noticeInvitingTenderDTO
createdTs1710330386677
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1939000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate13-03-2024 18:04:22
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate23-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1839000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710330386705
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT10398
titlePKG 621 (A) Improvements to road connecting Wanamarapalli with Raichur SH-15 from Ch 204.00 KM to 215.97 KM (in Selected Reaches) in Yadgir Taluk of Yadgir District (B) Improvements to road connecting Wanamarapalli with Raichur SH 15 from Ch 215.97 KM to 228.00 KM (in Selected Reaches) in Shahapur Taluk of Yadgir District
descriptionPKG 621 (A) Improvements to road connecting Wanamarapalli with Raichur SH-15 from Ch 204.00 KM to 215.97 KM (in Selected Reaches) in Yadgir Taluk of Yadgir District (B) Improvements to road connecting Wanamarapalli with Raichur SH 15 from Ch 215.97 KM to 228.00 KM (in Selected Reaches) in Shahapur Taluk of Yadgir District
categoryWORKS
categoryTextWorks
ecv193943285.04
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/ST-1/YDR/PKG-621/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103303870000NoneNoneRoadsPKG 621 (B) CROSS DRAINAGE WORKS220353.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043550102832None1.14.1Excavation Mechanical Means Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38500.0FalseNoneNoneFalseNoneFalse63190.00
3043551102832None2.2.1Concrete for Foundation Works Providing and laying in position Reinforced cement concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7789.597789.596.8FalseNoneNoneFalseNoneFalse52969.2120
3043552102832None2.1 hTMT for All Structures Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.01FalseNoneNoneFalseNoneFalse978.94630
3043553102832None13.14Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm104.08104.08101.25FalseNoneNoneFalseNoneFalse10538.10
3043554102832None8.18Guard Stones / Boundary Pillers Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.77100.0FalseNoneNoneFalseNoneFalse92677.00
17103303870000NoneNoneRoadsPKG 621 (B) Construction of Field Culverts385943.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043555102833None1.14.1Excavation Mechanical Means Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3855.16FalseNoneNoneFalseNoneFalse6971.12080
3043556102833None2.1.4Levelling Course - M10 Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7702.867702.863.44FalseNoneNoneFalseNoneFalse26497.83840
3043557102833None2.1 hTMT for All Structures Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.373FalseNoneNoneFalseNoneFalse36514.696990
3043558102833None34.17Concrete for Sub Structure Works Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.215.96FalseNoneNoneFalseNoneFalse125033.8320
3043559102833None9.1 iLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm11744.4811744.4815.0FalseNoneNoneFalseNoneFalse176167.20
3043560102833None1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum329.57329.5714.43FalseNoneNoneFalseNoneFalse4755.69510
3043561102833None1.1Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum626.74626.7415.96FalseNoneNoneFalseNoneFalse10002.77040
17103303870000NoneNoneRoadsPKG 621 (B) Road Portion54158469.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043562102834None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3043563102834None2.5Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.93263.88FalseNoneNoneFalseNoneFalse128491.08840
3043564102834None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.718796.0FalseNoneNoneFalseNoneFalse1035377.160
3043565102834None3.5Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519 using Bituminous Concrete Grading - II" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11753.1511753.15769.65FalseNoneNoneFalseNoneFalse9045811.89750
3043566102834None3.6Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.831838.95FalseNoneNoneFalseNoneFalse1123285.82850
3043567102834None5.3Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.3417.3451310.0FalseNoneNoneFalseNoneFalse889715.40
3043568102834None5.12 cDense Graded Bituminous Macadam Grading - II for traffic 20 MSADense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11707.3111707.312693.78FalseNoneNoneFalseNoneFalse31536917.53180
3043569102834None5.16 cBituminous Concrete Grading II for traffic 20 MSA Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13461.7413461.74769.65FalseNoneNoneFalseNoneFalse10360828.1910
17103303870000NoneNoneRoadsPKG 621 (B) Road Safety Measures8298519.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043570102835None8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach6295.366295.364.0FalseNoneNoneFalseNoneFalse25181.440
3043571102835None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.5519.0FalseNoneNoneFalseNoneFalse68904.450
3043572102835None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1043.241043.2476.0FalseNoneNoneFalseNoneFalse79286.240
3043573102835None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.672793.5FalseNoneNoneFalseNoneFalse1834407.6450
3043574102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5882.775882.7732.0FalseNoneNoneFalseNoneFalse188248.640
3043575102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo7954.387954.3836.0FalseNoneNoneFalseNoneFalse286357.680
3043576102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8238.118238.1124.0FalseNoneNoneFalseNoneFalse197714.640
3043577102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5512.315512.3136.0FalseNoneNoneFalseNoneFalse198443.160
3043578102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5294.255294.2555.0FalseNoneNoneFalseNoneFalse291183.750
3043579102835None8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8208.388208.3836.0FalseNoneNoneFalseNoneFalse295501.680
3043580102835None8.17Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2504.022504.0245.0FalseNoneNoneFalseNoneFalse112680.90
3043581102835None8.31Rumble Strips Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm232.93232.93553.0FalseNoneNoneFalseNoneFalse128810.290
3043582102835None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo452.24452.243054.0FalseNoneNoneFalseNoneFalse1381140.960
3043583102835None8.14 iPainting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control Over 10 cm in width" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm146.0146.046.13FalseNoneNoneFalseNoneFalse6734.980
3043584102835None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.715.2FalseNoneNoneFalseNoneFalse612.0920
3043585102835None8.25 iMetal Beam Crash Barrier Providing and erecting a ""W"" metal beam crash barriersystem comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo4509.964509.96700.0FalseNoneNoneFalseNoneFalse3156972.00
3043586102835None8.18Guard Stones / Boundary Pillers Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo926.77926.7750.0FalseNoneNoneFalseNoneFalse46338.50
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 10.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043587102836NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043588102836NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% quantity to be exucuted 19880) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043589102836NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043590102836NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 29820) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043591102836NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043592102836NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 20.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043593102837NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043594102837NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%(quantity to be executed 7952) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043595102837NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043596102837NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 2982) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043597102837NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043598102837NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 3767914.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043599102838NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8479.16FalseNoneNoneFalseNoneFalse44712.73440
3043600102838NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.625864.0FalseNoneNoneFalseNoneFalse50547.680
3043601102838NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05659.7FalseNoneNoneFalseNoneFalse36976.1850
3043602102838NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.412199.0FalseNoneNoneFalseNoneFalse306562.590
3043603102838NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.26256.55FalseNoneNoneFalseNoneFalse157075.3030
3043604102838NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.541260.0FalseNoneNoneFalseNoneFalse172040.40
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 4785280.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043605102839NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8479.16FalseNoneNoneFalseNoneFalse44712.73440
3043606102839NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.625864.0FalseNoneNoneFalseNoneFalse50547.680
3043607102839NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05659.7FalseNoneNoneFalseNoneFalse36976.1850
3043608102839NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.412199.0FalseNoneNoneFalseNoneFalse306562.590
3043609102839NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.26256.55FalseNoneNoneFalseNoneFalse157075.3030
3043610102839NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.541260.0FalseNoneNoneFalseNoneFalse172040.40
3043611102839None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting ofmandatory requlatory cautionary nformatory and place identifications sign board as perdrawings and technical specification Clause 1910 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2083.22083.27.33FalseNoneNoneFalseNoneFalse15269.8560
3043612102839None16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.867.33FalseNoneNoneFalseNoneFalse2095.35380
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 51275576.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043613102840NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3179.16FalseNoneNoneFalseNoneFalse46253.97960
3043614102840NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.928.925864.0FalseNoneNoneFalseNoneFalse52306.880
3043615102840NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9857.98659.7FalseNoneNoneFalseNoneFalse38249.4060
3043616102840NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.224398.0FalseNoneNoneFalseNoneFalse634279.560
3043617102840NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm636.35636.35513.1FalseNoneNoneFalseNoneFalse326511.1850
3043618102840NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.251260.0FalseNoneNoneFalseNoneFalse177975.00
17103303870000NoneNoneRoadsPKG 621 (B) Maintenance Year 631195177.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043619102841NoneVol - 3, Vide P.No 147, I. Code 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3048.13048.17.33FalseNoneNoneFalseNoneFalse22342.5730
3043620102841NoneVol - 3, Vide P.No 148, I. Code 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm316.49316.497.33FalseNoneNoneFalseNoneFalse2319.87170
3043621102841NoneVol - 3, Vide P.No 66, I. Code 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm167.46167.463200.0FalseNoneNoneFalseNoneFalse535872.00
3043622102841NoneVol - 3, Vide P.No 63, I. Code 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.381.384500.0FalseNoneNoneFalseNoneFalse6210.00
3043623102841NoneVol - 3, Vide P.No 31, I. Code 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18.4318.4351310.0FalseNoneNoneFalseNoneFalse945643.30
3043624102841NoneVol - 3, Vide P.No 38, I. Code 5.16 CBituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects - Rates are inclusive of GST 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16693.016693.01539.3FalseNoneNoneFalseNoneFalse25695534.90
3043625102841NoneVol - 3, Vide P.No 67, I. Code 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm814.27814.272793.5FalseNoneNoneFalseNoneFalse2274663.2450
3043626102841NoneVol - 3, Vide P.No 74, I. Code 8.43Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in ccordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be ess than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos560.77560.773054.0FalseNoneNoneFalseNoneFalse1712591.580
17103303870000NoneNoneRoadsPKG 621 (A) Road Portion51907663.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043627102842None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3043628102842None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm486.93486.93100.98FalseNoneNoneFalseNoneFalse49170.19140
3043629102842None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.7117.72160.0FalseNoneNoneFalseNoneFalse254232.00
3043630102842NoneSR 2023-24 V- 3 Item No 3.5 Page No 17Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519 using Bituminous Concrete Grading - II ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11753.1511753.15280.03FalseNoneNoneFalseNoneFalse3291234.59450
3043631102842NoneSR 2023-24 V- 1 Item No 1.8 Page No 7Embankment from Barrow Materials Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29655.0FalseNoneNoneFalseNoneFalse384674.950
3043632102842NoneSR 2023-24 V- 3 Item No 3.6 Page No 17Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.833688.23FalseNoneNoneFalseNoneFalse2252881.53090
3043633102842NoneSR 2023-24 V- 3 Item No 4.2iv Page No 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.81306.72FalseNoneNoneFalseNoneFalse3819281.2160
3043634102842NoneSR 2023-24 V- 3 Item No 4.17 Page No 26Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.61747.88FalseNoneNoneFalseNoneFalse5541828.3280
3043635102842NoneSR 2023-24 V- 3 Item No 5.1 Page No 31Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.85895.0FalseNoneNoneFalseNoneFalse299466.00
3043636102842NoneSR 2023-24 V- 3 Item No 5.3 Page No 31Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm14.8714.8737410.0FalseNoneNoneFalseNoneFalse556286.70
3043637102842NoneSR 2023-24 V- 3 Item No 5.12 c Page No 35Dense Graded Bituminous Macadam Grading - II for traffic 20 MSADense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11707.3111707.311624.44FalseNoneNoneFalseNoneFalse19017822.65640
3043638102842NoneSR 2023-24 V- 3 Item No 5.16 c Page No 37Bituminous Concrete Grading II for traffic 20 MSA Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13461.7413461.741122.3FalseNoneNoneFalseNoneFalse15108110.8020
3043639102842NoneSR 2023-24 V- 3 Item No 6.8.2 Page No 51Precast Cement Concrete Interlocking Blocks Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1438.481438.48900.0FalseNoneNoneFalseNoneFalse1294632.00
17103303870000NoneNoneRoadsPKG 621 (A) Road Furnitures19608366.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043640102843NoneSR 2023-24, V-3,Pg. No. 67 I. No.8.16iKilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC 5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
3043641102843NoneSR 2023-24, V-3,Pg. No. 67 I. No.8.16iiKilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC 5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16ii ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3636.553636.556.0FalseNoneNoneFalseNoneFalse21819.30
3043642102843NoneSR 2023-24, V-3, Iteam No 8.16 iii Page No 67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1043.241043.2424.0FalseNoneNoneFalseNoneFalse25037.760
3043643102843NoneSR 2023-24, V-3, Iteam No 8.15 Page No 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.672740.65FalseNoneNoneFalseNoneFalse1799702.63550
3043644102843NoneSR 2023-24, V-3, Iteam No 8.6 ii Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.7718.0FalseNoneNoneFalseNoneFalse105889.860
3043645102843NoneSR 2023-24, V-3, Iteam No 8.6 vii, Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach7954.387954.3823.0FalseNoneNoneFalseNoneFalse182950.740
3043646102843NoneSR 2023-24, V-3, Iteam No 8.6 ix, Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 mm x 75 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach8238.118238.1118.0FalseNoneNoneFalseNoneFalse148285.980
3043647102843NoneSR 2023-24, V-3, Iteam No 8.6 xi, Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 mm x 50 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5512.315512.3116.0FalseNoneNoneFalseNoneFalse88196.960
3043648102843NoneSR 2023-24, V-3, Iteam No 8.6 xii, Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5294.255294.2525.0FalseNoneNoneFalseNoneFalse132356.250
3043649102843NoneSR 2023-24, V-3, Iteam No 8.6 xv, Page No 64-65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach8208.388208.3821.0FalseNoneNoneFalseNoneFalse172375.980
3043650102843NoneSR 2023-24, V-3, Iteam No 8.17, Page No 67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.02370.0FalseNoneNoneFalseNoneFalse926487.40
3043651102843NoneSR 2023-24, V-3 Iteam No 8.31, Page No 71Rumble Strips Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm232.93232.93405.0FalseNoneNoneFalseNoneFalse94336.650
3043652102843NoneSR 2023-24, V-3 Iteam No 8.43, Page No 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach452.24452.241496.25FalseNoneNoneFalseNoneFalse676664.10
3043653102843NoneSR 2023-24, V-3 Iteam No 8.14i, Page No 66Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control Over 10 cm in width ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm177.18177.1851.25FalseNoneNoneFalseNoneFalse9080.4750
3043654102843NoneSR 2023-24, V-1 Iteam No 1.12 Page No 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST1 * 6 Reels117.71117.7118.94FalseNoneNoneFalseNoneFalse2229.42740
3043655102843NoneSR 2023-24, V-3, Iteam No 8.25i, Page No 69Metal Beam Crash Barrier Providing and erecting a ""W"" metal beam crash barriersystem comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr4509.964509.962545.0FalseNoneNoneFalseNoneFalse11477848.20
3043656102843NoneSR 2023-24, V-3 Iteam No 8.18 Page No 67Guard Stones / Boundary Pillers Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.77200.0FalseNoneNoneFalseNoneFalse185354.00
3043657102843NoneSR 2023-24 V- 3 Item No 14.4 A Page No 129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.971500.0FalseNoneNoneFalseNoneFalse3553455.00
17103303870000NoneNoneRoadsPKG 621 (A) CD Repair63190.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043658102844NoneSR 2023-24 V- 1 Item No 1.14.1 Page No 8Excavation Mechanical Means Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38500.0FalseNoneNoneFalseNoneFalse63190.00
17103303870000NoneNoneRoadsPKG 621 (A) Field Culverts964098.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043659102845NoneSR 2023-24, V-1 Iteam No 1.14.1 Page No 8Excavation Mechanical Means Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38137.9FalseNoneNoneFalseNoneFalse17427.8020
3043660102845NoneSR 2023-24, V-1 Iteam No 2.1.4 Page No 15Levelling Course - M10 Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7702.867702.868.59FalseNoneNoneFalseNoneFalse66167.56740
3043661102845NoneSR 2023-24,V-1 Iteam No 2.1 h Page No 18TMT for All Structures Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTt97894.6397894.630.93FalseNoneNoneFalseNoneFalse91042.00590
3043662102845NoneSR 2023-24, V-1 Iteam No 2.4.2 Page No 16Concrete for Sub Structure Works Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.239.86FalseNoneNoneFalseNoneFalse312271.2120
3043663102845NoneSR 2023-24, V-3 Iteam No 9.1 i, Page No 87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets i. 1000 mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr11744.4811744.4837.5FalseNoneNoneFalseNoneFalse440418.00
3043664102845NoneSR 2023-24, V-1 Iteam No 1.9 Page No 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum329.57329.5736.08FalseNoneNoneFalseNoneFalse11890.88560
3043665102845NoneAddendum IForm work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPercentage623.74623.7439.89FalseNoneNoneFalseNoneFalse24880.98860
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Chapter0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043666102846NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043667102846NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% quantity to be exucuted 19880) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043668102846NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043669102846NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 29820) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043670102846NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043671102846NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Year 20.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043672102847NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043673102847NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%(quantity to be executed 7952) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043674102847NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043675102847NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 2982) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043676102847NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3043677102847NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Year 3258602.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043678102848NoneS.R. 2023-24, Vol - 3 Vide Page No. 9 Itm 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3630.29FalseNoneNoneFalseNoneFalse16518.95440
3043679102848NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.328.322280.0FalseNoneNoneFalseNoneFalse18969.60
3043680102848NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12256.5FalseNoneNoneFalseNoneFalse13881.780
3043681102848NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.6134.6855.0FalseNoneNoneFalseNoneFalse115083.00
3043682102848NoneVol - 3, Vide P.No 147, I. Code 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.22753.22.85FalseNoneNoneFalseNoneFalse7846.620
3043683102848NoneVol - 3, Vide P.No 148, I. Code 16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.862.85FalseNoneNoneFalseNoneFalse814.7010
3043684102848NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm591.15591.1599.75FalseNoneNoneFalseNoneFalse58967.21250
3043685102848NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.8390.0FalseNoneNoneFalseNoneFalse11864.70
3043686102848NoneVol - 3, Vide P.No 66, I. Code 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.26151.2660.0FalseNoneNoneFalseNoneFalse9075.60
3043687102848NoneVol - 3, Vide P.No 63, I. Code 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.241.244500.0FalseNoneNoneFalseNoneFalse5580.00
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Year 4403448.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043688102849NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8430.29FalseNoneNoneFalseNoneFalse17109.00360
3043689102849NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.622280.0FalseNoneNoneFalseNoneFalse19653.60
3043690102849NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05256.5FalseNoneNoneFalseNoneFalse14376.8250
3043691102849NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.41855.0FalseNoneNoneFalseNoneFalse119195.550
3043692102849NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.2699.75FalseNoneNoneFalseNoneFalse61072.9350
3043693102849NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.541260.0FalseNoneNoneFalseNoneFalse172040.40
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Year 5604451.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043694102850NoneVol - 3, Vide P.No 9, I. Code 2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3130.29FalseNoneNoneFalseNoneFalse17698.74990
3043695102850NoneVol - 3, Vide P.No 147, I. Code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.928.922280.0FalseNoneNoneFalseNoneFalse20337.60
3043696102850NoneVol - 3, Vide P.No 91, I. Code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9857.98256.5FalseNoneNoneFalseNoneFalse14871.870
3043697102850NoneVol - 3, Vide P.No 91, I. Code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.221710.0FalseNoneNoneFalseNoneFalse246616.20
3043698102850NoneVol - 3, Vide P.No 91, I. Code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm636.35636.35199.5FalseNoneNoneFalseNoneFalse126951.8250
3043699102850NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.251260.0FalseNoneNoneFalseNoneFalse177975.00
17103303870000NoneNoneRoadsPKG 621 (A) Maintenance Year 623046232.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3043700102851NoneVol - 3, Vide P.No 147, I. Code 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3048.13048.12.85FalseNoneNoneFalseNoneFalse8687.0850
3043701102851NoneVol - 3, Vide P.No 148, I. Code 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm316.49316.492.85FalseNoneNoneFalseNoneFalse901.99650
3043702102851NoneVol - 3, Vide P.No 66, I. Code 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm167.46167.463200.0FalseNoneNoneFalseNoneFalse535872.00
3043703102851NoneVol - 3, Vide P.No 63, I. Code 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.381.384500.0FalseNoneNoneFalseNoneFalse6210.00
3043704102851NoneVol - 3, Vide P.No 31, I. Code 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18.4318.4337410.0FalseNoneNoneFalseNoneFalse689466.30
3043705102851NoneVol - 3, Vide P.No 38, I. Code 5.16 CBituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects - Rates are inclusive of GST 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16693.016693.01122.3FalseNoneNoneFalseNoneFalse18734553.90
3043706102851NoneVol - 3, Vide P.No 67, I. Code 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm814.27814.272740.65FalseNoneNoneFalseNoneFalse2231629.07550
3043707102851NoneVol - 3, Vide P.No 74, I. Code 8.43Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in ccordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be ess than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos560.77560.771496.0FalseNoneNoneFalseNoneFalse838911.920
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103303880000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103303880000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103303880001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103304140000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103304250000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17103304310000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidderNone
17103304510000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17103304540000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17103304620000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17103304700000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103304760000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I RegistrationNone
17103304830000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17103307210000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tenderNone
17103307330000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the workNone
17103307620000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17103307710000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103307780000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approvalNone
17103307860000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejectedNone
17103307930000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103308020000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17103308090000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including GSTNone
17103308150000NoneNoneELIGIBILITYGST shall not be paid separatelyNone
17103308220000NoneNoneELIGIBILITYPotholes and other maintenance items shall be rectified irrespective of quantities during DLP & maintenance periodNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.969.72Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work:1. Earth Work for Embankment/ Subgrade/ Shoulders : 13709.9 Cum2. GSB/WMM : 2443.69Cum3. BM/SDBC/DBM/BC :4968.12Cum4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) :9.62cum5. Reinforced Cement Concrete (RCC) M20 & higher grades : 50.12cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No2.Mechanical Paver Finisher:1 No3. Static Road Roller: 1 No.4. Vibratory Road Roller: 1 No.5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- as per KW4 Document
NoneNoneNoneNoneSection 2 ITT 3.3(b)ii Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill :1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No6.Excavator 0.90 Cum Bucket Capacity:2 No7.Tipper Trucks:6 Nos8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos 9. Water Tanker: 3 No.10.Double drum roller:1No 11.Milling machine:1NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- as per KW4 Document
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AXNX1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bid capacity
NoneNoneNoneNoneDetails of Committed WorksCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- details of committed works
NoneNoneNoneNoneCopies of Tax RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3878.86 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.581.83 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover certificate for the past five years along with Balance sheets and UDIN mentioned duly attested by Charted accountantTrueTechnical Bid
GST RegistrationTrueTechnical Bid
Workdone certificate issued by an Officer not below the rank of EE or equivalentTrueTechnical Bid
Line of creditTrueTechnical Bid
Section 2 ITT 3.3 as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.7 as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.2 as mentioned in bid documentTrueTechnical Bid
KPWD Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710333165000
version0
createdDateNone
modifiedDateNone
blockNumberO/o The Chief Project Officer, PIU, SHDP, K. R. Circle, Bangalore
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone