398165NoneChapter-1.I.no.1.5.2Supplying and fixing PVC/metal conduit Deep junction box a) 25mm deep junction box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each69.3869.3825.0FalseNoneNoneFalseNoneFalse1734.50
296755498165NoneChapter-1.I.no.1.13Supplyin and Fixing Metal Fan Box with Round Hook. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No144.96144.969.0FalseNoneNoneFalseNoneFalse1304.640
296755598165NoneChapter-2. I.no.2.2.1, 2.2.2, 2.2.3Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet a) Short point up to 3Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point333.29333.296.0FalseNoneNoneFalseNoneFalse1999.740
296755698165NoneChapter-2. I.no.2.2.1, 2.2.2, 2.2.3Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet a) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point469.58469.5816.0FalseNoneNoneFalseNoneFalse7513.280
296755798165NoneChapter-2. I.no.2.2.1, 2.2.2, 2.2.3Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS 694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. b) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point687.65687.6524.0FalseNoneNoneFalseNoneFalse16503.60
296755898165NoneChapter-2, I.no.2.3.1, 2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.a) 1 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m23.5423.5470.0FalseNoneNoneFalseNoneFalse1647.80
296755998165NoneChapter-2, I.no.2.3.1, 2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.b) 2.5 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m52.0452.04140.0FalseNoneNoneFalseNoneFalse7285.60
296756098165NoneChapter-2. I.no.2.6.1Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to IS:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100Volts as per IS-694:1990.3C X 2.5Sq.mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m144.96144.9640.0FalseNoneNoneFalseNoneFalse5798.40
296756198165NoneChapter-3. I.no. 3.4.3,3.4.6Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall a) 4-5 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each219.3219.32.0FalseNoneNoneFalseNoneFalse438.60
296756298165NoneChapter-3. I.no. 3.4.3,3.4.6Supplying and flush mounting powder coated / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall b)10-12 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each395.25395.256.0FalseNoneNoneFalseNoneFalse2371.50
296756398165NoneChapter-3,I.no.3.5.3, 3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. a) 4 Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each216.83216.832.0FalseNoneNoneFalseNoneFalse433.660
296756498165NoneChapter-3,I.no.3.5.3, 3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.b) 10-12 Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each426.22426.222.0FalseNoneNoneFalseNoneFalse852.440
296756598165NoneChapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.a) 6Amps one way Switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each126.38126.3840.0FalseNoneNoneFalseNoneFalse5055.20
296756698165NoneChapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. b) 6Amps 3 way socket ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each211.87211.874.0FalseNoneNoneFalseNoneFalse847.480
296756798165NoneChapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. c) Stepped Fan Regulator.Two Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each442.32442.329.0FalseNoneNoneFalseNoneFalse3980.880
296756898165NoneChapter-3, I.No.3.6.1, 3.6.3, 3.6.4, 3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. d) 32Amps DP switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each403.91403.919.0FalseNoneNoneFalseNoneFalse3635.190
296756998165NoneChapter-3, I.No.3.14.6Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board. a) 6Amps Pendent holder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each87.9787.9726.0FalseNoneNoneFalseNoneFalse2287.220
296757098165NoneChapter-5.I.no.5.7.2Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32 Amps ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each298.6298.64.0FalseNoneNoneFalseNoneFalse1194.40
296757198165NoneChapter-5.I.no.5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. a) 6 - 32 Amps DP ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each915.62915.622.0FalseNoneNoneFalseNoneFalse1831.240
296757298165NoneChapter-5, I.no. 5.30Supplying,fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with mper Proof Energy Meter. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1709.821709.821.0FalseNoneNoneFalseNoneFalse1709.820
296757398165NoneChapter-5.I.no.5.42.2Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.16SWG ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sq CM0.530.537000.0FalseNoneNoneFalseNoneFalse3710.00
296757498165NoneChapter-6, I.no.6.1Supplying exhaust fan of 1440 RPM of 300 mm(12') size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1848.591848.592.0FalseNoneNoneFalseNoneFalse3697.180
296757598165NoneChapter-6, I.no.6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" sweep. (1200mm) Regular model ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each3697.183697.189.0FalseNoneNoneFalseNoneFalse33274.620
296757698165NoneChapter-11.I.no.11.3.3Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4'- 36/40 w ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1572.291572.2921.0FalseNoneNoneFalseNoneFalse33018.090
296757798165NoneChapter-11.I.no.11.11.5Supplying & fixing of retrofit type LED bulb.W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per watt, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 12W, 6500K ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each333.29333.293.0FalseNoneNoneFalseNoneFalse999.870
296757898165NoneChapter-13.I.no.13.7.1Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each151.16151.1621.0FalseNoneNoneFalseNoneFalse3174.360
296757998165NoneChapter-13.I.no.13.10Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each211.87211.879.0FalseNoneNoneFalseNoneFalse1906.830
296758098165NoneChapter-13.I.no.13.12Extra length of GI pipe of class B 19mm dia for down rod ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m244.2244.21.0FalseNoneNoneFalseNoneFalse244.20
296758198165NoneChapter-13.I.no.13.14Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. Ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each609.59609.592.0FalseNoneNoneFalseNoneFalse1219.180
296758298165NoneChapter-12.I.no.12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cut outs and other equipment's on the meter board using 40mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of sizeas per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No4348.894348.891.0FalseNoneNoneFalseNoneFalse4348.890
296758398165NoneSR.P.No.13. I.No.32.02, 32.071.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 (11 GI Strips - 4 x 0.8 mm) [BESCO.SR 2023-24.Material commom a) 10 Sqmm, 2 Core, (9 GI Strips-4 x 0.8mm) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Km98168.4598168.450.05FalseNoneNoneFalseNoneFalse4908.42250
296758498165NoneSR.P.No.52, I.No.21.05Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm [BESCO.SR 2023-24.Labour commom ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Km25877.425877.40.05FalseNoneNoneFalseNoneFalse1293.870
296758598165NonePWD Civil SR ,Volume-1, Chapter-1, P.No.6, I.No.1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils. Depth upto 1.50m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m599.68599.6840.0FalseNoneNoneFalseNoneFalse23987.20
296758698165NoneW.S & UGD SR-2023-24 Chapter-13 I.No.13.6.1Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments 1.00 HP/0.75kW - 7 STG(stage) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each16501.016501.01.0FalseNoneNoneFalseNoneFalse16501.00
296758798165NoneW.S & UGD SR-2023-24 Chapter-13 I.No.13.25.1Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1548.751548.751.0FalseNoneNoneFalseNoneFalse1548.750
296758898165NoneW.S & UGD SR-2023-24 Chapter-13 I.No.13.32Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Job8053.58053.51.0FalseNoneNoneFalseNoneFalse8053.50
296758998165NoneW.S & UGD SR-2023-24 Chapter-13 I.No.13.33Labour charges for erection of indoor type panel board and meter board units with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Job1672.651672.651.0FalseNoneNoneFalseNoneFalse1672.650
17098236390000NoneNoneBuildingsPackage1-2 Construction of roads and drains in horticulture campus at Ulivala in Holenarasipura Taluk.4753887.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
296759098166None9-2.5(ii) a Vol-3Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using dozer in area of light jungle ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.100 Sqm486.93486.9315.6FalseNoneNoneFalseNoneFalse7596.1080
296759198166None8-1.14.1 Vol-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum126.38126.38633.3FalseNoneNoneFalseNoneFalse80036.4540
296759298166None15-2.1.3 Vol-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7420.377420.3729.6FalseNoneNoneFalseNoneFalse219642.9520
296759398166None16-2.4.2 Vol-1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7834.27834.266.0FalseNoneNoneFalseNoneFalse517057.20
296759498166None111-3 Vol-1Adding formwork for drain raft ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum391.71391.7113.5FalseNoneNoneFalseNoneFalse5288.0850
296759598166None111-4 Vol-1Adding formwork for drain side walls ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2741.972741.9740.5FalseNoneNoneFalseNoneFalse111049.7850
296759698166None18-2.11(h) Vol-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire/soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.t97894.6397894.632.16FalseNoneNoneFalseNoneFalse211452.40080
296759798166None7-1.7 Vol-1Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum147.44147.44189.99FalseNoneNoneFalseNoneFalse28012.12560
296759898166None7-1.8 Vol-1Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum587.29587.29111.61FalseNoneNoneFalseNoneFalse65547.43690
296759998166None23-4.1(v) Vol-3Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Plant Mix Method For Grading -V Material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3081.393081.3999.0FalseNoneNoneFalseNoneFalse305057.610
296760098166None26-4.17 Vol-3Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3170.63170.6148.5FalseNoneNoneFalseNoneFalse470834.10
296760198166None149-16.28 Vol-3Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8368.218368.21198.0FalseNoneNoneFalseNoneFalse1656905.580
296760298166None51-6.8.1 Vol-3Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1323.251323.25518.0FalseNoneNoneFalseNoneFalse685443.50
296760398166None74-8.42.3 Vol-3Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra). 600 x 300 x 150 mm size ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m573.66573.66550.0FalseNoneNoneFalseNoneFalse315513.00
296760498166None48-8.40 Vol-2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm142.49142.49522.5FalseNoneNoneFalseNoneFalse74451.0250
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17098236400000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17098236400001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17098236400001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17099741550000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17099741670000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17099741750000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17099741820000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17099741880000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender and the employer will in no case be responsible and liable for these costsNone
17099741960000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all Tender without assigning any reasonsNone
17099742020000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E-Procurement PortalNone
17099742100000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17099742240000NoneNoneELIGIBILITYAs per Government order LD/300/LET/2006 Bangalore dated 1.01.2007 nad Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17099742350000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17099742410000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approvalNone
17099742510000NoneNoneELIGIBILITYMaterials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work.None
17099742620000NoneNoneELIGIBILITYContractors should be registered with KPWD Class III and above RegistrationNone
17099742720000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should give all details and documents as per K.W-3None
17099742850000NoneNoneELIGIBILITYWork should be carried out as per K/W-3 STD attached with tender .None
17099742960000NoneNoneELIGIBILITYThe period of completion of this work is 6 MonthsNone
17099743040000NoneNoneELIGIBILITYThe eligible contractor should maintain the work FOR ONE YEAR AFTER THE SUCCESSFUL COMPLETION OF THE PROJECT.None
17099743130000NoneNoneELIGIBILITYContractor shall bound to comply the prevailing rules and regulations with regard to the EPF Contribution rules and any modifications thereof before and after execution of agreementNone
17099743230000NoneNoneELIGIBILITYContractors has to upload the EPF RegistrationNone
17099743320000NoneNoneELIGIBILITYThe FSD payable at the time of executing agreement, will be refunded only after successful completion of Defect Liability PeriodNone
17099743400000NoneNoneELIGIBILITYContractors has to submit their labour EPF details with every Running BillNone
17099743600000NoneNoneELIGIBILITYThe Contractor should upload original scanned copy of Purchase invoice/RC Book/Sale Deed duly attested by Notary along with original purchase invoice/Ownership transfer in RC book/Hire or Lease Agreement duly attested by Notary along with original purchase invoice or RC bookNone
17099743730000NoneNoneELIGIBILITYThe GST shall not be paid in the extended period of contract for which the Contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17099743810000NoneNoneELIGIBILITYThe Contractor has to establish site laboratories and should furnish the documents for having required lab testing equipments.None
17099743930000NoneNoneELIGIBILITYSuccessful bidder has to furnish 0.1% of award contract amount as insurance during entering in to agreement.None
17099744030000NoneNoneELIGIBILITYEstimate rates are inclusive of 18 percentage GST .Therefore amount put to tender and ECV amount are including GST.None
17099746140000NoneNoneELIGIBILITYSub Estimate Name 1 Construction of Raitha Tarabeti kendra and other related works in horticulture campus at Ulivala in Holenarasipura taluk. First foor and Terrace, In Item No:14 Item Code 43-8.10 Vol-2, Unit is written as Cum read it as Sqm and in Item No:19, Item Code 64-9.32 Vol-2, Unit is written as Cum read it as SqmNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21,2021-22 , 2022-23 Mandating Satisfactorily completion as prime contractor, for atleast one similar work of value not less than Rs.47.40 lakhs(Updated to 2023-24 Price Level)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certificate issued from the competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneThe tenderer or his identified sub contractor should possess required valid electrical license for executing building electrification works and should have executed similar works totaling Rs.1.20 lakhs in any one year during last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22, 2022-23 (Updated to 2023-24 Price level)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- certificate issued from the competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneThe tenderer or his identified sub contractor should possess required valid license for executing building water supply/ sanitary works and should have executed similar works totaling Rs.1.10 lakhs in any one year during last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22, 2022-23 (Updated to 2023-24 Price level)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- certificate issued from the competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneExecuted in any one year i.e, 2018-19, 2019-20, 2020-21,2021-22, 2022-23 the following minimum quantities of work 1 Earth work/Embankment/Filling 810.26Cum 2PCC/RCC 319.08Cum 3Plastering 502.19Sqm 4Flooring 203.96Sqm 5Painting 1559.23Sqm 6BBM 39.63Cum 7Steel 7.64Tons 8GSB 79.20Cum WMM 118.80CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- certificate issued from from the competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under : Assessed available tender capacity:(AxNx2.5 -B ) should be greater than or equal to Rs.94.80 lakhs where A-Maximum value of works executed in any one year during the last five years taking into account the completed as well as works in progress. (updated to 2023-24 price level) N-Number of years prescribed for completion of the works for which tenders are invited-6 Months. B-Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 6 Months. (Period of completion of the works for which tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Submit information as per Section 3 of Tender Documen
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e.,2018-19, 2019-20, 2020-21,2021-22 , 2022-23, Achieved in atleast two financial years an average annual financial turnover of Rs 94.80 Lakhs(Updated to 2023-24 Price Level)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Balance Sheets, Profit & Loss Statements certified from an Registered Chartered Accountant with UDIN
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs28.44 lakhs (credit lines / letter of credit/ certificates from Nationalized banks) for meeting the fund requirement etc (The fomat should be as per KW-3 Bid document Section-3 Para 1.10)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalised Bank
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate certificate issued by Approved Chartered Accountant with UDIN i.e., 2018-19, 2019-20, 2020-21,2021-22 , 2022-23 as per KW-3 Rs.94.80 lakhsTrueTechnical Bid
KPWD Class-III and above above Registration CertificateTrueTechnical Bid
Work done certificate as per KW-3-50percent amount put to tender i.e., Rs.47.40lakhs certificate should be issued not below the rank of Executive EngineerTrueTechnical Bid
Line of credit as per KW-3 Rs.28.44 lakhsTrueTechnical Bid
Contractors has to upload the EPF RegistrationTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710237951000
version0
createdDateNone
modifiedDateNone
blockNumberEE PWD HASSAN
streetNone
cityHassan
stateKarnataka
pin573201
tenderRecallDTONone