createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710456069071
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1915000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate15-03-2024 04:49:50
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1815000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710456069103
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9905
titlePkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.
descriptionPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 via Melukote, Sravanabelagula, Tiptur, Huliyar, Hosadurga, Holalkere, Anagudu, Harapanahalli Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Daswara, Makali Ujjani, Hitlapur, Hiliyuru Durga, K. Honnamachanahalli, Kilara, Hanchipura, Paduvagere, Hanumapur, (SH-84) Kodavatti, Yediyur, NH-150A), Bochahihalli, Talakere, Aralikere Palya, Vishwanathpur, (NH-150A), Thuruvekere, Nonavinakere, Hedagarahalli (State Highway-47) Hunaseghatta, Sasalahalli Dasarighatta Cross Kenkere (SH-71) Eedigarahatti, Gandasi, Doddakanagal Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reaches) Tiptur Taluk of Tumakuru District.
categoryWORKS
categoryTextWorks
ecv191476290.40
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-747/TMK/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - Road construction42904162.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081546105633Nonevol- 3ItemNo16.29PageNo149Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3081547105633Nonevol- 3ItemNo3.5PageNo17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No 3.5 , Page No 17 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm7.087.082275.0FalseNoneNoneFalseNoneFalse16107.00
3081548105633Nonevol- 3ItemNo2.5PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 , Page No 9 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm463.74463.7459.7FalseNoneNoneFalseNoneFalse27685.2780
3081549105633Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum112.1112.16479.25FalseNoneNoneFalseNoneFalse726323.9250
3081550105633Nonevol- 3ItemNo4.2 (v)PageNo23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No 4.2 (v) , Page No 23 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2783.622783.622799.01FalseNoneNoneFalseNoneFalse7791380.21620
3081551105633Nonevol- 3ItemNo4.17PageNo26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No 4.17 , Page No 26 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3019.623019.622603.26FalseNoneNoneFalseNoneFalse7860855.96120
3081552105633Nonevol- 3ItemNo5.1 A (I)PageNo31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.1 A (I) , Page No 31 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm48.3848.3821670.04FalseNoneNoneFalseNoneFalse1048396.53520
3081553105633Nonevol- 3ItemNo5.4PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/sqm on Granular surface Schedule of Rates PWD 2023-24 vol- 3, Item No 5.4 , Page No 31 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm16.5216.5224925.04FalseNoneNoneFalseNoneFalse411761.66080
3081554105633Nonevol- 3ItemNo5.12 (C)PageNo35Dense Graded Bituminous Macadam Grading - II for traffic less than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.12 (C) , Page No 35 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum11149.8211149.821185.49FalseNoneNoneFalseNoneFalse13218000.11180
3081555105633Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic less than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No 5.16 C , Page No 38 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72747.75FalseNoneNoneFalseNoneFalse9665207.130
3081556105633Nonevol- 3ItemNo10.15 (ii)PageNo93Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per sqm over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 10.15 (ii) , Page No 93 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm586.46586.461561.0FalseNoneNoneFalseNoneFalse915464.060
3081557105633Nonevol- 3, Item No: 3.6 , Page No: 17Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum581.74581.742040.0FalseNoneNoneFalseNoneFalse1186749.60
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District.-RCC drain13041983.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081558105634Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.362497.3FalseNoneNoneFalseNoneFalse300575.0280
3081559105634Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.02248.6FalseNoneNoneFalseNoneFalse1756861.1720
3081560105634Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.9829.92FalseNoneNoneFalseNoneFalse2789530.76160
3081561105634Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7461.147461.14305.1FalseNoneNoneFalseNoneFalse2276393.8140
3081562105634Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum10072.5410072.54406.8FalseNoneNoneFalseNoneFalse4097509.2720
3081563105634Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8953.368953.36203.4FalseNoneNoneFalseNoneFalse1821113.4240
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. -Pipe culvert964173.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081564105635Nonevol- 3ItemNo2.11PageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No 2.11 , Page No 10 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.49.5FalseNoneNoneFalseNoneFalse2017.80
3081565105635Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.3641.14FalseNoneNoneFalseNoneFalse4951.61040
3081566105635Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.026.72FalseNoneNoneFalseNoneFalse47490.37440
3081567105635Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.980.57FalseNoneNoneFalseNoneFalse53142.79860
3081568105635Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8058.038058.0339.13FalseNoneNoneFalseNoneFalse315310.71390
3081569105635Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 12 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 9.1.ii , Page No 87 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm12705.0612705.0625.0FalseNoneNoneFalseNoneFalse317626.50
3081570105635Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No 12.3A , Page No 117 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum1378.241378.2482.93FalseNoneNoneFalseNoneFalse114297.44320
3081571105635Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS 280 & IS4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No 14.2 , Page No 129 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2895.722895.727.65FalseNoneNoneFalseNoneFalse22152.2580
3081572105635Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 14.4(a) , Page No 129 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1622.19FalseNoneNoneFalseNoneFalse50064.19040
3081573105635Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 12.4 , Page No 117 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8611.09FalseNoneNoneFalseNoneFalse35031.75740
3081574105635Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6214.74FalseNoneNoneFalseNoneFalse1895.85880
3081575105635Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.06180.96FalseNoneNoneFalseNoneFalse191.81760
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - Road Furnitures2297414.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081576105636Nonevol- 3ItemNo8.16 (i)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (i) , Page No 67 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3081577105636Nonevol- 3ItemNo8.16 (ii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (ii) , Page No 67 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3081578105636Nonevol- 3ItemNo8.16 (iii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (iii) , Page No 67 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach993.56993.569.0FalseNoneNoneFalseNoneFalse8942.040
3081579105636Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.15 , Page No 67 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.4736.62FalseNoneNoneFalseNoneFalse460682.1480
3081580105636Nonevol- 3ItemNo8.6 iiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 ii , Page No 64 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5602.645602.6431.0FalseNoneNoneFalseNoneFalse173681.840
3081581105636Nonevol- 3ItemNo8.6 iiiPageNo65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 75 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 iii , Page No 65 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4862.784862.782.0FalseNoneNoneFalseNoneFalse9725.560
3081582105636Nonevol- 3ItemNo8.6 xvPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xv) 90 cm high octagon Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 xv , Page No 64 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach7817.57817.511.0FalseNoneNoneFalseNoneFalse85992.50
3081583105636Nonevol- 3ItemNo8.6 xiiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xii) 60 cm x 45 cm rectangular Schedule of Rates PWD 2023-24 vol- 3, Item No 8. 6xii , Page No 64 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5042.145042.149.0FalseNoneNoneFalseNoneFalse45379.260
3081584105636Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 ./- 2 mm and with minimum reflective area of 13 csqm on each side and the slope to the base shall be 35 ./- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 ./- 2 mm and height not less than 30./- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.43 , Page No 74 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.7562.0FalseNoneNoneFalseNoneFalse242053.40
3081585105636Nonevol- 3ItemNo8.17PageNo67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.17 , Page No 67 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach2384.782384.782.0FalseNoneNoneFalseNoneFalse4769.560
3081586105636Nonevol- 3ItemNo8.31PageNo71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.31 , Page No 71 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm221.84221.84375.0FalseNoneNoneFalseNoneFalse83190.00
3081587105636Nonevol- 3ItemNo8.60.2 iiiPageNo80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 992018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022.Two lane with formation width of 9.00 m Schedule of Rates PWD 2023-24 vol- 3, Item No 8.60.2 iii , Page No 80 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo61205.4261205.4214.0FalseNoneNoneFalseNoneFalse856875.880
3081588105636Nonevol- 3ItemNo8.29 (i)PageNo71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC 98 - 1997 and approved drawings. Single row for one utility service Schedule of Rates PWD 2023-24 vol- 3, Item No 8.29 (i) , Page No 71 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2610.162610.16120.0FalseNoneNoneFalseNoneFalse313219.20
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - Electric Pole Shifting1249714.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081589105637NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22220.0FalseNoneNoneFalseNoneFalse163288.40
3081590105637NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34220.0FalseNoneNoneFalseNoneFalse288934.80
3081591105637NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22220.0FalseNoneNoneFalseNoneFalse163288.40
3081592105637NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34220.0FalseNoneNoneFalseNoneFalse288934.80
3081593105637NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSet303.26303.26220.0FalseNoneNoneFalseNoneFalse66717.20
3081594105637NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm188.8188.8220.0FalseNoneNoneFalseNoneFalse41536.00
3081595105637NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo385.86385.86220.0FalseNoneNoneFalseNoneFalse84889.20
3081596105637NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanized steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo313.88313.88220.0FalseNoneNoneFalseNoneFalse69053.60
3081597105637NoneVOL6SRPWD202335Fixing of 4 pincross arm with insulator and Braces fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8220.0FalseNoneNoneFalseNoneFalse41536.00
3081598105637NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8220.0FalseNoneNoneFalseNoneFalse41536.00
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - Water Supply3036807.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081599105638Nonevol- 1, Item No: 1.17.1 , Page No: 10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (i) All kinds of soils. Depth upto 1.50 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum309.16309.162278.8FalseNoneNoneFalseNoneFalse704513.8080
3081600105638NoneSR 2023-24 vol- 5, Item No: 9.2.3, Page No: 96 Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0. HDPE Grade PE80-PN8.0,90mm dia (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm450.76450.764220.0FalseNoneNoneFalseNoneFalse1902207.20
3081601105638NonePWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum188.8188.82278.0FalseNoneNoneFalseNoneFalse430086.40
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - UGD1628872.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081602105639NoneVol 5ItemNo16.28.3PageNo198Repairs to Machinehole for different depths including removal of debris, levelling the brick masonry, construction of brick masonry upto Ground level, providing CC coping alround the MH cover, plastering both inside and outside to the brick masonry and fixing of manhole frame and cover, curing, refilling with appurtenances complete. Schedule of Rates PWD 2023-24 vol- 1, Item No 16.28.3 , Page No 198 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo32577.4432577.4450.0FalseNoneNoneFalseNoneFalse1628872.00
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 1st Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081603105640Nonevol- 3ItemNo2.5(II)APageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (II)A, Page No: 9(Rate inclusive of GST 18 percent)( Net quantity 8.44) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081604105640Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Net Qty=0) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081605105640Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Net qty=12126.6) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081606105640Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Net Qty=422) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081607105640Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Have to Rectify Irrespective of Qty) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Net Qty = 0) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081608105640Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Net Qty=45) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081609105641Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9 (Net Qty=12.66) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081610105641Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Net Qty=1688) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081611105641Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Net Qty=126.6) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081612105641Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Net Qty=422) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081613105641Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Have to Rectify Irrespective of Quantity) (Net Qty=426) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081614105641Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Net Qty=45) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 3rd Year Maintainance155082.98
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081615105642Nonevol- 3, Item No: 2.5 (ii) a , Page No 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a , Page No: 9 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm519.39519.3912.66FalseNoneNoneFalseNoneFalse6575.47740
3081616105642Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.937.931688.0FalseNoneNoneFalseNoneFalse13385.840
3081617105642Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm51.5451.54126.6FalseNoneNoneFalseNoneFalse6524.9640
3081618105642Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.19128.19422.0FalseNoneNoneFalseNoneFalse54096.180
3081619105642Nonevol- 3, Item No: 10.5 , Page No: 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm563.0563.0105.5FalseNoneNoneFalseNoneFalse59396.50
3081620105642Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2622.052622.052.11FalseNoneNoneFalseNoneFalse5532.52550
3081621105642Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm272.25272.252.11FalseNoneNoneFalseNoneFalse574.44750
3081622105642Nonevol- 1, Item No: 1.12 , Page No: 8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum125.55125.5545.0FalseNoneNoneFalseNoneFalse5649.750
3081623105642Nonevol- 3, Item No: 8.1 , Page No: 66Painting on Parapet Walls of CD Work:Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with ynthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm144.05144.0521.75FalseNoneNoneFalseNoneFalse3133.08750
3081624105642Nonevol- 3, Item No: 8.4 , Page No: 63Painting on Parapet Walls of CD Work: Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.191.19180.0FalseNoneNoneFalseNoneFalse214.20
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 4th Year Maintainance150825.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081625105643Nonevol- 3, Item No: 2.5 (ii) a , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a , Page No: 9 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm537.94537.9412.66FalseNoneNoneFalseNoneFalse6810.32040
3081626105643Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.218.211688.0FalseNoneNoneFalseNoneFalse13858.480
3081627105643Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm53.3853.38126.6FalseNoneNoneFalseNoneFalse6757.9080
3081628105643Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm132.77132.77422.0FalseNoneNoneFalseNoneFalse56028.940
3081629105643Nonevol- 3, Item No: 10.5 , Page No: 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm583.11583.11105.5FalseNoneNoneFalseNoneFalse61518.1050
3081630105643Nonevol- 1, Item No: 1.12 , Page No: 8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum130.03130.0345.0FalseNoneNoneFalseNoneFalse5851.350
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 5th Year Maintainance219659.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081631105644Nonevol- 3, Item No 2.5 (ii) a , Page No 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a , Page No 9 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm556.48556.4812.66FalseNoneNoneFalseNoneFalse7045.03680
3081632105644Nonevol- 3, Item No 16.19 , Page No 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.498.491688.0FalseNoneNoneFalseNoneFalse14331.120
3081633105644Nonevol- 3, Item No 10.3 , Page No 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No 10.3 , Page No 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm55.2255.22126.6FalseNoneNoneFalseNoneFalse6990.8520
3081634105644Nonevol- 3, Item No 10.2 , Page No 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No 10.2 , Page No 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm137.35137.35422.0FalseNoneNoneFalseNoneFalse57961.70
3081635105644Nonevol- 3, Item No 10.5 , Page No 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm603.21603.21211.0FalseNoneNoneFalseNoneFalse127277.310
3081636105644Nonevol- 1, Item No 1.12 , Page No 8NALA TRAINING Earth work in surface excavation by mechanical means for lowering leveling the ground for all works other than foundation in all kinds of soils upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum134.52134.5245.0FalseNoneNoneFalseNoneFalse6053.40
17104560690000NoneNoneRoadsPkg 747 (A) Improvements to road Mandya - Hadagali SH-47 Road from Ch 144.72 KM to 147.02 KM (in selected reaches) in Tiptur Taluk of Tumakuru District. - 6th Year Maintainance9230735.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081637105645NoneSR PWD 2023-24 vol- 3, Item No: 16Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2341.122341.122.11FalseNoneNoneFalseNoneFalse4939.76320
3081638105645NoneSR PWD 2023-24 vol- 3, Item No: 16Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm243.08243.082.11FalseNoneNoneFalseNoneFalse512.89880
3081639105645NoneSR PWD 2023-24 vol- 3, Item No: 8.Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6214.74FalseNoneNoneFalseNoneFalse1895.85880
3081640105645NoneSR PWD 2023-24 vol- 3, Item No: 8.Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.06180.0FalseNoneNoneFalseNoneFalse190.80
3081641105645NoneSR PWD 2023-24 vol- 3, Item No: 5.Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm14.1614.1621580.0FalseNoneNoneFalseNoneFalse305572.80
3081642105645NoneSR PWD 2023-24 vol- 3, Item No: 5Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72647.4FalseNoneNoneFalseNoneFalse8368111.1280
3081643105645NoneSR PWD 2023-24 vol- 3, Item No: 8.Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.4491.62FalseNoneNoneFalseNoneFalse307459.1480
3081644105645NoneSR PWD 2023-24 vol- 3, Item No: 8.Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.7562.0FalseNoneNoneFalseNoneFalse242053.40
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-Road construction83527571.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081645105646NonePWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 (Rates inclusive of GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3081646105646Nonevol- 3, Item No: 3.5 , Page No: 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17(Rates inclusive of GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm7.087.0818390.0FalseNoneNoneFalseNoneFalse130201.20
3081647105646Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9(Rates inclusive of GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm463.74463.7493.75FalseNoneNoneFalseNoneFalse43475.6250
3081648105646NonePWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)(Rates inclusive of GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum112.1112.17530.25FalseNoneNoneFalseNoneFalse844141.0250
3081649105646NonePWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr7.087.086860.0FalseNoneNoneFalseNoneFalse48568.80
3081650105646NonePWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum140.42140.426024.2FalseNoneNoneFalseNoneFalse845918.1640
3081651105646NonePWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2783.622783.626928.48FalseNoneNoneFalseNoneFalse19286255.49760
3081652105646NonePWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3019.623019.628062.88FalseNoneNoneFalseNoneFalse24346833.70560
3081653105646NonePWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm48.3848.3831393.52FalseNoneNoneFalseNoneFalse1518818.49760
3081654105646NonePWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm16.5216.5231393.52FalseNoneNoneFalseNoneFalse518620.95040
3081655105646NonePWD 2023-24 vol- 3, Item No: 5.12 (C) , Page No: 3Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum11149.8211149.821569.68FalseNoneNoneFalseNoneFalse17501649.45760
3081656105646NonePWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72941.81FalseNoneNoneFalseNoneFalse12173572.35320
3081657105646NonePWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum581.74581.747782.3FalseNoneNoneFalseNoneFalse4527275.2020
3081658105646NonePWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum559.32559.323050.15FalseNoneNoneFalseNoneFalse1706009.8980
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-Road furnitures2470547.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081659105647NonePWD 2023-24 vol- 3, Item No: 8.16 (i) , Page No: 6Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5994.45994.41.0FalseNoneNoneFalseNoneFalse5994.40
3081660105647NonePWD 2023-24 vol- 3, Item No: 8.16 (ii) ,Page No:67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3081661105647NonePWD 2023-24 vol- 3, Item No: 8.16 (iii) ,Page No67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach993.56993.5616.0FalseNoneNoneFalseNoneFalse15896.960
3081662105647NonePWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.41091.84FalseNoneNoneFalseNoneFalse682836.7360
3081663105647NonePWD 2023-24 vol- 3, Item No: 8.6 ii , Page No: 64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5602.645602.6416.0FalseNoneNoneFalseNoneFalse89642.240
3081664105647NonePWD 2023-24 vol- 3, Item No: 8.6 iii , Page No: 65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 75 cm equilateral triangle ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4862.784862.7810.0FalseNoneNoneFalseNoneFalse48627.80
3081665105647NonePWD 2023-24 vol- 3, Item No: 8.6 iii , Page No: 65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4252.724252.726.0FalseNoneNoneFalseNoneFalse25516.320
3081666105647NoneSchedule of Rates PWD 2023-24 vol- 3, Item No: 8.5Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach7817.57817.54.0FalseNoneNoneFalseNoneFalse31270.00
3081667105647NonePWD 2023-24 vol- 3, Item No: 8.6 xii , Page No: 64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xii) 60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5042.145042.14104.0FalseNoneNoneFalseNoneFalse524382.560
3081668105647NonePWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.71098.0FalseNoneNoneFalseNoneFalse472908.60
3081669105647NonePWD 2023-24 vol- 3, Item No: 8.17 , Page No: 67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach2384.782384.7816.0FalseNoneNoneFalseNoneFalse38156.480
3081670105647NonePWD 2023-24 vol- 3, Item No: 8.31 , Page No: 71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm221.84221.84105.0FalseNoneNoneFalseNoneFalse23293.20
3081671105647NonePWD 2023-24 vol- 3, Item No: 8.60.2 ii ,Page No80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo53635.7253635.724.0FalseNoneNoneFalseNoneFalse214542.880
3081672105647NonePWD 2023-24 vol- 3, Item No: 8.29 (i) , Page No: 7Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2610.162610.16110.0FalseNoneNoneFalseNoneFalse287117.60
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-Concrete drain3609462.99
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081673105648NonePWD 2023-24 vol- 3, Item No: 2.11(ii) A ,Page No10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.448.0FalseNoneNoneFalseNoneFalse10195.20
3081674105648NonePWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36768.0FalseNoneNoneFalseNoneFalse92436.480
3081675105648NonePWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0280.0FalseNoneNoneFalseNoneFalse565361.60
3081676105648NonePWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm93232.9893232.989.91FalseNoneNoneFalseNoneFalse923938.83180
3081677105648NonePWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7461.747461.7464.0FalseNoneNoneFalseNoneFalse477551.360
3081678105648NonePWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum10072.5410072.5496.0FalseNoneNoneFalseNoneFalse966963.840
3081679105648NonePWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8953.378953.3764.0FalseNoneNoneFalseNoneFalse573015.680
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-box culvert2534466.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081680105649NonePWD 2023-24 vol- 3, Item No:2.11 (ii) A ,Page No10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.47.62FalseNoneNoneFalseNoneFalse1618.4880
3081681105649NonePWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36223.02FalseNoneNoneFalseNoneFalse26842.68720
3081682105649NonePWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0232.79FalseNoneNoneFalseNoneFalse231727.58580
3081683105649NonePWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm93232.9893232.987.43FalseNoneNoneFalseNoneFalse692721.04140
3081684105649NonePWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8971.788971.7834.68FalseNoneNoneFalseNoneFalse311141.33040
3081685105649NonePWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8074.68074.627.23FalseNoneNoneFalseNoneFalse219871.3580
3081686105649NonePWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum9689.699689.697.56FalseNoneNoneFalseNoneFalse73254.05640
3081687105649NonePWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8636.72FalseNoneNoneFalseNoneFalse115993.33920
3081688105649NonePWD 2023-24 vol- 1, Item No: 2.2.1 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7418.667418.6641.03FalseNoneNoneFalseNoneFalse304387.61980
3081689105649NonePWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8036.988036.988.4FalseNoneNoneFalseNoneFalse67510.6320
3081690105649NonePWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum13965.313965.325.2FalseNoneNoneFalseNoneFalse351925.560
3081691105649NonePWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16485.7816485.781.57FalseNoneNoneFalseNoneFalse25882.67460
3081692105649NoneSPWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2118.12118.124.0FalseNoneNoneFalseNoneFalse50834.40
3081693105649NonePWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6217.09FalseNoneNoneFalseNoneFalse2198.11580
3081694105649NonePWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workcm1.061.06180.0FalseNoneNoneFalseNoneFalse190.80
3081695105649NonePWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 12Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1625.87FalseNoneNoneFalseNoneFalse58366.85920
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-pipe culvert4999612.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081696105650Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No 2.11 (ii) A, Page No 10 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.436.65FalseNoneNoneFalseNoneFalse7784.460
3081697105650Nonevol- 3ItemNo2.17 (ix) BPageNo11Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 2.17 (ix) B , Page No 11 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm1293.281293.2847.5FalseNoneNoneFalseNoneFalse61430.80
3081698105650Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36250.7FalseNoneNoneFalseNoneFalse30174.2520
3081699105650Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0231.65FalseNoneNoneFalseNoneFalse223671.1830
3081700105650Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.983.48FalseNoneNoneFalseNoneFalse324450.77040
3081701105650Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix using 20mm Nominal size graded crushed course aggregate Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8058.038058.03247.16FalseNoneNoneFalseNoneFalse1991622.69480
3081702105650Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 12 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 9.1.ii , Page No 87 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm12705.0612705.06100.0FalseNoneNoneFalseNoneFalse1270506.00
3081703105650Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No 12.3A , Page No 117 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum1378.241378.24307.68FalseNoneNoneFalseNoneFalse424056.88320
3081704105650Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS 280 & IS4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No 14.2 , Page No 129 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2895.722895.7248.3FalseNoneNoneFalseNoneFalse139863.2760
3081705105650Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 14.4(a) , Page No 129 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.16133.13FalseNoneNoneFalseNoneFalse300362.58080
3081706105650Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 12.4 , Page No 117 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8666.57FalseNoneNoneFalseNoneFalse210285.31020
3081707105650Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6290.1FalseNoneNoneFalseNoneFalse11588.6620
3081708105650Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.063600.0FalseNoneNoneFalseNoneFalse3816.00
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-Electric pole shifting994091.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081709105651NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22175.0FalseNoneNoneFalseNoneFalse129888.50
3081710105651NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34175.0FalseNoneNoneFalseNoneFalse229834.50
3081711105651NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22175.0FalseNoneNoneFalseNoneFalse129888.50
3081712105651NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34175.0FalseNoneNoneFalseNoneFalse229834.50
3081713105651NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSet303.26303.26175.0FalseNoneNoneFalseNoneFalse53070.50
3081714105651NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm188.8188.8175.0FalseNoneNoneFalseNoneFalse33040.00
3081715105651NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo385.86385.86175.0FalseNoneNoneFalseNoneFalse67525.50
3081716105651NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo313.88313.88175.0FalseNoneNoneFalseNoneFalse54929.00
3081717105651NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8175.0FalseNoneNoneFalseNoneFalse33040.00
3081718105651NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8175.0FalseNoneNoneFalseNoneFalse33040.00
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-water supply pipe line1151453.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081719105652NonePWD 2023-24 vol- 1, Item No: 1.17.1, Page No 10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (i) All kinds of soils. Depth upto 1.50 m ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum309.16309.16864.0FalseNoneNoneFalseNoneFalse267114.240
3081720105652NoneProviding, laying and jointing HDPE pipes of speciProviding, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0. HDPE Grade PE80-PN8.0,90mm dia (Including 18 percent GST) Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0. HDPE Grade PE80-PN8.0,90mm dia (Including 18 percent GST) Schedule of Rates PWD 2023-24 vol- 5, Item No: 9.2.3, Page No: 96 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm450.76450.761600.0FalseNoneNoneFalseNoneFalse721216.00
3081721105652NoneSchedule of Rates PWD 2023-24 vol- 1, Item No: 1.1Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Including 18 percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum188.8188.8864.0FalseNoneNoneFalseNoneFalse163123.20
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-1st year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081722105653Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9(Net Quantity 13.72sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081723105653Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Net quantity 2058m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081724105653Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91(net quantity 205.83 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081725105653Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91(net quantity 686 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081726105653Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91(net qunatity 0)(have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3081727105653Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(net quantity 450cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-2nd year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081728105654Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9(net quantity 20.58 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081729105654Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(net quantity 2744m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081730105654Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91(net quantity 205.80) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081731105654Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (net quantity 686 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081732105654Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91(net quantity0) (have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3081733105654Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(net quantity 450 cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-3rd year maintainance314683.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081734105655NonePWD 2023-24 vol- 3, Item No: 2.5 (ii) a ,Page No9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm519.39519.3920.58FalseNoneNoneFalseNoneFalse10689.04620
3081735105655NonePWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.937.932744.0FalseNoneNoneFalseNoneFalse21759.920
3081736105655NonePWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm51.5451.54205.8FalseNoneNoneFalseNoneFalse10606.9320
3081737105655NonePWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment(Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.2128.2686.0FalseNoneNoneFalseNoneFalse87945.20
3081738105655NonePWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm563.0563.0148.05FalseNoneNoneFalseNoneFalse83352.150
3081739105655NonePWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2622.052622.054.23FalseNoneNoneFalseNoneFalse11091.27150
3081740105655NonePWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm272.25272.254.23FalseNoneNoneFalseNoneFalse1151.61750
3081741105655NonePWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum125.55125.55450.0FalseNoneNoneFalseNoneFalse56497.50
3081742105655NonePWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm144.05144.05217.5FalseNoneNoneFalseNoneFalse31330.8750
3081743105655NonePWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any Shade. Printing new letter and figures of any shade with synthetic enamel paint black or any other approved color to give an even shade-English and Roman (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.191.19217.5FalseNoneNoneFalseNoneFalse258.8250
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-4th year maintainance280512.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081744105656NonePWD 2023-24 vol- 3, Item No: 2.5 (ii) a ,Page No:9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm537.94537.9420.58FalseNoneNoneFalseNoneFalse11070.80520
3081745105656NonePWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.218.212744.0FalseNoneNoneFalseNoneFalse22528.240
3081746105656NonePWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm53.3853.38205.8FalseNoneNoneFalseNoneFalse10985.6040
3081747105656NonePWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm132.77132.77686.0FalseNoneNoneFalseNoneFalse91080.220
3081748105656NoneSPWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm583.11583.11148.05FalseNoneNoneFalseNoneFalse86329.43550
3081749105656NonePWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum130.04130.04450.0FalseNoneNoneFalseNoneFalse58518.00
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-5th year maintainance379510.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081750105657NonePWD 2023-24 vol- 3, Item No: 2.5 (ii) a ,Page No:9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm556.49556.4920.58FalseNoneNoneFalseNoneFalse11452.56420
3081751105657NonePWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.58.52744.0FalseNoneNoneFalseNoneFalse23324.00
3081752105657NonePWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm55.2255.22205.8FalseNoneNoneFalseNoneFalse11364.2760
3081753105657NonePWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm137.35137.35686.0FalseNoneNoneFalseNoneFalse94222.10
3081754105657NonePWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm603.22603.22296.1FalseNoneNoneFalseNoneFalse178613.4420
3081755105657NonePWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum134.52134.52450.0FalseNoneNoneFalseNoneFalse60534.00
17104560690000NoneNoneRoadsPkg 747 (B) Improvements to road from Kengal (on NH275) to Alur (on SH110L) Road SH 275 from Ch 154.82 KM to 160.02 KM (in selected reahes) Tiptur Taluk of Tumakuru District.-6th year maintainance16334948.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3081756105658NonePWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2902.992902.994.23FalseNoneNoneFalseNoneFalse12279.64770
3081757105658NonePWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 14Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm301.42301.424.23FalseNoneNoneFalseNoneFalse1275.00660
3081758105658NonePWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm159.49159.49107.19FalseNoneNoneFalseNoneFalse17095.73310
3081759105658NonePWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.321.321260.0FalseNoneNoneFalseNoneFalse1663.20
3081760105658NonePWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm17.5617.5630000.0FalseNoneNoneFalseNoneFalse526800.00
3081761105658NonePWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16027.8916027.89900.0FalseNoneNoneFalseNoneFalse14425101.00
3081762105658NonePWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm775.5775.5985.59FalseNoneNoneFalseNoneFalse764325.0450
3081763105658NonePWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Inclusive of 18% GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo534.07534.071098.0FalseNoneNoneFalseNoneFalse586408.860
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17104560700001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17104560700001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government /Government of India /Union TerritoryNone
17104560700001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17104564700000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17104564780000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17104564840000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17104564920000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17104565020000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17104565190000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17104565310000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17104565410000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17104565510000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17104565620000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17104565750000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17104565850000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17104565950000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17104566020000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17104566100000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17104566170000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17104566260000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17104566320000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17104566430000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17104566520000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17104566600000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17104566730000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.957.38 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent, Bill copies shall not be accepted
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 34155.59 Cum 2. GSB/WMM : 16314.92 Cum 3. BM/SDBC/DBM/BC : 4793.72 Cum 4 PCC/DLC M10 & M15 : 326.54 Cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades :1039.78 cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No 2.Mechanical Paver Finisher:1 No 3. Static Road Roller: 1 No. 4. Vibratory Road Roller: 1 No. 5. Tippers:4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate:(ii) Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill : 1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4.Vibratory Road Roller (6T to 10T): 2 No 5.Tandem Roller:1 No 6.Excavator 0.90 Cum Bucket Capacity:2 No 7.Tipper Trucks:6 Nos 8.Self Loading Concrete Mixer 2 M3 Capacity:3 No 9.Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3829.52 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs 574.43 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAffidavitOthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
EPF registrationFalseTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710457516000
version0
createdDateNone
modifiedDateNone
blockNumberOFFICE OF THE CHIEF PROJECT OFFICER, PROJECT IMPLEMENTAION UNIT, STATE HIGHWAY DEVELOPMENT PROJECT, PWD ANNEX BUILDING, K R CIRCLE , BENGALURU
streetNone
cityBENGALURU
stateKarnataka
pin560001
tenderRecallDTONone